ROADWORKS SUMMARY
Farley Mount Road, WINCHESTER, SO21 2JE

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Farley Mount Road, SO21 2JE and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Farley Mount Road, WINCHESTER, SO21 2JE

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Farley Mount Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Southern Gas Networks logo
LONG TERM
Between
7 Aug and 11 Dec 2024
Details
View Map
Share
Harestock Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Harestock Road, Winchester.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 August 2024 and run through until 11 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Sep 2024 at 09:40.

Southern Gas Networks logo
LONG TERM
Between
14 Aug and 13 Dec 2024
Details
View Map
Share
Stockbridge Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Stockbridge Road, Winchester.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 August 2024 and run through until 13 December 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Sep 2024 at 09:50.

Hampshire County Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
North Drive

Hampshire County Council are carrying out Highway improvement works on North Drive, Littleton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 08:30 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 3 Dec 2024 at 12:09.

Hampshire County Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Fyfield Way

Hampshire County Council are carrying out Highway improvement works on Fyfield Way, Littleton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 08:30 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 3 Dec 2024 at 12:10.

Southern Gas Networks logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
Lakewood Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Lakewood Road, Chandler's Ford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 12:10 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 09:26.

Southern Gas Networks logo
LONG TERM
Until
22 Dec 2024
Details
View Map
Share
Follow
St Mary Street

Southern Gas Networks are carrying out Utility repair and maintenance works on St Mary Street, Winchester.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 October 2024 at 12:30 and could run through until 22 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 11:37.

Southern Gas Networks logo
LONG TERM
Between
7 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Stoney Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stoney Lane, Winchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 1 Oct 2024 at 14:49.

Southern Gas Networks logo
LONG TERM
Between
14 Oct 2024 and 27 Dec 2025
Details
View Map
Share
Follow
Lakewood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lakewood Road, Chandler's Ford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 27 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2024 at 15:56.

Hampshire County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Worthy Road

Hampshire County Council are carrying out Highway improvement works on Worthy Road, Winchester.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Hampshire County Council on 21 Oct 2024 at 13:23.

Hampshire County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Dyson Drive

Hampshire County Council are carrying out Highway improvement works on Dyson Drive, Winchester.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Hampshire County Council on 21 Oct 2024 at 08:22.

Southern Gas Networks logo
LONG TERM
Until
13 Dec 2024
Details
View Map
Share
Follow
Bereweeke Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Bereweeke Avenue, Winchester.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 October 2024 at 11:57 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 12:04.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Otterbourne Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Otterbourne Road, Compton.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 October 2024 at 10:07 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Nov 2024 at 11:21.

Southern Gas Networks logo
LONG TERM
Between
28 Oct 2024 and 14 Mar 2025
Details
View Map
Share
Follow
Harestock Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Harestock Road, Winchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 14 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 16:40.

Southern Gas Networks logo
LONG TERM
Between
6 Nov and 20 Dec 2024
Details
View Map
Share
Bradley Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Bradley Road, Harestock.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 November 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2024 at 09:37.

Southern Gas Networks logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
Meadow Way

Southern Gas Networks are carrying out Utility repair and maintenance works on Meadow Way, Badger Farm.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:10 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 15:21.

Southern Gas Networks logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
May Tree Close

Southern Gas Networks are carrying out Utility repair and maintenance works on May Tree Close, Badger Farm.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:10 and could run through until 16 December 2024. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 15:21.

Network Rail logo
LONG TERM
Between
11 Nov and 21 Dec 2024
Details
View Map
Share
Upper High Street

Network Rail were proposing to carry out Works for Rail Purposes on Upper High Street, Winchester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 21 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 21 Aug 2024 at 12:01.

Network Rail logo
Finishing
Saturday
Details
View Map
Share
Follow
Upper High Street

Network Rail are proposing to carry out Works for Rail Purposes on Upper High Street, Winchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 7 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 22 Aug 2024 at 15:50.

