ROADWORKS SUMMARY
The Woodlands, CORSHAM, SN13 8BW

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for The Woodlands, SN13 8BW and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to The Woodlands, CORSHAM, SN13 8BW

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for The Woodlands are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Wiltshire Council logo
LONG TERM
Between
30 Sep 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Lower Stoke

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Lower Stoke, Limpley Stoke.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wiltshire Council on 3 Oct 2024 at 12:54.

Wiltshire Council logo
LONG TERM
Between
30 Sep 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Lower Stoke

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Lower Stoke, Limpley Stoke.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wiltshire Council on 4 Oct 2024 at 12:32.

Wiltshire Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Henley Lane

Wiltshire Council are carrying out Highway repair and maintenance works on Henley Lane, Box.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 December 2024 at 15:56 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 4 Feb 2025 at 09:06.

Western Power Distribution (South West) logo
LONG TERM
Until
21 Feb 2025
Details
View Map
Share
Follow
Rivers Street

Western Power Distribution (South West) are carrying out Utility asset works on Rivers Street, City Centre, Bath.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 January 2025 at 09:00 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 5 Feb 2025 at 10:36.

Western Power Distribution (South West) logo
LONG TERM
Until
21 Feb 2025
Details
View Map
Share
Follow
Julian Road

Western Power Distribution (South West) are carrying out Utility repair and maintenance works on Julian Road, Lansdown, Bath.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 January 2025 at 09:00 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 6 Feb 2025 at 11:20.

Western Power Distribution (South West) logo
Between
22 Jan and 20 Feb 2025
Details
View Map
Share
Rivers Street

Western Power Distribution (South West) were proposing to carry out Utility asset works on Rivers Street, City Centre, Bath.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 January 2025 and run through until 20 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 23 Jan 2025 at 09:59.

Wiltshire Council logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Belcombe Road

Wiltshire Council are proposing to carry out roadworks on Belcombe Road, Bradford On Avon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 7 Nov 2024 at 16:38.

Bath And North East Somerset Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Bloomfield Road

Bath And North East Somerset Council are carrying out Highway improvement works on Bloomfield Road, Bloomfield, Bath.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 09:30 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 30 Jan 2025 at 12:14.

Bath And North East Somerset Council logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Widcombe Hill

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Widcombe Hill, Widcombe, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 11 Dec 2024 at 07:36.

Western Power Distribution (South West) logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Rossiter Road

Western Power Distribution (South West) are proposing to carry out Disconnection or alteration of supply on Rossiter Road, Widcombe, Bath.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 12 Nov 2024 at 14:53.

Western Power Distribution (South West) logo
Until
21 Feb 2025
Details
View Map
Share
Follow
Rossiter Road

Western Power Distribution (South West) are carrying out Disconnection or alteration of supply on Rossiter Road, Widcombe, Bath.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 13:57 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 27 Jan 2025 at 14:11.

Wales And West Utilities logo
LONG TERM
Until
21 Mar 2025
Details
View Map
Share
Follow
New King Street

Wales And West Utilities are carrying out Utility repair and maintenance works on New King Street, Kingsmead, Bath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 09:30 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 27 Jan 2025 at 11:05.

Wessex Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Paul Street

Wessex Water are proposing to carry out Utility repair and maintenance works on Paul Street, Corsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 30 Oct 2024 at 10:02.

Wessex Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Paul Street

Wessex Water are proposing to carry out Utility repair and maintenance works on Paul Street, Corsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 5 Nov 2024 at 09:46.

Western Power Distribution (South West) logo
Between
10 and 24 Feb 2025
Details
View Map
Share
Barton Street

Western Power Distribution (South West) were proposing to carry out Utility asset works on Barton Street, City Centre, Bath.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 24 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 12 Dec 2024 at 10:27.

Wiltshire Council logo
Finishing
Today
Details
View Map
Share
Follow
Bath Road

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Bath Road, Box.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 20 Jan 2025 at 15:41.

Wales And West Utilities logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Morford Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Morford Street, Lansdown, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 25 Oct 2024 at 14:37.

Wales And West Utilities logo
Finishing
Tomorrow
Details
View Map
Share
Morford Street

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Morford Street, Lansdown, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 February 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 6 Feb 2025 at 16:07.

