ROADWORKS SUMMARY
Fosseway Close, CHIPPENHAM, SN14 8EE

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Fosseway Close, SN14 8EE and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Fosseway Close, CHIPPENHAM, SN14 8EE

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Fosseway Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Bath And North East Somerset Council logo
Finishing
Today
Details
View Map
Share
Mill Lane

Bath And North East Somerset Council were proposing to carry out Highway improvement works on Mill Lane, Bathampton, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 28 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 11 Feb 2025 at 08:47.

Bath And North East Somerset Council logo
Finishing
Today
Details
View Map
Share
Follow
Mill Lane

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Mill Lane, Bathampton, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 6 Dec 2024 at 10:13.

Wales And West Utilities logo
Between
17 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Coalpit Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Coalpit Road, Batheaston, Bath.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 15 Nov 2024 at 08:28.

Wales And West Utilities logo
Between
17 Mar and 4 Apr 2025
Details
View Map
Share
Coalpit Road

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Coalpit Road, Batheaston, Bath.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 4 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 19 Mar 2025 at 15:47.

Wales And West Utilities logo
Finishing
Today
Details
View Map
Share
Follow
High Street

Wales And West Utilities are carrying out Utility repair and maintenance works on High Street, Bathampton, Bath.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 March 2025 at 14:21 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 24 Mar 2025 at 09:36.

BT logo
Finishing
Today
Details
View Map
Share
Follow
Fosse Way

BT are proposing to carry out Utility asset works on Fosse Way, Nettleton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 27 Dec 2024 at 14:50.

Wales And West Utilities logo
Finishing
Monday
Details
View Map
Share
Follow
London Road East

Wales And West Utilities are carrying out Utility repair and maintenance works on London Road East, Batheaston, Bath.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 13:00 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 27 Mar 2025 at 16:06.

Gigaclear logo
Finishing
Today
Details
View Map
Share
Follow
Eastrip Lane

Gigaclear are proposing to carry out Utility asset works on Eastrip Lane, Colerne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 15 Jan 2025 at 09:49.

Wales And West Utilities logo
Finishing
Wednesday
Details
View Map
Share
Follow
Wormwood

Wales And West Utilities are carrying out Utility repair and maintenance works on Wormwood, Box.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 March 2025 at 08:51 and could run through until 2 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 27 Mar 2025 at 15:57.

Bath And North East Somerset Council logo
Between
31 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Mill Lane

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Mill Lane, Bathampton, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 12 Feb 2025 at 09:56.

Bath And North East Somerset Council logo
Between
31 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Mill Lane

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Mill Lane, Bathampton, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 11 Feb 2025 at 11:19.

Wiltshire Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Rushmead Lane

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Rushmead Lane, Lower South Wraxall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 3 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 17 Feb 2025 at 12:26.

Wales And West Utilities logo
Between
1 and 4 Apr 2025
Details
View Map
Share
Follow
Bailbrook Lane

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Bailbrook Lane, Lower Swainswick, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 5 Feb 2025 at 11:10.

Wales And West Utilities logo
Between
1 and 4 Apr 2025
Details
View Map
Share
Follow
Bailbrook Lane

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Bailbrook Lane, Lower Swainswick, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 28 Jan 2025 at 12:37.

Wiltshire Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Monkton Farleigh

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Monkton Farleigh, Monkton Farleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 3 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 17 Feb 2025 at 12:25.

Wiltshire Council logo
Between
2 and 5 Apr 2025
Details
View Map
Share
Follow
Slaughterford North Over Common Hill To Junction

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Slaughterford North Over Common Hill To Junction, Slaughterford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2025 and could run through until 5 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 21 Feb 2025 at 11:57.

Wiltshire Council logo
Between
2 and 5 Apr 2025
Details
View Map
Share
Follow
Ford C151 South East To Junction C179 South Of Toplands Farm

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Ford C151 South East To Junction C179 South Of Toplands Farm, Slaughterford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2025 and could run through until 5 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 21 Feb 2025 at 11:57.

