ROADWORKS SUMMARY
The Folly, CHIPPENHAM, SN14 8JR

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for The Folly, SN14 8JR and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to The Folly, CHIPPENHAM, SN14 8JR

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for The Folly are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Western Power Distribution (South West) logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Upper Bristol Road

Western Power Distribution (South West) are carrying out New service connection on Upper Bristol Road, Lower Weston, Bath.

These works are categorised as Major.

The works started on 7 April 2025 at 11:49 and could run through until 4 June 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Western Power Distribution (South West) on 30 May 2025 at 16:26.

Wales And West Utilities logo
LONG TERM
Between
28 Apr and 25 Jun 2025
Details
View Map
Share
Footpaths Network Malvern Drive By 123 To Quantock Close By 53

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Footpaths Network Malvern Drive By 123 To Quantock Close By 53, Warmley.

These works were categorised as Major.

There were no traffic signals or road closures necessary for these works and traffic would have operated on a give-and-take basis. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 25 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 29 Apr 2025 at 12:20.

Wales And West Utilities logo
LONG TERM
Between
28 Apr and 25 Jun 2025
Details
View Map
Share
Footpaths Network Cloverlea Road By 8 To Quantock Close Rear Of 78

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Footpaths Network Cloverlea Road By 8 To Quantock Close Rear Of 78, Warmley.

These works were categorised as Major.

There were no traffic signals or road closures necessary for these works and traffic would have operated on a give-and-take basis. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 25 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 29 Apr 2025 at 12:20.

Western Power Distribution (South West) logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Warminster Road

Western Power Distribution (South West) are carrying out Utility repair and maintenance works on Warminster Road, Bathwick, Bath.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 April 2025 at 11:30 and could run through until 4 June 2025. The works will impact the verge only.

This roadwork event was last updated by Western Power Distribution (South West) on 3 Jun 2025 at 08:23.

Bristol Waterworks Company logo
LONG TERM
Between
12 May and 15 Aug 2025
Details
View Map
Share
Kelston Road

Bristol Waterworks Company were proposing to carry out Utility asset works on Kelston Road, Kelston, Bath.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 15 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 26 Feb 2025 at 13:54.

Wales And West Utilities logo
LONG TERM
Between
12 May and 8 Jul 2025
Details
View Map
Share
Follow
Footpaths Network Malvern Drive By 123 To Quantock Close By 53

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Footpaths Network Malvern Drive By 123 To Quantock Close By 53, Warmley.

These works are categorised as Major.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 12 May 2025 and could run through until 8 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 4 Feb 2025 at 13:45.

Wales And West Utilities logo
LONG TERM
Between
12 May and 8 Jul 2025
Details
View Map
Share
Follow
Footpaths Network Cloverlea Road By 8 To Quantock Close Rear Of 78

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Footpaths Network Cloverlea Road By 8 To Quantock Close Rear Of 78, Warmley.

These works are categorised as Major.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 12 May 2025 and could run through until 8 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 4 Feb 2025 at 13:44.

Bristol Waterworks Company logo
LONG TERM
Between
12 May and 15 Aug 2025
Details
View Map
Share
Bath Road

Bristol Waterworks Company were proposing to carry out Utility asset works on Bath Road, Kelston, Bath.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 15 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 26 Feb 2025 at 13:53.

Bristol Waterworks Company logo
LONG TERM
Between
19 May and 22 Aug 2025
Details
View Map
Share
Follow
Bath Road

Bristol Waterworks Company are proposing to carry out Utility asset works on Bath Road, Kelston, Bath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 7 Mar 2025 at 10:56.

Bristol Waterworks Company logo
LONG TERM
Until
22 Aug 2025
Details
View Map
Share
Follow
Bath Road

Bristol Waterworks Company are carrying out Utility asset works on Bath Road, Kelston, Bath.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 09:00 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 27 May 2025 at 09:08.

Bristol Waterworks Company logo
LONG TERM
Until
22 Aug 2025
Details
View Map
Share
Follow
Kelston Road

Bristol Waterworks Company are carrying out Utility asset works on Kelston Road, Kelston, Bath.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 09:00 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 27 May 2025 at 09:09.