Network Rail logo
Finishing
Saturday
Details
View Map
Share
Follow
Upper High Street

Network Rail are carrying out Works for Rail Purposes on Upper High Street, Winchester.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 22:00 and could run through until 7 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 12 Nov 2024 at 09:08.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
London Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on London Road, Headbourne Worthy.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 4 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Sep 2024 at 15:49.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
London Road

Southern Gas Networks are carrying out Utility repair and maintenance works on London Road, Headbourne Worthy.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 10:00 and could run through until 4 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 10:32.

Southern Gas Networks logo
LONG TERM
Between
14 Nov and 27 Dec 2024
Details
View Map
Share
Bradley Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Bradley Road, Harestock.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 November 2024 and run through until 27 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 11:14.

Southern Gas Networks logo
Until
13 Dec 2024
Details
View Map
Share
Follow
Compton Way

Southern Gas Networks are carrying out Remedial works on Compton Way, Olivers Battery.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 11:30 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 19:02.

Southern Gas Networks logo
LONG TERM
Between
19 Nov 2024 and 14 Feb 2025
Details
View Map
Share
Follow
Lakewood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lakewood Road, Chandler's Ford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jul 2024 at 17:41.

Southern Gas Networks logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Fromond Road Footpaths

Southern Gas Networks are carrying out Utility repair and maintenance works on Fromond Road Footpaths, Winchester.

These works are categorised as Major.

The works started on 22 November 2024 at 11:10 and could run through until 20 December 2024. The works will impact the footway, verge and footpath.

This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 09:27.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Queen Street

Southern Gas Networks are carrying out Utility repair and maintenance works on Queen Street, Twyford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 11:05 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 12:25.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Shipley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shipley Road, Twyford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Sep 2024 at 18:23.

Southern Gas Networks logo
Between
25 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Ruffield Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ruffield Close, Winchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 16:03.

Hampshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Ridgeway

Hampshire County Council are carrying out Highway repair and maintenance works on Ridgeway, Badger Farm.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 November 2024 at 09:00 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 26 Nov 2024 at 09:08.

Hampshire County Council logo
LONG TERM
Between
1 Dec 2024 and 12 Jan 2025
Details
View Map
Share
Follow
Upper Brook Street

Hampshire County Council are proposing to carry out Works for road purposes on Upper Brook Street, Winchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2024 and could run through until 12 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 6 Nov 2024 at 15:55.

Southern Gas Networks logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Church Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Church Lane, Twyford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 14:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 15:08.

Southern Gas Networks logo
LONG TERM
Between
2 Dec 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Park Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Road, Winchester.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 11:05.

Hampshire County Council logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Andover Road North

Hampshire County Council are proposing to carry out Section 50 on Andover Road North, Winchester.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 18 Nov 2024 at 15:23.

Hampshire County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Bereweeke Road

Hampshire County Council are proposing to carry out Highway improvement works on Bereweeke Road, Winchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 13 Nov 2024 at 10:00.

Cityfibre Metro Networks logo
Between
3 and 16 Dec 2024
Details
View Map
Share
Easton Lane

Cityfibre Metro Networks were proposing to carry out Utility asset works on Easton Lane, Easton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Sep 2024 at 12:43.

Cityfibre Metro Networks logo
Between
3 and 16 Dec 2024
Details
View Map
Share
Follow
Easton Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Easton Lane, Easton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Sep 2024 at 15:06.

Southern Gas Networks logo
Between
4 and 20 Dec 2024
Details
View Map
Share
Follow
Brownhill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brownhill Road, Chandler's Ford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Dec 2024 at 20:13.

Hampshire County Council logo
Between
4 and 11 Dec 2024
Details
View Map
Share
Follow
Hiltingbury Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Hiltingbury Road, Chandler's Ford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 15 Aug 2024 at 12:44.

