ROADWORKS SUMMARY
Malvern Gardens, SOUTHAMPTON, SO30 2UJ
Introduction
View current and future planned roadworks and road closures for Malvern Gardens, SO30 2UJ and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Malvern Gardens, SOUTHAMPTON, SO30 2UJ
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Malvern Gardens are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
Today
Southampton City Council are carrying out Highway repair and maintenance works on Cheriton Avenue Footpaths, Harefield, Southampton.
The works should not impact the carriageway.
The works started on 11 September 2023 at 09:49 and could run through until 25 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 29 Jun 2026 at 14:58.
25 Oct 2026
Hampshire County Council are carrying out Highway improvement works on Whiteley Way, Whiteley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 April 2024 at 07:30 and could run through until 25 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 26 Aug 2026 at 14:59.
7 Jul 2025 and 31 Oct 2026
Hampshire County Council are proposing to carry out Highway improvement works on Winchester Road, Fair Oak.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 31 October 2026. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Hampshire County Council on 27 Nov 2025 at 12:35.
7 Jul 2025 and 31 Oct 2026
Hampshire County Council are proposing to carry out Highway improvement works on Winchester Road, Fair Oak.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 31 October 2026. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Hampshire County Council on 27 Nov 2025 at 12:34.
7 Jul 2025 and 31 Oct 2026
Hampshire County Council are proposing to carry out Highway improvement works on Mortimers Lane, Fair Oak.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 31 October 2026. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Hampshire County Council on 27 Nov 2025 at 12:31.
Tuesday
Southampton City Council are carrying out Highway repair and maintenance works on The Itchen Bridge, Woolston, Southampton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 August 2025 at 19:00 and could run through until 29 September 2026. The works will impact the footway, carriageway, cycleway and footpath.
This roadwork event was last updated by Southampton City Council on 23 Sep 2026 at 11:32.
6 Apr 2027
Hampshire County Council are carrying out Highway improvement works on Woodhouse Lane, Botley.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 22 June 2026 at 08:00 and could run through until 6 April 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 9 Sep 2026 at 22:59.
12 Oct 2026
Hampshire County Council are carrying out Highway improvement works on Oatlands Road, Botley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 August 2026 at 07:30 and could run through until 12 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Hampshire County Council on 17 Aug 2026 at 12:42.
12 Oct 2026
Hampshire County Council are carrying out Highway improvement works on Crows Nest Lane, Botley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 August 2026 at 07:30 and could run through until 12 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 17 Aug 2026 at 12:43.
12 Oct 2026
Hampshire County Council are carrying out Highway improvement works on Maddoxford Lane, Botley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 August 2026 at 07:30 and could run through until 12 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Hampshire County Council on 17 Aug 2026 at 12:42.
12 Oct 2026
Hampshire County Council are carrying out Highway improvement works on Winchester Road, Botley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 August 2026 at 07:30 and could run through until 12 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 17 Aug 2026 at 12:41.
Wednesday
Hampshire County Council are carrying out Highway improvement works on Eastleigh Road, Fair Oak.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 September 2026 at 20:00 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 16 Sep 2026 at 14:12.
Wednesday
Hampshire County Council are carrying out Highway improvement works on Stubbington Way, Fair Oak.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 September 2026 at 20:00 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 16 Sep 2026 at 14:12.
Wednesday
Hampshire County Council are carrying out Highway improvement works on Botley Road, Fair Oak.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 September 2026 at 20:00 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 16 Sep 2026 at 14:13.
9 Oct 2026
Hampshire County Council are carrying out Highway repair and maintenance works on West End Road, West End.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 September 2026 at 07:30 and could run through until 9 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Hampshire County Council on 7 Sep 2026 at 08:15.
7 Sep and 12 Oct 2026
Hampshire County Council are proposing to carry out Highway improvement works on Crows Nest Lane, Botley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 September 2026 and could run through until 12 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 21 Aug 2026 at 10:28.
12 Oct 2026
Hampshire County Council are carrying out Highway improvement works on Crows Nest Lane, Botley.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 September 2026 at 09:00 and could run through until 12 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 7 Sep 2026 at 12:34.