Bristol Waterworks Company logo
LONG TERM
Between
19 May and 22 Aug 2025
Details
View Map
Share
Follow
Kelston Road

Bristol Waterworks Company are proposing to carry out Utility asset works on Kelston Road, Kelston, Bath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 7 Mar 2025 at 10:55.

Nexfibre Networks Limited logo
Finishing
Today
Details
View Map
Share
Follow
The Batch

Nexfibre Networks Limited are proposing to carry out Utility asset works on The Batch, Batheaston, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 21 Feb 2025 at 09:11.

Nexfibre Networks Limited logo
Finishing
Today
Details
View Map
Share
The Batch

Nexfibre Networks Limited were proposing to carry out Utility asset works on The Batch, Batheaston, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 3 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 27 May 2025 at 06:52.

Nexfibre Networks Limited logo
Finishing
Today
Details
View Map
Share
Follow
Coronation Cottages

Nexfibre Networks Limited are proposing to carry out Utility asset works on Coronation Cottages, Batheaston, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 21 Feb 2025 at 08:07.

Nexfibre Networks Limited logo
Finishing
Today
Details
View Map
Share
Follow
Northend

Nexfibre Networks Limited are proposing to carry out Utility asset works on Northend, Batheaston, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 21 Feb 2025 at 09:25.

Nexfibre Networks Limited logo
Finishing
Today
Details
View Map
Share
Coronation Cottages

Nexfibre Networks Limited were proposing to carry out Utility asset works on Coronation Cottages, Batheaston, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 3 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 27 May 2025 at 06:51.

Bristol Waterworks Company logo
Finishing
Friday
Details
View Map
Share
Kelston Hill Lane

Bristol Waterworks Company were proposing to carry out Utility asset works on Kelston Hill Lane, Kelston, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 26 Feb 2025 at 13:53.

Wales And West Utilities logo
LONG TERM
Between
27 May and 8 Aug 2025
Details
View Map
Share
Follow
Footpaths Network Malvern Drive By 123 To Quantock Close By 53

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Footpaths Network Malvern Drive By 123 To Quantock Close By 53, Warmley.

These works are categorised as Major.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 27 May 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 22 May 2025 at 10:04.

Wales And West Utilities logo
LONG TERM
Between
27 May and 8 Aug 2025
Details
View Map
Share
Follow
Footpaths Network Cloverlea Road By 8 To Quantock Close Rear Of 78

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Footpaths Network Cloverlea Road By 8 To Quantock Close Rear Of 78, Warmley.

These works are categorised as Major.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 27 May 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 22 May 2025 at 10:03.

Wales And West Utilities logo
Finishing
Tomorrow
Details
View Map
Share
Follow
High Street

Wales And West Utilities are carrying out Utility repair and maintenance works on High Street, Upper Weston, Bath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 May 2025 at 10:47 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 29 May 2025 at 14:05.

Wales And West Utilities logo
LONG TERM
Between
27 May and 29 Aug 2025
Details
View Map
Share
Cloverlea Road

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Cloverlea Road, Oldland Common.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 29 Apr 2025 at 12:24.

Wales And West Utilities logo
Finishing
Tomorrow
Details
View Map
Share
Follow
St Saviour's Road

Wales And West Utilities are carrying out Utility repair and maintenance works on St Saviour's Road, Larkhall, Bath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 09:00 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 30 May 2025 at 10:38.

Wales And West Utilities logo
Tomorrow
Details
View Map
Share
Penn Hill Road

Wales And West Utilities carried out Utility repair and maintenance works on Penn Hill Road, Lower Weston, Bath.

Two-way signals were in place for some or all of the period.

The works were originally planned between 29 May 2025 and 4 Jun 2025 and were actually completed between 29 May 2025 (12:01) and 3 Jun 2025 (12:46). The works impacted the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 3 Jun 2025 at 12:46.

South Gloucestershire Council logo
Between
1 and 30 Jun 2025
Details
View Map
Share
Follow
London Road

South Gloucestershire Council are proposing to carry out Highway improvement works on London Road, Wick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Gloucestershire Council on 24 Feb 2025 at 15:15.

South Gloucestershire Council logo
Between
1 and 30 Jun 2025
Details
View Map
Share
Follow
Tog Hill

South Gloucestershire Council are proposing to carry out Highway improvement works on Tog Hill, Wick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Gloucestershire Council on 20 Feb 2025 at 15:26.