Wiltshire Council logo
Between
3 and 5 Apr 2025
Details
View Map
Share
Follow
Monkton Farleigh

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Monkton Farleigh, Monkton Farleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 5 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 6 Mar 2025 at 15:11.

Wiltshire Council logo
Between
3 and 5 Apr 2025
Details
View Map
Share
Follow
Rushmead Lane

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Rushmead Lane, Lower South Wraxall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 5 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 26 Feb 2025 at 14:23.

Wiltshire Council logo
Between
3 and 5 Apr 2025
Details
View Map
Share
Follow
Rushmead Lane

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Rushmead Lane, Lower South Wraxall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 5 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 6 Mar 2025 at 16:13.

Wiltshire Council logo
Between
3 and 5 Apr 2025
Details
View Map
Share
Follow
Monkton Farleigh

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Monkton Farleigh, Monkton Farleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 5 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 26 Feb 2025 at 14:23.

Wiltshire Council logo
Between
4 and 6 Apr 2025
Details
View Map
Share
Follow
Slaughterford North Over Common Hill To Junction

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Slaughterford North Over Common Hill To Junction, Slaughterford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2025 and could run through until 6 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 12 Feb 2025 at 15:21.

Wiltshire Council logo
Between
4 and 6 Apr 2025
Details
View Map
Share
Follow
Ford C151 South East To Junction C179 South Of Toplands Farm

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Ford C151 South East To Junction C179 South Of Toplands Farm, Slaughterford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2025 and could run through until 6 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 12 Feb 2025 at 15:21.

Wiltshire Council logo
Between
5 and 7 Apr 2025
Details
View Map
Share
Follow
Junction With Bradford Road South West To Lynch Bottom

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Junction With Bradford Road South West To Lynch Bottom, Little Chalfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 7 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 10 Jan 2025 at 16:32.

Wiltshire Council logo
Between
5 and 7 Apr 2025
Details
View Map
Share
Follow
Barnetts Hill

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Barnetts Hill, Box Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 7 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 27 Jan 2025 at 16:50.

Wiltshire Council logo
Between
5 and 7 Apr 2025
Details
View Map
Share
Follow
Quarry Hill North East Past Grove Farm To Love Road

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Quarry Hill North East Past Grove Farm To Love Road, Box Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 7 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 27 Jan 2025 at 16:51.

Wiltshire Council logo
Between
5 and 7 Apr 2025
Details
View Map
Share
Follow
Wild Cross

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Wild Cross, South Wraxall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 7 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 10 Jan 2025 at 16:32.

Wiltshire Council logo
Between
6 and 8 Apr 2025
Details
View Map
Share
Follow
Rode Hill

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Rode Hill, Colerne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 April 2025 and could run through until 8 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 10 Jan 2025 at 16:38.

Wiltshire Council logo
Between
6 and 8 Apr 2025
Details
View Map
Share
Follow
Rode Hill South East C4 Past Ditteridge To Mill Lane Box

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Rode Hill South East C4 Past Ditteridge To Mill Lane Box, Ditteridge, Box.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 April 2025 and could run through until 8 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 10 Jan 2025 at 16:38.

Wessex Water logo
Between
7 Apr and 2 May 2025
Details
View Map
Share
Follow
Northend

Wessex Water are proposing to carry out Utility repair and maintenance works on Northend, Batheaston, Bath.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wessex Water on 10 Mar 2025 at 14:22.

Wales And West Utilities logo
Between
7 Apr and 1 May 2025
Details
View Map
Share
Follow
South Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on South Street, Corsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 1 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 11 Feb 2025 at 14:44.

Wales And West Utilities logo
Between
7 Apr and 1 May 2025
Details
View Map
Share
Follow
South Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on South Street, Corsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 1 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 21 Mar 2025 at 09:15.

Wessex Water logo
Between
7 Apr and 2 May 2025
Details
View Map
Share
Follow
Northend

Wessex Water are proposing to carry out Utility repair and maintenance works on Northend, Batheaston, Bath.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wessex Water on 5 Dec 2024 at 09:03.