Today
Hampshire County Council are proposing to carry out Highway improvement works on Dodwell Lane, Bursledon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2026 and could run through until 25 September 2026. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Hampshire County Council on 28 Aug 2026 at 11:54.
Today
Hampshire County Council are carrying out Highway improvement works on Dodwell Lane, Bursledon.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 September 2026 at 09:30 and could run through until 25 September 2026. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Hampshire County Council on 9 Sep 2026 at 14:05.
Today
Hampshire County Council are proposing to carry out Highway improvement works on Portsmouth Road, Bursledon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2026 and could run through until 25 September 2026. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Hampshire County Council on 28 Aug 2026 at 11:54.
Today
Hampshire County Council are carrying out Highway improvement works on Portsmouth Road, Bursledon.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 September 2026 at 09:30 and could run through until 25 September 2026. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Hampshire County Council on 9 Sep 2026 at 14:05.
Today
Hampshire County Council are carrying out Highway improvement works on Oakhill, Bursledon.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 September 2026 at 09:30 and could run through until 25 September 2026. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Hampshire County Council on 9 Sep 2026 at 14:04.
Today
Hampshire County Council are proposing to carry out Highway improvement works on Providence Hill, Bursledon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2026 and could run through until 25 September 2026. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Hampshire County Council on 28 Aug 2026 at 11:54.
Today
Hampshire County Council are carrying out Highway improvement works on Providence Hill, Bursledon.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 September 2026 at 09:30 and could run through until 25 September 2026. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Hampshire County Council on 9 Sep 2026 at 14:04.
24 Dec 2026
Network Rail are carrying out Works for Rail Purposes on Priory Road, Portswood, Southampton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 September 2026 at 22:00 and could run through until 24 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 12 Sep 2026 at 07:10.
Wednesday
Southampton City Council were proposing to carry out Highway improvement works on Doyle Court, Woolston, Southampton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 September 2026 and run through until 30 September 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southampton City Council on 4 Sep 2026 at 07:46.
5 Oct 2026
Scottish Hydro Electric Power Dis are carrying out New service connection on Winchester Road, Bishops Waltham.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 08:00 and could run through until 5 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Sep 2026 at 09:40.
26 Oct 2026
Southern Gas Networks are carrying out Utility repair and maintenance works on Highbridge Road, Highbridge.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2026 at 14:45 and could run through until 26 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 16 Sep 2026 at 15:14.
23 Oct 2026
Southern Gas Networks are carrying out Utility repair and maintenance works on Allbrook Hill, Eastleigh.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2026 at 14:45 and could run through until 23 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 22 Sep 2026 at 15:44.
Thursday
Southern Gas Networks are carrying out Utility repair and maintenance works on Spring Road, Peartree, Southampton.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 September 2026 at 11:00 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 22 Sep 2026 at 16:25.
Today
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Pound Road, Bursledon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 15 Jul 2026 at 12:02.
Today
Hampshire County Council are carrying out Highway repair and maintenance works on Pound Road, Bursledon.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 September 2026 at 08:58 and could run through until 25 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 21 Sep 2026 at 09:09.
Today
Southampton City Council are proposing to carry out Highway improvement works on Kingsway, Bargate, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 24 Aug 2026 at 07:42.
Today
Southern Water were proposing to carry out Utility repair and maintenance works on Monastery Road, Bitterne Park, Southampton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 September 2026 and run through until 25 September 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 24 Aug 2026 at 12:24.
21 Sep and 6 Oct 2026
Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Thomas Lewis Way, Portswood, Southampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 6 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 10 Sep 2026 at 15:48.
21 Sep and 2 Oct 2026
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Avenue Road, Bevois, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Aug 2026 at 15:42.
2 Oct 2026
Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Avenue Road, Bevois, Southampton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 September 2026 at 11:30 and could run through until 2 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Sep 2026 at 13:11.
21 Sep and 18 Oct 2026
Southampton City Council are proposing to carry out Highway improvement works on Glen Eyre Road, Bassett, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 18 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southampton City Council on 21 Aug 2026 at 13:55.
18 Oct 2026
Southampton City Council are carrying out Highway improvement works on Glen Eyre Road, Bassett, Southampton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 September 2026 at 07:30 and could run through until 18 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southampton City Council on 21 Sep 2026 at 09:26.
