ROADWORKS SUMMARY
SO31 7WY
Introduction
View current and future planned roadworks and road closures for SO31 7WY and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to SO31 7WY
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
3 Jul 2023 and 29 Nov 2024
Hampshire County Council are proposing to carry out Highway improvement works on Whiteley Way, Whiteley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2023 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Hampshire County Council on 29 Mar 2023 at 10:23.
3 Jul 2023 and 29 Nov 2024
Hampshire County Council are proposing to carry out Highway improvement works on Whiteley Way, Whiteley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2023 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Hampshire County Council on 25 Apr 2023 at 10:43.
28 Jun 2024
Southampton City Council are carrying out Highway improvement works on Cheriton Avenue Footpaths, Harefield, Southampton.
The works should not impact the carriageway.
The works started on 11 September 2023 at 09:49 and could run through until 28 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 27 Mar 2024 at 14:24.
7 Jun 2024
Hampshire County Council are carrying out Highway improvement works on Charles Watts Way, West End.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 November 2023 at 08:43 and could run through until 7 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 8 Mar 2024 at 14:18.
2 Jan and 26 Sep 2024
Hampshire County Council are proposing to carry out Highway improvement works on Wickham Road, Fareham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2024 and could run through until 26 September 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Hampshire County Council on 18 May 2023 at 09:39.
Friday
Hampshire County Council are carrying out Highway improvement works on Oakcroft Lane, Stubbington, Fareham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 January 2024 at 08:00 and could run through until 3 May 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 27 Mar 2024 at 13:08.
Friday
Hampshire County Council are carrying out Highway improvement works on Peak Lane, Fareham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 February 2024 at 07:00 and could run through until 3 May 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 19 Mar 2024 at 14:33.
9 May 2024
Portsmouth Waterworks Company are carrying out Utility repair and maintenance works on Drift Road, Fareham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 February 2024 at 10:58 and could run through until 9 May 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Portsmouth Waterworks Company on 16 Apr 2024 at 10:36.
Sunday
Hampshire County Council are proposing to carry out Works for road purposes on Quay Street, Fareham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2024 and could run through until 5 May 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Hampshire County Council on 7 Mar 2024 at 14:17.
10 May 2024
Southampton City Council are carrying out Highway improvement works on Station Road, Peartree, Southampton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 February 2024 at 07:30 and could run through until 10 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 28 Mar 2024 at 15:20.
10 May 2024
Southampton City Council are carrying out Highway improvement works on Spring Road, Peartree, Southampton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 February 2024 at 07:30 and could run through until 10 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 28 Mar 2024 at 15:24.
4 Mar and 20 Jun 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kathleen Road, Sholing, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2024 and could run through until 20 June 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 2 Jan 2024 at 11:34.
4 Mar and 20 Jun 2024
Southern Gas Networks are proposing to carry out Utility asset works on Kathleen Road, Sholing, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2024 and could run through until 20 June 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 2 Jan 2024 at 11:35.
4 Mar and 20 Jun 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Monica Road, Sholing, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2024 and could run through until 20 June 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 2 Jan 2024 at 11:35.
10 May 2024
Southampton City Council are carrying out Highway improvement works on Station Road, Peartree, Southampton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 March 2024 at 07:30 and could run through until 10 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 28 Mar 2024 at 15:22.
10 May 2024
Southampton City Council are carrying out Highway improvement works on Cranbury Road, Peartree, Southampton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 March 2024 at 07:30 and could run through until 10 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 28 Mar 2024 at 15:23.
27 Feb 2026
Hampshire County Council are carrying out Highway improvement works on Whiteley Way, Whiteley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 April 2024 at 06:30 and could run through until 27 February 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 10 Apr 2024 at 07:21.
16 May 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Lower New Road, West End.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 March 2024 at 08:30 and could run through until 16 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Apr 2024 at 13:17.
25 Mar 2024 and 29 Aug 2025
Hampshire County Council are proposing to carry out Highway improvement works on Wickham Road, Fareham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 March 2024 and could run through until 29 August 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Hampshire County Council on 11 Mar 2024 at 13:53.
25 Mar 2024 and 29 Aug 2025
Hampshire County Council are proposing to carry out Highway improvement works on Wickham Road, Fareham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 March 2024 and could run through until 29 August 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Hampshire County Council on 16 Feb 2024 at 09:31.
10 May 2024
Southampton City Council are carrying out Highway improvement works on Spring Road, Peartree, Southampton.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 April 2024 at 07:00 and could run through until 10 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 11 Apr 2024 at 07:39.