Hampshire County Council logo
Between
4 and 11 Dec 2024
Details
View Map
Share
Follow
Hiltingbury Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Hiltingbury Road, Chandler's Ford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 19 Aug 2024 at 10:06.

Scottish Hydro Electric Power Dis logo
Between
5 and 19 Dec 2024
Details
View Map
Share
Otterbourne Hill

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Otterbourne Hill, Otterbourne.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 December 2024 and run through until 19 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Nov 2024 at 15:06.

Hampshire County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Stanmore Lane

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Stanmore Lane, Winchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 10 Jun 2024 at 12:22.

Hampshire County Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Down Farm Lane

Hampshire County Council are proposing to carry out Section 50 on Down Farm Lane, Headbourne Worthy.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 27 Nov 2024 at 09:52.

Southern Gas Networks logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Park Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Lane, Twyford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 12:01.

Hampshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
The Street

Hampshire County Council are proposing to carry out Highway repair and maintenance works on The Street, Rotherwick, Hook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 15 Nov 2024 at 15:51.

Hampshire County Council logo
Between
10 and 13 Dec 2024
Details
View Map
Share
Follow
North Millers Dale

Hampshire County Council are proposing to carry out Highway repair and maintenance works on North Millers Dale, Chandler's Ford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 23 Sep 2024 at 09:00.

Scottish Hydro Electric Power Dis logo
Between
10 and 13 Dec 2024
Details
View Map
Share
Follow
Wellhouse Lane

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Wellhouse Lane, Headbourne Worthy.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 22 Oct 2024 at 09:28.

Scottish Hydro Electric Power Dis logo
Between
10 and 13 Dec 2024
Details
View Map
Share
Follow
Wellhouse Lane

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Wellhouse Lane, Headbourne Worthy.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 22 Oct 2024 at 11:47.

Hampshire County Council logo
Between
13 and 18 Dec 2024
Details
View Map
Share
Follow
Bereweeke Road

Hampshire County Council are proposing to carry out Highway improvement works on Bereweeke Road, Winchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 18 Nov 2024 at 16:59.

Hampshire County Council logo
Between
13 and 18 Dec 2024
Details
View Map
Share
Follow
Bereweeke Road

Hampshire County Council are proposing to carry out Highway improvement works on Bereweeke Road, Winchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 22 Nov 2024 at 10:51.

Hampshire County Council logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Scantabout Avenue

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Scantabout Avenue, Chandler's Ford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 20 Nov 2024 at 17:08.

Hampshire County Council logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Scantabout Avenue

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Scantabout Avenue, Chandler's Ford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 22 Nov 2024 at 15:32.

Hampshire County Council logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Romsey Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Romsey Road, Winchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 7 Aug 2024 at 11:01.

Hampshire County Council logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Romsey Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Romsey Road, Winchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 7 Aug 2024 at 15:10.

Hampshire County Council logo
Between
27 Dec 2024 and 5 Jan 2025
Details
View Map
Share
Follow
Harestock Road

Hampshire County Council are proposing to carry out Section 50 on Harestock Road, Winchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 5 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 14 Nov 2024 at 09:33.

Hampshire County Council logo
LONG TERM
Between
30 Dec 2024 and 2 Feb 2025
Details
View Map
Share
Follow
Andover Road North

Hampshire County Council are proposing to carry out Section 50 on Andover Road North, Winchester.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 2 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 28 Oct 2024 at 13:50.

Southern Gas Networks logo
Between
2 and 24 Jan 2025
Details
View Map
Share
Follow
Bourne Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bourne Lane, Twyford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 17:33.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Stoney Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stoney Lane, Winchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 14:44.

Hampshire County Council logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Springhill Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Springhill Road, Chandler's Ford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 15 Oct 2024 at 13:26.

Hampshire County Council logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Springhill Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Springhill Road, Chandler's Ford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 19 Oct 2024 at 21:25.

