ROADWORKS SUMMARY
Salisbury Road, SOUTHAMPTON, SO40 3ZP

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Salisbury Road, SO40 3ZP and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Salisbury Road, SOUTHAMPTON, SO40 3ZP

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Salisbury Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Hampshire County Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Redbridge Lane

Hampshire County Council are carrying out Highway improvement works on Redbridge Lane, Nursling.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 February 2024 at 09:30 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 7 Feb 2024 at 09:34.

Hampshire County Council logo
LONG TERM
Between
6 Feb and 6 Dec 2024
Details
View Map
Share
Follow
Romsey Road

Hampshire County Council are proposing to carry out Highway improvement works on Romsey Road, Nursling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Hampshire County Council on 8 Jan 2024 at 14:29.

Hampshire County Council logo
LONG TERM
Between
6 Feb and 6 Dec 2024
Details
View Map
Share
Follow
Redbridge Lane

Hampshire County Council are proposing to carry out Highway improvement works on Redbridge Lane, Nursling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Hampshire County Council on 8 Jan 2024 at 15:10.

Hampshire County Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Romsey Road

Hampshire County Council are carrying out Highway improvement works on Romsey Road, Nursling.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 February 2024 at 09:30 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 7 Feb 2024 at 09:33.

Hampshire County Council logo
LONG TERM
Between
6 Feb and 6 Dec 2024
Details
View Map
Share
Follow
Bakers Drove

Hampshire County Council are proposing to carry out Highway improvement works on Bakers Drove, Rownhams.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Hampshire County Council on 8 Jan 2024 at 15:06.

Hampshire County Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Bakers Drove

Hampshire County Council are carrying out Highway improvement works on Bakers Drove, Rownhams.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 February 2024 at 09:30 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 7 Feb 2024 at 09:34.

Hampshire County Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Nursling Street

Hampshire County Council are carrying out Highway improvement works on Nursling Street, Nursling.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 February 2024 at 09:30 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 7 Feb 2024 at 09:34.

Hampshire County Council logo
LONG TERM
Between
6 Feb and 6 Dec 2024
Details
View Map
Share
Follow
Nursling Street

Hampshire County Council are proposing to carry out Highway improvement works on Nursling Street, Nursling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Hampshire County Council on 8 Jan 2024 at 14:52.

Hampshire County Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Horns Drove

Hampshire County Council are carrying out Highway improvement works on Horns Drove, Rownhams.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 February 2024 at 09:30 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 7 Feb 2024 at 09:34.

Hampshire County Council logo
LONG TERM
Between
6 Feb and 6 Dec 2024
Details
View Map
Share
Follow
Horns Drove

Hampshire County Council are proposing to carry out Highway improvement works on Horns Drove, Rownhams.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Hampshire County Council on 8 Jan 2024 at 14:47.

Southampton City Council logo
LONG TERM
Until
27 Dec 2024
Details
View Map
Share
Follow
Cleasby Close Footpath

Southampton City Council are carrying out Highway improvement works on Cleasby Close Footpath, Millbrook, Southampton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 April 2024 at 17:19 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 30 Sep 2024 at 16:24.

Network Rail logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
St Denys Road

Network Rail are carrying out Works for Rail Purposes on St Denys Road, Portswood, Southampton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 12 April 2024 at 00:01 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 5 Sep 2024 at 15:43.

Southern Water logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Princes Crescent

Southern Water are carrying out Utility repair and maintenance works on Princes Crescent, Lyndhurst.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 August 2024 at 23:30 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 18 Nov 2024 at 09:59.

Hampshire County Council logo
LONG TERM
Between
4 Sep and 6 Dec 2024
Details
View Map
Share
Follow
Redbridge Lane

Hampshire County Council are proposing to carry out Highway improvement works on Redbridge Lane, Nursling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Hampshire County Council on 29 Aug 2024 at 08:37.

Hampshire County Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Redbridge Lane

Hampshire County Council are carrying out Highway improvement works on Redbridge Lane, Nursling.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 September 2024 at 07:00 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 4 Sep 2024 at 08:55.