Wiltshire Council logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
Entrance To Rugby Club East To Little Stubbage

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Entrance To Rugby Club East To Little Stubbage, Westrop.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 10 Jan 2025 at 16:41.

Wiltshire Council logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
Rushmead Lane

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Rushmead Lane, Lower South Wraxall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 19 Feb 2025 at 09:18.

Wiltshire Council logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
Monkton Farleigh

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Monkton Farleigh, Monkton Farleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 19 Feb 2025 at 09:22.

Wiltshire Council logo
Between
8 and 10 Apr 2025
Details
View Map
Share
Follow
Wild Cross

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Wild Cross, South Wraxall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 19 Feb 2025 at 10:24.

Wiltshire Council logo
Between
8 and 10 Apr 2025
Details
View Map
Share
Follow
Junction With Bradford Road South West To Lynch Bottom

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Junction With Bradford Road South West To Lynch Bottom, Little Chalfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 19 Feb 2025 at 10:29.

Wiltshire Council logo
Between
8 and 10 Apr 2025
Details
View Map
Share
Follow
Barnetts Hill

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Barnetts Hill, Box Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 19 Feb 2025 at 09:39.

Wiltshire Council logo
Between
8 and 10 Apr 2025
Details
View Map
Share
Follow
Quarry Hill North East Past Grove Farm To Love Road

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Quarry Hill North East Past Grove Farm To Love Road, Box Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 19 Feb 2025 at 09:31.

Wiltshire Council logo
Between
9 and 11 Apr 2025
Details
View Map
Share
Follow
Rode Hill

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Rode Hill, Colerne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 19 Feb 2025 at 10:34.

Wiltshire Council logo
Between
9 and 11 Apr 2025
Details
View Map
Share
Follow
Rode Hill South East C4 Past Ditteridge To Mill Lane Box

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Rode Hill South East C4 Past Ditteridge To Mill Lane Box, Ditteridge, Box.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 19 Feb 2025 at 10:40.

BT logo
Between
10 and 14 Apr 2025
Details
View Map
Share
Follow
Barnetts Hill

BT are proposing to carry out Utility asset works on Barnetts Hill, Box Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 14 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 10 Mar 2025 at 14:00.

BT logo
Between
10 and 14 Apr 2025
Details
View Map
Share
Follow
Barnetts Hill

BT are proposing to carry out Utility asset works on Barnetts Hill, Box Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 14 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 21 Jan 2025 at 10:34.

Wiltshire Council logo
Between
10 and 14 Apr 2025
Details
View Map
Share
Follow
Entrance To Rugby Club East To Little Stubbage

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Entrance To Rugby Club East To Little Stubbage, Westrop.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 14 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 19 Feb 2025 at 10:50.

Wiltshire Council logo
Between
10 and 14 Apr 2025
Details
View Map
Share
Follow
Lacock Road

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Lacock Road, Corsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 14 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 19 Feb 2025 at 10:44.

Wiltshire Council logo
Between
22 and 24 Apr 2025
Details
View Map
Share
Follow
County Boundary North To Junction Road To Colerne

Wiltshire Council are proposing to carry out Highway repair and maintenance works on County Boundary North To Junction Road To Colerne, North Colerne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 21 Feb 2025 at 12:25.

BT logo
Between
22 and 28 Apr 2025
Details
View Map
Share
Follow
Quarry Hill North East Past Grove Farm To Love Road

BT are proposing to carry out Utility asset works on Quarry Hill North East Past Grove Farm To Love Road, Box Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 28 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 4 Mar 2025 at 19:03.

BT logo
Between
22 and 28 Apr 2025
Details
View Map
Share
Follow
Quarry Hill North East Past Grove Farm To Love Road

BT are proposing to carry out Utility asset works on Quarry Hill North East Past Grove Farm To Love Road, Box Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 28 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 21 Jan 2025 at 10:29.

