ROADWORKS SUMMARY
Lower Kingsdown Road, CORSHAM, SN13 8BQ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Lower Kingsdown Road, SN13 8BQ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Lower Kingsdown Road, CORSHAM, SN13 8BQ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Lower Kingsdown Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Bath And North East Somerset Council logo
LONG TERM
Between
9 Jun and 30 Sep 2025
Details
View Map
Share
Follow
Beau Street

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Beau Street, City Centre, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bath And North East Somerset Council on 23 May 2025 at 15:38.

Bath And North East Somerset Council logo
LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Beau Street

Bath And North East Somerset Council are carrying out Highway improvement works on Beau Street, City Centre, Bath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 June 2025 at 08:45 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 9 Jun 2025 at 09:54.

Wiltshire Council logo
LONG TERM
Between
12 Jun and 6 Nov 2025
Details
View Map
Share
Follow
Woolley Street

Wiltshire Council are proposing to carry out Remedial works on Woolley Street, Bradford On Avon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wiltshire Council on 3 Apr 2025 at 15:58.

Wales And West Utilities logo
LONG TERM
Between
23 Jul and 31 Oct 2025
Details
View Map
Share
Follow
High Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on High Street, Upper Weston, Bath.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wales And West Utilities on 10 Feb 2025 at 11:14.

Wales And West Utilities logo
LONG TERM
Between
23 Jul and 31 Oct 2025
Details
View Map
Share
Follow
High Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on High Street, Upper Weston, Bath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wales And West Utilities on 10 Feb 2025 at 15:04.

Wales And West Utilities logo
LONG TERM
Between
23 Jul and 31 Oct 2025
Details
View Map
Share
High Street

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on High Street, Upper Weston, Bath.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 July 2025 and run through until 31 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 16 Jul 2025 at 11:31.

LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Park Lane

Leep Utilities Electric are carrying out New service connection on Park Lane, Lower Weston, Bath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 July 2025 at 09:30 and could run through until 20 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leep Utilities Electric on 11 Sep 2025 at 15:48.

Wiltshire Council logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Wormcliff Lane

Wiltshire Council are proposing to carry out roadworks on Wormcliff Lane, Kingsdown.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wiltshire Council on 23 May 2025 at 13:51.

Bath And North East Somerset Council logo
LONG TERM
Between
19 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Entry Hill

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Entry Hill, Lyncombe, Bath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 27 Jun 2025 at 14:32.

Bath And North East Somerset Council logo
LONG TERM
Between
19 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Entry Hill

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Entry Hill, Lyncombe, Bath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 30 Jun 2025 at 09:32.

Bath And North East Somerset Council logo
LONG TERM
Between
25 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Entry Hill

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Entry Hill, Lyncombe, Bath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 2 Apr 2025 at 11:53.

Bath And North East Somerset Council logo
LONG TERM
Between
25 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Entry Hill

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Entry Hill, Lyncombe, Bath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 3 Apr 2025 at 08:04.

Wales And West Utilities logo
LONG TERM
Between
26 Aug and 14 Nov 2025
Details
View Map
Share
Follow
Southdown Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Southdown Road, Southdown, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 25 Apr 2025 at 11:11.

Wales And West Utilities logo
LONG TERM
Until
14 Nov 2025
Details
View Map
Share
Follow
Southdown Road

Wales And West Utilities are carrying out Utility repair and maintenance works on Southdown Road, Southdown, Bath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 10:30 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 26 Aug 2025 at 11:03.

Wales And West Utilities logo
LONG TERM
Between
26 Aug and 17 Oct 2025
Details
View Map
Share
Follow
High Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on High Street, Upper Weston, Bath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 16 Jul 2025 at 11:52.

Wales And West Utilities logo
LONG TERM
Until
17 Oct 2025
Details
View Map
Share
Follow
High Street

Wales And West Utilities are carrying out Utility repair and maintenance works on High Street, Upper Weston, Bath.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 09:00 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 11 Sep 2025 at 09:33.

Wales And West Utilities logo
LONG TERM
Between
26 Aug and 17 Oct 2025
Details
View Map
Share
Footpaths Associated Southlands

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Footpaths Associated Southlands, Upper Weston, Bath.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 16 Jul 2025 at 11:42.

Wales And West Utilities logo
LONG TERM
Between
26 Aug and 17 Oct 2025
Details
View Map
Share
High Street

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on High Street, Upper Weston, Bath.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 16 Jul 2025 at 11:33.

Bath And North East Somerset Council logo
Between
29 Aug and 26 Sep 2025
Details
View Map
Share
Follow
Oakley

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Oakley, Claverton Down, Bath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 14 Mar 2025 at 08:52.