Southern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Merdon Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Merdon Avenue, Chandler's Ford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 17:26.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 24 Mar 2025
Details
View Map
Share
Follow
Main Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Main Road, Twyford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Sep 2024 at 15:53.

Southern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
High Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Twyford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Sep 2024 at 14:45.

Southern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Ridgeway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ridgeway, Badger Farm.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 16:42.

Southern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Ridgeway Footpath

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ridgeway Footpath, Badger Farm.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Nov 2024 at 22:33.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 14 Apr 2025
Details
View Map
Share
Follow
Stanmore Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stanmore Lane, Winchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 20:19.

Hampshire County Council logo
LONG TERM
Between
7 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Stoke Road

Hampshire County Council are proposing to carry out Highway improvement works on Stoke Road, Winchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Hampshire County Council on 19 Nov 2024 at 15:18.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Green Jacket Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Green Jacket Close, Winchester.

These works are categorised as Major.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 13 January 2025 and could run through until 16 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 May 2024 at 08:23.

Southern Water logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Colebrook Street

Southern Water were proposing to carry out Utility repair and maintenance works on Colebrook Street, Winchester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 27 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 19 Sep 2024 at 11:38.

Southern Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Colebrook Street

Southern Water are proposing to carry out Utility repair and maintenance works on Colebrook Street, Winchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 19 Sep 2024 at 12:44.

Southern Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Colebrook Street

Southern Water are proposing to carry out Utility repair and maintenance works on Colebrook Street, Winchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 19 Sep 2024 at 15:55.

Southern Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Colebrook Street

Southern Water were proposing to carry out Utility repair and maintenance works on Colebrook Street, Winchester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 28 Oct 2024 at 08:42.

Cityfibre Metro Networks logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Hyde Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on Hyde Street, Winchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Sep 2024 at 12:45.

Cityfibre Metro Networks logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Hyde Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on Hyde Street, Winchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 27 Sep 2024 at 15:48.

Hampshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Hyde Street

Hampshire County Council are proposing to carry out Highway improvement works on Hyde Street, Winchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 18 Nov 2024 at 17:00.

Hampshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Hyde Street

Hampshire County Council are proposing to carry out Highway improvement works on Hyde Street, Winchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 19 Nov 2024 at 15:39.

Southern Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Woodman Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Woodman Lane, Sparsholt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Water on 9 Oct 2024 at 17:22.

Southern Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Woodman Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Woodman Lane, Sparsholt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Water on 10 Oct 2024 at 12:46.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 16 May 2025
Details
View Map
Share
Follow
Harestock Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Harestock Road, Winchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 11:26.

Southern Gas Networks logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Merdon Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Merdon Avenue, Chandler's Ford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 17:22.

Hampshire County Council logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Friarsgate

Hampshire County Council were proposing to carry out Highway repair and maintenance works on Friarsgate, Winchester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 15 Nov 2024 at 14:10.

Hampshire County Council logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Friarsgate

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Friarsgate, Winchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 15 Nov 2024 at 18:15.

Hampshire County Council logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Friarsgate

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Friarsgate, Winchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 18 Nov 2024 at 11:31.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 25 Apr 2025
Details
View Map
Share
Follow
Stoney Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stoney Lane, Winchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 12:54.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 25 Apr 2025
Details
View Map
Share
Stoney Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Stoney Lane, Winchester.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 25 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Nov 2024 at 12:08.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 25 Apr 2025
Details
View Map
Share
Follow
Stoney Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stoney Lane, Winchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Nov 2024 at 14:56.

Southern Gas Networks logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Fromond Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fromond Road, Winchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 15:31.

Southern Gas Networks logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Bradley Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Bradley Road, Harestock.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 14 February 2025. The works were due to impact the footway, carriageway and footpath.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 11:07.

Southern Gas Networks logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Bradley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bradley Road, Harestock.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 15:31.

