ROADWORKS SUMMARY
Ridgeway Lane, CHIPPENHAM, SN15 4LD

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Ridgeway Lane, SN15 4LD and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Ridgeway Lane, CHIPPENHAM, SN15 4LD

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Ridgeway Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Wessex Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Catcomb Street

Wessex Water were proposing to carry out Utility asset works on Catcomb Street, Hilmarton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wessex Water on 7 Oct 2024 at 12:24.

Wessex Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Beacon Hill

Wessex Water were proposing to carry out Utility asset works on Beacon Hill, Hilmarton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 23 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 7 Oct 2024 at 12:21.

Scottish Hydro Electric Power Dis logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Park Street

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Park Street, Charlton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 5 Feb 2025 at 16:11.

Scottish Hydro Electric Power Dis logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Park Street

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Park Street, Charlton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Jan 2025 at 08:00.

Scottish Hydro Electric Power Dis logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Park Street

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Park Street, Charlton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 27 Nov 2024 at 15:35.

Scottish Hydro Electric Power Dis logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Charlton Bridge East To Junction With Park Street

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Charlton Bridge East To Junction With Park Street, Charlton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Feb 2025 at 09:37.

Scottish Hydro Electric Power Dis logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Charlton Bridge East To Junction With Park Street

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Charlton Bridge East To Junction With Park Street, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Jan 2025 at 08:01.

Scottish Hydro Electric Power Dis logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Charlton Bridge East To Junction With Park Street

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Charlton Bridge East To Junction With Park Street, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 27 Nov 2024 at 15:31.

Wiltshire Council logo
Until
28 Feb 2025
Details
View Map
Share
Follow
St Marys Lane

Wiltshire Council are carrying out Highway repair and maintenance works on St Marys Lane, Malmesbury.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2025 at 11:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 14 Feb 2025 at 15:13.

Wiltshire Council logo
Until
28 Feb 2025
Details
View Map
Share
Follow
Seagry Road Sutton Benger To T Junc At Coach House Upper Seagry

Wiltshire Council are carrying out Highway repair and maintenance works on Seagry Road Sutton Benger To T Junc At Coach House Upper Seagry, Upper Seagry.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2025 at 08:00 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 13 Feb 2025 at 17:43.

Gigaclear logo
Finishing
Wednesday
Details
View Map
Share
Westfield House North East C167 To Maud Heaths Causeway

Gigaclear were proposing to carry out Utility asset works on Westfield House North East C167 To Maud Heaths Causeway, Tytherton Lucas.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gigaclear on 20 Jan 2025 at 14:50.

Wessex Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Gastons Road

Wessex Water are carrying out Utility repair and maintenance works on Gastons Road, Malmesbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 09:00 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 17 Feb 2025 at 09:59.

Wessex Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Gastons Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Gastons Road, Malmesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 13 Nov 2024 at 18:18.

Gigaclear logo
Finishing
Wednesday
Details
View Map
Share
Follow
Westfield House North East C167 To Maud Heaths Causeway

Gigaclear are proposing to carry out Utility asset works on Westfield House North East C167 To Maud Heaths Causeway, Tytherton Lucas.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 13 Nov 2024 at 18:10.

Wiltshire Council logo
Between
20 and 24 Feb 2025
Details
View Map
Share
Follow
Pink Lane

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Pink Lane, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 14 Jan 2025 at 16:16.

Gigaclear logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Mill Lane

Gigaclear were proposing to carry out Utility asset works on Mill Lane, Corston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 February 2025 and run through until 27 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gigaclear on 20 Jan 2025 at 08:14.

Gigaclear logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Follow
Mill Lane

Gigaclear are proposing to carry out Utility asset works on Mill Lane, Corston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 26 Nov 2024 at 09:30.

Wiltshire Council logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Follow
The Green

Wiltshire Council are proposing to carry out Highway improvement works on The Green, Lyneham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 27 Jan 2025 at 12:24.

BT logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Bristol Street

BT are proposing to carry out Utility asset works on Bristol Street, Malmesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 11 Dec 2024 at 09:07.

BT logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
The Triangle

BT are proposing to carry out Utility asset works on The Triangle, Malmesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 11 Dec 2024 at 09:08.

Vodafone logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
B4122 To High Street

Vodafone are proposing to carry out Utility repair and maintenance works on B4122 To High Street, Draycot Cerne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 30 Dec 2024 at 13:06.

Vodafone logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
B4122 To High Street

Vodafone are proposing to carry out Utility repair and maintenance works on B4122 To High Street, Draycot Cerne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 23 Jan 2025 at 15:00.

Wiltshire Council logo
Between
18 and 21 Mar 2025
Details
View Map
Share
Follow
Farthing Lane

Wiltshire Council are proposing to carry out Highway improvement works on Farthing Lane, Lyneham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 5 Feb 2025 at 16:36.

Wiltshire Council logo
Between
2 and 4 Apr 2025
Details
View Map
Share
Follow
Sundays Hill

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Sundays Hill, Brinkworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 10 Jan 2025 at 16:13.

BT logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Bristol Street

BT are proposing to carry out Utility asset works on Bristol Street, Malmesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 22 Jan 2025 at 15:59.

BT logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Bristol Street

BT are proposing to carry out Utility asset works on Bristol Street, Malmesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 15 Jan 2025 at 10:05.

BT logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
The Triangle

BT are proposing to carry out Utility asset works on The Triangle, Malmesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 15 Jan 2025 at 11:06.

BT logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
The Triangle

BT are proposing to carry out Utility asset works on The Triangle, Malmesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 22 Jan 2025 at 16:00.