21 Apr and 9 May 2024
Hampshire County Council are proposing to carry out Works for road purposes on Hill Head Road, Hillhead, Fareham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2024 and could run through until 9 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 12 Apr 2024 at 14:43.
22 Apr and 14 Jun 2024
Southampton City Council are proposing to carry out Highway improvement works on Bridge Road/portsmouth Road Footpaths, Peartree, Southampton.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 22 April 2024 and could run through until 14 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 20 Feb 2024 at 14:18.
22 Apr and 14 Jun 2024
Southampton City Council are proposing to carry out Highway improvement works on Bridge Road/portsmouth Road Footpaths, Peartree, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 14 June 2024. The works will impact the footpath only.
This roadwork event was last updated by Southampton City Council on 20 Feb 2024 at 15:39.
Thursday
Southern Gas Networks are carrying out Utility repair and maintenance works on Spring Road, Peartree, Southampton.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 April 2024 at 10:40 and could run through until 2 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Apr 2024 at 14:35.
Today
Hampshire County Council are proposing to carry out Highway improvement works on Stubbington By-pass, Stubbington, Fareham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 April 2024 and could run through until 29 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 25 Mar 2024 at 13:15.
Wednesday
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Netherhill, Botley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 26 Apr 2024 at 11:03.
Thursday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Botany Bay Road, Sholing, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 2 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Apr 2024 at 07:39.
Friday
Hampshire County Council are proposing to carry out Highway improvement works on Peak Lane, Fareham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 3 May 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 11 Apr 2024 at 14:15.
Wednesday
Southampton City Council are proposing to carry out Highway improvement works on Coates Road, Bitterne, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 19 Apr 2024 at 14:25.
Wednesday
Southampton City Council are proposing to carry out Highway improvement works on Coates Road, Bitterne, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 19 Apr 2024 at 13:12.
Wednesday
Southampton City Council are proposing to carry out Highway improvement works on Coates Road, Bitterne, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 19 Apr 2024 at 13:07.
Wednesday
Southampton City Council are proposing to carry out Highway improvement works on Coates Road, Bitterne, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 19 Apr 2024 at 13:09.
Wednesday
Southampton City Council are proposing to carry out Highway improvement works on Coates Road, Bitterne, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 19 Apr 2024 at 13:08.
Wednesday
Southampton City Council are proposing to carry out Highway improvement works on Coates Road, Bitterne, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 19 Apr 2024 at 13:03.
Wednesday
Southampton City Council are proposing to carry out Highway improvement works on Coates Road, Bitterne, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 19 Apr 2024 at 13:10.
Wednesday
Southampton City Council are proposing to carry out Highway improvement works on Coates Road, Bitterne, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 19 Apr 2024 at 13:07.
Wednesday
Southampton City Council are proposing to carry out Highway improvement works on Coates Road, Bitterne, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 19 Apr 2024 at 13:12.
29 Apr and 13 May 2024
Cityfibre Metro Networks are proposing to carry out Utility asset works on Freemantle Common Road, Peartree, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 13 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 4 Mar 2024 at 15:09.
29 Apr and 8 May 2024
Hampshire County Council are proposing to carry out Highway improvement works on Moorhill Road, West End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 8 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 8 Apr 2024 at 14:34.
Friday
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Shamblehurst Lane North, Botley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 3 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 15 Mar 2024 at 09:07.
Friday
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Shamblehurst Lane North, Botley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 3 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 15 Mar 2024 at 09:07.
30 Apr and 30 May 2024
Hampshire County Council are proposing to carry out Highway repair and maintenance works on School Road, Bursledon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 April 2024 and could run through until 30 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 19 Apr 2024 at 12:58.
Saturday
Hampshire County Council are proposing to carry out Highway improvement works on Botley Road, Curbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 May 2024 and could run through until 4 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 24 Apr 2024 at 10:21.
6 and 17 May 2024
Hampshire County Council are proposing to carry out Highway improvement works on Geoffrey Crescent, Fareham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 17 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Hampshire County Council on 12 Apr 2024 at 12:13.
6 May and 7 Jun 2024
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Gosport Road, Fareham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 7 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 10 Apr 2024 at 14:48.
6 May and 7 Jun 2024
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Western Way, Fareham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 7 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 10 Apr 2024 at 14:47.
6 May and 7 Jun 2024
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Eastern Way, Fareham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 7 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 10 Apr 2024 at 14:47.
6 May and 7 Jun 2024
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Portland Street, Fareham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 7 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 10 Apr 2024 at 14:48.