Hampshire County Council logo
LONG TERM
Between
4 Sep and 6 Dec 2024
Details
View Map
Share
Follow
Romsey Road

Hampshire County Council are proposing to carry out Highway improvement works on Romsey Road, Nursling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Hampshire County Council on 29 Aug 2024 at 08:22.

Hampshire County Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Romsey Road

Hampshire County Council are carrying out Highway improvement works on Romsey Road, Nursling.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 September 2024 at 07:00 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 4 Sep 2024 at 08:55.

Hampshire County Council logo
LONG TERM
Between
4 Sep and 6 Dec 2024
Details
View Map
Share
Follow
Bakers Drove

Hampshire County Council are proposing to carry out Highway improvement works on Bakers Drove, Rownhams.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Hampshire County Council on 29 Aug 2024 at 08:40.

Hampshire County Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Bakers Drove

Hampshire County Council are carrying out Highway improvement works on Bakers Drove, Rownhams.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 September 2024 at 09:00 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 4 Sep 2024 at 13:27.

Southampton City Council logo
LONG TERM
Until
18 Dec 2024
Details
View Map
Share
Follow
Havelock Road

Southampton City Council are carrying out Highway repair and maintenance works on Havelock Road, Bargate, Southampton.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 September 2024 at 11:50 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 15 Oct 2024 at 14:43.

Southampton City Council logo
LONG TERM
Between
16 Sep and 13 Dec 2024
Details
View Map
Share
Follow
Lodge Road

Southampton City Council are proposing to carry out Highway improvement works on Lodge Road, Bevois, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southampton City Council on 22 Aug 2024 at 15:02.

Hampshire County Council logo
LONG TERM
Between
16 Sep and 8 Dec 2024
Details
View Map
Share
Follow
Salisbury Road

Hampshire County Council are proposing to carry out Highway improvement works on Salisbury Road, Calmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 8 December 2024. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Hampshire County Council on 6 Aug 2024 at 12:35.

Hampshire County Council logo
LONG TERM
Until
8 Dec 2024
Details
View Map
Share
Follow
Salisbury Road

Hampshire County Council are carrying out Highway improvement works on Salisbury Road, Calmore.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 08:00 and could run through until 8 December 2024. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Hampshire County Council on 17 Sep 2024 at 08:49.

Southern Gas Networks logo
LONG TERM
Between
16 Sep and 20 Dec 2024
Details
View Map
Share
Follow
Aldermoor Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Aldermoor Road, Coxford, Southampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 6 Aug 2024 at 16:05.

Southern Gas Networks logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Aldermoor Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Aldermoor Road, Coxford, Southampton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 09:55 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2024 at 10:02.

Southampton City Council logo
LONG TERM
Between
23 Sep and 31 Dec 2024
Details
View Map
Share
Follow
Bevois Hill

Southampton City Council are proposing to carry out Highway improvement works on Bevois Hill, Bevois, Southampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 31 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southampton City Council on 5 Aug 2024 at 10:07.

Southampton City Council logo
LONG TERM
Between
23 Sep and 31 Dec 2024
Details
View Map
Share
Follow
Lodge Road

Southampton City Council are proposing to carry out Highway improvement works on Lodge Road, Bevois, Southampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 31 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southampton City Council on 5 Aug 2024 at 10:07.

Southampton City Council logo
LONG TERM
Between
23 Sep and 31 Dec 2024
Details
View Map
Share
Follow
Thomas Lewis Way

Southampton City Council are proposing to carry out Highway improvement works on Thomas Lewis Way, Portswood, Southampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 31 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southampton City Council on 5 Aug 2024 at 10:07.

Southampton City Council logo
LONG TERM
Between
23 Sep and 31 Dec 2024
Details
View Map
Share
Follow
Portswood Road

Southampton City Council are proposing to carry out Highway improvement works on Portswood Road, Portswood, Southampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 31 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southampton City Council on 5 Aug 2024 at 10:07.

Southampton City Council logo
LONG TERM
Between
30 Sep and 13 Dec 2024
Details
View Map
Share
Follow
Bevois Valley Road

Southampton City Council are proposing to carry out Highway improvement works on Bevois Valley Road, Bevois, Southampton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southampton City Council on 22 Aug 2024 at 15:00.

