ROADWORKS SUMMARY
Hatchet Lane, WINDSOR, SL4 2ED
Introduction
![Image of petrol pumps](https://streetguide.co.uk/assets/intro-image/roadworks/image1.jpg)
View current and future planned roadworks and road closures for Hatchet Lane, SL4 2ED and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Hatchet Lane, WINDSOR, SL4 2ED
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Hatchet Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
14 Oct 2024 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on London Road, Windlesham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 10:44.
14 Oct 2024 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on London Road, Windlesham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 23 Aug 2024 at 07:22.
21 Oct 2024 and 3 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on London Road, Windlesham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 3 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 13:00.
3 Mar 2025
Cadent Gas are carrying out Utility asset works on London Road, Windlesham.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 October 2024 at 08:02 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 09:00.
21 Oct 2024 and 7 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on London Road, Windlesham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 October 2024 and run through until 7 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 12:57.
6 Jan and 7 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Hatchet Lane, Winkfield, Windsor.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 09:56.
24 Jul 2025
Royal Borough Of Windsor And Maidenhead are carrying out Highway improvement works on Holyport Road, Maidenhead.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 07:30 and could run through until 24 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 6 Jan 2025 at 08:19.
7 Apr 2025
Cadent Gas are carrying out Utility asset works on Hatchet Lane, Winkfield, Windsor.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 12:29 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Jan 2025 at 15:14.
6 Jan and 7 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Hatchet Lane, Winkfield, Windsor.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 11:18.
6 Jan and 24 Jul 2025
Royal Borough Of Windsor And Maidenhead are proposing to carry out Highway improvement works on Windsor Road, Maidenhead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 13 Aug 2024 at 12:04.
6 Jan and 24 Jul 2025
Royal Borough Of Windsor And Maidenhead are proposing to carry out Highway improvement works on Holyport Road, Maidenhead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 13 Aug 2024 at 12:05.
24 Jul 2025
Royal Borough Of Windsor And Maidenhead are carrying out Highway improvement works on Windsor Road, Maidenhead.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 07:30 and could run through until 24 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 6 Jan 2025 at 08:19.
Wednesday
Cadent Gas are carrying out Utility asset works on Brockenhurst Road, Ascot.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 January 2025 at 12:01 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 11:10.
Tomorrow
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Willoughby Road, Bracknell.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 17 February 2025. The works were due to impact the footway, carriageway and footpath.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Dec 2024 at 16:02.
3 Feb and 22 May 2025
Thames Water were proposing to carry out Utility asset works on Goddard Way, Warfield, Bracknell.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 22 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Jan 2025 at 15:13.
3 Feb and 22 May 2025
Thames Water were proposing to carry out Utility asset works on Harvest Ride, Warfield, Bracknell.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 22 May 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 21 Jan 2025 at 16:17.
3 Feb and 22 May 2025
Thames Water were proposing to carry out Utility asset works on Harvest Ride, Warfield, Bracknell.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 22 May 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 30 Jan 2025 at 10:34.
Tomorrow
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Willoughby Road, Bracknell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Jan 2025 at 08:11.
Friday
Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Willoughby Road, Bracknell.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 February 2025 at 07:00 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Feb 2025 at 07:54.
7 Mar 2025
Cadent Gas are carrying out Utility asset works on Brockenhurst Road, Ascot.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 February 2025 at 13:41 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Feb 2025 at 14:25.
10 Feb and 7 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Windsor Road, Maidenhead.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 09:15.
12 Feb and 20 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Footpath 54 Liscombe To Ringmead, Bracknell.
These works are categorised as Major.
The works will start on or after 12 February 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Jan 2025 at 16:30.
12 Feb and 20 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Footpath 54 Liscombe To Ringmead, Bracknell.
These works are categorised as Major.
The works will start on or after 12 February 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 09:41.
Tomorrow
Network Rail are carrying out Works for Rail Purposes on London Road, Sunningdale, Ascot.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 February 2025 at 00:30 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 15 Feb 2025 at 08:28.
Tomorrow
Network Rail are proposing to carry out Works for Rail Purposes on London Road, Sunningdale, Ascot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 21 Oct 2024 at 08:31.
17 Feb and 7 Mar 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Bagshot Road, Bracknell.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 7 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 13 Feb 2025 at 07:24.
17 Feb and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Brockenhurst Road, Ascot.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 14:40.
Thursday
Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Harmans Water Road, Bracknell.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 20 February 2025. The works were due to impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 31 Jan 2025 at 09:16.