South Gloucestershire Council logo
Between
1 and 30 Jun 2025
Details
View Map
Share
Follow
Gorse Lane

South Gloucestershire Council are proposing to carry out Highway improvement works on Gorse Lane, Cold Ashton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Gloucestershire Council on 21 Feb 2025 at 08:35.

Wales And West Utilities logo
Finishing
Monday
Details
View Map
Share
Follow
Fosse Lane

Wales And West Utilities are carrying out Utility repair and maintenance works on Fosse Lane, Batheaston, Bath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 11:00 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 3 Jun 2025 at 12:03.

Bath And North East Somerset Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Green Street

Bath And North East Somerset Council are carrying out Highway improvement works on Green Street, City Centre, Bath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 22:00 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 3 Jun 2025 at 07:47.

Bristol Waterworks Company logo
Between
2 and 13 Jun 2025
Details
View Map
Share
Follow
Kelston Hill Lane

Bristol Waterworks Company are proposing to carry out Utility asset works on Kelston Hill Lane, Kelston, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 5 Mar 2025 at 09:15.

Bristol Waterworks Company logo
Between
2 and 13 Jun 2025
Details
View Map
Share
Follow
Kelston Hill Lane

Bristol Waterworks Company are proposing to carry out Utility asset works on Kelston Hill Lane, Kelston, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 16 May 2025 at 10:21.

Bath And North East Somerset Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Broad Street

Bath And North East Somerset Council are carrying out Highway improvement works on Broad Street, City Centre, Bath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 22:00 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 3 Jun 2025 at 07:47.

Bath And North East Somerset Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Broad Street

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Broad Street, City Centre, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 10 Apr 2025 at 12:19.

Bath And North East Somerset Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Saracen Street

Bath And North East Somerset Council are carrying out Highway improvement works on Saracen Street, City Centre, Bath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 22:00 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 3 Jun 2025 at 07:47.

Bath And North East Somerset Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Saracen Street

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Saracen Street, City Centre, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 10 Apr 2025 at 12:19.

Wales And West Utilities logo
LONG TERM
Between
2 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Footpath Summerhill Road To Weston Park East

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Footpath Summerhill Road To Weston Park East, Lansdown, Bath.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Wales And West Utilities on 19 Mar 2025 at 09:11.

Bath And North East Somerset Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Green Street

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Green Street, City Centre, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 10 Apr 2025 at 12:19.

BT logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Broad Street

BT are proposing to carry out Utility repair and maintenance works on Broad Street, City Centre, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 5 Mar 2025 at 09:50.

Wessex Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Charlcombe Lane

Wessex Water were proposing to carry out Utility asset works on Charlcombe Lane, Charlcombe, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 11 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wessex Water on 12 Mar 2025 at 13:49.

Western Power Distribution (South West) logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Coxgrove Hill

Western Power Distribution (South West) are proposing to carry out Diversionary works on Coxgrove Hill, Pucklechurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 24 Apr 2025 at 07:29.

Bristol Waterworks Company logo
LONG TERM
Between
16 Jun and 15 Aug 2025
Details
View Map
Share
Church Lane

Bristol Waterworks Company were proposing to carry out Utility asset works on Church Lane, Kelston, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 15 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 26 Feb 2025 at 13:54.

Wales And West Utilities logo
Between
16 and 19 Jun 2025
Details
View Map
Share
Bathampton Lane

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Bathampton Lane, Bathampton, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 19 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 4 Apr 2025 at 14:38.

Western Power Distribution (South West) logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Coxgrove Hill

Western Power Distribution (South West) are proposing to carry out Diversionary works on Coxgrove Hill, Pucklechurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 1 May 2025 at 13:48.

South Gloucestershire Council logo
Between
17 Jun and 5 Jul 2025
Details
View Map
Share
Follow
Hyde's Lane

South Gloucestershire Council are proposing to carry out Highway improvement works on Hyde's Lane, Cold Ashton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 5 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 13 Mar 2025 at 07:08.

Bristol Waterworks Company logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Upper Street

Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Upper Street, Dyrham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Bristol Waterworks Company on 27 May 2025 at 14:57.

Bristol Waterworks Company logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Upper Street

Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Upper Street, Dyrham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Bristol Waterworks Company on 21 May 2025 at 08:12.