Southampton City Council logo
LONG TERM
Between
30 Sep and 31 Dec 2024
Details
View Map
Share
Follow
Bevois Hill

Southampton City Council are proposing to carry out Highway improvement works on Bevois Hill, Bevois, Southampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 31 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southampton City Council on 22 Aug 2024 at 14:05.

Southampton City Council logo
LONG TERM
Between
30 Sep and 31 Dec 2024
Details
View Map
Share
Lodge Road

Southampton City Council were proposing to carry out Highway improvement works on Lodge Road, Bevois, Southampton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2024 and run through until 31 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 22 Aug 2024 at 14:05.

Southampton City Council logo
LONG TERM
Between
30 Sep and 31 Dec 2024
Details
View Map
Share
Thomas Lewis Way

Southampton City Council were proposing to carry out Highway improvement works on Thomas Lewis Way, Portswood, Southampton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2024 and run through until 31 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 22 Aug 2024 at 14:11.

Southampton City Council logo
LONG TERM
Between
30 Sep and 31 Dec 2024
Details
View Map
Share
Follow
Portswood Road

Southampton City Council are proposing to carry out Highway improvement works on Portswood Road, Portswood, Southampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 31 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southampton City Council on 22 Aug 2024 at 14:11.

Southampton City Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Thomas Lewis Way

Southampton City Council are carrying out Highway improvement works on Thomas Lewis Way, Portswood, Southampton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 October 2024 at 09:30 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 12 Nov 2024 at 11:49.

Southampton City Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
St Denys Road

Southampton City Council are carrying out Highway improvement works on St Denys Road, Portswood, Southampton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 October 2024 at 09:30 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 12 Nov 2024 at 11:48.

Southampton City Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Kent Road

Southampton City Council are carrying out Highway improvement works on Kent Road, Portswood, Southampton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 October 2024 at 09:30 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 12 Nov 2024 at 11:48.

Southampton City Council logo
LONG TERM
Until
13 Dec 2024
Details
View Map
Share
Follow
Bevois Valley Road

Southampton City Council are carrying out Highway improvement works on Bevois Valley Road, Bevois, Southampton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 08:00 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 8 Oct 2024 at 07:21.

Southampton City Council logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Bevois Hill

Southampton City Council are carrying out Highway improvement works on Bevois Hill, Bevois, Southampton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 08:00 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 7 Oct 2024 at 09:01.

Southampton City Council logo
LONG TERM
Until
13 Dec 2024
Details
View Map
Share
Follow
Lodge Road

Southampton City Council are carrying out Highway improvement works on Lodge Road, Bevois, Southampton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 08:00 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 8 Oct 2024 at 07:20.

Southampton City Council logo
LONG TERM
Between
7 Oct and 13 Dec 2024
Details
View Map
Share
Follow
Lodge Road

Southampton City Council are proposing to carry out Highway improvement works on Lodge Road, Bevois, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southampton City Council on 2 Oct 2024 at 14:17.

Southampton City Council logo
LONG TERM
Until
13 Dec 2024
Details
View Map
Share
Follow
Lodge Road

Southampton City Council are carrying out Highway improvement works on Lodge Road, Bevois, Southampton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 08:00 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 7 Oct 2024 at 09:00.

Southampton City Council logo
LONG TERM
Between
7 Oct and 21 Dec 2024
Details
View Map
Share
Follow
Lawn Road

Southampton City Council are proposing to carry out Highway improvement works on Lawn Road, Portswood, Southampton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southampton City Council on 1 Oct 2024 at 16:22.

Southampton City Council logo
LONG TERM
Until
13 Dec 2024
Details
View Map
Share
Follow
Portswood Road

Southampton City Council are carrying out Highway improvement works on Portswood Road, Portswood, Southampton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 08:00 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 7 Oct 2024 at 09:01.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
15 Oct 2024 and 25 Mar 2025
Details
View Map
Share
Toothill Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Toothill Road, Toothill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 October 2024 and run through until 25 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Oct 2024 at 12:51.

