ROADWORKS SUMMARY
Hill Terrace, ALRESFORD, SO24 9BB

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Hill Terrace, SO24 9BB and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Hill Terrace, ALRESFORD, SO24 9BB

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Hill Terrace are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Hampshire County Council logo
LONG TERM
Until
21 Feb 2025
Details
View Map
Share
Follow
Alresford Bypass

Hampshire County Council are carrying out Highway improvement works on Alresford Bypass, Alresford.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 March 2024 at 08:00 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 18 Mar 2024 at 13:12.

Hampshire County Council logo
LONG TERM
Until
11 May 2025
Details
View Map
Share
Follow
Whitehill Lane

Hampshire County Council are carrying out Highway improvement works on Whitehill Lane, Alresford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 May 2024 at 08:00 and could run through until 11 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 8 May 2024 at 07:12.

Hampshire County Council logo
LONG TERM
Until
11 May 2025
Details
View Map
Share
Follow
Whitehill Lane

Hampshire County Council are carrying out Highway improvement works on Whitehill Lane, Bishops Sutton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 May 2024 at 07:00 and could run through until 11 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 8 May 2024 at 06:13.

Southern Gas Networks logo
LONG TERM
Between
27 Aug 2024 and 16 May 2025
Details
View Map
Share
Follow
Tichborne Down

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tichborne Down, Alresford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2024 and could run through until 16 May 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 5 Jul 2024 at 09:43.

Southern Gas Networks logo
LONG TERM
Between
27 Aug 2024 and 16 May 2025
Details
View Map
Share
Follow
Sun Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sun Lane, Alresford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2024 and could run through until 16 May 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 5 Jul 2024 at 09:38.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Spring Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Spring Way, Alresford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 24 Sep 2024 at 12:36.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Spring Way

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Spring Way, Alresford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2024 and run through until 29 November 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 14:08.

Southern Gas Networks logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Ashburton Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Ashburton Road, Alresford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 10:30 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 14:03.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
South Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on South Close, Alresford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Sep 2024 at 15:44.

Southern Gas Networks logo
Between
11 Nov and 6 Dec 2024
Details
View Map
Share
Spring Way

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Spring Way, Alresford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 6 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 14:37.

Southern Gas Networks logo
LONG TERM
Between
11 Nov 2024 and 9 Feb 2025
Details
View Map
Share
Spring Way

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Spring Way, Alresford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 9 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 11:47.

Southern Gas Networks logo
Between
11 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Spring Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Spring Way, Alresford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 14:59.

Southern Gas Networks logo
Until
9 Dec 2024
Details
View Map
Share
Follow
Spring Way

Southern Gas Networks are carrying out Utility repair and maintenance works on Spring Way, Alresford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 11:45 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 11:52.

Hampshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Kilmeston Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Kilmeston Road, Kilmeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 26 Nov 2024 at 14:02.

Southern Gas Networks logo
Between
30 Nov and 16 Dec 2024
Details
View Map
Share
Follow
New Farm Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on New Farm Road, Alresford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2024 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 11:16.

Southern Gas Networks logo
Between
2 and 15 Dec 2024
Details
View Map
Share
Follow
Ashburton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashburton Road, Alresford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 15 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 12:15.

Southern Gas Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Ashburton Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Ashburton Road, Alresford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 14:53.

Southern Gas Networks logo
Between
2 and 15 Dec 2024
Details
View Map
Share
Follow
Ashburton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashburton Road, Alresford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 15 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 15:02.

Southern Gas Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
New Farm Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on New Farm Road, Alresford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Oct 2024 at 16:42.

Southern Gas Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
New Farm Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on New Farm Road, Alresford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 14:14.

Scottish Hydro Electric Power Dis logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Colden Lane

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Colden Lane, Old Alresford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the verge only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Sep 2024 at 13:41.

Scottish Hydro Electric Power Dis logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Colden Lane

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Colden Lane, Old Alresford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the verge only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 5 Sep 2024 at 14:57.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 2 May 2025
Details
View Map
Share
Grange Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Grange Road, Alresford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 2 May 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 13:59.

Southern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
New Farm Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on New Farm Road, Alresford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 15:56.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 2 May 2025
Details
View Map
Share
Follow
Grange Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grange Road, Alresford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Oct 2024 at 16:41.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 2 May 2025
Details
View Map
Share
Follow
Grange Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grange Road, Alresford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 11:54.

Southern Gas Networks logo
Between
6 and 15 Jan 2025
Details
View Map
Share
Follow
New Farm Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on New Farm Road, Alresford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 15:14.

Hampshire County Council logo
LONG TERM
Between
13 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Winchester Road

Hampshire County Council are proposing to carry out Highway improvement works on Winchester Road, Four Marks, Alton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 8 Nov 2024 at 09:14.