Wessex Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Rosemary Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Rosemary Lane, Freshford, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 7 Jan 2025 at 15:21.

Wessex Water logo
Finishing
Tomorrow
Details
View Map
Share
Rosemary Lane

Wessex Water were proposing to carry out Utility repair and maintenance works on Rosemary Lane, Freshford, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wessex Water on 20 Jan 2025 at 11:03.

Bath And North East Somerset Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Prior Park Road

Bath And North East Somerset Council are carrying out Highway improvement works on Prior Park Road, Widcombe, Bath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2025 at 07:00 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 12 Feb 2025 at 08:37.

Wales And West Utilities logo
Finishing
Wednesday
Details
View Map
Share
Follow
The Gravel

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on The Gravel, Holt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 29 Nov 2024 at 16:39.

Wales And West Utilities logo
Finishing
Wednesday
Details
View Map
Share
Follow
The Gravel

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on The Gravel, Holt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 6 Jan 2025 at 15:23.

Wales And West Utilities logo
Between
17 and 21 Feb 2025
Details
View Map
Share
The Gravel

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on The Gravel, Holt.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 28 Nov 2024 at 16:24.

Bath And North East Somerset Council logo
Between
17 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Bloomfield Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Bloomfield Road, Bloomfield, Bath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 30 Jan 2025 at 15:03.

Bath And North East Somerset Council logo
Between
17 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Bloomfield Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Bloomfield Road, Bloomfield, Bath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 31 Jan 2025 at 08:40.

Bath And North East Somerset Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Prior Park Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Prior Park Road, Widcombe, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 28 Jan 2025 at 13:59.

Bath And North East Somerset Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Prior Park Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Prior Park Road, Widcombe, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 29 Jan 2025 at 10:31.

Wiltshire Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
First Lane

Wiltshire Council are proposing to carry out Highway repair and maintenance works on First Lane, Whitley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 13 Dec 2024 at 11:18.

Wiltshire Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
First Lane

Wiltshire Council are proposing to carry out Highway repair and maintenance works on First Lane, Whitley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 6 Jan 2025 at 11:14.

BT logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Salisbury Road

BT are proposing to carry out Utility asset works on Salisbury Road, Larkhall, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 27 Nov 2024 at 15:11.

Wales And West Utilities logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Lyncombe Vale Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Lyncombe Vale Road, Lyncombe, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 9 Dec 2024 at 11:18.

Bath And North East Somerset Council logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Widcombe Hill

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Widcombe Hill, Widcombe, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 12 Dec 2024 at 14:31.

Western Power Distribution (South West) logo
Between
24 Feb and 10 Mar 2025
Details
View Map
Share
Sawclose

Western Power Distribution (South West) were proposing to carry out Utility asset works on Sawclose, City Centre, Bath.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 10 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 12 Dec 2024 at 10:40.

Western Power Distribution (South West) logo
Between
24 Feb and 10 Mar 2025
Details
View Map
Share
Upper Borough Walls

Western Power Distribution (South West) were proposing to carry out Utility asset works on Upper Borough Walls, City Centre, Bath.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 10 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 12 Dec 2024 at 10:40.

Wales And West Utilities logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Edward Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Edward Street, Bathwick, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 23 Sep 2024 at 07:47.

Wessex Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Watergates

Wessex Water are proposing to carry out Utility repair and maintenance works on Watergates, Colerne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 18 Dec 2024 at 11:04.

Gigaclear logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Round Barrow Close

Gigaclear were proposing to carry out Utility asset works on Round Barrow Close, Colerne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 26 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gigaclear on 20 Dec 2024 at 13:47.

Wessex Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Thickwood Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Thickwood Lane, Colerne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 28 Nov 2024 at 10:35.

Wessex Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Thickwood Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Thickwood Lane, Colerne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 5 Dec 2024 at 11:10.

Gigaclear logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Newtown

Gigaclear are proposing to carry out Utility asset works on Newtown, Bradford On Avon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 13 Dec 2024 at 15:16.

Gigaclear logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Newtown

Gigaclear were proposing to carry out Utility asset works on Newtown, Bradford On Avon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gigaclear on 12 Feb 2025 at 07:39.

Western Power Distribution (South West) logo
Between
26 Feb and 18 Mar 2025
Details
View Map
Share
Follow
Russell Street

Western Power Distribution (South West) are proposing to carry out Utility asset works on Russell Street, City Centre, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 25 Sep 2024 at 11:20.