15 Dec 2026
Southern Gas Networks are carrying out Utility repair and maintenance works on Fair Oak Road, Bishopstoke.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 September 2026 at 11:00 and could run through until 15 December 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 23 Sep 2026 at 12:01.
Monday
Southern Water are carrying out Utility repair and maintenance works on Chapel Road, West End.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 September 2026 at 10:00 and could run through until 28 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 22 Sep 2026 at 15:49.
Tuesday
Southern Gas Networks are carrying out Utility repair and maintenance works on Meggeson Avenue, Bitterne Park, Southampton.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 September 2026 at 11:15 and could run through until 29 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Sep 2026 at 15:56.
Tomorrow
Southampton City Council are carrying out Highway improvement works on Kingsway, Bargate, Southampton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 September 2026 at 20:00 and could run through until 26 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 24 Sep 2026 at 08:40.
23 Sep and 9 Oct 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bursledon Road, Hedge End.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 Jul 2026 at 12:11.
23 Sep and 9 Oct 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pretoria Road, Hedge End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 Jul 2026 at 12:09.
Thursday
Hampshire County Council are carrying out Highway improvement works on Sandy Lane, Fair Oak.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 September 2026 at 20:00 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 24 Sep 2026 at 09:14.
Wednesday
Hampshire County Council are carrying out Highway repair and maintenance works on Ratcliffe Road, Hedge End.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 September 2026 at 07:37 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 25 Sep 2026 at 07:47.
28 Sep and 2 Nov 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sholing Road, Peartree, Southampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 2 November 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 27 Mar 2026 at 10:17.
28 Sep and 2 Nov 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sholing Road, Peartree, Southampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 2 November 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 21 Sep 2026 at 11:24.
Wednesday
Southampton City Council are proposing to carry out Highway improvement works on Lime Avenue, Sholing, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 25 Jun 2026 at 15:50.
Wednesday
Southampton City Council are proposing to carry out Highway improvement works on London Road, Bevois, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 14 Jul 2026 at 15:23.
28 Sep and 5 Dec 2026
Southampton City Council are proposing to carry out Highway improvement works on Angel Crescent, Bitterne, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 5 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 29 Jul 2026 at 16:22.
28 Sep and 5 Dec 2026
Southampton City Council are proposing to carry out Highway improvement works on Angel Crescent, Bitterne, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 5 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 11 Sep 2026 at 07:47.
28 Sep and 5 Dec 2026
Southampton City Council are proposing to carry out Highway improvement works on Peartree Avenue, Peartree, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 5 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 29 Jul 2026 at 16:08.
28 Sep and 5 Dec 2026
Southampton City Council are proposing to carry out Highway improvement works on Peartree Avenue, Peartree, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 5 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 11 Sep 2026 at 07:46.
28 Sep and 23 Oct 2026
Cityfibre Metro Networks are proposing to carry out Utility asset works on Lower Northam Road, Hedge End.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 6 Sep 2026 at 23:36.
28 Sep and 5 Dec 2026
Southampton City Council are proposing to carry out Highway improvement works on Angel Crescent, Bitterne, Southampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 5 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southampton City Council on 29 Jul 2026 at 16:29.
28 Sep and 5 Dec 2026
Southampton City Council are proposing to carry out Highway improvement works on Angel Crescent, Bitterne, Southampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 5 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southampton City Council on 18 Sep 2026 at 14:47.
28 Sep and 5 Dec 2026
Southampton City Council are proposing to carry out Highway improvement works on Bitterne Road, Peartree, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 5 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 29 Jul 2026 at 16:09.
28 Sep and 5 Dec 2026
Southampton City Council are proposing to carry out Highway improvement works on Bitterne Road, Peartree, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 5 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 11 Sep 2026 at 07:47.
28 Sep and 4 Dec 2026
Southampton City Council are proposing to carry out Highway improvement works on West End Road, Harefield, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 4 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 29 Jul 2026 at 15:59.
28 Sep and 4 Dec 2026
Southampton City Council are proposing to carry out Highway improvement works on West End Road, Harefield, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 4 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 11 Sep 2026 at 07:45.
28 Sep and 16 Oct 2026
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Botley Road, West End.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Hampshire County Council on 24 Sep 2026 at 12:59.
