ROADWORKS SUMMARY
Vicarage Lane, SOUTHAMPTON, SO40 2PA

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Vicarage Lane, SO40 2PA and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Vicarage Lane, SOUTHAMPTON, SO40 2PA

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Vicarage Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Hampshire County Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Redbridge Lane

Hampshire County Council are carrying out Highway improvement works on Redbridge Lane, Nursling.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 February 2024 at 09:30 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 7 Feb 2024 at 09:34.

Hampshire County Council logo
LONG TERM
Between
6 Feb and 6 Dec 2024
Details
View Map
Share
Follow
Horns Drove

Hampshire County Council are proposing to carry out Highway improvement works on Horns Drove, Rownhams.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Hampshire County Council on 8 Jan 2024 at 14:47.

Hampshire County Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Horns Drove

Hampshire County Council are carrying out Highway improvement works on Horns Drove, Rownhams.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 February 2024 at 09:30 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 7 Feb 2024 at 09:34.

Hampshire County Council logo
LONG TERM
Between
6 Feb and 6 Dec 2024
Details
View Map
Share
Follow
Nursling Street

Hampshire County Council are proposing to carry out Highway improvement works on Nursling Street, Nursling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Hampshire County Council on 8 Jan 2024 at 14:52.

Hampshire County Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Nursling Street

Hampshire County Council are carrying out Highway improvement works on Nursling Street, Nursling.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 February 2024 at 09:30 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 7 Feb 2024 at 09:34.

Hampshire County Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Bakers Drove

Hampshire County Council are carrying out Highway improvement works on Bakers Drove, Rownhams.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 February 2024 at 09:30 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 7 Feb 2024 at 09:34.

Hampshire County Council logo
LONG TERM
Between
6 Feb and 6 Dec 2024
Details
View Map
Share
Follow
Romsey Road

Hampshire County Council are proposing to carry out Highway improvement works on Romsey Road, Nursling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Hampshire County Council on 8 Jan 2024 at 14:29.

Hampshire County Council logo
LONG TERM
Between
6 Feb and 6 Dec 2024
Details
View Map
Share
Follow
Redbridge Lane

Hampshire County Council are proposing to carry out Highway improvement works on Redbridge Lane, Nursling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Hampshire County Council on 8 Jan 2024 at 15:10.

Hampshire County Council logo
LONG TERM
Between
6 Feb and 6 Dec 2024
Details
View Map
Share
Follow
Bakers Drove

Hampshire County Council are proposing to carry out Highway improvement works on Bakers Drove, Rownhams.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Hampshire County Council on 8 Jan 2024 at 15:06.

Hampshire County Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Romsey Road

Hampshire County Council are carrying out Highway improvement works on Romsey Road, Nursling.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 February 2024 at 09:30 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 7 Feb 2024 at 09:33.

Southampton City Council logo
LONG TERM
Until
27 Dec 2024
Details
View Map
Share
Follow
Cleasby Close Footpath

Southampton City Council are carrying out Highway improvement works on Cleasby Close Footpath, Millbrook, Southampton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 April 2024 at 17:19 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 30 Sep 2024 at 16:24.

Southern Water logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Princes Crescent

Southern Water are carrying out Utility repair and maintenance works on Princes Crescent, Lyndhurst.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 August 2024 at 23:30 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 18 Nov 2024 at 09:59.

Hampshire County Council logo
LONG TERM
Between
4 Sep and 6 Dec 2024
Details
View Map
Share
Follow
Romsey Road

Hampshire County Council are proposing to carry out Highway improvement works on Romsey Road, Nursling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Hampshire County Council on 29 Aug 2024 at 08:22.

Hampshire County Council logo
LONG TERM
Between
4 Sep and 6 Dec 2024
Details
View Map
Share
Follow
Redbridge Lane

Hampshire County Council are proposing to carry out Highway improvement works on Redbridge Lane, Nursling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Hampshire County Council on 29 Aug 2024 at 08:37.

Hampshire County Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Redbridge Lane

Hampshire County Council are carrying out Highway improvement works on Redbridge Lane, Nursling.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 September 2024 at 07:00 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 4 Sep 2024 at 08:55.

Hampshire County Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Romsey Road

Hampshire County Council are carrying out Highway improvement works on Romsey Road, Nursling.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 September 2024 at 07:00 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 4 Sep 2024 at 08:55.