Western Power Distribution (South West) logo
Between
26 Feb and 18 Mar 2025
Details
View Map
Share
Follow
Russell Street

Western Power Distribution (South West) are proposing to carry out Utility asset works on Russell Street, City Centre, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 18 Oct 2024 at 09:29.

Wales And West Utilities logo
Between
3 and 6 Mar 2025
Details
View Map
Share
Follow
Sharpstone Lane

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Sharpstone Lane, Freshford, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 7 Jan 2025 at 12:28.

Wales And West Utilities logo
Between
3 and 6 Mar 2025
Details
View Map
Share
Follow
Sharpstone Lane

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Sharpstone Lane, Freshford, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 15 Jan 2025 at 15:34.

Bath And North East Somerset Council logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Widcombe Hill

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Widcombe Hill, Widcombe, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 11 Feb 2025 at 11:03.

Bath And North East Somerset Council logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Widcombe Hill

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Widcombe Hill, Widcombe, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 12 Feb 2025 at 09:55.

Wales And West Utilities logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Pulteney Mews

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Pulteney Mews, Bathwick, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 23 Sep 2024 at 07:49.

Wales And West Utilities logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Pulteney Mews

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Pulteney Mews, Bathwick, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 1 Oct 2024 at 14:46.

Wales And West Utilities logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Pulteney Mews

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Pulteney Mews, Bathwick, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 2 Oct 2024 at 12:09.

Bath And North East Somerset Council logo
LONG TERM
Between
3 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Milsom Street

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Milsom Street, City Centre, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 11 Dec 2024 at 07:38.

Bath And North East Somerset Council logo
LONG TERM
Between
3 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Milsom Street

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Milsom Street, City Centre, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 11 Dec 2024 at 13:55.

Wales And West Utilities logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Edward Street

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Edward Street, Bathwick, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 5 Sep 2024 at 19:03.

Wales And West Utilities logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Edward Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Edward Street, Bathwick, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 1 Oct 2024 at 14:45.

Wales And West Utilities logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Edward Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Edward Street, Bathwick, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 2 Oct 2024 at 12:09.

Bath And North East Somerset Council logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Mill Lane

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Mill Lane, Bathampton, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 6 Dec 2024 at 10:13.

Bath And North East Somerset Council logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Mill Lane

Bath And North East Somerset Council were proposing to carry out Highway improvement works on Mill Lane, Bathampton, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 28 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 11 Feb 2025 at 08:47.

Bristol Waterworks Company logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Ashwicke Road

Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Ashwicke Road, Marshfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Bristol Waterworks Company on 29 Nov 2024 at 10:48.

Bristol Waterworks Company logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Ashwicke Road

Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Ashwicke Road, Marshfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Bristol Waterworks Company on 10 Dec 2024 at 09:49.

Wales And West Utilities logo
Between
4 and 7 Mar 2025
Details
View Map
Share
Follow
Cottles Lane

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Cottles Lane, Turleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 17 Dec 2024 at 16:40.

Wales And West Utilities logo
Between
4 and 6 Mar 2025
Details
View Map
Share
Follow
Cottles Lane

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Cottles Lane, Turleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 2 Jan 2025 at 17:03.

Wiltshire Council logo
Between
7 and 10 Mar 2025
Details
View Map
Share
Follow
Pickwick

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Pickwick, Corsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 29 Jan 2025 at 09:34.

Wiltshire Council logo
Between
7 and 10 Mar 2025
Details
View Map
Share
Follow
Chippenham Road

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Chippenham Road, Corsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 29 Jan 2025 at 09:34.

Wales And West Utilities logo
LONG TERM
Between
10 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Lyncombe Vale

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Lyncombe Vale, Lyncombe, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 9 Dec 2024 at 11:19.

Network Rail logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Bradford Road

Network Rail are proposing to carry out Works for Rail Purposes on Bradford Road, Bathford, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 17 Dec 2024 at 11:49.

Network Rail logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Bradford Road

Network Rail are proposing to carry out Works for Rail Purposes on Bradford Road, Bathford, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 6 Jan 2025 at 12:36.

