ROADWORKS SUMMARY
Ferry Lane, MARLOW, SL7 2EZ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Ferry Lane, SL7 2EZ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Ferry Lane, MARLOW, SL7 2EZ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Ferry Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Southern Gas Networks logo
LONG TERM
Between
23 Sep and 9 Dec 2024
Details
View Map
Share
Follow
Northfield Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Northfield Avenue, Lower Shiplake, Henley-on-thames.

These works are categorised as Major.

The works will start on or after 23 September 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 10 Sep 2024 at 11:28.

Thames Water logo
LONG TERM
Until
12 Dec 2024
Details
View Map
Share
Follow
Booker Place

Thames Water are carrying out Utility repair and maintenance works on Booker Place, High Wycombe.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 18:30 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Nov 2024 at 15:48.

Cadent Gas logo
Between
18 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Bovingdon Green

Cadent Gas are proposing to carry out Utility asset works on Bovingdon Green, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 22 Jul 2024 at 14:09.

Cadent Gas logo
Between
19 Nov and 10 Dec 2024
Details
View Map
Share
Follow
Lock Lane

Cadent Gas are proposing to carry out Utility asset works on Lock Lane, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 16:35.

Cadent Gas logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Lock Lane

Cadent Gas are carrying out Utility asset works on Lock Lane, Maidenhead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 07:48 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 09:04.

Buckinghamshire Council logo
Finishing
Monday
Details
View Map
Share
Follow
Beechtree Avenue

Buckinghamshire Council are carrying out Highway repair and maintenance works on Beechtree Avenue, Marlow Bottom.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 November 2024 at 09:30 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 29 Nov 2024 at 10:00.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Lock Road

Thames Water were proposing to carry out Utility repair and maintenance works on Lock Road, Marlow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 4 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Nov 2024 at 12:28.

Cadent Gas logo
LONG TERM
Between
2 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Oak Tree Road

Cadent Gas are proposing to carry out Utility asset works on Oak Tree Road, Marlow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 09:09.

Cadent Gas logo
LONG TERM
Between
2 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Oak Tree Road

Cadent Gas are proposing to carry out Utility asset works on Oak Tree Road, Marlow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 16:09.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Main Road

Thames Water were proposing to carry out Utility repair and maintenance works on Main Road, Rotten Row, Hambleden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 4 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Nov 2024 at 12:19.

Southern Gas Networks logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Duke Street

Southern Gas Networks are proposing to carry out New service connection on Duke Street, Henley-on-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 14:19.

Scottish Hydro Electric Power Dis logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Frieth Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Frieth Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 30 Sep 2024 at 10:38.

Cadent Gas logo
LONG TERM
Between
6 Jan and 21 Apr 2025
Details
View Map
Share
Follow
Marlow Road

Cadent Gas are proposing to carry out Utility asset works on Marlow Road, Little Marlow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Aug 2024 at 12:03.

Cadent Gas logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Birdwood Road

Cadent Gas are proposing to carry out Utility asset works on Birdwood Road, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 13:20.

Cadent Gas logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Mundaydean Lane

Cadent Gas are proposing to carry out Utility asset works on Mundaydean Lane, Marlow.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 11:18.

Cadent Gas logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Mundaydean Lane

Cadent Gas are proposing to carry out Utility asset works on Mundaydean Lane, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 14:42.

Cadent Gas logo
LONG TERM
Between
6 Jan and 21 Apr 2025
Details
View Map
Share
Follow
Marlow Road

Cadent Gas are proposing to carry out Utility asset works on Marlow Road, Little Marlow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 15:32.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Hatch Gate Lane

Thames Water are proposing to carry out New service connection on Hatch Gate Lane, Cockpole Green, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 15:47.

Cadent Gas logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Wessex Way

Cadent Gas are proposing to carry out Utility asset works on Wessex Way, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 10:30.

Cadent Gas logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Wessex Way

Cadent Gas are proposing to carry out Utility asset works on Wessex Way, Maidenhead.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 16:24.

Network Rail logo
Between
7 and 11 Jan 2025
Details
View Map
Share
Maidenhead Road

Network Rail were proposing to carry out Works for Rail Purposes on Maidenhead Road, Cookham, Maidenhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 11 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 16 Sep 2024 at 16:01.

Scottish Hydro Electric Power Dis logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Frieth Road

Scottish Hydro Electric Power Dis are proposing to carry out Permanent reinstatement on Frieth Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 20 Nov 2024 at 12:13.