Hampshire County Council logo
LONG TERM
Between
4 Sep and 6 Dec 2024
Details
View Map
Share
Follow
Bakers Drove

Hampshire County Council are proposing to carry out Highway improvement works on Bakers Drove, Rownhams.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Hampshire County Council on 29 Aug 2024 at 08:40.

Hampshire County Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Bakers Drove

Hampshire County Council are carrying out Highway improvement works on Bakers Drove, Rownhams.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 September 2024 at 09:00 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 4 Sep 2024 at 13:27.

Hampshire County Council logo
LONG TERM
Between
16 Sep and 8 Dec 2024
Details
View Map
Share
Follow
Salisbury Road

Hampshire County Council are proposing to carry out Highway improvement works on Salisbury Road, Calmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 8 December 2024. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Hampshire County Council on 6 Aug 2024 at 12:35.

Hampshire County Council logo
LONG TERM
Until
8 Dec 2024
Details
View Map
Share
Follow
Salisbury Road

Hampshire County Council are carrying out Highway improvement works on Salisbury Road, Calmore.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 08:00 and could run through until 8 December 2024. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Hampshire County Council on 17 Sep 2024 at 08:49.

Hampshire County Council logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Romsey Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Romsey Road, Lyndhurst.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 28 November 2024. The works will impact the verge only.

This roadwork event was last updated by Hampshire County Council on 23 Oct 2024 at 15:40.

Hampshire County Council logo
LONG TERM
Between
30 Oct 2024 and 10 Apr 2025
Details
View Map
Share
Follow
Junction Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Junction Road, Totton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 10 Jul 2024 at 08:25.

Southern Gas Networks logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Salisbury Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Salisbury Road, Totton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 31 October 2024 at 11:33 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 16:05.

Scottish Hydro Electric Power Dis logo
LONG TERM
Until
23 Dec 2024
Details
View Map
Share
Follow
Upton Lane

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Upton Lane, Nursling.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:00 and could run through until 23 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Nov 2024 at 09:16.

Southern Water logo
LONG TERM
Between
19 Nov 2024 and 21 Feb 2025
Details
View Map
Share
Pauncefoot Hill

Southern Water were proposing to carry out Utility repair and maintenance works on Pauncefoot Hill, Romsey.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 November 2024 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 28 Aug 2024 at 15:23.

Hampshire County Council logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Horns Drove

Hampshire County Council are proposing to carry out Highway improvement works on Horns Drove, Rownhams.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 15 Nov 2024 at 12:51.

Hampshire County Council logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Horns Drove

Hampshire County Council are proposing to carry out Highway improvement works on Horns Drove, Rownhams.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 6 Nov 2024 at 13:29.

Hampshire County Council logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Romsey Road

Hampshire County Council are proposing to carry out Highway improvement works on Romsey Road, Nursling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 15 Nov 2024 at 12:51.

Hampshire County Council logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Romsey Road

Hampshire County Council are proposing to carry out Highway improvement works on Romsey Road, Nursling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 6 Nov 2024 at 13:11.

Hampshire County Council logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Nursling Street

Hampshire County Council are proposing to carry out Highway improvement works on Nursling Street, Nursling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 15 Nov 2024 at 12:51.

Hampshire County Council logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Nursling Street

Hampshire County Council are proposing to carry out Highway improvement works on Nursling Street, Nursling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 6 Nov 2024 at 13:25.

Hampshire County Council logo
Between
3 and 5 Dec 2024
Details
View Map
Share
Follow
Gardeners Lane

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Gardeners Lane, East Wellow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 15 Nov 2024 at 10:03.

Hampshire County Council logo
Between
3 and 5 Dec 2024
Details
View Map
Share
Follow
Gardeners Lane

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Gardeners Lane, East Wellow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 14 Nov 2024 at 15:07.

Hampshire County Council logo
Between
3 and 5 Dec 2024
Details
View Map
Share
Follow
Gardeners Lane

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Gardeners Lane, East Wellow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 8 Nov 2024 at 15:35.

Hampshire County Council logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Lyndhurst Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Lyndhurst Road, Minstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 11 Nov 2024 at 10:07.

Hampshire County Council logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Lyndhurst Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Lyndhurst Road, Minstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 8 Nov 2024 at 16:04.

