ROADWORKS SUMMARY
Hazel Grove, SOUTHAMPTON, SO32 1PS

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Hazel Grove, SO32 1PS and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Hazel Grove, SOUTHAMPTON, SO32 1PS

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Hazel Grove are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Hampshire County Council logo
LONG TERM
Until
16 Mar 2025
Details
View Map
Share
Follow
Botley Road

Hampshire County Council are carrying out Remedial works on Botley Road, Curbridge.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 January 2025 at 06:00 and could run through until 16 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 13 Jan 2025 at 14:57.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 10 Mar 2025
Details
View Map
Share
Follow
High Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Shirrell Heath.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 1 Oct 2024 at 09:51.

Hampshire County Council logo
LONG TERM
Until
4 Apr 2025
Details
View Map
Share
Follow
Station Road

Hampshire County Council are carrying out Highway improvement works on Station Road, Bishops Waltham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 January 2025 at 08:00 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 27 Jan 2025 at 10:43.

Hampshire County Council logo
LONG TERM
Between
27 Jan and 23 Mar 2025
Details
View Map
Share
Follow
Burnetts Lane

Hampshire County Council are proposing to carry out Highway improvement works on Burnetts Lane, Horton Heath.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 23 March 2025. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Hampshire County Council on 23 Dec 2024 at 11:28.

Hampshire County Council logo
LONG TERM
Between
17 Feb and 20 Apr 2025
Details
View Map
Share
Burnetts Lane

Hampshire County Council were proposing to carry out Highway improvement works on Burnetts Lane, Horton Heath.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 20 April 2025. The works were due to impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Hampshire County Council on 17 Feb 2025 at 13:18.

Southern Gas Networks logo
LONG TERM
Until
21 Mar 2025
Details
View Map
Share
Follow
Chapel Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Chapel Road, Swanmore.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 February 2025 at 15:55 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Feb 2025 at 15:55.

Southern Gas Networks logo
Between
17 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Chapel Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chapel Road, Swanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Dec 2024 at 10:00.

Hampshire County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Sciviers Lane

Hampshire County Council are carrying out Highway repair and maintenance works on Sciviers Lane, Upham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 February 2025 at 09:00 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 27 Feb 2025 at 08:48.

Southern Water logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Mortimers Lane Service Road

Southern Water were proposing to carry out Utility repair and maintenance works on Mortimers Lane Service Road, Fair Oak.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 5 Dec 2024 at 11:29.

Southern Gas Networks logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Follow
Hill Pound

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hill Pound, Swanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 20 Dec 2024 at 13:40.

Southern Gas Networks logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Follow
Hill Pound

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hill Pound, Swanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 20 Dec 2024 at 08:30.

Hampshire County Council logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Church Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Church Road, Newtown.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 17 Jan 2025 at 10:38.

Hampshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Chancellors Lane

Hampshire County Council are proposing to carry out Highway improvement works on Chancellors Lane, Botley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 10 Jan 2025 at 09:27.

Hampshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Chancellors Lane

Hampshire County Council are proposing to carry out Highway improvement works on Chancellors Lane, Botley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 9 Jan 2025 at 15:14.

Cityfibre Metro Networks logo
Finishing
Thursday
Details
View Map
Share
Follow
Cams Hill Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Cams Hill Lane, Hambledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 7 Jan 2025 at 10:24.

Cityfibre Metro Networks logo
Finishing
Thursday
Details
View Map
Share
Follow
Cams Hill Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Cams Hill Lane, Hambledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Dec 2024 at 09:32.

Cityfibre Metro Networks logo
Finishing
Thursday
Details
View Map
Share
Follow
Cams Hill Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Cams Hill Lane, Hambledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Dec 2024 at 15:15.

Cityfibre Metro Networks logo
Finishing
Thursday
Details
View Map
Share
Follow
Cams Hill Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Cams Hill Lane, Hambledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 15 Jan 2025 at 13:44.

Hampshire County Council logo
Between
10 and 13 Mar 2025
Details
View Map
Share
Winchester Road

Hampshire County Council were proposing to carry out Highway improvement works on Winchester Road, Wickham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 13 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 4 Dec 2024 at 07:56.

