ROADWORKS SUMMARY
London Terrace, CORSHAM, SN13 8HS

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for London Terrace, SN13 8HS and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to London Terrace, CORSHAM, SN13 8HS

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for London Terrace are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Wiltshire Council logo
LONG TERM
Between
1 Mar 2025 and 30 Dec 2026
Details
View Map
Share
West Cepen Way

Wiltshire Council were proposing to carry out Statutory Infrastructure Works on West Cepen Way, Chippenham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 March 2025 and run through until 30 December 2026. The works were due to impact the carriageway, verge and footpath.

This roadwork event was last updated by Wiltshire Council on 30 Apr 2025 at 13:44.

Western Power Distribution (South West) logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Warminster Road

Western Power Distribution (South West) are carrying out Utility repair and maintenance works on Warminster Road, Bathwick, Bath.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 April 2025 at 11:30 and could run through until 4 June 2025. The works will impact the verge only.

This roadwork event was last updated by Western Power Distribution (South West) on 3 Jun 2025 at 08:23.

Wiltshire Council logo
LONG TERM
Between
12 May 2025 and 26 Nov 2026
Details
View Map
Share
Follow
West Cepen Way

Wiltshire Council are proposing to carry out Statutory Infrastructure Works on West Cepen Way, Chippenham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 26 November 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Wiltshire Council on 15 May 2025 at 08:19.

Wiltshire Council logo
LONG TERM
Between
12 May 2025 and 26 Nov 2026
Details
View Map
Share
Follow
West Cepen Way

Wiltshire Council are proposing to carry out Statutory Infrastructure Works on West Cepen Way, Chippenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 26 November 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 30 Apr 2025 at 08:47.

Wales And West Utilities logo
Finishing
Today
Details
View Map
Share
Follow
St Saviour's Road

Wales And West Utilities are carrying out Utility repair and maintenance works on St Saviour's Road, Larkhall, Bath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 09:00 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 30 May 2025 at 10:38.

Wessex Water logo
LONG TERM
Between
1 Jun and 29 Aug 2025
Details
View Map
Share
Follow
Bath Road

Wessex Water are proposing to carry out Utility asset works on Bath Road, Shaw.

These works are categorised as Major.

The works will start on or after 1 June 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wessex Water on 3 Jan 2025 at 16:34.

Wales And West Utilities logo
Finishing
Monday
Details
View Map
Share
Follow
Fosse Lane

Wales And West Utilities are carrying out Utility repair and maintenance works on Fosse Lane, Batheaston, Bath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 11:00 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 3 Jun 2025 at 12:03.

Wiltshire Council logo
Finishing
Monday
Details
View Map
Share
Chippenham Road

Wiltshire Council were proposing to carry out Highway repair and maintenance works on Chippenham Road, Corsham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 June 2025 and run through until 9 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 1 May 2025 at 11:48.

Wiltshire Council logo
Finishing
Monday
Details
View Map
Share
Pickwick

Wiltshire Council were proposing to carry out Highway repair and maintenance works on Pickwick, Corsham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 June 2025 and run through until 9 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 1 May 2025 at 11:47.

Wales And West Utilities logo
LONG TERM
Between
9 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Bradford Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Bradford Road, Holt.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 12 Mar 2025 at 12:43.

Wales And West Utilities logo
LONG TERM
Between
9 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Church Rise

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Church Rise, Neston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 30 May 2025 at 10:17.

Wessex Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Charlcombe Lane

Wessex Water were proposing to carry out Utility asset works on Charlcombe Lane, Charlcombe, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 11 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wessex Water on 12 Mar 2025 at 13:49.

Wiltshire Council logo
Between
9 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Beanacre Road

Wiltshire Council are proposing to carry out Section 50 on Beanacre Road, Melksham.

These works are categorised as Major.

The works will start on or after 9 June 2025 and could run through until 2 July 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Wiltshire Council on 3 Jun 2025 at 16:09.

Wiltshire Council logo
Between
9 and 30 Jun 2025
Details
View Map
Share
Follow
Beanacre Road

Wiltshire Council are proposing to carry out Section 50 on Beanacre Road, Melksham.

These works are categorised as Major.

The works will start on or after 9 June 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Wiltshire Council on 3 Jun 2025 at 15:43.

Wales And West Utilities logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
Leigh Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Leigh Road, Holt.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 12 Mar 2025 at 11:13.

Wales And West Utilities logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
Leigh Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Leigh Road, Holt.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 15 May 2025 at 19:52.

Wales And West Utilities logo
LONG TERM
Between
9 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Bradford Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Bradford Road, Holt.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 15 May 2025 at 19:48.