Gigaclear logo
Between
12 and 14 Mar 2025
Details
View Map
Share
Follow
Westwells

Gigaclear are proposing to carry out Utility asset works on Westwells, Rudloe, Neston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 13 Dec 2024 at 08:56.

Gigaclear logo
Between
12 and 14 Mar 2025
Details
View Map
Share
Follow
Westwells

Gigaclear are proposing to carry out Utility asset works on Westwells, Rudloe, Neston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 7 Jan 2025 at 16:02.

Wales And West Utilities logo
Between
17 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Coalpit Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Coalpit Road, Batheaston, Bath.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 15 Nov 2024 at 08:28.

Wales And West Utilities logo
Between
17 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Coalpit Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Coalpit Road, Batheaston, Bath.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 20 Nov 2024 at 14:34.

Wessex Water logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Lanes End

Wessex Water are proposing to carry out Utility repair and maintenance works on Lanes End, Gastard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 13 Dec 2024 at 08:59.

Wessex Water logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Lanes End

Wessex Water are proposing to carry out Utility repair and maintenance works on Lanes End, Gastard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 19 Dec 2024 at 10:30.

Bath And North East Somerset Council logo
Between
18 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Monksdale Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Monksdale Road, Moorlands, Bath.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 9 Jan 2025 at 14:22.

Bath And North East Somerset Council logo
Between
18 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Monksdale Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Monksdale Road, Moorlands, Bath.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 13 Jan 2025 at 08:20.

Gigaclear logo
Between
24 and 26 Mar 2025
Details
View Map
Share
Belcombe Place

Gigaclear were proposing to carry out Utility asset works on Belcombe Place, Bradford On Avon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 26 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gigaclear on 31 Dec 2024 at 12:12.

Gigaclear logo
Between
26 and 28 Mar 2025
Details
View Map
Share
Follow
Eastrip Lane

Gigaclear are proposing to carry out Utility asset works on Eastrip Lane, Colerne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 15 Jan 2025 at 09:49.

Gigaclear logo
Between
26 and 28 Mar 2025
Details
View Map
Share
Follow
Eastrip Lane

Gigaclear are proposing to carry out Utility asset works on Eastrip Lane, Colerne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 12 Feb 2025 at 12:56.

Wessex Water logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Mill Lane

Wessex Water are proposing to carry out Utility asset works on Mill Lane, Monkton Combe, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 24 Oct 2024 at 14:58.

Wessex Water logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Mill Lane

Wessex Water are proposing to carry out Utility asset works on Mill Lane, Monkton Combe, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 2 Jan 2025 at 09:49.

Bath And North East Somerset Council logo
Between
31 Mar and 25 Apr 2025
Details
View Map
Share
Widcombe Hill

Bath And North East Somerset Council were proposing to carry out Highway improvement works on Widcombe Hill, Widcombe, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 25 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 13 Dec 2024 at 13:39.

Bath And North East Somerset Council logo
Between
31 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Widcombe Hill

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Widcombe Hill, Widcombe, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 13 Dec 2024 at 13:57.

Bath And North East Somerset Council logo
Between
31 Mar and 25 Apr 2025
Details
View Map
Share
Widcombe Hill

Bath And North East Somerset Council were proposing to carry out Highway improvement works on Widcombe Hill, Widcombe, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 25 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 11 Feb 2025 at 08:47.

Wiltshire Council logo
Between
31 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Rushmead Lane

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Rushmead Lane, Lower South Wraxall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 2 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 5 Feb 2025 at 09:48.

Wiltshire Council logo
Between
31 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Monkton Farleigh

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Monkton Farleigh, Monkton Farleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 2 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 5 Feb 2025 at 09:48.

Bath And North East Somerset Council logo
Between
31 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Mill Lane

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Mill Lane, Bathampton, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 11 Feb 2025 at 11:19.

Bath And North East Somerset Council logo
Between
31 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Mill Lane

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Mill Lane, Bathampton, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 12 Feb 2025 at 09:56.

Wales And West Utilities logo
Between
1 and 4 Apr 2025
Details
View Map
Share
Follow
Bailbrook Lane

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Bailbrook Lane, Lower Swainswick, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 28 Jan 2025 at 12:37.

Wales And West Utilities logo
Between
1 and 4 Apr 2025
Details
View Map
Share
Follow
Bailbrook Lane

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Bailbrook Lane, Lower Swainswick, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 5 Feb 2025 at 11:10.