Wednesday
Southampton City Council are proposing to carry out Highway improvement works on Portswood Road, Portswood, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 7 Aug 2026 at 10:17.
Wednesday
Southampton City Council are proposing to carry out Highway improvement works on Portswood Road, Portswood, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 25 Aug 2026 at 13:26.
Wednesday
Southampton City Council are proposing to carry out Highway improvement works on Kitchener Road, Swaythling, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 7 Aug 2026 at 10:17.
Wednesday
Southampton City Council are proposing to carry out Highway improvement works on Kitchener Road, Swaythling, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 25 Aug 2026 at 13:26.
Wednesday
Southampton City Council are proposing to carry out Highway improvement works on Sirdar Road, Swaythling, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 7 Aug 2026 at 10:16.
Wednesday
Southampton City Council are proposing to carry out Highway improvement works on Sirdar Road, Swaythling, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 25 Aug 2026 at 13:26.
28 Sep and 2 Oct 2026
Hampshire County Council are proposing to carry out Highway improvement works on Snakemoor Lane, Durley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 20 Apr 2026 at 14:23.
Wednesday
BT are proposing to carry out Utility asset works on Knowle Hill, Eastleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by BT on 30 Jun 2026 at 16:22.
29 Sep and 13 Oct 2026
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Kew Lane, Bursledon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2026 and could run through until 13 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 24 Aug 2026 at 11:28.
29 Sep and 2 Oct 2026
Southampton City Council are proposing to carry out Highway improvement works on London Road, Bevois, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 23 Sep 2026 at 15:59.
30 Sep and 15 Oct 2026
Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Horseshoe Bridge, Portswood, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2026 and could run through until 15 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 16 Sep 2026 at 16:07.
30 Sep and 15 Oct 2026
Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Thomas Lewis Way, Portswood, Southampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2026 and could run through until 15 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Sep 2026 at 15:09.
1 and 6 Oct 2026
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Longclose Road, Hedge End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2026 and could run through until 6 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 11 Sep 2026 at 10:53.
2 and 19 Oct 2026
Hampshire County Council are proposing to carry out Highway improvement works on Coniston Road, Eastleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 30 Jul 2026 at 12:10.
5 and 8 Oct 2026
Southampton City Council are proposing to carry out Highway improvement works on Lime Avenue, Sholing, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 8 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 8 Sep 2026 at 15:24.
5 and 23 Oct 2026
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Kings Park Road, Bevois, Southampton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 October 2026 and run through until 23 October 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Sep 2026 at 15:48.
5 Oct 2026 and 14 Feb 2027
Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Turnpike Way, Hedge End.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 October 2026 and run through until 14 February 2027. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Sep 2026 at 14:57.
5 Oct and 13 Dec 2026
Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Turnpike Way, Hedge End.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 13 December 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Sep 2026 at 23:06.
5 Oct and 13 Dec 2026
Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Turnpike Way, Hedge End.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 13 December 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 23 Sep 2026 at 10:23.
5 Oct and 1 Nov 2026
Hampshire County Council are proposing to carry out Highway improvement works on Mortimers Lane, Fair Oak.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 1 November 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 24 Sep 2026 at 14:39.
5 and 7 Oct 2026
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Bodycoats Road, Chandler's Ford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 7 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 16 Jul 2026 at 09:27.
5 and 7 Oct 2026
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Bodycoats Road, Chandler's Ford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 7 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 28 Jul 2026 at 10:48.
5 and 30 Oct 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Allbrook Hill, Eastleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 30 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 26 Mar 2026 at 07:50.
7 and 9 Oct 2026
Hampshire County Council are proposing to carry out Highway repair and maintenance works on West End Road, West End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2026 and could run through until 9 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 22 Jul 2026 at 12:02.
7 and 9 Oct 2026
Cityfibre Metro Networks are proposing to carry out Utility asset works on Quob Lane, West End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2026 and could run through until 9 October 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 25 Aug 2026 at 13:27.
7 and 9 Oct 2026
Cityfibre Metro Networks are proposing to carry out Utility asset works on Quob Lane, West End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2026 and could run through until 9 October 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 4 Sep 2026 at 15:58.