18 Feb and 14 Mar 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Winkfield Lane, Winkfield, Windsor.
These works are categorised as Major.
The works will start on or after 18 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 13 Feb 2025 at 09:35.
18 Feb and 14 Mar 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Winkfield Lane, Winkfield, Windsor.
These works are categorised as Major.
The works will start on or after 18 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 14 Feb 2025 at 11:05.
Friday
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Birch Hill Road, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 30 Dec 2024 at 15:00.
Friday
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Birch Hill Road, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 19 Dec 2024 at 10:42.
19 and 28 Feb 2025
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Permanent reinstatement on Harvest Hill Road, Maidenhead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 21 Nov 2024 at 10:40.
21 Feb and 17 Mar 2025
National Highways are proposing to carry out Highway repair and maintenance works on Bracknell Road, Bagshot.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 17 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 30 Jan 2025 at 14:35.
24 and 26 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Tilehurst Lane, Binfield, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Jan 2025 at 10:49.
24 and 28 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Buckhurst Road, Ascot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 12 Nov 2024 at 16:34.
24 Feb and 28 Mar 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Mill Lane, Bracknell.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 14 Feb 2025 at 15:05.
24 Feb and 28 Mar 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Mill Lane, Bracknell.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 4 Feb 2025 at 16:18.
24 Feb and 11 Mar 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Broad Lane, Bracknell.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 11 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 12 Dec 2024 at 15:32.
24 Feb and 7 Mar 2025
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Permanent reinstatement on Harvest Hill Road, Maidenhead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 3 Dec 2024 at 16:36.
24 Feb and 11 Mar 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Broad Lane, Bracknell.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 11 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 7 Jan 2025 at 11:03.
24 Feb and 11 Mar 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Broad Lane, Bracknell.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 11 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 10 Jan 2025 at 09:52.
1 Mar and 26 Apr 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Ringmead, Hanworth, Bracknell.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 March 2025 and run through until 26 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 22 Nov 2024 at 10:21.
1 Mar and 26 Apr 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Ringmead, Hanworth, Bracknell.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 March 2025 and run through until 26 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 10 Dec 2024 at 12:26.
3 and 7 Mar 2025
BT were proposing to carry out Utility asset works on Bruce Walk, Windsor.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the footway and verge.
This roadwork event was last updated by BT on 2 Dec 2024 at 11:15.
10 Mar and 16 May 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Malt Hill, Warfield, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 12 Sep 2024 at 09:14.
10 Mar and 25 Apr 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Harvest Ride, Warfield, Bracknell.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 14 Feb 2025 at 11:07.
10 Mar and 25 Apr 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Harvest Ride, Warfield, Bracknell.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 13 Feb 2025 at 10:38.
10 and 21 Mar 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Station Way, Bracknell.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 20 Jan 2025 at 09:29.
10 and 21 Mar 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Church Road, Bracknell.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 14 Feb 2025 at 10:47.
10 and 21 Mar 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Church Road, Bracknell.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 14 Feb 2025 at 10:33.
10 and 21 Mar 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Market Street, Bracknell.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 23 Jan 2025 at 09:18.
10 and 21 Mar 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Station Roundabout, Bracknell.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 14 Feb 2025 at 16:30.
10 and 14 Mar 2025
BT were proposing to carry out Utility asset works on Westwood Road, Windlesham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 14 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 6 Dec 2024 at 11:25.
12 and 14 Mar 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Broad Lane, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 5 Feb 2025 at 15:36.
12 and 14 Mar 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Broad Lane, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 12 Dec 2024 at 15:33.
17 Mar and 9 May 2025
Cadent Gas are proposing to carry out Utility asset works on Station Hill, Ascot.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 14:40.
17 Mar and 30 Apr 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Old Bracknell Lane West, Bracknell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Jan 2025 at 12:36.
17 Mar and 30 Apr 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Old Bracknell Lane West, Bracknell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 20 Dec 2024 at 16:05.
17 Mar and 30 Apr 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Old Bracknell Lane West, Bracknell.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 March 2025 and run through until 30 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Dec 2024 at 14:51.
24 and 28 Mar 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Bagshot Road, Ascot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 7 Jan 2025 at 09:51.
24 and 28 Mar 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Mill Lane, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 15 Jan 2025 at 16:30.
24 and 28 Mar 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Bagshot Road, Ascot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 27 Jan 2025 at 16:30.
24 and 28 Mar 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Mill Lane, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 7 Jan 2025 at 09:53.
24 and 28 Mar 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Wildridings Road, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 7 Jan 2025 at 09:51.