6 May and 7 Jun 2024
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Quay Street, Fareham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 7 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 12 Apr 2024 at 09:14.
6 and 9 May 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Wangfield Lane, Curdridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 9 May 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 22 Apr 2024 at 10:28.
7 May and 19 Jul 2024
Portsmouth Waterworks Company are proposing to carry out Utility repair and maintenance works on Knights Bank Road, Hillhead, Fareham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 19 July 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Portsmouth Waterworks Company on 4 Apr 2024 at 15:38.
7 and 31 May 2024
Portsmouth Waterworks Company are proposing to carry out Utility repair and maintenance works on Little Gays, Hillhead, Fareham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 31 May 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Portsmouth Waterworks Company on 4 Apr 2024 at 15:40.
7 and 9 May 2024
Hampshire County Council are proposing to carry out Highway improvement works on Quay Street, Fareham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 9 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 13 Feb 2024 at 13:48.
7 and 17 May 2024
Southern Water are proposing to carry out Utility repair and maintenance works on Beacon Bottom, Park Gate, Fareham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 17 May 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Water on 16 Feb 2024 at 08:40.
7 and 9 May 2024
Southampton City Council are proposing to carry out Highway improvement works on Spring Road, Peartree, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 9 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 28 Mar 2024 at 14:59.
7 and 21 May 2024
Hampshire County Council are proposing to carry out Highway improvement works on Pern Drive, Botley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 21 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 24 Apr 2024 at 11:57.
8 and 14 May 2024
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Southampton Road, Park Gate, Fareham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 May 2024 and could run through until 14 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 9 Apr 2024 at 07:17.
10 and 18 May 2024
Southampton City Council are proposing to carry out Highway improvement works on Spring Road, Peartree, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 May 2024 and could run through until 18 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 28 Mar 2024 at 14:57.
12 and 16 May 2024
Hampshire County Council are proposing to carry out Works for road purposes on Fawley Road, Fawley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2024 and could run through until 16 May 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 10 Apr 2024 at 09:22.
12 and 14 May 2024
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Highlands Road, Fareham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2024 and could run through until 14 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 19 Apr 2024 at 07:50.
12 and 15 May 2024
Southampton City Council are proposing to carry out Highway repair and maintenance works on Hannay Rise, Bitterne, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2024 and could run through until 15 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 24 Apr 2024 at 09:15.
12 and 16 May 2024
Hampshire County Council are proposing to carry out Highway improvement works on Winchester Road, Wickham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2024 and could run through until 16 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 9 Jan 2024 at 13:10.
13 May and 2 Jun 2024
Hampshire County Council are proposing to carry out Highway improvement works on Grange Road, Netley Abbey.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 2 June 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 24 Apr 2024 at 12:48.
14 and 17 May 2024
Portsmouth Waterworks Company are proposing to carry out Utility repair and maintenance works on Ranvilles Lane, Stubbington, Fareham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 May 2024 and could run through until 17 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Portsmouth Waterworks Company on 21 Mar 2024 at 20:20.
19 and 24 May 2024
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Southampton Road, Park Gate, Fareham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2024 and could run through until 24 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 19 Apr 2024 at 07:36.
19 and 30 May 2024
Southampton City Council are proposing to carry out Highway repair and maintenance works on Hannay Rise, Bitterne, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 24 Apr 2024 at 09:15.
19 and 30 May 2024
Southampton City Council are proposing to carry out Highway repair and maintenance works on Gerard Crescent, Bitterne, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 24 Apr 2024 at 09:12.
19 and 29 May 2024
Southampton City Council are proposing to carry out Highway repair and maintenance works on Meon Court, Harefield, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2024 and could run through until 29 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 24 Apr 2024 at 09:07.
20 and 22 May 2024
Hampshire County Council are proposing to carry out Highway improvement works on Greenaway Lane, Warsash, Fareham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 22 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Hampshire County Council on 11 Mar 2024 at 11:22.
20 and 26 May 2024
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Southampton Road, Park Gate, Fareham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 26 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 24 Apr 2024 at 07:48.
20 May and 15 Jun 2024
Southampton City Council are proposing to carry out Highway improvement works on Botley Road, Bitterne, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 15 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 4 Apr 2024 at 16:14.
20 May and 15 Jun 2024
Southampton City Council are proposing to carry out Highway improvement works on Portsmouth Road, Woolston, Southampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 15 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southampton City Council on 4 Apr 2024 at 13:55.
20 May and 15 Jun 2024
Southampton City Council are proposing to carry out Highway improvement works on Portsmouth Road, Woolston, Southampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 15 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southampton City Council on 5 Apr 2024 at 09:18.