9 Oct and 2 Nov 2026
Hampshire County Council are proposing to carry out Highway repair and maintenance works on West End Road, West End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Hampshire County Council on 27 Aug 2026 at 14:25.
9 and 12 Oct 2026
Southern Water were proposing to carry out Utility repair and maintenance works on Wide Lane, Swaythling, Southampton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 October 2026 and run through until 12 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 1 Sep 2026 at 13:23.
12 and 16 Oct 2026
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Titchfield Lane, Wickham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 18 Sep 2026 at 08:09.
12 and 30 Oct 2026
Southampton City Council are proposing to carry out Highway improvement works on Doyle Court, Woolston, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southampton City Council on 4 Sep 2026 at 08:35.
12 and 30 Oct 2026
Southampton City Council are proposing to carry out Highway improvement works on Doyle Court, Woolston, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southampton City Council on 10 Sep 2026 at 16:43.
12 and 14 Oct 2026
Southampton City Council are proposing to carry out Highway improvement works on Lime Avenue, Sholing, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 24 Sep 2026 at 19:21.
12 Oct and 20 Nov 2026
Cityfibre Metro Networks are proposing to carry out Utility asset works on Bursledon Road, Hedge End.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 20 November 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 3 Sep 2026 at 23:35.
12 and 23 Oct 2026
Southampton City Council are proposing to carry out Highway repair and maintenance works on Itchenside Close, Swaythling, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 17 Sep 2026 at 14:47.
12 and 23 Oct 2026
National Highways were proposing to carry out Highway repair and maintenance works on Leigh Road, Eastleigh.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 October 2026 and run through until 23 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by National Highways on 18 Sep 2026 at 23:19.
12 and 23 Oct 2026
National Highways are proposing to carry out Highway repair and maintenance works on Leigh Road, Eastleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 7 May 2026 at 10:53.
12 and 23 Oct 2026
National Highways were proposing to carry out Highway repair and maintenance works on Leigh Road, Eastleigh.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 October 2026 and run through until 23 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by National Highways on 18 Sep 2026 at 23:19.
13 and 26 Oct 2026
Hampshire County Council were proposing to carry out Highway improvement works on Kelvin Road, Eastleigh.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 October 2026 and run through until 26 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 24 Aug 2026 at 13:37.
13 and 26 Oct 2026
Hampshire County Council were proposing to carry out Highway improvement works on Tennyson Road, Eastleigh.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 October 2026 and run through until 26 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 24 Aug 2026 at 13:37.
13 and 26 Oct 2026
Hampshire County Council were proposing to carry out Highway repair and maintenance works on Chadwick Road, Eastleigh.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 October 2026 and run through until 26 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 24 Aug 2026 at 13:38.
14 Oct and 6 Nov 2026
Hampshire County Council are proposing to carry out Diversionary works on Winchester Street, Botley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2026 and could run through until 6 November 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 1 Jul 2026 at 10:24.
14 Oct and 6 Nov 2026
Scottish Hydro Electric Power Dis are proposing to carry out Disconnection or alteration of supply on Winchester Street, Botley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2026 and could run through until 6 November 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Jul 2026 at 23:11.
14 and 16 Oct 2026
Hampshire County Council are proposing to carry out Highway repair and maintenance works on West End Road, West End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 24 Jul 2026 at 14:31.
15 Oct 2026 and 1 Mar 2027
Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Empress Road, Bevois, Southampton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 October 2026 and could run through until 1 March 2027. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 23 Sep 2026 at 16:00.
16 Oct and 2 Dec 2026
Hampshire County Council are proposing to carry out Works for road purposes on Hamble Lane, Hamble-le-rice.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2026 and could run through until 2 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 25 Jun 2026 at 13:25.
19 Oct and 2 Nov 2026
Hampshire County Council are proposing to carry out Works for road purposes on Hamble Lane, Hamble-le-rice.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 23 Jun 2026 at 11:51.
19 and 22 Oct 2026
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Hamble Lane, Netley Abbey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 22 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 3 Sep 2026 at 23:39.
19 Oct and 6 Nov 2026
Cityfibre Metro Networks are proposing to carry out Utility asset works on Peewit Hill, Bursledon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 6 November 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 25 Aug 2026 at 12:59.