Southern Water logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Vicarage Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Vicarage Lane, Curdridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Water on 5 Dec 2024 at 10:51.

Hampshire County Council logo
Between
10 and 13 Mar 2025
Details
View Map
Share
Follow
Winchester Road

Hampshire County Council are proposing to carry out Highway improvement works on Winchester Road, Wickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 28 Nov 2024 at 09:54.

Hampshire County Council logo
Between
10 and 19 Mar 2025
Details
View Map
Share
Follow
Winchester Road

Hampshire County Council are proposing to carry out Highway improvement works on Winchester Road, Wickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 18 Nov 2024 at 10:52.

Southern Water logo
Between
10 and 28 Mar 2025
Details
View Map
Share
Follow
Mortimers Lane Service Road

Southern Water are proposing to carry out Utility repair and maintenance works on Mortimers Lane Service Road, Fair Oak.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 23 Jan 2025 at 16:49.

Southern Water logo
Between
10 and 28 Mar 2025
Details
View Map
Share
Follow
Mortimers Lane Service Road

Southern Water are proposing to carry out Utility repair and maintenance works on Mortimers Lane Service Road, Fair Oak.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 5 Dec 2024 at 14:04.

Hampshire County Council logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Chapel Lane

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Chapel Lane, Curdridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 4 Feb 2025 at 14:40.

Hampshire County Council logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Chapel Lane

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Chapel Lane, Curdridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 13 Feb 2025 at 15:34.

Hampshire County Council logo
Between
11 and 19 Mar 2025
Details
View Map
Share
Follow
Mortimers Lane

Hampshire County Council are proposing to carry out Highway improvement works on Mortimers Lane, Fair Oak.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 4 Dec 2024 at 11:57.

Hampshire County Council logo
Between
11 and 19 Mar 2025
Details
View Map
Share
Follow
Mortimers Lane

Hampshire County Council are proposing to carry out Highway improvement works on Mortimers Lane, Upham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 4 Dec 2024 at 11:57.

Hampshire County Council logo
Between
11 and 19 Mar 2025
Details
View Map
Share
Follow
Mortimers Lane

Hampshire County Council are proposing to carry out Highway improvement works on Mortimers Lane, Upham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 3 Dec 2024 at 20:10.

Hampshire County Council logo
Between
11 and 19 Mar 2025
Details
View Map
Share
Follow
Mortimers Lane

Hampshire County Council are proposing to carry out Highway improvement works on Mortimers Lane, Fair Oak.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 3 Dec 2024 at 20:10.

Southern Gas Networks logo
LONG TERM
Between
17 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Twynhams Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Twynhams Hill, Shirrell Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Oct 2024 at 10:03.

Southern Gas Networks logo
LONG TERM
Between
17 Mar and 2 May 2025
Details
View Map
Share
Follow
High Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Shirrell Heath.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Oct 2024 at 10:02.

Portsmouth Waterworks Company logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Cott Street

Portsmouth Waterworks Company are proposing to carry out Utility repair and maintenance works on Cott Street, Swanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Portsmouth Waterworks Company on 29 Jan 2025 at 09:59.

Portsmouth Waterworks Company logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Cott Street

Portsmouth Waterworks Company are proposing to carry out Utility repair and maintenance works on Cott Street, Swanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Portsmouth Waterworks Company on 27 Jan 2025 at 13:01.

Portsmouth Waterworks Company logo
Between
18 and 21 Mar 2025
Details
View Map
Share
Follow
Cott Street

Portsmouth Waterworks Company are proposing to carry out Utility repair and maintenance works on Cott Street, Swanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Portsmouth Waterworks Company on 29 Jan 2025 at 13:41.

Hampshire County Council logo
Between
19 and 25 Mar 2025
Details
View Map
Share
Follow
Winchester Road

Hampshire County Council are proposing to carry out Highway improvement works on Winchester Road, Wickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 25 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 6 Feb 2025 at 14:44.

Hampshire County Council logo
Between
27 and 31 Mar 2025
Details
View Map
Share
Follow
Mortimers Lane

Hampshire County Council are proposing to carry out Highway improvement works on Mortimers Lane, Fair Oak.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 25 Feb 2025 at 09:57.