Hampshire County Council logo
LONG TERM
Between
13 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Winchester Road

Hampshire County Council are proposing to carry out Highway improvement works on Winchester Road, Four Marks, Alton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 8 Nov 2024 at 14:27.

Hampshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Beauworth Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Beauworth Road, Beauworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 18 Nov 2024 at 15:27.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 9 May 2025
Details
View Map
Share
Follow
Grange Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grange Road, Alresford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 9 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 14:37.

Hampshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Beauworth Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Beauworth Road, Beauworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 20 Nov 2024 at 09:52.

South East Water logo
Between
16 and 20 Jan 2025
Details
View Map
Share
Follow
Dunsells Lane

South East Water are proposing to carry out Utility asset works on Dunsells Lane, Ropley, Alresford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 15 Nov 2024 at 14:51.

South East Water logo
Between
16 and 20 Jan 2025
Details
View Map
Share
Follow
Dunsells Lane

South East Water are proposing to carry out Utility asset works on Dunsells Lane, Ropley, Alresford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 14 Nov 2024 at 11:22.

Southern Gas Networks logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
South Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on South Road, Alresford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Oct 2024 at 16:29.

Southern Water logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Itchen Down

Southern Water are proposing to carry out Utility repair and maintenance works on Itchen Down, Itchen Abbas.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Water on 13 Nov 2024 at 16:45.

Southern Water logo
Between
17 and 27 Feb 2025
Details
View Map
Share
Follow
Itchen Down

Southern Water are proposing to carry out Utility repair and maintenance works on Itchen Down, Itchen Abbas.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 27 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Water on 14 Nov 2024 at 10:11.

Southern Water logo
Between
17 and 27 Feb 2025
Details
View Map
Share
Follow
Itchen Down

Southern Water are proposing to carry out Utility repair and maintenance works on Itchen Down, Itchen Abbas.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 27 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Water on 14 Nov 2024 at 15:26.

Southern Gas Networks logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
South Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on South Road, Alresford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Sep 2024 at 15:53.


Roadworks Map near to Hill Terrace, ALRESFORD, SO24 9BB

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Nov 2024 06:25
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Hill Terrace, ALRESFORD, SO24 9BB (29 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cityfibre Metro Networks logo
EAST STREET 
(0.3 miles)
Cityfibre Metro Networks
Utility asset works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 18 Nov 2024 - 29 Nov 2024
0.3
Details
Share
Follow
2
Cityfibre Metro Networks logo
BISHOPS SUTTON ROAD 
(0.3 miles)
Cityfibre Metro Networks
Utility asset works - Footway, Carriageway - Two-way signals
Planned
Scheduled: 18 Nov 2024 - 29 Nov 2024
0.3
Details
Share
Follow
3
Southern Gas Networks logo
MAJOR
  
BEECH ROAD 
(0.4 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Give and take
In Progress
Since: 16 Oct 2024 09:30
(Scheduled: 14 Oct 2024 - 10 Dec 2024)
0.4
Details
Share
Follow
4
Southern Gas Networks logo
MAJOR
  
NURSERY ROAD 
(0.4 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Give and take
In Progress
Since: 10 Sep 2024 11:15
(Scheduled: 9 Sep 2024 - 20 Jan 2025)
0.4
Details
Share
Follow
5
Southern Gas Networks logo
MAJOR
  
SUN LANE 
(0.4 miles)
Southern Gas Networks
Optional permit (no fee) e.g. for traffic management etc - Footway, Carriageway, Verge - No carriageway incursion
In Progress
Since: 9 Sep 2024 09:00
(Scheduled: 3 Sep 2024 - 20 Jan 2025)
0.4
Details
Share
Follow
6
Southern Gas Networks logo
MAJOR
  
ASHBURTON ROAD 
(0.5 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Give and take
Planned
Scheduled: 11 Nov 2024 - 17 Jan 2025
0.5
Details
Share
Follow
7
Southern Gas Networks logo
MAJOR
  
ASHBURTON ROAD 
(0.5 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Give and take
Planned
Scheduled: 11 Nov 2024 - 17 Jan 2025
0.5
Details
Share
Follow
8
Southern Gas Networks logo
MAJOR
  
ASHBURTON ROAD 
(0.5 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Multi-way signals
In Progress
Since: 28 Oct 2024 10:30
(Scheduled: 28 Oct 2024 - 20 Dec 2024)
0.5
Details
Share
Follow
9
Southern Gas Networks logo
MAJOR
  
LOVELLS WALK 
(0.5 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Give and take
Planned
Scheduled: 18 Nov 2024 - 6 Dec 2024
0.5
Details
Share
Follow
10
Cityfibre Metro Networks logo
THE AVENUE 
(0.6 miles)
Cityfibre Metro Networks
Utility asset works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 18 Nov 2024 - 29 Nov 2024
0.6
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.