20 May and 15 Jun 2024
Southampton City Council are proposing to carry out Highway improvement works on Portsmouth Road, Woolston, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 15 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southampton City Council on 5 Apr 2024 at 09:07.
20 May and 15 Jun 2024
Southampton City Council are proposing to carry out Highway improvement works on Spring Road, Peartree, Southampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 15 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southampton City Council on 4 Apr 2024 at 14:14.
20 May and 13 Jul 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bursledon Road, Hedge End.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 13 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Apr 2024 at 10:20.
20 and 31 May 2024
Southampton City Council are proposing to carry out Highway repair and maintenance works on Burke Drive, Bitterne, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 24 Apr 2024 at 09:59.
21 May and 6 Jun 2024
Hampshire County Council are proposing to carry out Works for road purposes on Calcot Lane, Curdridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 May 2024 and could run through until 6 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 8 Apr 2024 at 11:23.
24 May and 5 Jun 2024
Hampshire County Council are proposing to carry out Highway improvement works on Moorhill Road, West End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 May 2024 and could run through until 5 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 18 Apr 2024 at 12:06.
26 May and 7 Jun 2024
Hampshire County Council are proposing to carry out Highway improvement works on Buddens Road, Wickham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2024 and could run through until 7 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 25 Apr 2024 at 13:28.
27 May and 5 Dec 2024
Hampshire County Council are proposing to carry out Highway improvement works on Knowle Road, Fareham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 5 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 3 Apr 2024 at 13:07.
27 and 29 May 2024
Southampton City Council are proposing to carry out Highway improvement works on Warburton Road, Bitterne, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 29 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 26 Apr 2024 at 10:22.
28 and 31 May 2024
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Warsash Road, Warsash, Fareham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 26 Feb 2024 at 15:18.
28 and 31 May 2024
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Warsash Road, Locks Heath, Fareham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 26 Feb 2024 at 15:18.
28 and 30 May 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Winchester Street, Botley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 30 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 13 Mar 2024 at 14:37.
3 Jun and 15 Jul 2024
Hampshire County Council are proposing to carry out Highway improvement works on Woodhouse Lane, Botley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 15 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 8 Apr 2024 at 10:39.
12 and 14 Jun 2024
BT are proposing to carry out Utility repair and maintenance works on Lee Ground, Titchfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 June 2024 and could run through until 14 June 2024. The works will impact the verge only.
This roadwork event was last updated by BT on 15 Mar 2024 at 08:32.
16 Jun and 8 Aug 2024
Portsmouth Waterworks Company are proposing to carry out Utility repair and maintenance works on Serpentine Road, Fareham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2024 and could run through until 8 August 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Portsmouth Waterworks Company on 26 Apr 2024 at 16:32.
16 and 29 Jun 2024
Southampton City Council are proposing to carry out Highway improvement works on Fort Road, Woolston, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2024 and could run through until 29 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southampton City Council on 22 Apr 2024 at 12:25.
17 and 21 Jun 2024
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Kiln Road, Fareham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 21 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 12 Mar 2024 at 09:29.
17 Jun and 26 Jul 2024
Southampton City Council are proposing to carry out Highway improvement works on The Grove, Sholing, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 26 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southampton City Council on 4 Apr 2024 at 16:25.
17 Jun and 26 Jul 2024
Southampton City Council are proposing to carry out Highway improvement works on The Grove, Sholing, Southampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 26 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 4 Apr 2024 at 16:20.
17 Jun and 26 Jul 2024
Southampton City Council are proposing to carry out Highway improvement works on The Grove, Sholing, Southampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 26 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 4 Apr 2024 at 14:46.
17 Jun and 26 Jul 2024
Southampton City Council are proposing to carry out Highway improvement works on Portsmouth Road, Woolston, Southampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 26 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southampton City Council on 4 Apr 2024 at 16:30.
17 Jun and 26 Jul 2024
Southampton City Council are proposing to carry out Highway improvement works on Botley Road, Bitterne, Southampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 26 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 4 Apr 2024 at 14:42.
17 Jun and 26 Jul 2024
Southampton City Council are proposing to carry out Highway improvement works on Portsmouth Road, Woolston, Southampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 26 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 4 Apr 2024 at 14:52.
17 Jun and 26 Jul 2024
Southampton City Council are proposing to carry out Highway improvement works on Adey Close, Sholing, Southampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 26 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southampton City Council on 4 Apr 2024 at 14:56.