Hampshire County Council logo
Between
27 and 31 Mar 2025
Details
View Map
Share
Follow
Mortimers Lane

Hampshire County Council are proposing to carry out Highway improvement works on Mortimers Lane, Upham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 25 Feb 2025 at 10:03.

Hampshire County Council logo
Between
1 and 4 Apr 2025
Details
View Map
Share
Follow
Winchester Road

Hampshire County Council are proposing to carry out Highway improvement works on Winchester Road, Wickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 19 Feb 2025 at 09:33.

Southern Gas Networks logo
Between
7 Apr and 2 May 2025
Details
View Map
Share
Follow
Gravel Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gravel Hill, Shirrell Heath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Aug 2024 at 16:03.

Hampshire County Council logo
Between
7 and 10 Apr 2025
Details
View Map
Share
Follow
Winchester Road

Hampshire County Council are proposing to carry out Highway improvement works on Winchester Road, Wickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 26 Feb 2025 at 09:48.

Hampshire County Council logo
Between
7 and 10 Apr 2025
Details
View Map
Share
Follow
Winchester Road

Hampshire County Council are proposing to carry out Highway improvement works on Winchester Road, Wickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 25 Feb 2025 at 09:50.

Hampshire County Council logo
Between
15 Apr and 9 May 2025
Details
View Map
Share
Follow
Winchester Road

Hampshire County Council are proposing to carry out Highway improvement works on Winchester Road, Bishops Waltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 28 Nov 2024 at 13:04.

Hampshire County Council logo
Between
16 Apr and 1 May 2025
Details
View Map
Share
Follow
Park View

Hampshire County Council are proposing to carry out Highway improvement works on Park View, Botley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 16 Jan 2025 at 09:15.

Hampshire County Council logo
Between
16 Apr and 1 May 2025
Details
View Map
Share
Follow
Park View

Hampshire County Council are proposing to carry out Highway improvement works on Park View, Botley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 15 Jan 2025 at 15:36.

Hampshire County Council logo
Between
16 Apr and 1 May 2025
Details
View Map
Share
Follow
Alexandra Way

Hampshire County Council are proposing to carry out Highway improvement works on Alexandra Way, Botley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 16 Jan 2025 at 09:14.

Hampshire County Council logo
Between
16 Apr and 1 May 2025
Details
View Map
Share
Follow
Alexandra Way

Hampshire County Council are proposing to carry out Highway improvement works on Alexandra Way, Botley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 15 Jan 2025 at 15:36.

BT logo
Between
21 and 25 Apr 2025
Details
View Map
Share
Follow
Belmore Lane

BT are proposing to carry out Utility asset works on Belmore Lane, Upham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 13 Jan 2025 at 13:06.

BT logo
Between
21 and 25 Apr 2025
Details
View Map
Share
Follow
Salt Lane

BT are proposing to carry out Utility asset works on Salt Lane, Upham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 13 Jan 2025 at 13:08.

Hampshire County Council logo
Between
22 Apr and 6 May 2025
Details
View Map
Share
Follow
Baybridge Lane

Hampshire County Council are proposing to carry out Highway improvement works on Baybridge Lane, Owslebury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 6 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 13 Jan 2025 at 14:23.

Hampshire County Council logo
Between
22 Apr and 6 May 2025
Details
View Map
Share
Follow
Baybridge Lane

Hampshire County Council are proposing to carry out Highway improvement works on Baybridge Lane, Owslebury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 6 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 14 Jan 2025 at 16:42.

BT logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
Heath Road

BT are proposing to carry out Utility asset works on Heath Road, Wickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 17 Jan 2025 at 11:19.

BT logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
Heath Road

BT are proposing to carry out Utility asset works on Heath Road, Wickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 19 Feb 2025 at 11:18.

BT logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
Heath Road

BT are proposing to carry out Utility asset works on Heath Road, Soberton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 19 Feb 2025 at 11:19.

BT logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
Heath Road

BT are proposing to carry out Utility asset works on Heath Road, Soberton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 17 Jan 2025 at 11:20.

BT logo
Between
28 Apr and 3 May 2025
Details
View Map
Share
Follow
Belmore Lane

BT are proposing to carry out Utility asset works on Belmore Lane, Upham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 3 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 15 Jan 2025 at 16:57.