Wiltshire Council logo
Between
11 and 14 Jun 2025
Details
View Map
Share
Follow
B4039 Crossroads C153 South East To Bristol Road

Wiltshire Council are proposing to carry out Highway repair and maintenance works on B4039 Crossroads C153 South East To Bristol Road, Lanhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 7 Mar 2025 at 13:57.

Wiltshire Council logo
Between
11 and 14 Jun 2025
Details
View Map
Share
Follow
A420 Yatton Road To Bristol Road Allington

Wiltshire Council are proposing to carry out Highway repair and maintenance works on A420 Yatton Road To Bristol Road Allington, Lanhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 7 Mar 2025 at 13:57.

Wiltshire Council logo
LONG TERM
Between
12 Jun and 6 Nov 2025
Details
View Map
Share
Follow
Woolley Street

Wiltshire Council are proposing to carry out Remedial works on Woolley Street, Bradford On Avon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 3 Apr 2025 at 15:58.

Between
14 and 16 Jun 2025
Details
View Map
Share
Follow
Entrance To Rugby Club East To Little Stubbage

JSM Group Services LTD are proposing to carry out Utility asset works on Entrance To Rugby Club East To Little Stubbage, Westrop.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by JSM Group Services LTD on 18 Mar 2025 at 17:05.

Wales And West Utilities logo
LONG TERM
Between
16 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Church Rise

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Church Rise, Neston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 22 Apr 2025 at 15:48.

Scottish Hydro Electric Power Dis logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Westlands Lane

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Westlands Lane, Whitley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 26 Mar 2025 at 12:25.

Scottish Hydro Electric Power Dis logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Westlands Lane

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Westlands Lane, Whitley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Mar 2025 at 10:12.

Scottish Hydro Electric Power Dis logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Westlands Lane

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Westlands Lane, Whitley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Mar 2025 at 08:28.

Wales And West Utilities logo
Between
16 and 19 Jun 2025
Details
View Map
Share
Bathampton Lane

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Bathampton Lane, Bathampton, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 19 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 4 Apr 2025 at 14:38.

Wiltshire Council logo
Between
18 and 25 Jun 2025
Details
View Map
Share
Follow
West Cepen Way

Wiltshire Council are proposing to carry out Statutory Infrastructure Works on West Cepen Way, Chippenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 3 Jun 2025 at 12:48.

Wiltshire Council logo
Between
18 and 25 Jun 2025
Details
View Map
Share
Follow
West Cepen Way

Wiltshire Council are proposing to carry out Statutory Infrastructure Works on West Cepen Way, Chippenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 3 Jun 2025 at 13:19.

Scottish Hydro Electric Power Dis logo
Between
19 and 25 Jun 2025
Details
View Map
Share
Corsham Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Corsham Road, Whitley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 June 2025 and run through until 25 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Apr 2025 at 09:00.

Wiltshire Council logo
Between
20 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Pound Pill

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Pound Pill, Corsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 7 Mar 2025 at 17:47.

Wiltshire Council logo
Between
20 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Prospect

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Prospect, Corsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 7 Mar 2025 at 17:47.

Bath And North East Somerset Council logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Ostlings Lane

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Ostlings Lane, Bathford, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 2 May 2025 at 11:00.

Bath And North East Somerset Council logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Ostlings Lane

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Ostlings Lane, Bathford, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 2 May 2025 at 14:12.

Scottish Hydro Electric Power Dis logo
Between
25 Jun and 1 Jul 2025
Details
View Map
Share
Corsham Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Corsham Road, Whitley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 June 2025 and run through until 1 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 26 Mar 2025 at 12:23.

Wiltshire Council logo
Between
25 Jun and 2 Jul 2025
Details
View Map
Share
Follow
West Cepen Way

Wiltshire Council are proposing to carry out Statutory Infrastructure Works on West Cepen Way, Chippenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 3 Jun 2025 at 13:27.

Wiltshire Council logo
Between
25 Jun and 2 Jul 2025
Details
View Map
Share
Follow
West Cepen Way

Wiltshire Council are proposing to carry out Statutory Infrastructure Works on West Cepen Way, Chippenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 3 Jun 2025 at 13:25.

Scottish Hydro Electric Power Dis logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Shaw Hill

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Shaw Hill, Shaw.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 4 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 16 Apr 2025 at 15:29.

Wales And West Utilities logo
Between
1 and 4 Jul 2025
Details
View Map
Share
Follow
Church Acre

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Church Acre, Bradford On Avon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 14 Apr 2025 at 09:40.