17 Jun and 26 Jul 2024
Southampton City Council are proposing to carry out Highway improvement works on Adey Close, Sholing, Southampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 26 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southampton City Council on 4 Apr 2024 at 16:47.
17 and 28 Jun 2024
Southampton City Council are proposing to carry out Highway improvement works on Portsmouth Road, Woolston, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 28 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 20 Feb 2024 at 10:39.
30 Jun and 5 Jul 2024
Southern Water are proposing to carry out Utility repair and maintenance works on Portsmouth Road, Woolston, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2024 and could run through until 5 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 26 Apr 2024 at 13:54.
8 and 12 Jul 2024
Southern Water are proposing to carry out Utility repair and maintenance works on Swift Road, Woolston, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2024 and could run through until 12 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 8 Apr 2024 at 12:18.
8 and 12 Jul 2024
Southern Water are proposing to carry out Utility repair and maintenance works on Church Road, Woolston, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2024 and could run through until 12 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 8 Apr 2024 at 12:18.
11 and 13 Jul 2024
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Speedfields Park, Fareham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 July 2024 and could run through until 13 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 11 Mar 2024 at 10:46.
11 and 13 Jul 2024
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Bridge Street, Titchfield, Fareham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 July 2024 and could run through until 13 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 8 Mar 2024 at 10:12.
14 and 18 Jul 2024
Portsmouth Waterworks Company are proposing to carry out Utility repair and maintenance works on Quay Street, Fareham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2024 and could run through until 18 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Portsmouth Waterworks Company on 23 Apr 2024 at 12:22.
14 Jul and 13 Sep 2024
Portsmouth Waterworks Company are proposing to carry out Utility repair and maintenance works on Harrison Road, Fareham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2024 and could run through until 13 September 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Portsmouth Waterworks Company on 26 Apr 2024 at 16:43.
15 Jul and 6 Sep 2024
Southampton City Council are proposing to carry out Works for road purposes on The Itchen Bridge Bus Lane, Woolston, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 6 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southampton City Council on 17 Jan 2024 at 14:37.
15 and 18 Jul 2024
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Kings Copse Avenue, Hedge End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 18 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 7 Mar 2024 at 15:49.
17 and 22 Jul 2024
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Heath House Lane, Hedge End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2024 and could run through until 22 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 7 Mar 2024 at 15:50.
21 Jul and 29 Aug 2024
Portsmouth Waterworks Company are proposing to carry out Utility repair and maintenance works on Greyshott Avenue, Fareham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2024 and could run through until 29 August 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Portsmouth Waterworks Company on 16 Oct 2023 at 12:24.
21 Jul and 28 Aug 2024
Southampton City Council are proposing to carry out Highway improvement works on The Grove, Sholing, Southampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2024 and could run through until 28 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southampton City Council on 12 Apr 2024 at 13:24.
21 Jul and 28 Aug 2024
Southampton City Council are proposing to carry out Highway improvement works on Botley Road, Bitterne, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2024 and could run through until 28 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 12 Apr 2024 at 13:24.
21 Jul and 28 Aug 2024
Southampton City Council are proposing to carry out Highway improvement works on Portsmouth Road, Woolston, Southampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2024 and could run through until 28 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southampton City Council on 12 Apr 2024 at 13:24.
21 Jul and 28 Aug 2024
Southampton City Council are proposing to carry out Highway improvement works on Portsmouth Road, Woolston, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2024 and could run through until 28 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 12 Apr 2024 at 13:23.
21 Jul and 28 Aug 2024
Southampton City Council are proposing to carry out Highway improvement works on Adey Close, Sholing, Southampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2024 and could run through until 28 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southampton City Council on 12 Apr 2024 at 13:24.
22 Jul and 30 Aug 2024
Portsmouth Waterworks Company are proposing to carry out Utility repair and maintenance works on Wynton Way, Fareham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 30 August 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Portsmouth Waterworks Company on 19 Mar 2024 at 15:28.
22 Jul and 12 Aug 2024
Portsmouth Waterworks Company are proposing to carry out Utility repair and maintenance works on Fareham Park Road, Fareham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 12 August 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Portsmouth Waterworks Company on 19 Mar 2024 at 11:26.
Roadworks Map near to SO31 7WY
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to SO31 7WY (30 Events)
(Scheduled Dates)
(miles)
(Scheduled: 24 Apr 2024 - 29 Apr 2024)
(Scheduled: 26 Apr 2024 - 1 May 2024)
Contains public sector information licensed under the Open Government Licence v3.0.