Hampshire County Council logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Follow
Sandy Lane

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Sandy Lane, Fair Oak.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 24 Feb 2025 at 12:01.

BT logo
Between
28 Apr and 3 May 2025
Details
View Map
Share
Follow
Salt Lane

BT are proposing to carry out Utility asset works on Salt Lane, Upham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 3 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 15 Jan 2025 at 16:56.

Hampshire County Council logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Follow
Sandy Lane

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Sandy Lane, Fair Oak.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 22 Feb 2025 at 19:32.

Hampshire County Council logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Sandy Lane

Hampshire County Council were proposing to carry out Highway repair and maintenance works on Sandy Lane, Fair Oak.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 30 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 21 Feb 2025 at 14:54.

Cityfibre Metro Networks logo
Between
2 and 16 May 2025
Details
View Map
Share
Follow
Green Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Green Lane, Hambledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 9 Feb 2025 at 14:19.

Cityfibre Metro Networks logo
LONG TERM
Between
5 May and 20 Jun 2025
Details
View Map
Share
Follow
Hambledon Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Hambledon Road, Droxford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 20 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Feb 2025 at 09:48.

Cityfibre Metro Networks logo
LONG TERM
Between
5 May and 20 Jun 2025
Details
View Map
Share
Follow
Hambledon Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Hambledon Road, Droxford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 20 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 27 Feb 2025 at 09:35.

Hampshire County Council logo
LONG TERM
Between
6 May and 12 Aug 2025
Details
View Map
Share
Follow
Botley Road

Hampshire County Council are proposing to carry out Highway improvement works on Botley Road, Curbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 12 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 27 Feb 2025 at 15:34.

Hampshire County Council logo
LONG TERM
Between
6 May and 12 Aug 2025
Details
View Map
Share
Follow
Station Hill

Hampshire County Council are proposing to carry out Highway improvement works on Station Hill, Curdridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 12 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 27 Feb 2025 at 15:35.

Hampshire County Council logo
LONG TERM
Between
6 May and 12 Aug 2025
Details
View Map
Share
Follow
Station Hill

Hampshire County Council are proposing to carry out Highway improvement works on Station Hill, Curdridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 12 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 25 Feb 2025 at 12:53.

Hampshire County Council logo
LONG TERM
Between
6 May and 12 Aug 2025
Details
View Map
Share
Follow
Botley Road

Hampshire County Council are proposing to carry out Highway improvement works on Botley Road, Curbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 12 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 25 Feb 2025 at 12:57.

BT logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
Belmore Lane

BT are proposing to carry out Utility asset works on Belmore Lane, Upham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 6 Feb 2025 at 09:52.

BT logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
Salt Lane

BT are proposing to carry out Utility asset works on Salt Lane, Upham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 6 Feb 2025 at 09:54.

Between
15 and 19 May 2025
Details
View Map
Share
Follow
Winchester Road

Last Mile Gas are proposing to carry out Utility repair and maintenance works on Winchester Road, Botley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2025 and could run through until 19 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Gas on 20 Feb 2025 at 11:58.

Hampshire County Council logo
Between
17 and 22 May 2025
Details
View Map
Share
Follow
Botley Road

Hampshire County Council are proposing to carry out Highway improvement works on Botley Road, Curbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 May 2025 and could run through until 22 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 19 Nov 2024 at 08:40.

Hampshire County Council logo
Between
18 and 22 May 2025
Details
View Map
Share
Follow
Buddens Lane

Hampshire County Council are proposing to carry out Highway improvement works on Buddens Lane, Wood End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 May 2025 and could run through until 22 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 19 Nov 2024 at 09:21.

Hampshire County Council logo
Between
20 May and 3 Jun 2025
Details
View Map
Share
Follow
Winchester Road

Hampshire County Council are proposing to carry out Highway improvement works on Winchester Road, Wickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 4 Feb 2025 at 10:55.

Hampshire County Council logo
Between
20 and 27 May 2025
Details
View Map
Share
Follow
Buddens Lane

Hampshire County Council are proposing to carry out Highway improvement works on Buddens Lane, Wood End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2025 and could run through until 27 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 30 Sep 2024 at 16:08.

