ROADWORKS SUMMARY
Vale Leaze, CHIPPENHAM, SN15 5JS

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Vale Leaze, SN15 5JS and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Vale Leaze, CHIPPENHAM, SN15 5JS

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Vale Leaze are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Scottish Hydro Electric Power Dis logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Park Street

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Park Street, Charlton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 5 Feb 2025 at 16:11.

Scottish Hydro Electric Power Dis logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Charlton Bridge East To Junction With Park Street

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Charlton Bridge East To Junction With Park Street, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 27 Nov 2024 at 15:31.

Scottish Hydro Electric Power Dis logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Charlton Bridge East To Junction With Park Street

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Charlton Bridge East To Junction With Park Street, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Jan 2025 at 08:01.

Scottish Hydro Electric Power Dis logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Charlton Bridge East To Junction With Park Street

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Charlton Bridge East To Junction With Park Street, Charlton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Feb 2025 at 09:37.

Scottish Hydro Electric Power Dis logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Park Street

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Park Street, Charlton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 27 Nov 2024 at 15:35.

Scottish Hydro Electric Power Dis logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Park Street

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Park Street, Charlton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Jan 2025 at 08:00.

Wiltshire Council logo
Until
28 Feb 2025
Details
View Map
Share
Follow
Seagry Road Sutton Benger To T Junc At Coach House Upper Seagry

Wiltshire Council are carrying out Highway repair and maintenance works on Seagry Road Sutton Benger To T Junc At Coach House Upper Seagry, Upper Seagry.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2025 at 08:00 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 13 Feb 2025 at 17:43.

Wiltshire Council logo
Until
28 Feb 2025
Details
View Map
Share
Follow
St Marys Lane

Wiltshire Council are carrying out Highway repair and maintenance works on St Marys Lane, Malmesbury.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2025 at 11:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 14 Feb 2025 at 15:13.

Wessex Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Gastons Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Gastons Road, Malmesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 19 Nov 2024 at 15:19.

Wessex Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Gastons Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Gastons Road, Malmesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 13 Nov 2024 at 18:18.

Wiltshire Council logo
Between
20 and 24 Feb 2025
Details
View Map
Share
Follow
Pink Lane

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Pink Lane, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 14 Jan 2025 at 16:16.

Gigaclear logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Follow
Mill Lane

Gigaclear are proposing to carry out Utility asset works on Mill Lane, Corston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 26 Nov 2024 at 09:30.

Gigaclear logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Mill Lane

Gigaclear were proposing to carry out Utility asset works on Mill Lane, Corston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 February 2025 and run through until 27 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gigaclear on 20 Jan 2025 at 08:14.

Wiltshire Council logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Follow
The Green

Wiltshire Council are proposing to carry out Highway improvement works on The Green, Lyneham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 27 Jan 2025 at 12:24.

Vodafone logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
B4122 To High Street

Vodafone are proposing to carry out Utility repair and maintenance works on B4122 To High Street, Draycot Cerne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 23 Jan 2025 at 15:00.

BT logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
The Triangle

BT are proposing to carry out Utility asset works on The Triangle, Malmesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 11 Dec 2024 at 09:08.

BT logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Bristol Street

BT are proposing to carry out Utility asset works on Bristol Street, Malmesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 11 Dec 2024 at 09:07.

Vodafone logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
B4122 To High Street

Vodafone are proposing to carry out Utility repair and maintenance works on B4122 To High Street, Draycot Cerne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 30 Dec 2024 at 13:06.

Wiltshire Council logo
Between
18 and 21 Mar 2025
Details
View Map
Share
Follow
Farthing Lane

Wiltshire Council are proposing to carry out Highway improvement works on Farthing Lane, Lyneham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 5 Feb 2025 at 16:36.

Wessex Water logo
Between
1 and 3 Apr 2025
Details
View Map
Share
Follow
Entrance To Stert Farm South To Junction With St Leonards Close

Wessex Water are proposing to carry out Utility repair and maintenance works on Entrance To Stert Farm South To Junction With St Leonards Close, Upper Minety.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 3 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 12 Feb 2025 at 08:59.