Scottish Hydro Electric Power Dis logo
Between
6 and 21 Jan 2025
Details
View Map
Share
Kings Close

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Kings Close, Lyndhurst.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 21 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Oct 2024 at 15:09.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Redbridge Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Redbridge Lane, Nursling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 10:05.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Romsey Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Romsey Road, Nursling.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 14 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 14:37.

Scottish Hydro Electric Power Dis logo
Between
6 and 21 Jan 2025
Details
View Map
Share
Follow
Kings Close

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Kings Close, Lyndhurst.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Oct 2024 at 14:15.

National Highways logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Hill Street

National Highways are proposing to carry out Works for road purposes on Hill Street, Calmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 7 Oct 2024 at 10:57.

Hampshire County Council logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Winsor Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Winsor Road, Winsor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 22 Nov 2024 at 14:50.

Murphy Power Distribution logo
LONG TERM
Between
8 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Whartons Lane

Murphy Power Distribution are proposing to carry out New service connection on Whartons Lane, Ashurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 22 Nov 2024 at 13:23.

Southern Water logo
Between
8 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Whartons Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Whartons Lane, Ashurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 10 Oct 2024 at 14:52.

Southern Water logo
Between
8 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Whartons Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Whartons Lane, Ashurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 10 Oct 2024 at 13:02.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
13 Jan and 24 Mar 2025
Details
View Map
Share
Follow
Romsey Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Romsey Road, Lyndhurst.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 20 Sep 2024 at 10:35.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
13 Jan and 24 Mar 2025
Details
View Map
Share
Romsey Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Romsey Road, Lyndhurst.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 24 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Sep 2024 at 15:40.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Redbridge Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Redbridge Lane, Nursling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2024 at 14:50.

Scottish Hydro Electric Power Dis logo
Between
29 Jan and 19 Feb 2025
Details
View Map
Share
Follow
Forest Gardens

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Forest Gardens, Lyndhurst.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Oct 2024 at 13:11.

Scottish Hydro Electric Power Dis logo
Between
29 Jan and 19 Feb 2025
Details
View Map
Share
Follow
Queens Parade

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Queens Parade, Lyndhurst.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 30 Sep 2024 at 12:41.

Scottish Hydro Electric Power Dis logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Kings Close

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Kings Close, Lyndhurst.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Oct 2024 at 15:55.

Hampshire County Council logo
LONG TERM
Between
3 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Nursling Street

Hampshire County Council are proposing to carry out Highway improvement works on Nursling Street, Nursling.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Hampshire County Council on 13 Nov 2024 at 09:32.

Hampshire County Council logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Lower Common Road

Hampshire County Council are proposing to carry out Highway improvement works on Lower Common Road, West Wellow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 31 Oct 2024 at 15:42.

Hampshire County Council logo
LONG TERM
Between
3 Feb and 1 Apr 2025
Details
View Map
Share
Follow
Commercial Road

Hampshire County Council are proposing to carry out Highway improvement works on Commercial Road, Totton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 1 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 10 Jul 2024 at 08:25.

Hampshire County Council logo
LONG TERM
Between
3 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Nursling Street

Hampshire County Council are proposing to carry out Highway improvement works on Nursling Street, Nursling.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Hampshire County Council on 13 Nov 2024 at 12:13.

Murphy Gas Networks logo
Between
8 and 15 Feb 2025
Details
View Map
Share
Follow
Whartons Lane

Murphy Gas Networks are proposing to carry out New service connection on Whartons Lane, Ashurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 February 2025 and could run through until 15 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Gas Networks on 22 Nov 2024 at 13:30.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
14 Feb and 18 Apr 2025
Details
View Map
Share
Southampton Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Southampton Road, Toothill.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 February 2025 and run through until 18 April 2025. The works were due to impact the carriageway and cycleway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 15:16.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
17 Feb and 14 May 2025
Details
View Map
Share
Follow
Romsey Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Romsey Road, Lyndhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Oct 2024 at 14:16.

Scottish Hydro Electric Power Dis logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Romsey Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Romsey Road, Lyndhurst.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 14 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Oct 2024 at 15:17.


Roadworks Map near to Vicarage Lane, SOUTHAMPTON, SO40 2PA

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 24 Nov 2024 05:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Vicarage Lane, SOUTHAMPTON, SO40 2PA (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.