Hampshire County Council logo
Between
21 May and 4 Jun 2025
Details
View Map
Share
Follow
Swanmore Road

Hampshire County Council are proposing to carry out Highway improvement works on Swanmore Road, Droxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 4 Feb 2025 at 14:53.

Hampshire County Council logo
Between
21 May and 3 Jun 2025
Details
View Map
Share
Follow
Winchester Road

Hampshire County Council are proposing to carry out Highway improvement works on Winchester Road, Wickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 12 Feb 2025 at 11:12.

Hampshire County Council logo
Between
21 May and 4 Jun 2025
Details
View Map
Share
Follow
West Hoe Lane

Hampshire County Council are proposing to carry out Highway improvement works on West Hoe Lane, Bishops Waltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 4 Feb 2025 at 14:44.

Hampshire County Council logo
Between
22 May and 5 Jun 2025
Details
View Map
Share
Follow
Mortimers Lane

Hampshire County Council are proposing to carry out Highway improvement works on Mortimers Lane, Fair Oak.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 6 Feb 2025 at 15:46.

Hampshire County Council logo
Between
22 May and 5 Jun 2025
Details
View Map
Share
Follow
Mortimers Lane

Hampshire County Council are proposing to carry out Highway improvement works on Mortimers Lane, Upham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 4 Feb 2025 at 14:38.

Hampshire County Council logo
Between
22 May and 6 Jun 2025
Details
View Map
Share
Follow
Gravel Hill

Hampshire County Council are proposing to carry out Highway improvement works on Gravel Hill, Swanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 24 Feb 2025 at 09:29.

Hampshire County Council logo
Between
22 May and 5 Jun 2025
Details
View Map
Share
Follow
Evelyn Close

Hampshire County Council are proposing to carry out Highway improvement works on Evelyn Close, Waltham Chase.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 4 Feb 2025 at 14:28.

Hampshire County Council logo
Between
23 and 30 May 2025
Details
View Map
Share
Follow
Swanmore Road

Hampshire County Council are proposing to carry out Highway improvement works on Swanmore Road, Droxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 17 Feb 2025 at 09:10.

Hampshire County Council logo
Between
23 and 30 May 2025
Details
View Map
Share
Follow
West Hoe Lane

Hampshire County Council are proposing to carry out Highway improvement works on West Hoe Lane, Bishops Waltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 5 Feb 2025 at 14:33.

Hampshire County Council logo
Between
23 and 30 May 2025
Details
View Map
Share
Follow
West Hoe Lane

Hampshire County Council are proposing to carry out Highway improvement works on West Hoe Lane, Bishops Waltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 6 Feb 2025 at 10:11.

Hampshire County Council logo
Between
23 and 30 May 2025
Details
View Map
Share
Follow
Swanmore Road

Hampshire County Council are proposing to carry out Highway improvement works on Swanmore Road, Droxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 7 Feb 2025 at 14:08.

Cityfibre Metro Networks logo
Between
26 May and 9 Jun 2025
Details
View Map
Share
Follow
Green Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Green Lane, Hambledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 12 Feb 2025 at 17:17.

Hampshire County Council logo
Between
27 and 30 May 2025
Details
View Map
Share
Follow
Evelyn Close

Hampshire County Council are proposing to carry out Highway improvement works on Evelyn Close, Waltham Chase.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 5 Feb 2025 at 14:32.

Hampshire County Council logo
Between
27 and 30 May 2025
Details
View Map
Share
Follow
Evelyn Close

Hampshire County Council are proposing to carry out Highway improvement works on Evelyn Close, Waltham Chase.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 6 Feb 2025 at 10:09.


Roadworks Map near to Hazel Grove, SOUTHAMPTON, SO32 1PS

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 2 Mar 2025 15:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Hazel Grove, SOUTHAMPTON, SO32 1PS (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Hampshire County Council logo
MAJOR
  
STATION ROAD 
(0.8 miles)
Hampshire County Council
Highway improvement works - Footway, Carriageway, Verge - Road closure
In Progress
Since: 24 Jan 2025 08:00
(Scheduled: 24 Jan 2025 - 4 Apr 2025)
0.8
Details
Share
Follow