Wiltshire Council logo
Between
3 and 5 Apr 2025
Details
View Map
Share
Follow
Rushmead Lane

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Rushmead Lane, Lower South Wraxall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 5 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 6 Feb 2025 at 10:32.

Wiltshire Council logo
Between
3 and 5 Apr 2025
Details
View Map
Share
Follow
Monkton Farleigh

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Monkton Farleigh, Monkton Farleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 5 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 6 Feb 2025 at 10:37.

Wiltshire Council logo
Between
4 and 8 Apr 2025
Details
View Map
Share
Follow
The Common

Wiltshire Council are proposing to carry out Highway repair and maintenance works on The Common, Broughton Gifford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2025 and could run through until 8 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 11 Feb 2025 at 10:53.

Wiltshire Council logo
Between
5 and 7 Apr 2025
Details
View Map
Share
Follow
Road From 216 Blackberry Lane South To Junction At Winsley Hill

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Road From 216 Blackberry Lane South To Junction At Winsley Hill, Conkwell, Limpley Stoke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 7 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 12 Feb 2025 at 09:39.

Wiltshire Council logo
Between
5 and 7 Apr 2025
Details
View Map
Share
Follow
Mill Lane

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Mill Lane, Broughton Gifford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 7 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 10 Jan 2025 at 16:36.

Wiltshire Council logo
Between
5 and 7 Apr 2025
Details
View Map
Share
Follow
Wild Cross

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Wild Cross, South Wraxall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 7 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 10 Jan 2025 at 16:32.

Wiltshire Council logo
Between
5 and 7 Apr 2025
Details
View Map
Share
Follow
Junction With Bradford Road South West To Lynch Bottom

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Junction With Bradford Road South West To Lynch Bottom, Little Chalfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 7 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 10 Jan 2025 at 16:32.

Wiltshire Council logo
Between
5 and 7 Apr 2025
Details
View Map
Share
Follow
Quarry Hill North East Past Grove Farm To Love Road

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Quarry Hill North East Past Grove Farm To Love Road, Box Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 7 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 27 Jan 2025 at 16:51.

Wiltshire Council logo
Between
5 and 7 Apr 2025
Details
View Map
Share
Follow
Barnetts Hill

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Barnetts Hill, Box Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 7 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 27 Jan 2025 at 16:50.

Wiltshire Council logo
Between
6 and 8 Apr 2025
Details
View Map
Share
Follow
Rode Hill South East C4 Past Ditteridge To Mill Lane Box

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Rode Hill South East C4 Past Ditteridge To Mill Lane Box, Ditteridge, Box.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 April 2025 and could run through until 8 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 10 Jan 2025 at 16:38.

Wiltshire Council logo
Between
6 and 8 Apr 2025
Details
View Map
Share
Follow
Rode Hill

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Rode Hill, Colerne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 April 2025 and could run through until 8 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 10 Jan 2025 at 16:38.

Wessex Water logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Rosemary Lane

Wessex Water were proposing to carry out Utility repair and maintenance works on Rosemary Lane, Freshford, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 9 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wessex Water on 7 Jan 2025 at 13:55.

Bath And North East Somerset Council logo
Between
7 and 16 Apr 2025
Details
View Map
Share
Follow
Ralph Allen Drive

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Ralph Allen Drive, Lyncombe, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 16 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 28 Jan 2025 at 14:31.

Bath And North East Somerset Council logo
Between
7 and 16 Apr 2025
Details
View Map
Share
Follow
Ralph Allen Drive

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Ralph Allen Drive, Lyncombe, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 16 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 29 Jan 2025 at 10:31.

Electricity Network Company logo
Between
7 and 23 Apr 2025
Details
View Map
Share
Dorset Close

Electricity Network Company were proposing to carry out New service connection on Dorset Close, Twerton, Bath.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 23 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 11 Feb 2025 at 09:09.

Wessex Water logo
Between
7 Apr and 2 May 2025
Details
View Map
Share
Follow
Northend

Wessex Water are proposing to carry out Utility repair and maintenance works on Northend, Batheaston, Bath.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wessex Water on 5 Dec 2024 at 09:03.