24 and 28 Mar 2025
Bracknell Forest Council were proposing to carry out Highway repair and maintenance works on Wildridings Road, Bracknell.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 March 2025 and run through until 28 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 14 Feb 2025 at 15:08.
27 Mar and 3 Apr 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Sunninghill Road, Ascot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 March 2025 and could run through until 3 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 13 Feb 2025 at 11:15.
28 Mar and 18 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Ringmead, Birch Hill, Bracknell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 March 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Feb 2025 at 10:11.
31 Mar and 11 Apr 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Nine Mile Ride, Bracknell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 6 Feb 2025 at 10:20.
31 Mar and 17 Apr 2025
Cadent Gas were proposing to carry out Utility asset works on Bay Drive, Bracknell.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 March 2025 and run through until 17 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Feb 2025 at 09:09.
31 Mar and 17 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Bay Drive, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 17 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 12 Feb 2025 at 10:00.
1 Apr and 1 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on South Road, Englefield Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 29 Nov 2024 at 12:53.
5 and 17 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Bagshot Road, Ascot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 April 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 14:40.
5 Apr and 11 May 2025
Thames Water are proposing to carry out Utility asset works on Harvest Ride, Warfield, Bracknell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 April 2025 and could run through until 11 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 11 Feb 2025 at 14:37.
7 and 29 Apr 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Locks Ride, Ascot.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 29 April 2025. The works will impact the verge and footpath.
This roadwork event was last updated by Nexfibre Networks Limited on 7 Jan 2025 at 09:49.
7 and 10 Apr 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Winkfield Row, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 22 Jan 2025 at 12:42.
7 and 10 Apr 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Winkfield Row, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 17 Jan 2025 at 16:09.
7 and 15 Apr 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Bottle Lane, Warfield, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 13 Feb 2025 at 12:04.
7 and 15 Apr 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Bottle Lane, Warfield, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 14 Feb 2025 at 11:06.
7 and 10 Apr 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Winkfield Row, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 14 Jan 2025 at 08:09.
7 and 10 Apr 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Winkfield Row, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 19 Dec 2024 at 11:35.
7 and 15 Apr 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Bottle Lane, Binfield, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 13 Feb 2025 at 11:52.
7 and 10 Apr 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Winkfield Row, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 9 Dec 2024 at 15:32.
7 and 10 Apr 2025
Bracknell Forest Council were proposing to carry out Highway repair and maintenance works on Winkfield Row, Bracknell.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 April 2025 and run through until 10 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 16 Dec 2024 at 11:12.
14 and 17 Apr 2025
South East Water are proposing to carry out New service connection on Newell Green, Warfield, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 17 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South East Water on 10 Feb 2025 at 16:28.
14 and 17 Apr 2025
South East Water are proposing to carry out New service connection on Newell Green, Warfield, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 17 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South East Water on 11 Feb 2025 at 08:59.
16 and 23 Apr 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Pigeonhouse Lane, Winkfield, Windsor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2025 and could run through until 23 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 13 Feb 2025 at 12:36.
16 and 23 Apr 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on North Street, Winkfield, Windsor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2025 and could run through until 23 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 13 Feb 2025 at 15:02.
29 Apr and 1 May 2025
BT are proposing to carry out Utility asset works on Ferry Road, Bray, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 1 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 28 Jan 2025 at 09:17.
30 Apr and 6 May 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Winkfield Lane, Winkfield, Windsor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 April 2025 and could run through until 6 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 13 Feb 2025 at 14:25.
6 and 20 May 2025
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Harvest Hill Road, Maidenhead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 May 2025 and run through until 20 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 5 Feb 2025 at 10:05.
6 and 20 May 2025
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Permanent reinstatement on Harvest Hill Road, Maidenhead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 May 2025 and run through until 20 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 5 Feb 2025 at 10:06.
6 and 20 May 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Harvest Hill Road, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 20 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 5 Feb 2025 at 11:10.
12 and 14 May 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Monks Road, Windsor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 14 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Jan 2025 at 14:55.
12 and 16 May 2025
BT were proposing to carry out Utility asset works on Liddell Way, Ascot.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 16 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 10 Feb 2025 at 16:17.
16 and 23 May 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Harvest Hill Road, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 14 Feb 2025 at 14:31.
Roadworks Map near to Hatchet Lane, WINDSOR, SL4 2ED
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Hatchet Lane, WINDSOR, SL4 2ED (4 Events)
(Scheduled Dates)
(miles)
(Scheduled: 6 Jan 2025 - 7 Apr 2025)
Contains public sector information licensed under the Open Government Licence v3.0.