Bath And North East Somerset Council logo
Between
29 Aug and 26 Sep 2025
Details
View Map
Share
Oakley

Bath And North East Somerset Council were proposing to carry out Highway improvement works on Oakley, Claverton Down, Bath.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 August 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 14 Mar 2025 at 12:26.

Bath And North East Somerset Council logo
Between
29 Aug and 26 Sep 2025
Details
View Map
Share
Follow
Bathwick Hill

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Bathwick Hill, Bathwick, Bath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 14 Mar 2025 at 12:44.

Bath And North East Somerset Council logo
Between
29 Aug and 26 Sep 2025
Details
View Map
Share
Bathwick Hill

Bath And North East Somerset Council were proposing to carry out Highway improvement works on Bathwick Hill, Bathwick, Bath.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 August 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 28 Apr 2025 at 14:38.

Wiltshire Council logo
LONG TERM
Between
1 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Winsley Bypass

Wiltshire Council are proposing to carry out Highway improvement works on Winsley Bypass, Winsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 31 Jan 2025 at 17:58.

Bath And North East Somerset Council logo
LONG TERM
Between
1 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Midford Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Midford Road, Odd Down, Bath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 22 May 2025 at 09:40.

Bath And North East Somerset Council logo
LONG TERM
Between
1 Sep and 3 Oct 2025
Details
View Map
Share
Midford Road

Bath And North East Somerset Council were proposing to carry out Highway improvement works on Midford Road, Odd Down, Bath.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 3 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 13 Aug 2025 at 13:04.

Bath And North East Somerset Council logo
LONG TERM
Between
1 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Entry Hill

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Entry Hill, Lyncombe, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bath And North East Somerset Council on 13 Aug 2025 at 10:10.

Bath And North East Somerset Council logo
Finishing
Today
Details
View Map
Share
Follow
Entry Hill

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Entry Hill, Lyncombe, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 2 Apr 2025 at 09:22.

Wiltshire Council logo
Between
1 and 26 Sep 2025
Details
View Map
Share
Follow
Folly Lane

Wiltshire Council are proposing to carry out Remedial works on Folly Lane, Shaw.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 22 Aug 2025 at 09:10.

Bath And North East Somerset Council logo
LONG TERM
Between
8 Sep and 21 Nov 2025
Details
View Map
Share
Bradford Road

Bath And North East Somerset Council were proposing to carry out Highway improvement works on Bradford Road, Combe Down, Bath.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 21 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 21 May 2025 at 18:30.

Bath And North East Somerset Council logo
Between
8 Sep and 3 Oct 2025
Details
View Map
Share
Combe Road

Bath And North East Somerset Council were proposing to carry out Highway improvement works on Combe Road, Combe Down, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 3 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 4 Sep 2025 at 09:42.

Bath And North East Somerset Council logo
LONG TERM
Between
8 Sep and 5 Nov 2025
Details
View Map
Share
Follow
Combe Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Combe Road, Combe Down, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 4 Sep 2025 at 16:44.

Bath And North East Somerset Council logo
LONG TERM
Between
8 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Widcombe Hill

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Widcombe Hill, Widcombe, Bath.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 26 Jun 2025 at 10:16.

Bath And North East Somerset Council logo
LONG TERM
Between
8 Sep and 7 Nov 2025
Details
View Map
Share
Follow
Lower Bristol Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Lower Bristol Road, Westmoreland, Bath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 3 Jun 2025 at 12:52.

Bath And North East Somerset Council logo
LONG TERM
Between
8 Sep and 7 Nov 2025
Details
View Map
Share
Lower Bristol Road

Bath And North East Somerset Council were proposing to carry out Highway improvement works on Lower Bristol Road, Westmoreland, Bath.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 7 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 10 Sep 2025 at 15:39.

Bath And North East Somerset Council logo
LONG TERM
Between
8 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Lower Bristol Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Lower Bristol Road, Westmoreland, Bath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 29 May 2025 at 09:25.

Bath And North East Somerset Council logo
LONG TERM
Between
8 Sep and 25 Nov 2025
Details
View Map
Share
Follow
Green Park Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Green Park Road, City Centre, Bath.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 3 Jun 2025 at 12:54.

Until
27 Sep 2025
Details
View Map
Share
Follow
Upper Bristol Road

Leep Utilities Electric are carrying out New service connection on Upper Bristol Road, Lower Weston, Bath.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 12:30 and could run through until 27 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leep Utilities Electric on 12 Sep 2025 at 07:44.

Wales And West Utilities logo
Between
8 and 26 Sep 2025
Details
View Map
Share
Follow
Bedford Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Bedford Street, Walcot, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 2 Jul 2025 at 11:41.

Wales And West Utilities logo
Until
26 Sep 2025
Details
View Map
Share
Follow
Bedford Street

Wales And West Utilities are carrying out Utility repair and maintenance works on Bedford Street, Walcot, Bath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2025 at 09:00 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 9 Sep 2025 at 09:43.