Wales And West Utilities logo
Between
7 Apr and 1 May 2025
Details
View Map
Share
Follow
South Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on South Street, Corsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 1 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 11 Feb 2025 at 14:44.

Wales And West Utilities logo
Between
7 Apr and 1 May 2025
Details
View Map
Share
Follow
South Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on South Street, Corsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 1 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 12 Feb 2025 at 14:57.

Gigaclear logo
Between
8 and 10 Apr 2025
Details
View Map
Share
Follow
Belcombe Place

Gigaclear are proposing to carry out Utility asset works on Belcombe Place, Bradford On Avon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 10 Jan 2025 at 17:06.

Wales And West Utilities logo
Between
8 and 11 Apr 2025
Details
View Map
Share
Follow
Shaft Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Shaft Road, Monkton Combe, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 12 Feb 2025 at 08:12.

BT logo
Between
10 and 14 Apr 2025
Details
View Map
Share
Follow
Barnetts Hill

BT are proposing to carry out Utility asset works on Barnetts Hill, Box Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 14 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 21 Jan 2025 at 10:34.

Bath And North East Somerset Council logo
Between
22 and 25 Apr 2025
Details
View Map
Share
Follow
Park Lane

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Park Lane, Lower Weston, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 28 Jan 2025 at 14:43.

Bath And North East Somerset Council logo
Between
22 and 25 Apr 2025
Details
View Map
Share
Follow
Park Lane

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Park Lane, Lower Weston, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 29 Jan 2025 at 10:32.

BT logo
Between
22 and 28 Apr 2025
Details
View Map
Share
Follow
Quarry Hill North East Past Grove Farm To Love Road

BT are proposing to carry out Utility asset works on Quarry Hill North East Past Grove Farm To Love Road, Box Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 28 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 21 Jan 2025 at 10:29.

Gigaclear logo
Between
22 and 24 Apr 2025
Details
View Map
Share
Follow
Nursery Road

Gigaclear are proposing to carry out Utility asset works on Nursery Road, Colerne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 29 Jan 2025 at 14:27.

Wiltshire Council logo
Between
22 and 24 Apr 2025
Details
View Map
Share
Follow
Doncombe Hill

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Doncombe Hill, North Wraxall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 23 Jan 2025 at 09:22.

Wessex Water logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
Footpath Eldon Place To Dafford Street

Wessex Water are proposing to carry out Utility repair and maintenance works on Footpath Eldon Place To Dafford Street, Larkhall, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 22 Jan 2025 at 07:59.

Wiltshire Council logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
Holbutts Farm South East C183 To Middlehill

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Holbutts Farm South East C183 To Middlehill, Middlehill, Box.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 23 Jan 2025 at 11:35.

Bath And North East Somerset Council logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Follow
Brook Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Brook Road, Twerton, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 28 Jan 2025 at 14:34.

Bath And North East Somerset Council logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Follow
Brook Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Brook Road, Twerton, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 29 Jan 2025 at 10:32.

BT logo
Between
12 and 14 May 2025
Details
View Map
Share
Follow
Upper Lansdown Mews

BT are proposing to carry out Utility asset works on Upper Lansdown Mews, Lansdown, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 14 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 4 Feb 2025 at 12:19.

BT logo
Between
12 and 14 May 2025
Details
View Map
Share
Follow
Upper Lansdown Mews

BT are proposing to carry out Utility asset works on Upper Lansdown Mews, Lansdown, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 14 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 11 Feb 2025 at 12:50.


Roadworks Map near to The Woodlands, CORSHAM, SN13 8BW (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 13 Feb 2025 05:58
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to The Woodlands, CORSHAM, SN13 8BW (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Wiltshire Council logo
BATH ROAD 
(0.6 miles)
Wiltshire Council
Highway repair and maintenance works - Carriageway - Two-way signals
Planned
Scheduled: 10 Feb 2025 - 21 Feb 2025
0.6
Details
Share
Follow
2
Bath And North East Somerset Council logo
HIGH STREET, BATHFORD 
(0.9 miles)
Bath And North East Somerset Council
Highway repair and maintenance works - Footpath - Some carriageway incursion
In Progress
Since: 11 Feb 2025 12:25
(Scheduled: 11 Feb 2025 - 13 Feb 2025)
0.9
Details
Share
Follow