ROADWORKS SUMMARY
Charlton, PEWSEY, SN9 6EZ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for SN9 6EZ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Charlton, PEWSEY, SN9 6EZ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Wiltshire Council logo
LONG TERM
Until
4 Sep 2025
Details
View Map
Share
Follow
Marlborough Road

Wiltshire Council are carrying out roadworks on Marlborough Road, Pewsey.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 March 2025 at 16:00 and could run through until 4 September 2025. The works will impact the verge only.

This roadwork event was last updated by Wiltshire Council on 4 Mar 2025 at 20:13.

Network Rail logo
Finishing
Sunday
Details
View Map
Share
Follow
Hollybush Lane

Network Rail are carrying out Works for Rail Purposes on Hollybush Lane, Pewsey.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 May 2025 at 22:30 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 31 May 2025 at 07:10.

Wiltshire Council logo
Finishing
Thursday
Details
View Map
Share
Follow
A345 Salisbury Road Netheravon North To Enford Hill

Wiltshire Council are proposing to carry out Highway repair and maintenance works on A345 Salisbury Road Netheravon North To Enford Hill, Enford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 12 May 2025 at 16:56.

Wiltshire Council logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
A345 Marlborough Road Pewsey Near Junction With Roads To Wilcot And Stowell Park North East To Oare

Wiltshire Council are proposing to carry out Highway improvement works on A345 Marlborough Road Pewsey Near Junction With Roads To Wilcot And Stowell Park North East To Oare, Oare.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 23 May 2025 at 11:45.

Wiltshire Council logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
A345 Marlborough Road Pewsey Near Junction With Roads To Wilcot And Stowell Park North East To Oare

Wiltshire Council are proposing to carry out Highway improvement works on A345 Marlborough Road Pewsey Near Junction With Roads To Wilcot And Stowell Park North East To Oare, Oare.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 22 May 2025 at 11:22.

Wessex Water logo
LONG TERM
Between
16 Jun and 18 Jul 2025
Details
View Map
Share
Follow
C52 North From A345 To Dragon Lane

Wessex Water are proposing to carry out Utility asset works on C52 North From A345 To Dragon Lane, Manningford Bruce.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 20 Mar 2025 at 10:44.

BT logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Little Abbots North C52 To Hare Street

BT are proposing to carry out Utility asset works on Little Abbots North C52 To Hare Street, Manningford Abbots.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 7 Mar 2025 at 16:51.

BT logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Little Abbots North C52 To Hare Street

BT are proposing to carry out Utility asset works on Little Abbots North C52 To Hare Street, Manningford Abbots.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 11 Apr 2025 at 11:40.

Wessex Water logo
LONG TERM
Between
26 Jun and 28 Jul 2025
Details
View Map
Share
C52 North From A345 To Dragon Lane

Wessex Water were proposing to carry out Utility asset works on C52 North From A345 To Dragon Lane, Manningford Bruce.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 June 2025 and run through until 28 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wessex Water on 12 May 2025 at 13:39.

Wessex Water logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Broad Street

Wessex Water are proposing to carry out Utility repair and maintenance works on Broad Street, Beechingstoke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 28 Apr 2025 at 14:57.

Wessex Water logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Woodborough

Wessex Water are proposing to carry out Utility repair and maintenance works on Woodborough, Woodborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 28 Apr 2025 at 15:05.

Wessex Water logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Woodborough

Wessex Water are proposing to carry out Utility repair and maintenance works on Woodborough, Woodborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 22 May 2025 at 11:19.

Wessex Water logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Smithy Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Smithy Lane, Woodborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 28 Apr 2025 at 15:02.

Wessex Water logo
Between
21 Jul and 15 Aug 2025
Details
View Map
Share
Follow
C52 North From A345 To Dragon Lane

Wessex Water are proposing to carry out Utility asset works on C52 North From A345 To Dragon Lane, Manningford Bruce.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 2 Jun 2025 at 07:42.

Wessex Water logo
Between
21 Jul and 15 Aug 2025
Details
View Map
Share
Follow
C52 North From A345 To Dragon Lane

Wessex Water are proposing to carry out Utility asset works on C52 North From A345 To Dragon Lane, Manningford Bruce.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 27 May 2025 at 15:56.

Wessex Water logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Smithy Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Smithy Lane, Woodborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 22 May 2025 at 11:19.

Network Rail logo
Between
11 and 23 Aug 2025
Details
View Map
Share
Follow
Hollybush Lane

Network Rail are proposing to carry out Works for Rail Purposes on Hollybush Lane, Pewsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 23 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 7 Mar 2025 at 17:02.

Wessex Water logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
Broad Street

Wessex Water are proposing to carry out Utility repair and maintenance works on Broad Street, Beechingstoke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 22 May 2025 at 11:19.


Roadworks Map near to Charlton, PEWSEY, SN9 6EZ (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 19:37
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Charlton, PEWSEY, SN9 6EZ (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Wiltshire Council logo
PEWSEY ROAD 
(0.8 miles)
Wiltshire Council
Highway repair and maintenance works - Carriageway - Two-way signals
In Progress
Since: 3 Jun 2025 19:00
(Scheduled: 3 Jun 2025 - 6 Jun 2025)
0.8
Details
Share
Follow
2
Wiltshire Council logo
RUSHALL ROAD 
(1.0 miles)
Wiltshire Council
Highway repair and maintenance works - Carriageway - Two-way signals
In Progress
Since: 3 Jun 2025 19:00
(Scheduled: 3 Jun 2025 - 5 Jun 2025)
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.