Wessex Water logo
LONG TERM
Between
8 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Leafy Lane

Wessex Water are proposing to carry out Utility asset works on Leafy Lane, Corsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 2 Apr 2025 at 10:15.

Wessex Water logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Leafy Lane

Wessex Water are carrying out Utility asset works on Leafy Lane, Corsham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 09:00 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 8 Sep 2025 at 09:11.

Bath And North East Somerset Council logo
Between
10 and 26 Sep 2025
Details
View Map
Share
Follow
Combe Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Combe Road, Combe Down, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 22 May 2025 at 10:31.

Wiltshire Council logo
Finishing
Today
Details
View Map
Share
Follow
Cottles Lane

Wiltshire Council are carrying out Highway repair and maintenance works on Cottles Lane, Turleigh.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:00 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 15 Sep 2025 at 09:30.

Bath And North East Somerset Council logo
Until
8 Oct 2025
Details
View Map
Share
Follow
Midford Road

Bath And North East Somerset Council are carrying out Highway improvement works on Midford Road, Odd Down, Bath.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 11:00 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 15 Sep 2025 at 12:00.

Bath And North East Somerset Council logo
Finishing
Today
Details
View Map
Share
Entry Hill

Bath And North East Somerset Council were proposing to carry out Highway improvement works on Entry Hill, Lyncombe, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 19 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 13 Aug 2025 at 13:03.

Bath And North East Somerset Council logo
Between
17 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Midford Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Midford Road, Odd Down, Bath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 13 Aug 2025 at 10:14.

Wessex Water logo
Finishing
Today
Details
View Map
Share
Kingston Road

Wessex Water were proposing to carry out Utility asset works on Kingston Road, City Centre, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 September 2025 and run through until 19 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wessex Water on 7 Jul 2025 at 12:02.

Wessex Water logo
Finishing
Monday
Details
View Map
Share
Follow
Oakford Lane

Wessex Water are carrying out Utility repair and maintenance works on Oakford Lane, Batheaston, Bath.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 08:00 and could run through until 22 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 17 Sep 2025 at 11:05.

Wiltshire Council logo
Between
22 Sep and 3 Oct 2025
Details
View Map
Share
Follow
The Star

Wiltshire Council are proposing to carry out Highway repair and maintenance works on The Star, Holt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 28 Aug 2025 at 11:26.

Wiltshire Council logo
Between
22 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Gaston

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Gaston, Holt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 28 Aug 2025 at 11:27.

Wiltshire Council logo
Between
22 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Ham Green

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Ham Green, Holt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 28 Aug 2025 at 11:27.

Bath And North East Somerset Council logo
Between
22 Sep and 7 Oct 2025
Details
View Map
Share
Follow
Mulberry Way

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Mulberry Way, Combe Down, Bath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 7 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 4 Sep 2025 at 11:07.

Bath And North East Somerset Council logo
Between
22 Sep and 7 Oct 2025
Details
View Map
Share
Follow
Mulberry Way

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Mulberry Way, Combe Down, Bath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 7 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 4 Sep 2025 at 15:54.

Bath And North East Somerset Council logo
Between
22 Sep and 11 Oct 2025
Details
View Map
Share
Follow
Copseland

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Copseland, Claverton Down, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 26 Jun 2025 at 10:17.

Bath And North East Somerset Council logo
LONG TERM
Between
22 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Lower Bristol Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Lower Bristol Road, Westmoreland, Bath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 26 Aug 2025 at 14:52.

Wales And West Utilities logo
Finishing
Thursday
Details
View Map
Share
Palace Yard Mews

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Palace Yard Mews, City Centre, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 25 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 2 Jul 2025 at 15:59.

Wales And West Utilities logo
Finishing
Thursday
Details
View Map
Share
Follow
Palace Yard Mews

Wales And West Utilities are proposing to carry out Disconnection or alteration of supply on Palace Yard Mews, City Centre, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 3 Jul 2025 at 14:30.

Wales And West Utilities logo
Finishing
Thursday
Details
View Map
Share
Follow
Palace Yard Mews

Wales And West Utilities are proposing to carry out Disconnection or alteration of supply on Palace Yard Mews, City Centre, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 10 Jul 2025 at 15:19.

Wessex Water logo
Between
22 and 30 Sep 2025
Details
View Map
Share
Follow
Portal Avenue

Wessex Water are proposing to carry out Utility asset works on Portal Avenue, Corsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 30 Apr 2025 at 11:51.

Wessex Water logo
Between
22 and 30 Sep 2025
Details
View Map
Share
Follow
Portal Avenue

Wessex Water are proposing to carry out Utility asset works on Portal Avenue, Corsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 8 May 2025 at 10:04.

