ROADWORKS SUMMARY
Pondwood Lane, MAIDENHEAD, SL6 3SS

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Pondwood Lane, SL6 3SS and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Pondwood Lane, MAIDENHEAD, SL6 3SS

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Pondwood Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thames Water logo
LONG TERM
Between
26 Aug and 20 Dec 2024
Details
View Map
Share
Follow
Waingels Road

Thames Water are proposing to carry out Utility asset works on Waingels Road, Charvil.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 12 Jul 2024 at 09:19.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
2 Sep and 9 Dec 2024
Details
View Map
Share
Western Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Western Road, Bracknell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 9 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Aug 2024 at 09:33.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
2 Sep and 9 Dec 2024
Details
View Map
Share
Cain Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Cain Road, Bracknell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 9 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 20 Aug 2024 at 08:09.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
2 Sep and 9 Dec 2024
Details
View Map
Share
Follow
Cain Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Cain Road, Bracknell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 16 Aug 2024 at 00:23.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
2 Sep and 9 Dec 2024
Details
View Map
Share
Cain Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Cain Road, Bracknell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 9 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 13 Aug 2024 at 21:59.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
2 Sep and 9 Dec 2024
Details
View Map
Share
Cain Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Cain Road, Bracknell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 9 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Aug 2024 at 09:53.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
2 Sep and 9 Dec 2024
Details
View Map
Share
Western Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Western Road, Bracknell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 9 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 20 Aug 2024 at 08:09.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
2 Sep and 9 Dec 2024
Details
View Map
Share
Follow
Western Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Western Road, Bracknell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 16 Aug 2024 at 00:24.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
2 Sep and 9 Dec 2024
Details
View Map
Share
Western Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Western Road, Bracknell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 9 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 13 Aug 2024 at 22:07.

Southern Gas Networks logo
LONG TERM
Between
16 Sep and 20 Dec 2024
Details
View Map
Share
Follow
London Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on London Road, Wokingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2024 at 14:00.

Thames Water logo
LONG TERM
Until
16 Feb 2025
Details
View Map
Share
Follow
Waingels Road

Thames Water are carrying out Utility asset works on Waingels Road, Charvil.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 10:00 and could run through until 16 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 11:42.

Thames Water logo
LONG TERM
Between
16 Sep 2024 and 16 Feb 2025
Details
View Map
Share
Follow
Waingels Road

Thames Water are proposing to carry out Utility asset works on Waingels Road, Charvil.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 16 February 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Aug 2024 at 13:35.

Southern Gas Networks logo
LONG TERM
Between
30 Sep and 9 Dec 2024
Details
View Map
Share
Follow
Robin Hood Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Robin Hood Way, Winnersh.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 11:15.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Windsor Road

Cadent Gas are carrying out Utility asset works on Windsor Road, Maidenhead.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 08:43 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 12:39.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Holyport Road

Cadent Gas are carrying out Utility asset works on Holyport Road, Maidenhead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 08:40 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 12:39.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Windsor Road

Cadent Gas are proposing to carry out Utility asset works on Windsor Road, Maidenhead.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 14:40.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Windsor Road

Cadent Gas are proposing to carry out Utility asset works on Windsor Road, Maidenhead.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 2 Sep 2024 at 08:56.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Windsor Road

Cadent Gas are proposing to carry out Utility asset works on Windsor Road, Maidenhead.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 26 Jul 2024 at 08:29.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Holyport Road

Cadent Gas are proposing to carry out Utility asset works on Holyport Road, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 26 Jul 2024 at 08:26.

Southern Gas Networks logo
LONG TERM
Until
21 Feb 2025
Details
View Map
Share
Follow
Binfield Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Binfield Road, Wokingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 October 2024 at 08:00 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 08:28.

Southern Gas Networks logo
LONG TERM
Between
7 Oct 2024 and 21 Feb 2025
Details
View Map
Share
Follow
Binfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Binfield Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2024 at 11:32.

Southern Gas Networks logo
LONG TERM
Between
7 Oct 2024 and 21 Feb 2025
Details
View Map
Share
Follow
Keephatch Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Keephatch Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2024 at 12:33.