Southampton City Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Bernard Street

Southampton City Council were proposing to carry out Highway improvement works on Bernard Street, Bargate, Southampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 25 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southampton City Council on 1 Aug 2024 at 10:14.

Hampshire County Council logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Romsey Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Romsey Road, Lyndhurst.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 28 November 2024. The works will impact the verge only.

This roadwork event was last updated by Hampshire County Council on 23 Oct 2024 at 15:40.

Southern Gas Networks logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Dale Valley Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Dale Valley Road, Bassett, Southampton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 November 2024 at 15:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 15:00.

Hampshire County Council logo
LONG TERM
Between
30 Oct 2024 and 10 Apr 2025
Details
View Map
Share
Follow
Junction Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Junction Road, Totton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 10 Jul 2024 at 08:25.

Southern Gas Networks logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Salisbury Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Salisbury Road, Totton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 31 October 2024 at 11:33 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 16:05.

Southampton City Council logo
Finishing
Tomorrow
Details
View Map
Share
Brookvale Road

Southampton City Council were proposing to carry out Highway improvement works on Brookvale Road, Portswood, Southampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 25 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 6 Nov 2024 at 09:06.

Southern Gas Networks logo
Finishing
Wednesday
Details
View Map
Share
Follow
Coxford Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Coxford Road, Coxford, Southampton.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 November 2024 at 10:00 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 16:13.

Southern Water logo
Finishing
Tuesday
Details
View Map
Share
Upper Toothill Road

Southern Water were proposing to carry out Utility repair and maintenance works on Upper Toothill Road, Rownhams.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 November 2024 and run through until 26 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 30 Jul 2024 at 11:31.

Southern Gas Networks logo
Finishing
Thursday
Details
View Map
Share
Follow
Conifer Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Conifer Road, Coxford, Southampton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 November 2024 at 09:50 and could run through until 28 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Nov 2024 at 10:01.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Melbourne Street

Southern Gas Networks are carrying out Utility repair and maintenance works on Melbourne Street, Bargate, Southampton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 November 2024 at 08:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 12:41.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Main Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Main Road, Marchwood.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:42 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 10:31.

Scottish Hydro Electric Power Dis logo
LONG TERM
Until
23 Dec 2024
Details
View Map
Share
Follow
Upton Lane

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Upton Lane, Nursling.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:00 and could run through until 23 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Nov 2024 at 09:16.

Southern Water logo
LONG TERM
Between
19 Nov 2024 and 21 Feb 2025
Details
View Map
Share
Pauncefoot Hill

Southern Water were proposing to carry out Utility repair and maintenance works on Pauncefoot Hill, Romsey.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 November 2024 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 28 Aug 2024 at 15:23.

Southern Water logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Lyon Street

Southern Water are proposing to carry out Utility repair and maintenance works on Lyon Street, Bevois, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 22 Aug 2024 at 10:51.

Hampshire County Council logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Nursling Street

Hampshire County Council are proposing to carry out Highway improvement works on Nursling Street, Nursling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 6 Nov 2024 at 13:25.

Hampshire County Council logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Nursling Street

Hampshire County Council are proposing to carry out Highway improvement works on Nursling Street, Nursling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 15 Nov 2024 at 12:51.

Hampshire County Council logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Romsey Road

Hampshire County Council are proposing to carry out Highway improvement works on Romsey Road, Nursling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 6 Nov 2024 at 13:11.

Hampshire County Council logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Romsey Road

Hampshire County Council are proposing to carry out Highway improvement works on Romsey Road, Nursling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 15 Nov 2024 at 12:51.

Hampshire County Council logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Horns Drove

Hampshire County Council are proposing to carry out Highway improvement works on Horns Drove, Rownhams.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 6 Nov 2024 at 13:29.

Hampshire County Council logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Horns Drove

Hampshire County Council are proposing to carry out Highway improvement works on Horns Drove, Rownhams.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 15 Nov 2024 at 12:51.

Hampshire County Council logo
Between
3 and 5 Dec 2024
Details
View Map
Share
Follow
Gardeners Lane

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Gardeners Lane, East Wellow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 8 Nov 2024 at 15:35.