Bath And North East Somerset Council logo
Between
25 and 27 Sep 2025
Details
View Map
Share
Follow
Oakley

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Oakley, Claverton Down, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 27 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 14 Mar 2025 at 08:48.

Bath And North East Somerset Council logo
Between
25 and 27 Sep 2025
Details
View Map
Share
Follow
Oakley

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Oakley, Claverton Down, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 27 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 14 Mar 2025 at 11:59.

Bath And North East Somerset Council logo
Between
25 and 27 Sep 2025
Details
View Map
Share
Oakley

Bath And North East Somerset Council were proposing to carry out Highway improvement works on Oakley, Claverton Down, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 September 2025 and run through until 27 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 23 Apr 2025 at 08:59.

Bath And North East Somerset Council logo
Between
25 and 27 Sep 2025
Details
View Map
Share
Follow
Copseland

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Copseland, Claverton Down, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 27 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 14 Mar 2025 at 08:49.

Bath And North East Somerset Council logo
Between
25 and 27 Sep 2025
Details
View Map
Share
Copseland

Bath And North East Somerset Council were proposing to carry out Highway improvement works on Copseland, Claverton Down, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 September 2025 and run through until 27 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 23 Apr 2025 at 08:59.

Bath And North East Somerset Council logo
Between
25 and 27 Sep 2025
Details
View Map
Share
Follow
North Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on North Road, Bathwick, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 27 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 14 Mar 2025 at 08:49.

Bath And North East Somerset Council logo
Between
25 and 27 Sep 2025
Details
View Map
Share
North Road

Bath And North East Somerset Council were proposing to carry out Highway improvement works on North Road, Bathwick, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 September 2025 and run through until 27 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 23 Apr 2025 at 08:59.

Bath And North East Somerset Council logo
Between
25 and 27 Sep 2025
Details
View Map
Share
Follow
Bathwick Hill

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Bathwick Hill, Bathwick, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 27 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 14 Mar 2025 at 08:49.

Bath And North East Somerset Council logo
Between
25 and 27 Sep 2025
Details
View Map
Share
Bathwick Hill

Bath And North East Somerset Council were proposing to carry out Highway improvement works on Bathwick Hill, Bathwick, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 September 2025 and run through until 27 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 23 Apr 2025 at 08:59.

Wiltshire Council logo
Between
26 and 28 Sep 2025
Details
View Map
Share
Poulton

Wiltshire Council were proposing to carry out Highway repair and maintenance works on Poulton, Bradford On Avon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 September 2025 and run through until 28 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 23 Jul 2025 at 10:21.

Wiltshire Council logo
Between
27 and 29 Sep 2025
Details
View Map
Share
Woolley Drive

Wiltshire Council were proposing to carry out Highway repair and maintenance works on Woolley Drive, Bradford On Avon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 September 2025 and run through until 29 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 23 Jul 2025 at 10:22.

Bath And North East Somerset Council logo
Between
29 Sep and 20 Oct 2025
Details
View Map
Share
Follow
Bradford Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Bradford Road, Combe Down, Bath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 22 May 2025 at 08:21.

Wiltshire Council logo
Between
29 Sep and 8 Oct 2025
Details
View Map
Share
Follow
High Street

Wiltshire Council are proposing to carry out Highway repair and maintenance works on High Street, Box.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 8 Apr 2025 at 15:51.

Wiltshire Council logo
Between
29 Sep and 8 Oct 2025
Details
View Map
Share
Follow
High Street

Wiltshire Council are proposing to carry out Highway repair and maintenance works on High Street, Box.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 3 Sep 2025 at 15:39.

Wiltshire Council logo
Between
29 Sep and 8 Oct 2025
Details
View Map
Share
Follow
Bath Road

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Bath Road, Box.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 8 Apr 2025 at 15:51.

Wiltshire Council logo
Between
29 Sep and 8 Oct 2025
Details
View Map
Share
Follow
Bath Road

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Bath Road, Box.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 3 Sep 2025 at 15:07.

Wiltshire Council logo
Between
30 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Poulton

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Poulton, Bradford On Avon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 15 Aug 2025 at 14:36.

Wiltshire Council logo
Between
30 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Poulton

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Poulton, Bradford On Avon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 4 Sep 2025 at 09:24.

Wiltshire Council logo
Between
30 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Woolley Drive

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Woolley Drive, Bradford On Avon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 15 Aug 2025 at 14:35.

Wiltshire Council logo
Between
30 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Woolley Drive

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Woolley Drive, Bradford On Avon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 29 Aug 2025 at 16:09.

Bath And North East Somerset Council logo
Between
30 Sep and 27 Oct 2025
Details
View Map
Share
Bradford Road

Bath And North East Somerset Council were proposing to carry out Highway improvement works on Bradford Road, Combe Down, Bath.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2025 and run through until 27 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 4 Sep 2025 at 09:52.