Southern Gas Networks logo
LONG TERM
Until
21 Feb 2025
Details
View Map
Share
Follow
Keephatch Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Keephatch Road, Wokingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 October 2024 at 08:00 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 08:35.

LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Holyport Road

Royal Borough Of Windsor And Maidenhead are proposing to carry out Works for road purposes on Holyport Road, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 15 Oct 2024 at 16:10.

LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Holyport Road

Royal Borough Of Windsor And Maidenhead are carrying out Works for road purposes on Holyport Road, Maidenhead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 October 2024 at 09:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 16 Oct 2024 at 16:23.

Cadent Gas logo
LONG TERM
Until
18 Dec 2024
Details
View Map
Share
Follow
Warfield Road

Cadent Gas are carrying out Utility asset works on Warfield Road, Bracknell.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 October 2024 at 17:30 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 10:38.

BT logo
Between
16 Nov and 8 Dec 2024
Details
View Map
Share
Avenue Road

BT were proposing to carry out Utility asset works on Avenue Road, Maidenhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 November 2024 and run through until 8 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 20 Aug 2024 at 10:15.

BT logo
Between
16 Nov and 8 Dec 2024
Details
View Map
Share
Glebe Road

BT were proposing to carry out Utility asset works on Glebe Road, Maidenhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 November 2024 and run through until 8 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 20 Aug 2024 at 09:18.

BT logo
Between
16 Nov and 8 Dec 2024
Details
View Map
Share
Bray Road

BT were proposing to carry out Utility asset works on Bray Road, Maidenhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 November 2024 and run through until 8 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 20 Aug 2024 at 09:13.

Finishing
Friday
Details
View Map
Share
St Cloud Way

Royal Borough Of Windsor And Maidenhead were proposing to carry out Highway improvement works on St Cloud Way, Maidenhead.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 11 Nov 2024 at 14:21.

Finishing
Friday
Details
View Map
Share
Follow
St Lukes Road

Royal Borough Of Windsor And Maidenhead are proposing to carry out Highway improvement works on St Lukes Road, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 30 Jul 2024 at 12:44.

Finishing
Friday
Details
View Map
Share
Follow
St Lukes Road

Royal Borough Of Windsor And Maidenhead are carrying out Highway improvement works on St Lukes Road, Maidenhead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 November 2024 at 14:34 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 15 Nov 2024 at 14:43.

Finishing
Friday
Details
View Map
Share
Follow
St Lukes Road

Royal Borough Of Windsor And Maidenhead are proposing to carry out Highway improvement works on St Lukes Road, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 19 Jul 2024 at 11:34.

Finishing
Friday
Details
View Map
Share
Forlease Road

Royal Borough Of Windsor And Maidenhead were proposing to carry out Highway improvement works on Forlease Road, Maidenhead.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 11 Nov 2024 at 14:21.

Cadent Gas logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Lock Lane

Cadent Gas are carrying out Utility asset works on Lock Lane, Maidenhead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 07:48 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 09:04.

Cadent Gas logo
Between
19 Nov and 10 Dec 2024
Details
View Map
Share
Follow
Lock Lane

Cadent Gas are proposing to carry out Utility asset works on Lock Lane, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 16:35.

South East Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Red Rose

South East Water are carrying out Utility repair and maintenance works on Red Rose, Binfield, Bracknell.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 November 2024 at 12:45 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 22 Nov 2024 at 13:48.

BT logo
Between
23 Nov and 15 Dec 2024
Details
View Map
Share
Bray Road

BT were proposing to carry out Utility asset works on Bray Road, Maidenhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 November 2024 and run through until 15 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 27 Sep 2024 at 09:20.

BT logo
Between
23 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Glebe Road

BT are proposing to carry out Utility asset works on Glebe Road, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 20 Aug 2024 at 13:34.

BT logo
Between
23 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Avenue Road

BT are proposing to carry out Utility asset works on Avenue Road, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 20 Aug 2024 at 13:34.