Hampshire County Council logo
Between
3 and 5 Dec 2024
Details
View Map
Share
Follow
Gardeners Lane

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Gardeners Lane, East Wellow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 14 Nov 2024 at 15:07.

Hampshire County Council logo
Between
3 and 5 Dec 2024
Details
View Map
Share
Follow
Gardeners Lane

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Gardeners Lane, East Wellow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 15 Nov 2024 at 10:03.

Hampshire County Council logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Lyndhurst Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Lyndhurst Road, Minstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 8 Nov 2024 at 16:04.

Hampshire County Council logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Lyndhurst Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Lyndhurst Road, Minstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 11 Nov 2024 at 10:07.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
9 Dec 2024 and 3 Feb 2025
Details
View Map
Share
Follow
Cracknore Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Cracknore Road, Freemantle, Southampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 11 Nov 2024 at 12:17.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
9 Dec 2024 and 3 Feb 2025
Details
View Map
Share
Follow
Cracknore Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Cracknore Road, Freemantle, Southampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Nov 2024 at 11:34.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
9 Dec 2024 and 3 Feb 2025
Details
View Map
Share
Cracknore Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Cracknore Road, Freemantle, Southampton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 3 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 13:25.

Scottish Hydro Electric Power Dis logo
Between
9 and 18 Dec 2024
Details
View Map
Share
Follow
Holly Hill/golf Course Road Footpath

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Holly Hill/golf Course Road Footpath, Bassett, Southampton.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 9 December 2024 and could run through until 18 December 2024. The works will impact the verge and footpath.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 Oct 2024 at 11:54.

Scottish Hydro Electric Power Dis logo
Between
9 and 18 Dec 2024
Details
View Map
Share
Follow
Holly Hill/golf Course Road Footpath

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Holly Hill/golf Course Road Footpath, Bassett, Southampton.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 9 December 2024 and could run through until 18 December 2024. The works will impact the verge and footpath.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 Oct 2024 at 15:22.

Network Rail logo
Between
24 and 27 Dec 2024
Details
View Map
Share
Follow
Mount Pleasant Road

Network Rail are proposing to carry out Works for Rail Purposes on Mount Pleasant Road, Bevois, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 17 Jun 2024 at 09:00.

Southampton City Council logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
The Avenue

Southampton City Council are proposing to carry out Highway improvement works on The Avenue, Shirley, Southampton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 29 Oct 2024 at 08:14.

Hampshire County Council logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Winsor Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Winsor Road, Winsor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 22 Nov 2024 at 14:50.

Southampton City Council logo
Between
6 and 18 Jan 2025
Details
View Map
Share
Portswood Road

Southampton City Council were proposing to carry out Highway improvement works on Portswood Road, Portswood, Southampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 18 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 13 Nov 2024 at 11:43.

Southampton City Council logo
Between
6 and 18 Jan 2025
Details
View Map
Share
Follow
Portswood Road

Southampton City Council are proposing to carry out Highway improvement works on Portswood Road, Portswood, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 14 Nov 2024 at 08:31.

Southampton City Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Portswood Road

Southampton City Council are proposing to carry out Highway improvement works on Portswood Road, Portswood, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 14 Nov 2024 at 15:57.

Southampton City Council logo
Between
6 and 27 Jan 2025
Details
View Map
Share
St Denys Road

Southampton City Council were proposing to carry out Highway improvement works on St Denys Road, Portswood, Southampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 27 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 4 Oct 2024 at 10:55.

Southampton City Council logo
Between
6 and 18 Jan 2025
Details
View Map
Share
Follow
St Denys Road

Southampton City Council are proposing to carry out Highway improvement works on St Denys Road, Portswood, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 11 Oct 2024 at 16:20.

Southampton City Council logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Brookvale Road

Southampton City Council are proposing to carry out Highway improvement works on Brookvale Road, Portswood, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 3 Oct 2024 at 12:10.

Southern Water logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Bowden Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Bowden Lane, Portswood, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 27 Sep 2024 at 08:45.

Southern Water logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Bowden Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Bowden Lane, Portswood, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 16 Oct 2024 at 10:50.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Redbridge Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Redbridge Lane, Nursling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 10:05.