Wiltshire Council logo
Between
2 and 4 Oct 2025
Details
View Map
Share
Follow
The Laggar

Wiltshire Council are proposing to carry out Highway repair and maintenance works on The Laggar, Corsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 4 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 15 Aug 2025 at 12:19.

Wiltshire Council logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
Sandy Leaze

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Sandy Leaze, Bradford On Avon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 15 Aug 2025 at 10:29.

Bath And North East Somerset Council logo
LONG TERM
Between
6 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Lower Bristol Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Lower Bristol Road, Westmoreland, Bath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 5 Sep 2025 at 15:11.

Bath And North East Somerset Council logo
LONG TERM
Between
6 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Lower Bristol Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Lower Bristol Road, Westmoreland, Bath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 8 Sep 2025 at 09:24.

Bath And North East Somerset Council logo
LONG TERM
Between
6 Oct and 25 Nov 2025
Details
View Map
Share
Follow
Green Park Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Green Park Road, City Centre, Bath.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 5 Sep 2025 at 08:18.

Wessex Water logo
LONG TERM
Between
6 Oct and 19 Dec 2025
Details
View Map
Share
Follow
Church Lane

Wessex Water are proposing to carry out Utility asset works on Church Lane, Batheaston, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wessex Water on 20 May 2025 at 14:13.

Wessex Water logo
LONG TERM
Between
6 Oct and 19 Dec 2025
Details
View Map
Share
Follow
Church Lane

Wessex Water are proposing to carry out Utility asset works on Church Lane, Batheaston, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wessex Water on 18 Sep 2025 at 09:59.

Wiltshire Council logo
Between
7 and 9 Oct 2025
Details
View Map
Share
Sandy Leaze

Wiltshire Council were proposing to carry out Highway repair and maintenance works on Sandy Leaze, Bradford On Avon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2025 and run through until 9 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 4 Aug 2025 at 09:52.

Wiltshire Council logo
Between
8 and 10 Oct 2025
Details
View Map
Share
Follow
Sandy Leaze

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Sandy Leaze, Bradford On Avon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 17 Sep 2025 at 09:13.

Bath And North East Somerset Council logo
Between
8 Oct and 4 Nov 2025
Details
View Map
Share
Follow
Bradford Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Bradford Road, Combe Down, Bath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 4 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 4 Sep 2025 at 16:32.

Bath And North East Somerset Council logo
Between
8 Oct and 4 Nov 2025
Details
View Map
Share
Follow
Bradford Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Bradford Road, Combe Down, Bath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 4 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 5 Sep 2025 at 11:18.

Bath And North East Somerset Council logo
LONG TERM
Between
8 Oct and 19 Nov 2025
Details
View Map
Share
Follow
Entry Hill

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Entry Hill, Lyncombe, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bath And North East Somerset Council on 4 Sep 2025 at 16:34.

Wessex Water logo
Between
8 and 10 Oct 2025
Details
View Map
Share
Follow
Footpath Camden Road To Rivers Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Footpath Camden Road To Rivers Road, Beacon Hill, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 8 Jul 2025 at 12:50.

Wessex Water logo
Between
8 and 10 Oct 2025
Details
View Map
Share
Follow
Footpath Camden Road To Rivers Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Footpath Camden Road To Rivers Road, Beacon Hill, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 24 Jul 2025 at 11:53.

Bath And North East Somerset Council logo
Between
9 and 11 Oct 2025
Details
View Map
Share
Follow
Claverton Down Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Claverton Down Road, Claverton Down, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 26 Jun 2025 at 10:17.

Bath And North East Somerset Council logo
Between
9 and 11 Oct 2025
Details
View Map
Share
Follow
Widcombe Hill

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Widcombe Hill, Widcombe, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 26 Jun 2025 at 10:17.

Wessex Water logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Ostlings Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Ostlings Lane, Bathford, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 9 Jun 2025 at 14:20.

Wessex Water logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Ostlings Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Ostlings Lane, Bathford, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 23 Jun 2025 at 13:04.

Wessex Water logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Mill Lane

Wessex Water are proposing to carry out Utility asset works on Mill Lane, Monkton Combe, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 10 Jul 2025 at 15:52.

Wessex Water logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Mill Lane

Wessex Water are proposing to carry out Utility asset works on Mill Lane, Monkton Combe, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 11 Jul 2025 at 07:40.

Western Power Distribution (South West) logo
Between
20 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Sion Hill

Western Power Distribution (South West) are proposing to carry out Utility repair and maintenance works on Sion Hill, Lansdown, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 1 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 21 Aug 2025 at 09:19.

