ROADWORKS SUMMARY
Pondwood Lane, MAIDENHEAD, SL6 3SS
Introduction
View current and future planned roadworks and road closures for Pondwood Lane, SL6 3SS and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Pondwood Lane, MAIDENHEAD, SL6 3SS
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Pondwood Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
26 Aug and 20 Dec 2024
Thames Water are proposing to carry out Utility asset works on Waingels Road, Charvil.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 12 Jul 2024 at 09:19.
2 Sep and 9 Dec 2024
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Western Road, Bracknell.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2024 and run through until 9 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Aug 2024 at 09:33.
2 Sep and 9 Dec 2024
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Cain Road, Bracknell.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2024 and run through until 9 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 20 Aug 2024 at 08:09.
2 Sep and 9 Dec 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Cain Road, Bracknell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 16 Aug 2024 at 00:23.
2 Sep and 9 Dec 2024
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Cain Road, Bracknell.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2024 and run through until 9 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 13 Aug 2024 at 21:59.
2 Sep and 9 Dec 2024
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Cain Road, Bracknell.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2024 and run through until 9 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Aug 2024 at 09:53.
2 Sep and 9 Dec 2024
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Western Road, Bracknell.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2024 and run through until 9 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 20 Aug 2024 at 08:09.
2 Sep and 9 Dec 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Western Road, Bracknell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 16 Aug 2024 at 00:24.
2 Sep and 9 Dec 2024
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Western Road, Bracknell.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2024 and run through until 9 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 13 Aug 2024 at 22:07.
16 Sep and 20 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on London Road, Wokingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 12 Aug 2024 at 14:00.
16 Feb 2025
Thames Water are carrying out Utility asset works on Waingels Road, Charvil.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2024 at 10:00 and could run through until 16 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 16 Sep 2024 at 11:42.
16 Sep 2024 and 16 Feb 2025
Thames Water are proposing to carry out Utility asset works on Waingels Road, Charvil.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 16 February 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 14 Aug 2024 at 13:35.
30 Sep and 9 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Robin Hood Way, Winnersh.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 11:15.
Friday
Cadent Gas are carrying out Utility asset works on Windsor Road, Maidenhead.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 October 2024 at 08:43 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 12:39.
Friday
Cadent Gas are carrying out Utility asset works on Holyport Road, Maidenhead.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 October 2024 at 08:40 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 12:39.
Friday
Cadent Gas are proposing to carry out Utility asset works on Windsor Road, Maidenhead.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 14:40.
Friday
Cadent Gas are proposing to carry out Utility asset works on Windsor Road, Maidenhead.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 2 Sep 2024 at 08:56.
Friday
Cadent Gas are proposing to carry out Utility asset works on Windsor Road, Maidenhead.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 26 Jul 2024 at 08:29.
Friday
Cadent Gas are proposing to carry out Utility asset works on Holyport Road, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 26 Jul 2024 at 08:26.
21 Feb 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Binfield Road, Wokingham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 October 2024 at 08:00 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 08:28.
7 Oct 2024 and 21 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Binfield Road, Wokingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 1 Aug 2024 at 11:32.
7 Oct 2024 and 21 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Keephatch Road, Wokingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 1 Aug 2024 at 12:33.
21 Feb 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Keephatch Road, Wokingham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 October 2024 at 08:00 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 08:35.
Friday
Royal Borough Of Windsor And Maidenhead are proposing to carry out Works for road purposes on Holyport Road, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 15 Oct 2024 at 16:10.
Friday
Royal Borough Of Windsor And Maidenhead are carrying out Works for road purposes on Holyport Road, Maidenhead.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 October 2024 at 09:00 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 16 Oct 2024 at 16:23.
18 Dec 2024
Cadent Gas are carrying out Utility asset works on Warfield Road, Bracknell.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 October 2024 at 17:30 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 10:38.
16 Nov and 8 Dec 2024
BT were proposing to carry out Utility asset works on Avenue Road, Maidenhead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 November 2024 and run through until 8 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 20 Aug 2024 at 10:15.