National Highways logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Hill Street

National Highways are proposing to carry out Works for road purposes on Hill Street, Calmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 7 Oct 2024 at 10:57.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Rownhams Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Rownhams Lane, Rownhams.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Oct 2024 at 10:39.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Rownhams Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Rownhams Lane, Rownhams.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Oct 2024 at 16:23.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Romsey Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Romsey Road, Nursling.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 14 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 14:37.

Southern Water logo
Between
7 and 21 Jan 2025
Details
View Map
Share
New Road

Southern Water were proposing to carry out Utility repair and maintenance works on New Road, Bargate, Southampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 21 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 7 Nov 2024 at 11:45.

Southern Water logo
Between
8 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Whartons Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Whartons Lane, Ashurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 10 Oct 2024 at 13:02.

Southern Water logo
Between
8 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Whartons Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Whartons Lane, Ashurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 10 Oct 2024 at 14:52.

Murphy Power Distribution logo
LONG TERM
Between
8 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Whartons Lane

Murphy Power Distribution are proposing to carry out New service connection on Whartons Lane, Ashurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 22 Nov 2024 at 13:23.

Network Rail logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Main Road

Network Rail are proposing to carry out Works for Rail Purposes on Main Road, Marchwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 21 Oct 2024 at 09:22.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
20 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Harbour Parade

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Harbour Parade, Bargate, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Nov 2024 at 07:18.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Redbridge Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Redbridge Lane, Nursling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2024 at 14:50.

Scottish Hydro Electric Power Dis logo
Between
27 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Clovelly Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Clovelly Road, Bevois, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 16 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Nov 2024 at 15:56.

Scottish Hydro Electric Power Dis logo
Between
29 Jan and 19 Feb 2025
Details
View Map
Share
Follow
Queens Parade

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Queens Parade, Lyndhurst.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 30 Sep 2024 at 12:41.

Scottish Hydro Electric Power Dis logo
Between
29 Jan and 19 Feb 2025
Details
View Map
Share
Follow
Forest Gardens

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Forest Gardens, Lyndhurst.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Oct 2024 at 13:11.

Hampshire County Council logo
LONG TERM
Between
3 Feb and 1 Apr 2025
Details
View Map
Share
Follow
Commercial Road

Hampshire County Council are proposing to carry out Highway improvement works on Commercial Road, Totton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 1 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 10 Jul 2024 at 08:25.

Hampshire County Council logo
LONG TERM
Between
3 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Nursling Street

Hampshire County Council are proposing to carry out Highway improvement works on Nursling Street, Nursling.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Hampshire County Council on 13 Nov 2024 at 09:32.

Hampshire County Council logo
LONG TERM
Between
3 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Nursling Street

Hampshire County Council are proposing to carry out Highway improvement works on Nursling Street, Nursling.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Hampshire County Council on 13 Nov 2024 at 12:13.

Hampshire County Council logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Lower Common Road

Hampshire County Council are proposing to carry out Highway improvement works on Lower Common Road, West Wellow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 31 Oct 2024 at 15:42.

Murphy Gas Networks logo
Between
8 and 15 Feb 2025
Details
View Map
Share
Follow
Whartons Lane

Murphy Gas Networks are proposing to carry out New service connection on Whartons Lane, Ashurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 February 2025 and could run through until 15 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Gas Networks on 22 Nov 2024 at 13:30.

Southern Water logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Villiers Road

Southern Water are proposing to carry out Utility repair and maintenance works on Villiers Road, Millbrook, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 19 Nov 2024 at 11:42.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
14 Feb and 18 Apr 2025
Details
View Map
Share
Southampton Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Southampton Road, Toothill.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 February 2025 and run through until 18 April 2025. The works were due to impact the carriageway and cycleway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 15:16.

Scottish Hydro Electric Power Dis logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Romsey Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Romsey Road, Lyndhurst.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 14 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Oct 2024 at 15:17.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
17 Feb and 14 May 2025
Details
View Map
Share
Follow
Romsey Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Romsey Road, Lyndhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Oct 2024 at 14:16.

Scottish Hydro Electric Power Dis logo
Between
17 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Derby Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Derby Road, Bevois, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Nov 2024 at 15:56.