Western Power Distribution (South West) logo
Between
20 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Sion Hill

Western Power Distribution (South West) are proposing to carry out Utility repair and maintenance works on Sion Hill, Lansdown, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 1 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 21 Aug 2025 at 14:33.

Western Power Distribution (South West) logo
Between
20 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Sion Hill

Western Power Distribution (South West) are proposing to carry out Utility repair and maintenance works on Sion Hill, Lansdown, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 1 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 8 Sep 2025 at 09:15.

Bath And North East Somerset Council logo
Between
21 Oct and 4 Nov 2025
Details
View Map
Share
Follow
Bradford Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Bradford Road, Combe Down, Bath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 4 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 22 May 2025 at 08:21.

Scottish Hydro Electric Power Dis logo
Between
22 and 24 Oct 2025
Details
View Map
Share
Norrington Lane

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Norrington Lane, Shaw.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 October 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Aug 2025 at 16:13.

Scottish Hydro Electric Power Dis logo
Between
22 and 24 Oct 2025
Details
View Map
Share
Norrington Lane

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Norrington Lane, Shaw.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 October 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 5 Sep 2025 at 09:00.

Wales And West Utilities logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Eastbourne Avenue

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Eastbourne Avenue, Larkhall, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 11 Jul 2025 at 14:47.

Wales And West Utilities logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Eastbourne Avenue

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Eastbourne Avenue, Larkhall, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 17 Jul 2025 at 10:43.

Wales And West Utilities logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Fairfield Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Fairfield Road, Fairfield Park, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 11 Jul 2025 at 14:48.

Wales And West Utilities logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Fairfield Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Fairfield Road, Fairfield Park, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 17 Jul 2025 at 10:43.

Wales And West Utilities logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Junction With Iford Hill East C217 To Westwood Road

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Junction With Iford Hill East C217 To Westwood Road, Lower Westwood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 7 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 11 Aug 2025 at 15:00.

Wales And West Utilities logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Junction With Iford Hill East C217 To Westwood Road

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Junction With Iford Hill East C217 To Westwood Road, Lower Westwood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 31 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 11 Aug 2025 at 15:49.

Wales And West Utilities logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Junction With Iford Hill East C217 To Westwood Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Junction With Iford Hill East C217 To Westwood Road, Lower Westwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 22 Aug 2025 at 15:16.

Wales And West Utilities logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Junction With Iford Hill East C217 To Westwood Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Junction With Iford Hill East C217 To Westwood Road, Lower Westwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 3 Sep 2025 at 12:11.

Wales And West Utilities logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Orchard Close

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Orchard Close, Lower Westwood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 7 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 11 Aug 2025 at 14:56.

Wales And West Utilities logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Linden Crescent

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Linden Crescent, Lower Westwood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 7 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 11 Aug 2025 at 14:21.

Wales And West Utilities logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Orchard Close

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Orchard Close, Lower Westwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 22 Aug 2025 at 15:20.

Wales And West Utilities logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Orchard Close

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Orchard Close, Lower Westwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 3 Sep 2025 at 12:09.

Wales And West Utilities logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
New Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on New Road, Freshford, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 6 Aug 2025 at 08:11.

Wales And West Utilities logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
New Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on New Road, Freshford, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 5 Sep 2025 at 09:24.

Wales And West Utilities logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Church Lane

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Church Lane, Freshford, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 6 Aug 2025 at 08:11.

Wales And West Utilities logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Church Lane

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Church Lane, Freshford, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 14 Aug 2025 at 08:55.

Wales And West Utilities logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Crowe Lane

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Crowe Lane, Freshford, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 6 Aug 2025 at 08:11.

Wales And West Utilities logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Crowe Lane

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Crowe Lane, Freshford, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 5 Sep 2025 at 09:26.

Wales And West Utilities logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Melksham Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Melksham Road, Holt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 21 Aug 2025 at 17:43.

Wales And West Utilities logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Melksham Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Melksham Road, Holt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 2 Sep 2025 at 09:51.

Wales And West Utilities logo
Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
The Avenue

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on The Avenue, Combe Down, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 29 Jul 2025 at 08:25.

Wales And West Utilities logo
Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
The Avenue

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on The Avenue, Combe Down, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 13 Aug 2025 at 15:36.

Wales And West Utilities logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Melksham Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Melksham Road, Holt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 8 Jul 2025 at 09:31.

Wales And West Utilities logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Melksham Road

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Melksham Road, Holt.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 7 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 28 Jul 2025 at 13:21.

Bath And North East Somerset Council logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Lower Bristol Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Lower Bristol Road, Westmoreland, Bath.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 29 May 2025 at 09:25.

Bath And North East Somerset Council logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Green Park Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Green Park Road, City Centre, Bath.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 29 May 2025 at 09:24.