Gigaclear logo
Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Eastrip Lane

Gigaclear are proposing to carry out Utility asset works on Eastrip Lane, Colerne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Gigaclear on 16 Apr 2025 at 15:37.

Gigaclear logo
Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Eastrip Lane

Gigaclear are proposing to carry out Utility asset works on Eastrip Lane, Colerne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Gigaclear on 30 Apr 2025 at 09:28.

Wiltshire Council logo
Between
11 and 14 Jul 2025
Details
View Map
Share
Chippenham Road

Wiltshire Council were proposing to carry out Highway repair and maintenance works on Chippenham Road, Corsham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 July 2025 and run through until 14 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 12 May 2025 at 14:05.

Wiltshire Council logo
Between
11 and 14 Jul 2025
Details
View Map
Share
Pickwick

Wiltshire Council were proposing to carry out Highway repair and maintenance works on Pickwick, Corsham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 July 2025 and run through until 14 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 12 May 2025 at 14:04.

Wiltshire Council logo
Between
14 and 25 Jul 2025
Details
View Map
Share
Follow
Ham Green

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Ham Green, Holt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 21 May 2025 at 07:23.

Wessex Water logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Bailbrook Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Bailbrook Lane, Lower Swainswick, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 15 May 2025 at 07:34.

Wessex Water logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Bailbrook Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Bailbrook Lane, Lower Swainswick, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 11 Apr 2025 at 07:53.

Wiltshire Council logo
Between
14 and 25 Jul 2025
Details
View Map
Share
Follow
Ham Green

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Ham Green, Holt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 13 May 2025 at 17:02.

BT logo
Between
18 and 22 Jul 2025
Details
View Map
Share
Follow
Barnetts Hill

BT are proposing to carry out Utility asset works on Barnetts Hill, Box Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 22 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 17 Apr 2025 at 09:57.

BT logo
Between
18 and 22 Jul 2025
Details
View Map
Share
Follow
Drewetts Mill Lane

BT are proposing to carry out Utility asset works on Drewetts Mill Lane, Box.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 22 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 17 Apr 2025 at 09:46.

BT logo
Between
18 and 22 Jul 2025
Details
View Map
Share
Follow
Drewetts Mill Lane

BT are proposing to carry out Utility asset works on Drewetts Mill Lane, Box.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 22 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 28 Apr 2025 at 16:26.

Gigaclear logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Lacock Road North East C157 Through Westrop To T Junction

Gigaclear are proposing to carry out Utility asset works on Lacock Road North East C157 Through Westrop To T Junction, Westrop.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Gigaclear on 30 Apr 2025 at 09:55.

Gigaclear logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Lacock Road North East C157 Through Westrop To T Junction

Gigaclear are proposing to carry out Utility asset works on Lacock Road North East C157 Through Westrop To T Junction, Westrop.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Gigaclear on 8 May 2025 at 08:58.

Bath And North East Somerset Council logo
LONG TERM
Between
23 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Oakley

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Oakley, Claverton Down, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 14 Mar 2025 at 08:52.

Bath And North East Somerset Council logo
LONG TERM
Between
23 Jul and 29 Aug 2025
Details
View Map
Share
Bathwick Hill

Bath And North East Somerset Council were proposing to carry out Highway improvement works on Bathwick Hill, Bathwick, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 July 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 23 Apr 2025 at 08:59.

Bath And North East Somerset Council logo
LONG TERM
Between
23 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Bathwick Hill

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Bathwick Hill, Bathwick, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 14 Mar 2025 at 11:51.

Bath And North East Somerset Council logo
LONG TERM
Between
23 Jul and 29 Aug 2025
Details
View Map
Share
Oakley

Bath And North East Somerset Council were proposing to carry out Highway improvement works on Oakley, Claverton Down, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 July 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 23 Apr 2025 at 08:59.

Bath And North East Somerset Council logo
LONG TERM
Between
23 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Oakley

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Oakley, Claverton Down, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 14 Mar 2025 at 11:50.

Bath And North East Somerset Council logo
LONG TERM
Between
23 Jul and 29 Aug 2025
Details
View Map
Share
Copseland

Bath And North East Somerset Council were proposing to carry out Highway improvement works on Copseland, Claverton Down, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 July 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 23 Apr 2025 at 08:59.

Bath And North East Somerset Council logo
LONG TERM
Between
23 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Copseland

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Copseland, Claverton Down, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 14 Mar 2025 at 08:50.

Wiltshire Council logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Hartham Lane

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Hartham Lane, Biddestone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 3 Jun 2025 at 15:39.