Scottish Hydro Electric Power Dis logo
Between
17 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Rownhams Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Rownhams Lane, Coxford, Southampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Oct 2024 at 12:54.

Scottish Hydro Electric Power Dis logo
Between
17 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Rownhams Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Rownhams Lane, Coxford, Southampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Oct 2024 at 11:24.

Scottish Hydro Electric Power Dis logo
Between
17 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Rownhams Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Rownhams Lane, Coxford, Southampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Oct 2024 at 14:56.

Scottish Hydro Electric Power Dis logo
Between
17 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Bakers Drove

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Bakers Drove, Rownhams.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 4 Oct 2024 at 10:16.

Scottish Hydro Electric Power Dis logo
Between
17 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Bakers Drove

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Bakers Drove, Rownhams.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Oct 2024 at 13:25.

Scottish Hydro Electric Power Dis logo
Between
17 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Bakers Drove

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Bakers Drove, Rownhams.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Oct 2024 at 14:19.


Roadworks Map near to Salisbury Road, SOUTHAMPTON, SO40 3ZP

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 24 Nov 2024 04:39
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Salisbury Road, SOUTHAMPTON, SO40 3ZP (11 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Southern Gas Networks logo
MAJOR
  
SALISBURY ROAD 
(0.2 miles)
Southern Gas Networks
Utility repair and maintenance works - Carriageway, Verge - Multi-way signals
In Progress
Since: 31 Oct 2024 11:33
(Scheduled: 31 Oct 2024 - 20 Dec 2024)
0.2
Details
Share
Follow
2
Hampshire County Council logo
MAJOR
  
SALISBURY ROAD 
(0.3 miles)
Hampshire County Council
Works for road purposes - Carriageway - No carriageway incursion
Cancelled
(Scheduled: 12 Nov 2024 - 26 Nov 2024)
0.3
Details
Share
3
Southern Gas Networks logo
MAJOR
  
TESTWOOD CRESCENT 
(0.4 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Give and take
In Progress
Since: 15 Oct 2024 09:21
(Scheduled: 15 Oct 2024 - 3 Dec 2024)
0.4
Details
Share
Follow
4
Southern Water logo
BEECHDALE WALK 
(0.6 miles)
Southern Water
Utility repair and maintenance works - Footpath - No carriageway incursion
Planned
Scheduled: 25 Nov 2024 - 27 Nov 2024
0.6
Details
Share
Follow
5
BT logo
WATER LANE 
(0.7 miles)
BT
Remedial works - Carriageway - Some carriageway incursion
Planned
Scheduled: 25 Nov 2024 - 27 Nov 2024
0.7
Details
Share
Follow
6
Southern Water logo
BARNSFIELD CRESCENT 
(0.7 miles)
Southern Water
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 22 Nov 2024 14:22
(Scheduled: 22 Nov 2024 - 26 Nov 2024)
0.7
Details
Share
Follow
7
Hampshire County Council logo
MAJOR
  
SALISBURY ROAD 
(0.8 miles)
Hampshire County Council
Highway improvement works - Footway, Carriageway, Verge, Cycleway - Multi-way signals
Planned
Scheduled: 16 Sep 2024 - 8 Dec 2024
0.8
Details
Share
Follow
8
Hampshire County Council logo
MAJOR
  
SALISBURY ROAD 
(0.8 miles)
Hampshire County Council
Highway improvement works - Footway, Carriageway, Verge, Cycleway - Multi-way signals
In Progress
Since: 16 Sep 2024 08:00
(Scheduled: 16 Sep 2024 - 8 Dec 2024)
0.8
Details
Share
Follow
9
Hampshire County Council logo
MAYNARD ROAD 
(0.8 miles)
Hampshire County Council
Highway repair and maintenance works - Footway - Some carriageway incursion
Complete
21 Nov 2024 10:30 - 15:30
0.8
Details
Share
10
Hampshire County Council logo
MAJOR
  
JUNCTION ROAD 
(0.8 miles)
Hampshire County Council
Highway repair and maintenance works - Carriageway - Road closure
Planned
Scheduled: 30 Oct 2024 - 10 Apr 2025
0.8
Details
Share
Follow