Bath And North East Somerset Council logo
Between
28 Oct and 13 Nov 2025
Details
View Map
Share
Bradford Road

Bath And North East Somerset Council were proposing to carry out Highway improvement works on Bradford Road, Combe Down, Bath.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2025 and run through until 13 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 4 Sep 2025 at 10:25.

Bath And North East Somerset Council logo
Between
31 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Lower Bristol Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Lower Bristol Road, Westmoreland, Bath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 29 May 2025 at 09:25.

Wales And West Utilities logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Conigre Hill

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Conigre Hill, Bradford On Avon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 29 Aug 2025 at 08:33.

Wales And West Utilities logo
Between
3 and 6 Nov 2025
Details
View Map
Share
Follow
Sydney Buildings

Wales And West Utilities are proposing to carry out Disconnection or alteration of supply on Sydney Buildings, Bathwick, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 27 Aug 2025 at 10:36.

Western Power Distribution (South West) logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Palace Yard Mews

Western Power Distribution (South West) are proposing to carry out New service connection on Palace Yard Mews, City Centre, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 15 Aug 2025 at 15:21.

Western Power Distribution (South West) logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Palace Yard Mews

Western Power Distribution (South West) are proposing to carry out New service connection on Palace Yard Mews, City Centre, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 26 Aug 2025 at 14:48.

Wales And West Utilities logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Camden Crescent

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Camden Crescent, Lansdown, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 21 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 16 Sep 2025 at 12:53.

Wales And West Utilities logo
Between
3 and 21 Nov 2025
Details
View Map
Share
St Stephen's Road

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on St Stephen's Road, Lansdown, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 21 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 16 Sep 2025 at 12:52.

Wales And West Utilities logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Camden Road

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Camden Road, Beacon Hill, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 21 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 16 Sep 2025 at 12:52.

Wessex Water logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Follow
Lower Kingsdown Road

Wessex Water are proposing to carry out New service connection on Lower Kingsdown Road, Kingsdown.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 6 Aug 2025 at 09:15.

Wessex Water logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Follow
Lower Kingsdown Road

Wessex Water are proposing to carry out New service connection on Lower Kingsdown Road, Kingsdown.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 13 Aug 2025 at 16:14.

Wales And West Utilities logo
Between
4 and 7 Nov 2025
Details
View Map
Share
Follow
Old Wells Road

Wales And West Utilities are proposing to carry out Disconnection or alteration of supply on Old Wells Road, Bear Flat, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 2 Jul 2025 at 07:54.

Wales And West Utilities logo
Between
4 and 7 Nov 2025
Details
View Map
Share
Follow
Old Wells Road

Wales And West Utilities are proposing to carry out Disconnection or alteration of supply on Old Wells Road, Bear Flat, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 14 Jul 2025 at 11:14.

Bath And North East Somerset Council logo
Between
5 and 28 Nov 2025
Details
View Map
Share
Follow
Combe Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Combe Road, Combe Down, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 5 Sep 2025 at 11:17.

Bath And North East Somerset Council logo
Between
5 and 28 Nov 2025
Details
View Map
Share
Follow
Combe Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Combe Road, Combe Down, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 5 Sep 2025 at 14:06.

Network Rail logo
Between
8 and 16 Nov 2025
Details
View Map
Share
Follow
Brook Road

Network Rail are proposing to carry out Works for Rail Purposes on Brook Road, Twerton, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2025 and could run through until 16 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 11 Aug 2025 at 10:53.

Wales And West Utilities logo
Between
10 and 14 Nov 2025
Details
View Map
Share
The Causeway

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on The Causeway, Holt.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 14 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 3 Sep 2025 at 16:39.

Wales And West Utilities logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
The Causeway

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on The Causeway, Holt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 3 Sep 2025 at 16:42.

Wales And West Utilities logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
The Causeway

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on The Causeway, Holt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 9 Sep 2025 at 09:04.

Bath And North East Somerset Council logo
Between
10 and 15 Nov 2025
Details
View Map
Share
Bradford Road

Bath And North East Somerset Council were proposing to carry out Highway improvement works on Bradford Road, Combe Down, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 15 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 21 May 2025 at 18:30.

BT logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Upper Lansdown Mews

BT are proposing to carry out Utility asset works on Upper Lansdown Mews, Lansdown, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 4 Aug 2025 at 08:49.

BT logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Upper Lansdown Mews

BT are proposing to carry out Utility asset works on Upper Lansdown Mews, Lansdown, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 18 Aug 2025 at 15:33.

Bath And North East Somerset Council logo
Between
12 and 14 Nov 2025
Details
View Map
Share
Follow
Midford Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Midford Road, Odd Down, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 5 Sep 2025 at 08:13.

BT logo
Between
12 and 14 Nov 2025
Details
View Map
Share
Follow
Mullins Close

BT are proposing to carry out Utility asset works on Mullins Close, Colerne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 3 Sep 2025 at 15:46.