Scottish Hydro Electric Power Dis logo
Finishing
Friday
Details
View Map
Share
Follow
Milley Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Milley Road, Waltham St Lawrence, Reading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Nov 2024 at 15:46.

Scottish Hydro Electric Power Dis logo
Finishing
Friday
Details
View Map
Share
Follow
Milley Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Milley Road, Waltham St Lawrence, Reading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 13 Nov 2024 at 12:03.

Cityfibre Metro Networks logo
Between
2 and 5 Dec 2024
Details
View Map
Share
Follow
Sawpit Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Sawpit Lane, Hurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 30 Sep 2024 at 13:31.

Between
2 and 12 Dec 2024
Details
View Map
Share
Follow
Australia Avenue

Royal Borough Of Windsor And Maidenhead are proposing to carry out Highway improvement works on Australia Avenue, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 3 Oct 2024 at 12:58.

Between
2 and 12 Dec 2024
Details
View Map
Share
Follow
Australia Avenue

Royal Borough Of Windsor And Maidenhead are proposing to carry out Highway improvement works on Australia Avenue, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 23 Jul 2024 at 13:21.

Cadent Gas logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Bay Drive

Cadent Gas are proposing to carry out Utility asset works on Bay Drive, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 15:56.

Cadent Gas logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Bay Drive

Cadent Gas are proposing to carry out Utility asset works on Bay Drive, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 16:08.

Scottish Hydro Electric Power Dis logo
Between
3 and 9 Dec 2024
Details
View Map
Share
Follow
Providence Place

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Providence Place, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 22 Aug 2024 at 13:49.

Scottish Hydro Electric Power Dis logo
Between
3 and 9 Dec 2024
Details
View Map
Share
Follow
Providence Place

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Providence Place, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Aug 2024 at 16:50.

Wokingham Borough Council logo
Between
9 and 14 Dec 2024
Details
View Map
Share
Follow
Wiltshire Road

Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on Wiltshire Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 22 Oct 2024 at 14:21.

Wokingham Borough Council logo
Between
9 and 14 Dec 2024
Details
View Map
Share
Follow
Wiltshire Road

Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on Wiltshire Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 11 Oct 2024 at 09:29.

Wokingham Borough Council logo
Between
9 and 14 Dec 2024
Details
View Map
Share
Follow
Rectory Road

Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on Rectory Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 22 Oct 2024 at 14:20.

Wokingham Borough Council logo
Between
9 and 14 Dec 2024
Details
View Map
Share
Follow
Rectory Road

Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on Rectory Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 11 Oct 2024 at 09:28.

Southern Gas Networks logo
LONG TERM
Between
9 Dec 2024 and 28 Mar 2025
Details
View Map
Share
London Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on London Road, Wokingham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 28 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Oct 2024 at 12:23.

BT logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Tilehurst Lane

BT are proposing to carry out Utility asset works on Tilehurst Lane, Binfield, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 27 Sep 2024 at 16:27.

Cityfibre Metro Networks logo
Between
19 and 24 Dec 2024
Details
View Map
Share
Follow
Sawpit Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Sawpit Lane, Hurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 30 Sep 2024 at 09:38.

BT logo
Between
4 and 26 Jan 2025
Details
View Map
Share
Follow
Bray Road

BT are proposing to carry out Utility asset works on Bray Road, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 27 Sep 2024 at 10:09.

Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
North Dean

Royal Borough Of Windsor And Maidenhead are proposing to carry out Works for road purposes on North Dean, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 4 Oct 2024 at 11:12.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Hatch Gate Lane

Thames Water are proposing to carry out New service connection on Hatch Gate Lane, Cockpole Green, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 15:47.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Ray Park Avenue

Cadent Gas were proposing to carry out Utility asset works on Ray Park Avenue, Maidenhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 10:15.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Ray Park Avenue

Cadent Gas were proposing to carry out Utility asset works on Ray Park Avenue, Maidenhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 09:01.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Ray Park Avenue

Cadent Gas are proposing to carry out Utility asset works on Ray Park Avenue, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 14:31.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Ray Park Avenue

Cadent Gas are proposing to carry out Utility asset works on Ray Park Avenue, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 14:26.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Ray Park Avenue

Cadent Gas are proposing to carry out Utility asset works on Ray Park Avenue, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 09:04.