19 Oct and 6 Nov 2026
Cityfibre Metro Networks are proposing to carry out Utility asset works on Peewit Hill, Bursledon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 6 November 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 7 Sep 2026 at 11:47.
19 and 21 Oct 2026
BT are proposing to carry out Utility asset works on Bitterne Road East (Service Road), Harefield, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 21 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 17 Jul 2026 at 09:42.
19 and 21 Oct 2026
Southampton City Council are proposing to carry out Highway repair and maintenance works on Fritham Road, Harefield, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 21 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southampton City Council on 15 Sep 2026 at 15:34.
19 Oct and 7 Nov 2026
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Winchester Road, Bishops Waltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 7 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 24 Apr 2026 at 13:21.
19 Oct and 13 Nov 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Haig Road, Bishopstoke.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Jun 2026 at 11:38.
19 Oct and 30 Nov 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Twyford Road, Eastleigh.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 30 November 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 26 Mar 2026 at 07:49.
20 and 23 Oct 2026
NWP Street (formerly New World Payphones) are proposing to carry out Highway improvement works on Mayfield Road, Swaythling, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by NWP Street (formerly New World Payphones) on 28 Aug 2026 at 13:27.
20 and 23 Oct 2026
NWP Street (formerly New World Payphones) are proposing to carry out Highway improvement works on Mayfield Road, Swaythling, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by NWP Street (formerly New World Payphones) on 9 Sep 2026 at 15:59.
21 and 24 Oct 2026
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Hamble Lane, Netley Abbey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2026 and could run through until 24 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 14 Sep 2026 at 16:09.
21 and 24 Oct 2026
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Hamble Lane, Netley Abbey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2026 and could run through until 24 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 16 Sep 2026 at 13:59.
21 and 23 Oct 2026
Network Rail are proposing to carry out Works for Rail Purposes on Mount Pleasant Road, Bevois, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 8 Dec 2025 at 09:36.
21 and 23 Oct 2026
Network Rail are proposing to carry out Works for Rail Purposes on Mount Pleasant Road, Bevois, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 24 Sep 2026 at 16:05.
24 Oct and 10 Nov 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pound Road, Bursledon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2026 and could run through until 10 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 May 2026 at 12:02.
24 Oct and 2 Nov 2026
Network Rail are proposing to carry out Works for Rail Purposes on Mount Pleasant Road, Bevois, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 13 Feb 2026 at 08:42.
26 and 30 Oct 2026
BT are proposing to carry out Utility asset works on Wessex Lane, Swaythling, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 16 Jun 2026 at 14:42.
26 and 30 Oct 2026
Southampton City Council were proposing to carry out Highway improvement works on Wide Lane, Swaythling, Southampton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 October 2026 and run through until 30 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 8 Sep 2026 at 17:38.
26 and 30 Oct 2026
Southampton City Council are proposing to carry out Highway improvement works on Wide Lane, Swaythling, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 8 Sep 2026 at 17:44.
26 and 30 Oct 2026
Southampton City Council are proposing to carry out Highway improvement works on Wide Lane, Swaythling, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 9 Sep 2026 at 14:59.
26 and 30 Oct 2026
Hampshire County Council are proposing to carry out Highway improvement works on Snakemoor Lane, Durley, Botley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 24 Sep 2026 at 12:58.
26 and 30 Oct 2026
Southern Water are proposing to carry out Utility repair and maintenance works on New Road, Colden Common.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 25 Aug 2026 at 13:02.
2 and 6 Nov 2026
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Titchfield Lane, Wickham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 24 Sep 2026 at 06:47.
2 and 6 Nov 2026
Scottish Hydro Electric Power Dis are proposing to carry out New service connection on South East Road, Sholing, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Aug 2026 at 11:47.
2 and 6 Nov 2026
Cityfibre Metro Networks are proposing to carry out Utility asset works on Telegraph Road, West End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 4 Sep 2026 at 00:04.
2 and 6 Nov 2026
Cityfibre Metro Networks are proposing to carry out Utility asset works on Telegraph Road, West End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 7 Sep 2026 at 11:46.
2 and 4 Nov 2026
BT are proposing to carry out Utility asset works on Kytes Lane, Durley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 4 November 2026. The works will impact the verge only.
This roadwork event was last updated by BT on 31 Jul 2026 at 13:07.