Gigaclear logo
Between
22 and 24 Apr 2025
Details
View Map
Share
Follow
Nursery Road

Gigaclear are proposing to carry out Utility asset works on Nursery Road, Colerne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 25 Mar 2025 at 15:22.

Wiltshire Council logo
Between
22 and 24 Apr 2025
Details
View Map
Share
Follow
Doncombe Hill

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Doncombe Hill, North Wraxall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 19 Mar 2025 at 16:14.

Gigaclear logo
Between
22 and 24 Apr 2025
Details
View Map
Share
Follow
Nursery Road

Gigaclear are proposing to carry out Utility asset works on Nursery Road, Colerne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 29 Jan 2025 at 14:27.

Wiltshire Council logo
Between
22 and 24 Apr 2025
Details
View Map
Share
Follow
Rushmead Lane

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Rushmead Lane, Lower South Wraxall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 14 Mar 2025 at 13:12.

Wiltshire Council logo
Between
22 and 24 Apr 2025
Details
View Map
Share
Follow
Monkton Farleigh

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Monkton Farleigh, Monkton Farleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 14 Mar 2025 at 13:12.

Wiltshire Council logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
Holbutts Farm South East C183 To Middlehill

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Holbutts Farm South East C183 To Middlehill, Middlehill, Box.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 23 Jan 2025 at 11:35.

Wessex Water logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
Footpath Eldon Place To Dafford Street

Wessex Water are proposing to carry out Utility repair and maintenance works on Footpath Eldon Place To Dafford Street, Larkhall, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 22 Jan 2025 at 07:59.

Wiltshire Council logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
Junction With Bradford Road South West To Lynch Bottom

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Junction With Bradford Road South West To Lynch Bottom, Little Chalfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 14 Mar 2025 at 10:49.

Wiltshire Council logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
Wild Cross

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Wild Cross, South Wraxall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 14 Mar 2025 at 10:49.

Wiltshire Council logo
Between
24 and 26 Apr 2025
Details
View Map
Share
Follow
Lacock Road

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Lacock Road, Corsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 26 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 18 Mar 2025 at 09:20.

Wiltshire Council logo
Between
24 and 26 Apr 2025
Details
View Map
Share
Follow
Entrance To Rugby Club East To Little Stubbage

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Entrance To Rugby Club East To Little Stubbage, Westrop.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 26 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 18 Mar 2025 at 09:20.

Wiltshire Council logo
Between
24 and 26 Apr 2025
Details
View Map
Share
Follow
Fosse Way

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Fosse Way, Nettleton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 26 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 18 Mar 2025 at 09:24.

Wiltshire Council logo
Between
27 and 29 Apr 2025
Details
View Map
Share
Follow
Rode Hill South East C4 Past Ditteridge To Mill Lane Box

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Rode Hill South East C4 Past Ditteridge To Mill Lane Box, Ditteridge, Box.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 18 Mar 2025 at 09:22.

Wiltshire Council logo
Between
27 and 29 Apr 2025
Details
View Map
Share
Follow
Rode Hill

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Rode Hill, Colerne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 18 Mar 2025 at 09:22.

Wessex Water logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Follow
Charlcombe Lane

Wessex Water are proposing to carry out Utility asset works on Charlcombe Lane, Charlcombe, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 13 Mar 2025 at 10:57.

Wessex Water logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Follow
Charlcombe Lane

Wessex Water are proposing to carry out Utility asset works on Charlcombe Lane, Charlcombe, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 13 Mar 2025 at 14:29.

Wiltshire Council logo
Between
29 Apr and 1 May 2025
Details
View Map
Share
Follow
Barnetts Hill

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Barnetts Hill, Box Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 18 Mar 2025 at 09:18.

Wiltshire Council logo
Between
29 Apr and 1 May 2025
Details
View Map
Share
Follow
Quarry Hill North East Past Grove Farm To Love Road

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Quarry Hill North East Past Grove Farm To Love Road, Box Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 18 Mar 2025 at 09:18.