Bath And North East Somerset Council logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Bradford Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Bradford Road, Combe Down, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 9 Jun 2025 at 11:17.

Virgin Media logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
Walcot Street

Virgin Media are proposing to carry out Utility asset works on Walcot Street, City Centre, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 13 Aug 2025 at 12:40.

Wales And West Utilities logo
Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Ashley Avenue

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Ashley Avenue, Lower Weston, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 16 Sep 2025 at 15:42.

Wales And West Utilities logo
Between
17 Nov and 12 Dec 2025
Details
View Map
Share
Eastbourne Avenue

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Eastbourne Avenue, Larkhall, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 12 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 13 Mar 2025 at 15:46.

Wales And West Utilities logo
Between
17 Nov and 12 Dec 2025
Details
View Map
Share
Fairfield Road

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Fairfield Road, Fairfield Park, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 12 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 13 Mar 2025 at 15:44.

Bath And North East Somerset Council logo
Between
19 and 22 Nov 2025
Details
View Map
Share
Follow
Bradford Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Bradford Road, Combe Down, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 4 Sep 2025 at 16:31.

Bath And North East Somerset Council logo
Between
19 and 22 Nov 2025
Details
View Map
Share
Follow
Bradford Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Bradford Road, Combe Down, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 5 Sep 2025 at 11:16.

Bath And North East Somerset Council logo
Between
24 and 30 Nov 2025
Details
View Map
Share
Follow
Midford Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Midford Road, Odd Down, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 30 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 25 Jun 2025 at 12:03.

Bath And North East Somerset Council logo
Between
24 and 30 Nov 2025
Details
View Map
Share
Midford Road

Bath And North East Somerset Council were proposing to carry out Highway improvement works on Midford Road, Odd Down, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 November 2025 and run through until 30 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 13 Aug 2025 at 13:04.

Bath And North East Somerset Council logo
Between
24 and 30 Nov 2025
Details
View Map
Share
Follow
Midford Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Midford Road, Odd Down, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 30 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 25 Jun 2025 at 09:25.

Bath And North East Somerset Council logo
Between
24 and 26 Nov 2025
Details
View Map
Share
Follow
Bradford Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Bradford Road, Combe Down, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 25 Jun 2025 at 14:07.

Bath And North East Somerset Council logo
Between
25 and 27 Nov 2025
Details
View Map
Share
Follow
Midford Road

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Midford Road, Odd Down, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 27 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 13 Aug 2025 at 10:16.

BT logo
Between
26 Nov and 7 Dec 2025
Details
View Map
Share
Follow
Beech Road

BT are proposing to carry out Utility asset works on Beech Road, Box Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2025 and could run through until 7 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 3 Sep 2025 at 16:09.

BT logo
Between
26 Nov and 7 Dec 2025
Details
View Map
Share
Follow
Beech Road

BT are proposing to carry out Utility asset works on Beech Road, Box Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2025 and could run through until 7 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 11 Sep 2025 at 11:38.

BT logo
Between
26 Nov and 7 Dec 2025
Details
View Map
Share
Follow
Barnetts Hill

BT are proposing to carry out Utility asset works on Barnetts Hill, Box Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2025 and could run through until 7 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 3 Sep 2025 at 16:08.

BT logo
Between
26 Nov and 7 Dec 2025
Details
View Map
Share
Follow
Barnetts Hill

BT are proposing to carry out Utility asset works on Barnetts Hill, Box Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2025 and could run through until 7 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 11 Sep 2025 at 15:39.

Wiltshire Council logo
Between
1 and 10 Dec 2025
Details
View Map
Share
Follow
Winsley Hill

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Winsley Hill, Limpley Stoke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 5 Aug 2025 at 16:05.

Wessex Water logo
Between
16 and 18 Dec 2025
Details
View Map
Share
Follow
Bradford Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Bradford Road, Corsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2025 and could run through until 18 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 17 Sep 2025 at 14:51.


Roadworks Map near to Lower Kingsdown Road, CORSHAM, SN13 8BQ (2 Events)

Colour Codes
Planned
In Progress
Completed
Cancelled
Marker
Marker
Last Updated: 18 Sep 2025 23:56
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Lower Kingsdown Road, CORSHAM, SN13 8BQ (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Wiltshire Council logo
MAJOR
  
WORMCLIFF LANE 
(0.6 miles)
Wiltshire Council
Optional permit (no fee) e.g. for traffic management etc - Carriageway - Road closure
Planned
Scheduled: 28 Jul 2025 - 25 Sep 2025
0.6
Details
Share
Follow
2
BT logo
MONKTON FARLEIGH 
(0.9 miles)
BT
New service connection - Verge - Some carriageway incursion
Planned
Scheduled: 17 Sep 2025 - 19 Sep 2025
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.