2 and 6 Nov 2026
Southern Water are proposing to carry out Utility repair and maintenance works on New Road, Colden Common.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 28 Aug 2026 at 12:48.
2 and 6 Nov 2026
Southern Water are proposing to carry out Utility repair and maintenance works on New Road, Colden Common.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 9 Sep 2026 at 23:22.
3 and 11 Nov 2026
Hampshire County Council are proposing to carry out Highway improvement works on Botley Road, Swanwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2026 and could run through until 11 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 20 Jul 2026 at 14:19.
4 and 13 Nov 2026
Southern Water are proposing to carry out Utility repair and maintenance works on West End Road, Harefield, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 3 Jul 2026 at 09:44.
5 and 18 Nov 2026
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Kew Lane, Bursledon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2026 and could run through until 18 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 28 Aug 2026 at 12:54.
5 and 12 Nov 2026
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Heath House Lane, Hedge End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2026 and could run through until 12 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 23 Sep 2026 at 15:27.
5 and 13 Nov 2026
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Durley Street, Durley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2026 and could run through until 13 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 7 Sep 2026 at 14:55.
5 and 14 Nov 2026
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Durley Street, Durley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2026 and could run through until 14 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 14 Sep 2026 at 14:47.
5 and 14 Nov 2026
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Durley Street, Durley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2026 and could run through until 14 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 15 Sep 2026 at 09:07.
9 and 18 Nov 2026
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Kew Lane, Bursledon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 18 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 22 Sep 2026 at 15:44.
9 and 18 Nov 2026
Hampshire County Council are proposing to carry out Highway improvement works on Botley Road, Burridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 18 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 14 Jul 2026 at 08:36.
9 and 11 Nov 2026
Southampton City Council are proposing to carry out Highway improvement works on Bramley Crescent, Sholing, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 11 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 18 Sep 2026 at 21:26.
9 and 11 Nov 2026
Southampton City Council are proposing to carry out Highway improvement works on Bramley Crescent, Sholing, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 11 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 18 Sep 2026 at 21:20.
9 and 23 Nov 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Spring Road, Peartree, Southampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 23 November 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 27 Mar 2026 at 14:01.
9 and 30 Nov 2026
Cityfibre Metro Networks are proposing to carry out Utility asset works on Moorgreen Road, West End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 30 November 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 26 Aug 2026 at 10:02.
9 and 25 Nov 2026
Hampshire County Council are proposing to carry out Highway improvement works on Michaels Way, Fair Oak.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 25 November 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 6 Aug 2026 at 16:33.
9 and 27 Nov 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Winchester Road, Fishers Pond.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 27 November 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 17 Jun 2026 at 10:09.
9 and 27 Nov 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Portsmouth Road, Fishers Pond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 27 November 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 24 Jun 2026 at 13:47.
10 and 18 Nov 2026
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Rosebery Crescent, Eastleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2026 and could run through until 18 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 3 Sep 2026 at 23:29.
15 and 20 Nov 2026
Southern Water are proposing to carry out Utility repair and maintenance works on Cedar Road, Eastleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 18 Jun 2026 at 23:47.
16 Nov and 2 Dec 2026
Hampshire County Council are proposing to carry out Works for road purposes on Hamble Lane, Hamble-le-rice.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 2 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 27 Jun 2026 at 00:00.
16 and 30 Nov 2026
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Sherwood Avenue, Hedge End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Hampshire County Council on 19 Mar 2026 at 13:11.
16 and 20 Nov 2026
Southern Water are proposing to carry out Utility repair and maintenance works on Clovelly Road, Bevois, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 19 Aug 2026 at 16:30.
16 and 19 Nov 2026
Southampton City Council are proposing to carry out Highway repair and maintenance works on Chessel Crescent, Peartree, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 19 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 27 Aug 2026 at 10:23.
16 and 20 Nov 2026
Southern Water are proposing to carry out Utility repair and maintenance works on Gordon Avenue, Bevois, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 19 Aug 2026 at 16:31.
16 and 18 Nov 2026
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Lower Chase Road, Waltham Chase.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 18 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 7 Sep 2026 at 14:50.
16 and 18 Nov 2026
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Lower Chase Road, Waltham Chase.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 18 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 14 Sep 2026 at 13:51.