Wessex Water logo
Between
7 and 18 Apr 2025
Details
View Map
Share
Follow
Leekshedge Farm North East C135 To Catcomb

Wessex Water are proposing to carry out Utility repair and maintenance works on Leekshedge Farm North East C135 To Catcomb, Spirthill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 18 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 14 Oct 2024 at 15:52.

Gigaclear logo
Between
8 and 10 Apr 2025
Details
View Map
Share
Follow
Cresswell Lane

Gigaclear are proposing to carry out Utility asset works on Cresswell Lane, Lea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 10 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Gigaclear on 27 Jan 2025 at 15:30.

Gigaclear logo
Between
9 and 11 Apr 2025
Details
View Map
Share
A3102 North To Railway Bridge

Gigaclear were proposing to carry out Utility asset works on A3102 North To Railway Bridge, Tockenham Wick.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 April 2025 and run through until 11 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gigaclear on 23 Jan 2025 at 11:13.

Wessex Water logo
LONG TERM
Between
14 Apr and 13 Jun 2025
Details
View Map
Share
Follow
Stockham Marsh Farm South East C111 To Junction Near Catcomb

Wessex Water are proposing to carry out Utility asset works on Stockham Marsh Farm South East C111 To Junction Near Catcomb, Foxham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 14 Oct 2024 at 15:51.

Wessex Water logo
Between
22 and 24 Apr 2025
Details
View Map
Share
Follow
Station Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Station Road, Christian Malford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 30 Jan 2025 at 11:46.

Wessex Water logo
Between
22 and 24 Apr 2025
Details
View Map
Share
Follow
Station Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Station Road, Christian Malford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 5 Feb 2025 at 16:24.

Wiltshire Council logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
T Junction North Of The Common North To Crossroads At Queen Street

Wiltshire Council are proposing to carry out Highway repair and maintenance works on T Junction North Of The Common North To Crossroads At Queen Street, Brinkworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 23 Jan 2025 at 10:36.

BT logo
Between
23 Apr and 14 May 2025
Details
View Map
Share
Follow
Breach Lane

BT are proposing to carry out Utility asset works on Breach Lane, Bushton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 14 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 30 Jan 2025 at 13:22.

Wiltshire Council logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
Park Lane

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Park Lane, Great Somerford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 23 Jan 2025 at 13:46.

Wiltshire Council logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
Top Street

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Top Street, Great Somerford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 23 Jan 2025 at 13:46.

BT logo
Between
23 Apr and 14 May 2025
Details
View Map
Share
Follow
Breach Lane

BT are proposing to carry out Utility asset works on Breach Lane, Royal Wootton Bassett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 14 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 30 Jan 2025 at 13:22.

Wiltshire Council logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
West Street

Wiltshire Council are proposing to carry out Highway repair and maintenance works on West Street, Great Somerford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 20 Jan 2025 at 15:57.

BT logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Follow
Primrose Hill To Junction At Heron Pond House

BT are proposing to carry out Utility asset works on Primrose Hill To Junction At Heron Pond House, Tockenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 11 Feb 2025 at 13:42.

BT logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Follow
Heron Pond House South To Greenway

BT are proposing to carry out Utility asset works on Heron Pond House South To Greenway, West Tockenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 11 Feb 2025 at 13:42.

BT logo
Between
29 Apr and 1 May 2025
Details
View Map
Share
Follow
Leekshedge Farm North East C135 To Catcomb

BT are proposing to carry out Utility asset works on Leekshedge Farm North East C135 To Catcomb, Spirthill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 1 May 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 11 Feb 2025 at 14:49.

BT logo
Between
29 Apr and 1 May 2025
Details
View Map
Share
Follow
Junction With Track To Bremhill House East C135 To Entrance Of Leekshedge Farm

BT are proposing to carry out Utility asset works on Junction With Track To Bremhill House East C135 To Entrance Of Leekshedge Farm, Spirthill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 1 May 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 11 Feb 2025 at 14:49.

BT logo
Between
29 Apr and 1 May 2025
Details
View Map
Share
Follow
Charlcutt East C135 To Junction With Track To Bremhill House

BT are proposing to carry out Utility asset works on Charlcutt East C135 To Junction With Track To Bremhill House, Charlcutt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 1 May 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 11 Feb 2025 at 14:49.

Network Rail logo
Between
3 and 23 May 2025
Details
View Map
Share
Follow
Trow Lane

Network Rail are proposing to carry out Works for Rail Purposes on Trow Lane, Lyneham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 12 Feb 2025 at 08:36.

Network Rail logo
Between
3 and 23 May 2025
Details
View Map
Share
Follow
Trow Lane

Network Rail are proposing to carry out Works for Rail Purposes on Trow Lane, Lyneham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 30 Jan 2025 at 15:36.

Network Rail logo
Between
10 and 23 May 2025
Details
View Map
Share
Trow Lane

Network Rail were proposing to carry out Works for Rail Purposes on Trow Lane, Lyneham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 May 2025 and run through until 23 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 14 Jan 2025 at 09:26.

Wessex Water logo
Between
12 and 14 May 2025
Details
View Map
Share
Follow
Tanners Bridge

Wessex Water are proposing to carry out Utility repair and maintenance works on Tanners Bridge, Garsdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 14 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 12 Feb 2025 at 13:07.


Roadworks Map near to Ridgeway Lane, CHIPPENHAM, SN15 4LD

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 17 Feb 2025 10:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Ridgeway Lane, CHIPPENHAM, SN15 4LD (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.