Wessex Water logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Camden Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Camden Road, Beacon Hill, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wessex Water on 19 Mar 2025 at 09:35.

Bath And North East Somerset Council logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Ostlings Lane

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Ostlings Lane, Bathford, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 2 May 2025 at 11:00.

Bristol Waterworks Company logo
LONG TERM
Between
23 Jun and 22 Aug 2025
Details
View Map
Share
Follow
Church Lane

Bristol Waterworks Company are proposing to carry out Utility asset works on Church Lane, Kelston, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 3 Jun 2025 at 10:35.

Bath And North East Somerset Council logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Ostlings Lane

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Ostlings Lane, Bathford, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 2 May 2025 at 14:12.

Wiltshire Council logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Drifton Hill East To Junction With Smith Street

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Drifton Hill East To Junction With Smith Street, West Kington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 30 Apr 2025 at 09:26.

Wiltshire Council logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Drifton Hill East To Junction With Smith Street

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Drifton Hill East To Junction With Smith Street, West Kington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 28 Apr 2025 at 13:08.

Bristol Waterworks Company logo
LONG TERM
Between
23 Jun and 22 Aug 2025
Details
View Map
Share
Follow
Church Lane

Bristol Waterworks Company are proposing to carry out Utility asset works on Church Lane, Kelston, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 5 Mar 2025 at 09:18.

Bath And North East Somerset Council logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Falconer Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Falconer Road, Upper Weston, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 26 Mar 2025 at 08:40.

Bath And North East Somerset Council logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Falconer Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Falconer Road, Upper Weston, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 25 Mar 2025 at 12:00.

Bath And North East Somerset Council logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Napier Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Napier Road, Upper Weston, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 26 Mar 2025 at 08:40.

Wales And West Utilities logo
LONG TERM
Between
30 Jun and 22 Sep 2025
Details
View Map
Share
Follow
Cloverlea Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Cloverlea Road, Oldland Common.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 27 Mar 2025 at 10:21.

Bath And North East Somerset Council logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Napier Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Napier Road, Upper Weston, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 25 Mar 2025 at 12:02.

South Gloucestershire Council logo
Between
3 and 5 Jul 2025
Details
View Map
Share
Follow
Sodbury Lane

South Gloucestershire Council are proposing to carry out Works for road purposes on Sodbury Lane, Westerleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Gloucestershire Council on 13 May 2025 at 07:08.

Bristol Waterworks Company logo
Between
7 and 10 Jul 2025
Details
View Map
Share
Follow
Manor Road

Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Manor Road, Wick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Bristol Waterworks Company on 2 Jun 2025 at 08:37.

Bristol Waterworks Company logo
Between
7 and 10 Jul 2025
Details
View Map
Share
Follow
Manor Road

Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Manor Road, Wick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Bristol Waterworks Company on 2 Apr 2025 at 14:46.

Gigaclear logo
Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Eastrip Lane

Gigaclear are proposing to carry out Utility asset works on Eastrip Lane, Colerne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Gigaclear on 16 Apr 2025 at 15:37.

Gigaclear logo
Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Eastrip Lane

Gigaclear are proposing to carry out Utility asset works on Eastrip Lane, Colerne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Gigaclear on 30 Apr 2025 at 09:28.

Wales And West Utilities logo
Between
14 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Millers Drive

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Millers Drive, North Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 28 Mar 2025 at 08:37.

Wales And West Utilities logo
Between
14 Jul and 1 Aug 2025
Details
View Map
Share
Millers Drive

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Millers Drive, North Common.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 1 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 29 Apr 2025 at 12:35.

Wessex Water logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Bailbrook Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Bailbrook Lane, Lower Swainswick, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 15 May 2025 at 07:34.

Wessex Water logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Bailbrook Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Bailbrook Lane, Lower Swainswick, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 11 Apr 2025 at 07:53.

Wessex Water logo
Between
15 and 17 Jul 2025
Details
View Map
Share
Follow
Church Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Church Road, Upper Weston, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 16 May 2025 at 11:38.

Wessex Water logo
Between
15 and 17 Jul 2025
Details
View Map
Share
Follow
Church Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Church Road, Upper Weston, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 11 Apr 2025 at 11:29.

Wales And West Utilities logo
LONG TERM
Between
23 Jul and 31 Oct 2025
Details
View Map
Share
Follow
High Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on High Street, Upper Weston, Bath.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 10 Feb 2025 at 11:14.