19 and 27 Nov 2026
Hampshire County Council are proposing to carry out Highway improvement works on Hungerford, Bursledon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 22 Feb 2026 at 23:10.
19 and 27 Nov 2026
Hampshire County Council are proposing to carry out Highway improvement works on Kew Lane, Bursledon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 22 Feb 2026 at 23:10.
19 and 23 Nov 2026
Southampton City Council are proposing to carry out Highway improvement works on Lime Avenue, Sholing, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southampton City Council on 24 Sep 2026 at 19:37.
23 and 27 Nov 2026
Southern Water are proposing to carry out Utility repair and maintenance works on Lyon Street, Bevois, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 1 Sep 2026 at 13:26.
23 and 27 Nov 2026
Southern Water are proposing to carry out Utility repair and maintenance works on Lyon Street, Bevois, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 4 Sep 2026 at 16:00.
23 and 27 Nov 2026
Southern Water are proposing to carry out Utility repair and maintenance works on Lyon Street, Bevois, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 16 Sep 2026 at 15:59.
23 and 27 Nov 2026
Southern Water are proposing to carry out Utility repair and maintenance works on Exford Avenue, Harefield, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 25 Sep 2026 at 08:47.
23 Nov and 4 Dec 2026
Southern Water were proposing to carry out Utility repair and maintenance works on Thompsons Lane, Owslebury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 November 2026 and run through until 4 December 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 24 Aug 2026 at 14:33.
25 and 27 Nov 2026
Southampton City Council are proposing to carry out Highway repair and maintenance works on Forster Road, Bevois, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southampton City Council on 27 Aug 2026 at 10:22.
25 and 30 Nov 2026
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Rosebery Crescent, Eastleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2026 and could run through until 30 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 22 Sep 2026 at 12:13.
30 Nov and 4 Dec 2026
Southern Water are proposing to carry out Utility repair and maintenance works on Frederick Street, Bevois, Southampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 4 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 18 Sep 2026 at 16:06.
30 Nov and 18 Dec 2026
Hampshire County Council are proposing to carry out Highway improvement works on Station Hill, Curdridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 18 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 11 Sep 2026 at 14:51.
30 Nov and 19 Dec 2026
Hampshire County Council are proposing to carry out Highway improvement works on Mortimers Lane, Fair Oak.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 19 December 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 16 Sep 2026 at 08:17.
30 Nov and 19 Dec 2026
Hampshire County Council are proposing to carry out Highway improvement works on Mortimers Lane, Fair Oak.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 19 December 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 18 Sep 2026 at 10:26.
30 Nov and 2 Dec 2026
BT are proposing to carry out Utility asset works on Stoke Park Road, Bishopstoke.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 2 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 1 Sep 2026 at 11:37.
7 and 18 Dec 2026
Southern Water are proposing to carry out Utility repair and maintenance works on Botley Road, Swanwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 18 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 7 Sep 2026 at 13:18.
7 and 18 Dec 2026
Southern Water are proposing to carry out Utility repair and maintenance works on Botley Road, Swanwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 18 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 7 Sep 2026 at 15:11.
7 and 18 Dec 2026
Southern Water are proposing to carry out Utility repair and maintenance works on Botley Road, Swanwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 18 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 8 Sep 2026 at 07:50.
7 and 19 Dec 2026
National Highways are proposing to carry out Highway repair and maintenance works on Leigh Road, Eastleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 19 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 1 Sep 2026 at 11:32.
Roadworks Map near to Malvern Gardens, SOUTHAMPTON, SO30 2UJ
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Malvern Gardens, SOUTHAMPTON, SO30 2UJ (13 Events)
(Scheduled Dates)
(miles)
(Scheduled: 17 Aug 2026 - 12 Oct 2026)
(Scheduled: 17 Aug 2026 - 12 Oct 2026)
(Scheduled: 24 Sep 2026 - 28 Sep 2026)
(Scheduled: 7 Sep 2026 - 12 Oct 2026)
(Scheduled: 17 Aug 2026 - 12 Oct 2026)
(Scheduled: 22 Jun 2026 - 6 Apr 2027)
Contains public sector information licensed under the Open Government Licence v3.0.