Hampshire County Council logo
Between
20 and 28 Jan 2025
Details
View Map
Share
Follow
Main Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Main Road, Littleton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 28 Nov 2024 at 17:32.

Hampshire County Council logo
Between
23 and 29 Jan 2025
Details
View Map
Share
Follow
Spring Lane

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Spring Lane, Colden Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 28 Nov 2024 at 18:52.

Hampshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Regent Road

Hampshire County Council are proposing to carry out Highway improvement works on Regent Road, Chandler's Ford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 27 Nov 2024 at 11:45.

Hampshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Regent Road

Hampshire County Council are proposing to carry out Highway improvement works on Regent Road, Chandler's Ford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 27 Nov 2024 at 15:53.

Hampshire County Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Highbridge Road

Hampshire County Council are proposing to carry out Highway improvement works on Highbridge Road, Twyford Moors.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 23 Aug 2024 at 00:33.

Hampshire County Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Highbridge Road

Hampshire County Council are proposing to carry out Highway improvement works on Highbridge Road, Highbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 23 Aug 2024 at 00:33.

Hampshire County Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Highbridge Road

Hampshire County Council are proposing to carry out Highway improvement works on Highbridge Road, Brambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 23 Aug 2024 at 00:33.

Hampshire County Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Highbridge Road

Hampshire County Council are proposing to carry out Highway improvement works on Highbridge Road, Twyford Moors.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 23 Aug 2024 at 00:33.

Hampshire County Council logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Worthy Road

Hampshire County Council are proposing to carry out Highway improvement works on Worthy Road, Winchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Hampshire County Council on 3 Jul 2024 at 07:45.

Hampshire County Council logo
Between
28 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Millers Lane

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Millers Lane, Pitt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 2 Dec 2024 at 10:05.

Hampshire County Council logo
Between
28 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Park Road

Hampshire County Council are proposing to carry out Highway improvement works on Park Road, Winchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 13 Nov 2024 at 09:54.

Hampshire County Council logo
Between
1 and 28 Feb 2025
Details
View Map
Share
Follow
Harestock Road

Hampshire County Council are proposing to carry out Section 50 on Harestock Road, Winchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 28 Oct 2024 at 11:11.

Scottish Hydro Electric Power Dis logo
Between
3 and 19 Feb 2025
Details
View Map
Share
Otterbourne Hill

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Otterbourne Hill, Otterbourne.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 19 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Nov 2024 at 11:15.

Scottish Hydro Electric Power Dis logo
Between
3 and 19 Feb 2025
Details
View Map
Share
Follow
Otterbourne Hill

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Otterbourne Hill, Otterbourne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Nov 2024 at 14:51.

Southern Gas Networks logo
Between
3 and 17 Feb 2025
Details
View Map
Share
Follow
Main Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Main Road, Twyford Moors.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 Oct 2024 at 13:48.

Southern Gas Networks logo
Between
3 and 17 Feb 2025
Details
View Map
Share
Follow
Main Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Main Road, Twyford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 25 Oct 2024 at 12:26.

Southern Gas Networks logo
Between
3 and 17 Feb 2025
Details
View Map
Share
Follow
High Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Twyford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 Oct 2024 at 13:49.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Lanham Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lanham Lane, Winchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Jul 2024 at 12:28.

Southern Gas Networks logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Dean Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dean Lane, Winchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 11:07.

Southern Gas Networks logo
Between
6 and 24 Feb 2025
Details
View Map
Share
Dean Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Dean Lane, Winchester.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 February 2025 and run through until 24 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 13:25.

Southern Gas Networks logo
Between
6 and 21 Feb 2025
Details
View Map
Share
Follow
Dean Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dean Lane, Winchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 13:28.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 22 Apr 2025
Details
View Map
Share
Follow
Main Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Main Road, Twyford Moors.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 22 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 11:59.

Cityfibre Metro Networks logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Easton Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Easton Lane, Easton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 9 Oct 2024 at 12:57.