16 Nov and 8 Dec 2024
BT were proposing to carry out Utility asset works on Glebe Road, Maidenhead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 November 2024 and run through until 8 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 20 Aug 2024 at 09:18.
16 Nov and 8 Dec 2024
BT were proposing to carry out Utility asset works on Bray Road, Maidenhead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 November 2024 and run through until 8 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 20 Aug 2024 at 09:13.
Friday
Royal Borough Of Windsor And Maidenhead were proposing to carry out Highway improvement works on St Cloud Way, Maidenhead.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 11 Nov 2024 at 14:21.
Friday
Royal Borough Of Windsor And Maidenhead are proposing to carry out Highway improvement works on St Lukes Road, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 30 Jul 2024 at 12:44.
Friday
Royal Borough Of Windsor And Maidenhead are carrying out Highway improvement works on St Lukes Road, Maidenhead.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 November 2024 at 14:34 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 15 Nov 2024 at 14:43.
Friday
Royal Borough Of Windsor And Maidenhead are proposing to carry out Highway improvement works on St Lukes Road, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 19 Jul 2024 at 11:34.
Friday
Royal Borough Of Windsor And Maidenhead were proposing to carry out Highway improvement works on Forlease Road, Maidenhead.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 11 Nov 2024 at 14:21.
20 Dec 2024
Cadent Gas are carrying out Utility asset works on Lock Lane, Maidenhead.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 07:48 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 09:04.
19 Nov and 10 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Lock Lane, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 16:35.
Wednesday
South East Water are carrying out Utility repair and maintenance works on Red Rose, Binfield, Bracknell.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 November 2024 at 12:45 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 22 Nov 2024 at 13:48.
23 Nov and 15 Dec 2024
BT were proposing to carry out Utility asset works on Bray Road, Maidenhead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 November 2024 and run through until 15 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 27 Sep 2024 at 09:20.
23 Nov and 15 Dec 2024
BT are proposing to carry out Utility asset works on Glebe Road, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2024 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by BT on 20 Aug 2024 at 13:34.
23 Nov and 15 Dec 2024
BT are proposing to carry out Utility asset works on Avenue Road, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2024 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by BT on 20 Aug 2024 at 13:34.
Friday
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Milley Road, Waltham St Lawrence, Reading.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Nov 2024 at 15:46.
Friday
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Milley Road, Waltham St Lawrence, Reading.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 13 Nov 2024 at 12:03.
2 and 5 Dec 2024
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Sawpit Lane, Hurst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 30 Sep 2024 at 13:31.
2 and 12 Dec 2024
Royal Borough Of Windsor And Maidenhead are proposing to carry out Highway improvement works on Australia Avenue, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 3 Oct 2024 at 12:58.
2 and 12 Dec 2024
Royal Borough Of Windsor And Maidenhead are proposing to carry out Highway improvement works on Australia Avenue, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 23 Jul 2024 at 13:21.
2 and 13 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Bay Drive, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 15:56.
2 and 13 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Bay Drive, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 16:08.
3 and 9 Dec 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Providence Place, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 22 Aug 2024 at 13:49.
3 and 9 Dec 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Providence Place, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Aug 2024 at 16:50.
9 and 14 Dec 2024
Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on Wiltshire Road, Wokingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wokingham Borough Council on 22 Oct 2024 at 14:21.
9 and 14 Dec 2024
Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on Wiltshire Road, Wokingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wokingham Borough Council on 11 Oct 2024 at 09:29.
9 and 14 Dec 2024
Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on Rectory Road, Wokingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wokingham Borough Council on 22 Oct 2024 at 14:20.
9 and 14 Dec 2024
Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on Rectory Road, Wokingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wokingham Borough Council on 11 Oct 2024 at 09:28.
9 Dec 2024 and 28 Mar 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on London Road, Wokingham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 28 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 1 Oct 2024 at 12:23.
16 and 18 Dec 2024
BT are proposing to carry out Utility asset works on Tilehurst Lane, Binfield, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 27 Sep 2024 at 16:27.