Oxfordshire County Council logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
St Andrews Road

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on St Andrews Road, Henley-on-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 9 Sep 2024 at 14:39.

Buckinghamshire Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Marlow Common Road

Buckinghamshire Council are proposing to carry out Core Sampling on Marlow Common Road, Marlow Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 22 Oct 2024 at 14:11.

Nexfibre Networks Limited logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Victoria Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Victoria Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 17 Oct 2024 at 14:27.

Cadent Gas logo
LONG TERM
Between
20 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Oak Tree Road

Cadent Gas are proposing to carry out Utility asset works on Oak Tree Road, Marlow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 15:17.

Cadent Gas logo
LONG TERM
Between
20 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Oak Tree Road

Cadent Gas are proposing to carry out Utility asset works on Oak Tree Road, Marlow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 14:34.

South East Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Butchers Lane

South East Water are proposing to carry out Utility repair and maintenance works on Butchers Lane, White Waltham, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 17 Oct 2024 at 16:39.

Cadent Gas logo
LONG TERM
Between
20 Jan and 21 Jul 2025
Details
View Map
Share
Follow
Marlow Bottom

Cadent Gas are proposing to carry out Utility asset works on Marlow Bottom, Marlow Bottom.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 15:44.

South East Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Butchers Lane

South East Water are proposing to carry out Utility repair and maintenance works on Butchers Lane, White Waltham, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 18 Nov 2024 at 16:14.

South East Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Startins Lane

South East Water are proposing to carry out Utility repair and maintenance works on Startins Lane, Cookham, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 19 Nov 2024 at 10:31.

South East Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Startins Lane

South East Water are proposing to carry out Utility repair and maintenance works on Startins Lane, Cookham, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 23 Oct 2024 at 14:54.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Glade Road

Thames Water are proposing to carry out New service connection on Glade Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 15:05.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Glade Road

Thames Water are proposing to carry out New service connection on Glade Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 14:06.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Hatch Gate Lane

Thames Water are proposing to carry out New service connection on Hatch Gate Lane, Cockpole Green, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 08:39.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Hatch Gate Lane

Thames Water are proposing to carry out New service connection on Hatch Gate Lane, Cockpole Green, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 15:01.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Hatch Gate Lane

Thames Water are proposing to carry out New service connection on Hatch Gate Lane, Cockpole Green, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 09:10.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Hatch Gate Lane

Thames Water are proposing to carry out New service connection on Hatch Gate Lane, Cockpole Green, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 11:54.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Hatch Gate Lane

Thames Water are proposing to carry out New service connection on Hatch Gate Lane, Cockpole Green, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 12:36.

Thames Water logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
Aston Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Aston Lane, Aston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 15:48.

South East Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Lower Road

South East Water are proposing to carry out Utility repair and maintenance works on Lower Road, Cookham, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 26 Nov 2024 at 12:57.

Thames Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Benhams Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Benhams Lane, Fawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 15:30.

South East Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Lower Road

South East Water are proposing to carry out Utility repair and maintenance works on Lower Road, Cookham, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 25 Oct 2024 at 15:01.

South East Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Church Road

South East Water are proposing to carry out Utility repair and maintenance works on Church Road, Cookham Dean, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway, verge and footpath.

This roadwork event was last updated by South East Water on 19 Nov 2024 at 15:25.

South East Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Church Road

South East Water are proposing to carry out Utility repair and maintenance works on Church Road, Cookham Dean, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway, verge and footpath.

This roadwork event was last updated by South East Water on 25 Oct 2024 at 15:01.

Buckinghamshire Council logo
Between
21 and 24 Feb 2025
Details
View Map
Share
Follow
Holmers Farm Way

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Holmers Farm Way, Cressex, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 12 Nov 2024 at 09:39.

Thames Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Kentons Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Kentons Lane, Wargrave.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 28 Nov 2024 at 13:17.

Cadent Gas logo
LONG TERM
Between
24 Feb and 13 Apr 2025
Details
View Map
Share
Follow
Belmont Road

Cadent Gas are proposing to carry out Utility asset works on Belmont Road, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 13 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 13:24.

Thames Water logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Follow
Thameside

Thames Water are proposing to carry out Utility repair and maintenance works on Thameside, Henley-on-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Nov 2024 at 11:43.


Roadworks Map near to Ferry Lane, MARLOW, SL7 2EZ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 30 Nov 2024 11:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Ferry Lane, MARLOW, SL7 2EZ (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.