Wessex Water logo
Between
1 and 3 Apr 2025
Details
View Map
Share
Follow
Entrance To Stert Farm South To Junction With St Leonards Close

Wessex Water are proposing to carry out Utility repair and maintenance works on Entrance To Stert Farm South To Junction With St Leonards Close, Upper Minety.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 3 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 11 Feb 2025 at 13:11.

Wessex Water logo
Between
1 and 3 Apr 2025
Details
View Map
Share
Follow
Entrance To Stert Farm South To Junction With St Leonards Close

Wessex Water are proposing to carry out Utility repair and maintenance works on Entrance To Stert Farm South To Junction With St Leonards Close, Upper Minety.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 3 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 6 Feb 2025 at 10:17.

Wiltshire Council logo
Between
2 and 4 Apr 2025
Details
View Map
Share
Follow
Sundays Hill

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Sundays Hill, Brinkworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 10 Jan 2025 at 16:13.

BT logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Bristol Street

BT are proposing to carry out Utility asset works on Bristol Street, Malmesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 15 Jan 2025 at 10:05.

BT logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Bristol Street

BT are proposing to carry out Utility asset works on Bristol Street, Malmesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 22 Jan 2025 at 15:59.

BT logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
The Triangle

BT are proposing to carry out Utility asset works on The Triangle, Malmesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 15 Jan 2025 at 11:06.

BT logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
The Triangle

BT are proposing to carry out Utility asset works on The Triangle, Malmesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 22 Jan 2025 at 16:00.

Gigaclear logo
Between
8 and 10 Apr 2025
Details
View Map
Share
Follow
Cresswell Lane

Gigaclear are proposing to carry out Utility asset works on Cresswell Lane, Lea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 10 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Gigaclear on 27 Jan 2025 at 15:30.

Gigaclear logo
Between
9 and 11 Apr 2025
Details
View Map
Share
A3102 North To Railway Bridge

Gigaclear were proposing to carry out Utility asset works on A3102 North To Railway Bridge, Tockenham Wick.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 April 2025 and run through until 11 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gigaclear on 23 Jan 2025 at 11:13.

Wessex Water logo
Between
22 and 24 Apr 2025
Details
View Map
Share
Follow
Station Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Station Road, Christian Malford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 30 Jan 2025 at 11:46.

Wessex Water logo
Between
22 and 24 Apr 2025
Details
View Map
Share
Follow
Station Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Station Road, Christian Malford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 5 Feb 2025 at 16:24.

Wiltshire Council logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
T Junction North Of The Common North To Crossroads At Queen Street

Wiltshire Council are proposing to carry out Highway repair and maintenance works on T Junction North Of The Common North To Crossroads At Queen Street, Brinkworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 23 Jan 2025 at 10:36.

Wiltshire Council logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
Top Street

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Top Street, Great Somerford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 23 Jan 2025 at 13:46.

Wiltshire Council logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
Park Lane

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Park Lane, Great Somerford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 23 Jan 2025 at 13:46.

Wiltshire Council logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
West Street

Wiltshire Council are proposing to carry out Highway repair and maintenance works on West Street, Great Somerford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 20 Jan 2025 at 15:57.

Network Rail logo
Between
3 and 23 May 2025
Details
View Map
Share
Follow
Trow Lane

Network Rail are proposing to carry out Works for Rail Purposes on Trow Lane, Lyneham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 30 Jan 2025 at 15:36.

Network Rail logo
Between
3 and 23 May 2025
Details
View Map
Share
Follow
Trow Lane

Network Rail are proposing to carry out Works for Rail Purposes on Trow Lane, Lyneham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 12 Feb 2025 at 08:36.

Network Rail logo
Between
10 and 23 May 2025
Details
View Map
Share
Trow Lane

Network Rail were proposing to carry out Works for Rail Purposes on Trow Lane, Lyneham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 May 2025 and run through until 23 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 14 Jan 2025 at 09:26.

Wessex Water logo
Between
12 and 14 May 2025
Details
View Map
Share
Follow
Tanners Bridge

Wessex Water are proposing to carry out Utility repair and maintenance works on Tanners Bridge, Garsdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 14 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 12 Feb 2025 at 13:07.


Roadworks Map near to Vale Leaze, CHIPPENHAM, SN15 5JS

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 17 Feb 2025 08:34
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Vale Leaze, CHIPPENHAM, SN15 5JS (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.