Wiltshire Council logo
Between
2 and 6 May 2025
Details
View Map
Share
Follow
Chippenham Road

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Chippenham Road, Corsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2025 and could run through until 6 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 24 Feb 2025 at 16:30.

Wiltshire Council logo
Between
2 and 6 May 2025
Details
View Map
Share
Follow
Pickwick

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Pickwick, Corsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2025 and could run through until 6 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 24 Feb 2025 at 16:30.

Vodafone logo
Between
14 and 16 May 2025
Details
View Map
Share
Follow
A420 North East To Road To Castle Combe

Vodafone are proposing to carry out Remedial works on A420 North East To Road To Castle Combe, North Wraxall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 25 Feb 2025 at 10:43.

Wiltshire Council logo
Between
17 and 19 May 2025
Details
View Map
Share
Follow
County Boundary North To Junction Road To Colerne

Wiltshire Council are proposing to carry out Highway repair and maintenance works on County Boundary North To Junction Road To Colerne, North Colerne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 May 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 26 Mar 2025 at 11:22.

Wiltshire Council logo
Between
17 and 19 May 2025
Details
View Map
Share
Follow
Doncombe Hill

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Doncombe Hill, North Wraxall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 May 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 26 Mar 2025 at 11:15.

Wiltshire Council logo
Between
18 and 20 May 2025
Details
View Map
Share
Follow
Holbutts Farm South East C183 To Middlehill

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Holbutts Farm South East C183 To Middlehill, Middlehill, Box.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 May 2025 and could run through until 20 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 26 Mar 2025 at 14:42.

Nexfibre Networks Limited logo
Between
19 May and 3 Jun 2025
Details
View Map
Share
Follow
The Batch

Nexfibre Networks Limited are proposing to carry out Utility asset works on The Batch, Batheaston, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 28 Mar 2025 at 07:53.

BT logo
Between
19 and 21 May 2025
Details
View Map
Share
Follow
Evelyn Terrace

BT are proposing to carry out Utility asset works on Evelyn Terrace, Fairfield Park, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 12 Mar 2025 at 12:39.

Nexfibre Networks Limited logo
Between
19 May and 3 Jun 2025
Details
View Map
Share
Follow
The Batch

Nexfibre Networks Limited are proposing to carry out Utility asset works on The Batch, Batheaston, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 21 Feb 2025 at 09:11.

Nexfibre Networks Limited logo
Between
19 May and 3 Jun 2025
Details
View Map
Share
Follow
Coronation Cottages

Nexfibre Networks Limited are proposing to carry out Utility asset works on Coronation Cottages, Batheaston, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 21 Feb 2025 at 08:07.

BT logo
Between
19 and 21 May 2025
Details
View Map
Share
Follow
Evelyn Terrace

BT are proposing to carry out Utility asset works on Evelyn Terrace, Fairfield Park, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 13 Feb 2025 at 14:47.

Nexfibre Networks Limited logo
Between
19 May and 3 Jun 2025
Details
View Map
Share
Follow
Northend

Nexfibre Networks Limited are proposing to carry out Utility asset works on Northend, Batheaston, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 11 Mar 2025 at 11:18.

Nexfibre Networks Limited logo
Between
19 May and 3 Jun 2025
Details
View Map
Share
Follow
Northend

Nexfibre Networks Limited are proposing to carry out Utility asset works on Northend, Batheaston, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 21 Feb 2025 at 09:25.

Nexfibre Networks Limited logo
Between
19 May and 3 Jun 2025
Details
View Map
Share
Follow
Coronation Cottages

Nexfibre Networks Limited are proposing to carry out Utility asset works on Coronation Cottages, Batheaston, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 11 Mar 2025 at 14:13.

Bath And North East Somerset Council logo
Between
27 and 30 May 2025
Details
View Map
Share
Follow
St Saviour's Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on St Saviour's Road, Larkhall, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 26 Feb 2025 at 15:20.

Bath And North East Somerset Council logo
Between
27 and 30 May 2025
Details
View Map
Share
St Saviour's Road

Bath And North East Somerset Council were proposing to carry out Highway improvement works on St Saviour's Road, Larkhall, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 30 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 21 Mar 2025 at 15:00.