Wiltshire Council logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Hartham Lane

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Hartham Lane, Biddestone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 15 May 2025 at 14:38.

Wiltshire Council logo
LONG TERM
Between
28 Jul and 25 Sep 2025
Details
View Map
Share
Follow
Wormcliff Lane

Wiltshire Council are proposing to carry out roadworks on Wormcliff Lane, Kingsdown.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 23 May 2025 at 13:51.

BT logo
Between
29 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Rough Street

BT are proposing to carry out Utility asset works on Rough Street, Corsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 1 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 3 Jun 2025 at 15:21.

BT logo
Between
29 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Rough Street

BT are proposing to carry out Utility asset works on Rough Street, Corsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 1 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 30 Apr 2025 at 11:04.

Between
9 and 11 Aug 2025
Details
View Map
Share
Follow
Entrance To Rugby Club East To Little Stubbage

JSM Group Services LTD are proposing to carry out Utility asset works on Entrance To Rugby Club East To Little Stubbage, Westrop.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 August 2025 and could run through until 11 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by JSM Group Services LTD on 30 Apr 2025 at 11:42.

Wiltshire Council logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Monks Lane

Wiltshire Council are proposing to carry out Section 50 on Monks Lane, Corsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 23 May 2025 at 13:54.

Wessex Water logo
Between
11 and 29 Aug 2025
Details
View Map
Share
Follow
Paul Street

Wessex Water are proposing to carry out Utility repair and maintenance works on Paul Street, Corsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 8 May 2025 at 08:49.

Wessex Water logo
Between
11 and 29 Aug 2025
Details
View Map
Share
Follow
Paul Street

Wessex Water are proposing to carry out Utility repair and maintenance works on Paul Street, Corsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 30 Apr 2025 at 11:48.

Wiltshire Council logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Monks Lane

Wiltshire Council are proposing to carry out Section 50 on Monks Lane, Corsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 27 May 2025 at 10:11.

Wessex Water logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Pickwick Road

Wessex Water were proposing to carry out Utility repair and maintenance works on Pickwick Road, Corsham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 August 2025 and run through until 22 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wessex Water on 16 Apr 2025 at 12:32.

Bath And North East Somerset Council logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
St Saviour's Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on St Saviour's Road, Larkhall, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 24 Mar 2025 at 11:30.

Bath And North East Somerset Council logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
St Saviour's Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on St Saviour's Road, Larkhall, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 21 Mar 2025 at 15:18.

Bath And North East Somerset Council logo
Between
29 Aug and 26 Sep 2025
Details
View Map
Share
Follow
Oakley

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Oakley, Claverton Down, Bath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 14 Mar 2025 at 08:52.

Bath And North East Somerset Council logo
Between
29 Aug and 26 Sep 2025
Details
View Map
Share
Bathwick Hill

Bath And North East Somerset Council were proposing to carry out Highway improvement works on Bathwick Hill, Bathwick, Bath.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 August 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 28 Apr 2025 at 14:38.

Bath And North East Somerset Council logo
Between
29 Aug and 26 Sep 2025
Details
View Map
Share
Follow
Bathwick Hill

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Bathwick Hill, Bathwick, Bath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 14 Mar 2025 at 12:44.

Bath And North East Somerset Council logo
Between
29 Aug and 26 Sep 2025
Details
View Map
Share
Oakley

Bath And North East Somerset Council were proposing to carry out Highway improvement works on Oakley, Claverton Down, Bath.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 August 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 14 Mar 2025 at 12:26.


Roadworks Map near to London Terrace, CORSHAM, SN13 8HS (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 4 Jun 2025 04:51
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to London Terrace, CORSHAM, SN13 8HS (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Wessex Water logo
URGENT
  
LONDON ROAD 
(0.4 miles)
Wessex Water
Utility repair and maintenance works - Footway, Carriageway - Two-way signals
In Progress
Since: 3 Jun 2025 09:30
(Scheduled: 3 Jun 2025 - 5 Jun 2025)
0.4
Details
Share
Follow
2
BT logo
URGENT
  
BRADFORD ROAD 
(0.8 miles)
BT
Utility repair and maintenance works - Carriageway - Multi-way signals
In Progress
Since: 2 Jun 2025 09:30
(Scheduled: 2 Jun 2025 - 5 Jun 2025)
0.8
Details
Share
Follow
3
Wiltshire Council logo
BATH ROAD 
(0.8 miles)
Wiltshire Council
Highway repair and maintenance works - Carriageway, Verge - Two-way signals
Planned
Scheduled: 2 Jun 2025 - 6 Jun 2025
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.