19 and 24 Dec 2024
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Sawpit Lane, Hurst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 December 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 30 Sep 2024 at 09:38.
4 and 26 Jan 2025
BT are proposing to carry out Utility asset works on Bray Road, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 27 Sep 2024 at 10:09.
6 and 8 Jan 2025
Royal Borough Of Windsor And Maidenhead are proposing to carry out Works for road purposes on North Dean, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 4 Oct 2024 at 11:12.
6 and 10 Jan 2025
Thames Water are proposing to carry out New service connection on Hatch Gate Lane, Cockpole Green, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Oct 2024 at 15:47.
6 and 24 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Ray Park Avenue, Maidenhead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 10:15.
6 and 24 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Ray Park Avenue, Maidenhead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 09:01.
6 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Ray Park Avenue, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 14:31.
6 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Ray Park Avenue, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 14:26.
6 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Ray Park Avenue, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 09:04.
6 Jan and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Wessex Way, Maidenhead.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 16:24.
6 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Warfield Street, Warfield, Bracknell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 11:30.
6 Jan and 21 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Plough Lane, Wokingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 1 Oct 2024 at 12:58.
6 Jan and 24 Jul 2025
Royal Borough Of Windsor And Maidenhead are proposing to carry out Highway improvement works on Holyport Road, Maidenhead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 13 Aug 2024 at 12:05.
6 Jan and 24 Jul 2025
Royal Borough Of Windsor And Maidenhead are proposing to carry out Highway improvement works on Windsor Road, Maidenhead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 13 Aug 2024 at 12:04.
13 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Windsor Road, Maidenhead.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 10:46.
13 and 17 Jan 2025
Bracknell Forest Council were proposing to carry out Highway repair and maintenance works on Bracknell Road, Warfield, Bracknell.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 4 Nov 2024 at 10:58.
20 and 24 Jan 2025
South East Water are proposing to carry out Utility repair and maintenance works on Butchers Lane, White Waltham, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 18 Nov 2024 at 16:14.
20 and 24 Jan 2025
South East Water are proposing to carry out Utility repair and maintenance works on Butchers Lane, White Waltham, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 17 Oct 2024 at 16:39.
27 and 31 Jan 2025
Thames Water are proposing to carry out New service connection on Hatch Gate Lane, Cockpole Green, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Oct 2024 at 09:10.
27 and 31 Jan 2025
Thames Water are proposing to carry out New service connection on Hatch Gate Lane, Cockpole Green, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Oct 2024 at 15:01.
27 and 31 Jan 2025
Thames Water are proposing to carry out New service connection on Hatch Gate Lane, Cockpole Green, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Oct 2024 at 08:39.
27 Jan and 2 May 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on London Road, Wokingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 10:16.
27 and 31 Jan 2025
Thames Water are proposing to carry out New service connection on Hatch Gate Lane, Cockpole Green, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Oct 2024 at 11:54.
27 and 31 Jan 2025
Thames Water are proposing to carry out New service connection on Hatch Gate Lane, Cockpole Green, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Oct 2024 at 12:36.
27 and 29 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Tilehurst Lane, Binfield, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Nov 2024 at 10:00.
3 and 7 Feb 2025
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Harmans Water Road, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 21 May 2024 at 08:15.
3 Feb and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Ray Park Road, Maidenhead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 11:31.
3 Feb and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Ray Park Road, Maidenhead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 14:52.
10 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Windsor Road, Maidenhead.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 12:19.
17 and 20 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Park Lane, Charvil.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 17 Sep 2024 at 16:47.
17 and 20 Feb 2025
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Harmans Water Road, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 21 May 2024 at 08:15.
19 and 28 Feb 2025
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Permanent reinstatement on Harvest Hill Road, Maidenhead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 21 Nov 2024 at 10:40.
Roadworks Map near to Pondwood Lane, MAIDENHEAD, SL6 3SS
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Pondwood Lane, MAIDENHEAD, SL6 3SS (0 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.