Wales And West Utilities logo
LONG TERM
Between
23 Jul and 31 Oct 2025
Details
View Map
Share
Follow
High Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on High Street, Upper Weston, Bath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 10 Feb 2025 at 15:04.

Wales And West Utilities logo
LONG TERM
Between
23 Jul and 31 Oct 2025
Details
View Map
Share
Follow
High Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on High Street, Upper Weston, Bath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 12 Feb 2025 at 08:16.

Bath And North East Somerset Council logo
Between
28 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Newbridge Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Newbridge Road, Newbridge, Bath.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 28 Feb 2025 at 12:47.

Wiltshire Council logo
LONG TERM
Between
28 Jul and 25 Sep 2025
Details
View Map
Share
Follow
Wormcliff Lane

Wiltshire Council are proposing to carry out roadworks on Wormcliff Lane, Kingsdown.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 23 May 2025 at 13:51.

Wales And West Utilities logo
LONG TERM
Between
28 Jul and 8 Sep 2025
Details
View Map
Share
Mill Lane

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Mill Lane, Warmley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 8 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 29 Apr 2025 at 12:38.

Wales And West Utilities logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Poplar Road

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Poplar Road, Warmley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 15 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 29 Apr 2025 at 12:39.

Wales And West Utilities logo
LONG TERM
Between
28 Jul and 3 Nov 2025
Details
View Map
Share
Victoria Road

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Victoria Road, Warmley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 3 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 29 Apr 2025 at 12:36.

Bath And North East Somerset Council logo
Between
28 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Newbridge Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Newbridge Road, Newbridge, Bath.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 28 Feb 2025 at 11:56.

Bath And North East Somerset Council logo
Between
28 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Newbridge Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Newbridge Road, Newbridge, Bath.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 28 Feb 2025 at 11:32.

Bath And North East Somerset Council logo
Between
28 Jul and 16 Aug 2025
Details
View Map
Share
Follow
Old Newbridge Hill

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Old Newbridge Hill, Newbridge, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 16 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 28 Feb 2025 at 11:57.

Bath And North East Somerset Council logo
Between
28 Jul and 16 Aug 2025
Details
View Map
Share
Follow
Old Newbridge Hill

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Old Newbridge Hill, Newbridge, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 16 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 28 Feb 2025 at 11:22.

Wales And West Utilities logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Cloverlea Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Cloverlea Road, Oldland Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 27 May 2025 at 10:29.

Bath And North East Somerset Council logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
St Saviour's Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on St Saviour's Road, Larkhall, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 24 Mar 2025 at 11:30.

Bath And North East Somerset Council logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
St Saviour's Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on St Saviour's Road, Larkhall, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 21 Mar 2025 at 15:18.

BT logo
Between
20 and 27 Aug 2025
Details
View Map
Share
Follow
Cann Lane

BT are proposing to carry out Utility asset works on Cann Lane, Oldland Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 27 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 27 May 2025 at 15:16.

Bath And North East Somerset Council logo
Between
21 and 23 Aug 2025
Details
View Map
Share
Follow
Newbridge Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Newbridge Road, Newbridge, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 23 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 28 Feb 2025 at 11:57.

Bath And North East Somerset Council logo
Between
21 and 23 Aug 2025
Details
View Map
Share
Follow
Newbridge Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Newbridge Road, Newbridge, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 23 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 28 Feb 2025 at 11:21.

Bath And North East Somerset Council logo
Between
21 and 23 Aug 2025
Details
View Map
Share
Follow
Brassmill Lane

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Brassmill Lane, Newbridge, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 23 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 28 Feb 2025 at 11:21.

Bath And North East Somerset Council logo
Between
21 and 23 Aug 2025
Details
View Map
Share
Follow
Brassmill Lane

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Brassmill Lane, Newbridge, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 23 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 28 Feb 2025 at 11:57.

BT logo
Between
26 and 29 Aug 2025
Details
View Map
Share
Follow
Broad Street

BT are proposing to carry out Utility repair and maintenance works on Broad Street, City Centre, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 21 May 2025 at 12:01.


Roadworks Map near to The Folly, CHIPPENHAM, SN14 8JR (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 21:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to The Folly, CHIPPENHAM, SN14 8JR (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.