Cadent Gas logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Wessex Way

Cadent Gas are proposing to carry out Utility asset works on Wessex Way, Maidenhead.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 16:24.

Cadent Gas logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Warfield Street

Cadent Gas are proposing to carry out Utility asset works on Warfield Street, Warfield, Bracknell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 11:30.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Plough Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Plough Lane, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Oct 2024 at 12:58.

LONG TERM
Between
6 Jan and 24 Jul 2025
Details
View Map
Share
Follow
Holyport Road

Royal Borough Of Windsor And Maidenhead are proposing to carry out Highway improvement works on Holyport Road, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 13 Aug 2024 at 12:05.

LONG TERM
Between
6 Jan and 24 Jul 2025
Details
View Map
Share
Follow
Windsor Road

Royal Borough Of Windsor And Maidenhead are proposing to carry out Highway improvement works on Windsor Road, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 13 Aug 2024 at 12:04.

Cadent Gas logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Windsor Road

Cadent Gas are proposing to carry out Utility asset works on Windsor Road, Maidenhead.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 10:46.

Bracknell Forest Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Bracknell Road

Bracknell Forest Council were proposing to carry out Highway repair and maintenance works on Bracknell Road, Warfield, Bracknell.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 4 Nov 2024 at 10:58.

South East Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Butchers Lane

South East Water are proposing to carry out Utility repair and maintenance works on Butchers Lane, White Waltham, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 18 Nov 2024 at 16:14.

South East Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Butchers Lane

South East Water are proposing to carry out Utility repair and maintenance works on Butchers Lane, White Waltham, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 17 Oct 2024 at 16:39.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Hatch Gate Lane

Thames Water are proposing to carry out New service connection on Hatch Gate Lane, Cockpole Green, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 09:10.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Hatch Gate Lane

Thames Water are proposing to carry out New service connection on Hatch Gate Lane, Cockpole Green, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 15:01.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Hatch Gate Lane

Thames Water are proposing to carry out New service connection on Hatch Gate Lane, Cockpole Green, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 08:39.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 2 May 2025
Details
View Map
Share
Follow
London Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on London Road, Wokingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 10:16.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Hatch Gate Lane

Thames Water are proposing to carry out New service connection on Hatch Gate Lane, Cockpole Green, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 11:54.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Hatch Gate Lane

Thames Water are proposing to carry out New service connection on Hatch Gate Lane, Cockpole Green, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 12:36.

Thames Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Tilehurst Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Tilehurst Lane, Binfield, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 10:00.

Cornerstone Telecommunications Infrastructure logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Harmans Water Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Harmans Water Road, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 21 May 2024 at 08:15.

Cadent Gas logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Ray Park Road

Cadent Gas are proposing to carry out Utility asset works on Ray Park Road, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 11:31.

Cadent Gas logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Ray Park Road

Cadent Gas are proposing to carry out Utility asset works on Ray Park Road, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 14:52.

Cadent Gas logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Windsor Road

Cadent Gas are proposing to carry out Utility asset works on Windsor Road, Maidenhead.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 12:19.

Network Rail logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Park Lane

Network Rail are proposing to carry out Works for Rail Purposes on Park Lane, Charvil.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 17 Sep 2024 at 16:47.

Cornerstone Telecommunications Infrastructure logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Harmans Water Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Harmans Water Road, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 21 May 2024 at 08:15.

Between
19 and 28 Feb 2025
Details
View Map
Share
Harvest Hill Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Permanent reinstatement on Harvest Hill Road, Maidenhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 21 Nov 2024 at 10:40.


Roadworks Map near to Pondwood Lane, MAIDENHEAD, SL6 3SS

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 24 Nov 2024 01:27
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Pondwood Lane, MAIDENHEAD, SL6 3SS (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.