Wales And West Utilities logo
Between
27 and 30 May 2025
Details
View Map
Share
Follow
St Saviour's Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on St Saviour's Road, Larkhall, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 26 Mar 2025 at 11:25.

Wales And West Utilities logo
Between
27 and 30 May 2025
Details
View Map
Share
Larkhall Place

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Larkhall Place, Larkhall, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 30 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 26 Mar 2025 at 11:38.

Wiltshire Council logo
Between
28 May and 3 Jun 2025
Details
View Map
Share
South From Yatton Keynell To Crossroads

Wiltshire Council were proposing to carry out Section 50 on South From Yatton Keynell To Crossroads, Yatton Keynell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 May 2025 and run through until 3 June 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 3 Mar 2025 at 13:03.

BT logo
Between
3 and 9 Jun 2025
Details
View Map
Share
Follow
Fosse Way

BT are proposing to carry out Utility asset works on Fosse Way, Nettleton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 9 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 27 Mar 2025 at 10:26.

BT logo
Between
3 and 9 Jun 2025
Details
View Map
Share
Follow
Fosse Way

BT are proposing to carry out Utility asset works on Fosse Way, Nettleton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 9 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 27 Feb 2025 at 09:19.

Wessex Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Charlcombe Lane

Wessex Water were proposing to carry out Utility asset works on Charlcombe Lane, Charlcombe, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 11 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wessex Water on 12 Mar 2025 at 13:49.

Wiltshire Council logo
Between
11 and 14 Jun 2025
Details
View Map
Share
Follow
B4039 Crossroads C153 South East To Bristol Road

Wiltshire Council are proposing to carry out Highway repair and maintenance works on B4039 Crossroads C153 South East To Bristol Road, Lanhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 7 Mar 2025 at 13:57.

Wiltshire Council logo
Between
11 and 14 Jun 2025
Details
View Map
Share
Follow
A420 Yatton Road To Bristol Road Allington

Wiltshire Council are proposing to carry out Highway repair and maintenance works on A420 Yatton Road To Bristol Road Allington, Lanhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 7 Mar 2025 at 13:57.

Between
14 and 16 Jun 2025
Details
View Map
Share
Follow
Entrance To Rugby Club East To Little Stubbage

JSM Group Services LTD are proposing to carry out Utility asset works on Entrance To Rugby Club East To Little Stubbage, Westrop.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by JSM Group Services LTD on 18 Mar 2025 at 17:05.

South Gloucestershire Council logo
Between
17 Jun and 5 Jul 2025
Details
View Map
Share
Follow
Hyde's Lane

South Gloucestershire Council are proposing to carry out Highway improvement works on Hyde's Lane, Cold Ashton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 5 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 13 Mar 2025 at 07:08.

Wiltshire Council logo
Between
20 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Prospect

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Prospect, Corsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 7 Mar 2025 at 17:47.

Wiltshire Council logo
Between
20 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Pound Pill

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Pound Pill, Corsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 7 Mar 2025 at 17:47.


Roadworks Map near to Fosseway Close, CHIPPENHAM, SN14 8EE

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 28 Mar 2025 08:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Fosseway Close, CHIPPENHAM, SN14 8EE (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Wessex Water logo
ROUND BARROW CLOSE 
(0.1 miles)
Wessex Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
26 Mar 2025 15:55 - 20:00
0.1
Details
Share
2
Gigaclear logo
MAJOR
  
EASTRIP LANE 
(0.4 miles)
Gigaclear
Utility asset works - Carriageway - Road closure
Planned
Scheduled: 26 Mar 2025 - 28 Mar 2025
0.4
Details
Share
Follow
3
Gigaclear logo
MAJOR
  
EASTRIP LANE 
(0.4 miles)
Gigaclear
Utility asset works - Carriageway - Road closure
Complete
26 Mar 2025 10:08 - 27 Mar 2025 10:23
0.4
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.