Cityfibre Metro Networks logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Easton Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Easton Lane, Easton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 9 Oct 2024 at 17:24.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
12 Feb and 19 Mar 2025
Details
View Map
Share
Follow
Boyatt Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Boyatt Lane, Otterbourne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 19 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Nov 2024 at 14:50.

Southern Gas Networks logo
Between
13 Feb and 3 Mar 2025
Details
View Map
Share
Ruffield Close

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Ruffield Close, Winchester.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 February 2025 and run through until 3 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 13:34.

Southern Gas Networks logo
Between
15 and 22 Feb 2025
Details
View Map
Share
Bridge Street

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Bridge Street, Winchester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 February 2025 and run through until 22 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 14:10.

Southern Gas Networks logo
Between
15 and 22 Feb 2025
Details
View Map
Share
Follow
Bridge Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridge Street, Winchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 22 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 22:50.

Hampshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Hiltingbury Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Hiltingbury Road, Chandler's Ford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 9 Sep 2024 at 13:39.

Hampshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Hiltingbury Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Hiltingbury Road, Chandler's Ford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 10 Sep 2024 at 11:58.

Southern Gas Networks logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Park Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Lane, Twyford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 17:04.

Southern Gas Networks logo
Between
17 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Stanmore Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stanmore Lane, Winchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 2 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Jun 2024 at 17:09.

Southern Gas Networks logo
Between
17 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Stanmore Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stanmore Lane, Winchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 16:25.

Southern Gas Networks logo
LONG TERM
Between
17 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Magdalen Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Magdalen Hill, Winchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Sep 2024 at 15:52.

Hampshire County Council logo
Between
19 and 25 Feb 2025
Details
View Map
Share
Follow
Spring Lane

Hampshire County Council are proposing to carry out Highway improvement works on Spring Lane, Colden Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 3 Dec 2024 at 20:06.

Hampshire County Council logo
Between
21 and 26 Feb 2025
Details
View Map
Share
Follow
Thurmond Crescent

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Thurmond Crescent, Winchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 15 Nov 2024 at 18:07.

Southern Gas Networks logo
LONG TERM
Between
22 Feb and 7 Apr 2025
Details
View Map
Share
Follow
Magdalen Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Magdalen Hill, Winchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 February 2025 and could run through until 7 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 10:58.

Hampshire County Council logo
Between
24 Feb and 1 Mar 2025
Details
View Map
Share
Follow
High Street

Hampshire County Council are proposing to carry out Highway repair and maintenance works on High Street, Winchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 14 Oct 2024 at 13:02.

Cityfibre Metro Networks logo
Between
3 and 6 Mar 2025
Details
View Map
Share
Follow
Hyde Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on Hyde Street, Winchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 1 Oct 2024 at 15:37.

Southern Gas Networks logo
LONG TERM
Between
3 Mar and 16 May 2025
Details
View Map
Share
Follow
Andover Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Andover Road, Winchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Oct 2024 at 16:33.

Southern Gas Networks logo
LONG TERM
Between
3 Mar and 25 Jul 2025
Details
View Map
Share
Follow
Andover Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Andover Road, Winchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 17:29.

Hampshire County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
New Lane

Hampshire County Council were proposing to carry out Highway improvement works on New Lane, Kings Somborne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 1 Oct 2024 at 09:34.

Hampshire County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
New Lane

Hampshire County Council are proposing to carry out Highway improvement works on New Lane, Kings Somborne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 1 Oct 2024 at 09:54.

Hampshire County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
New Lane

Hampshire County Council are proposing to carry out Highway improvement works on New Lane, Kings Somborne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 4 Oct 2024 at 09:36.


Roadworks Map near to Farley Mount Road, WINCHESTER, SO21 2JE

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 4 Dec 2024 09:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Farley Mount Road, WINCHESTER, SO21 2JE (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.