ROADWORKS SUMMARY
Elliman Avenue, SLOUGH, SL2 5BG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Elliman Avenue, SL2 5BG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Elliman Avenue, SLOUGH, SL2 5BG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Elliman Avenue are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Follow
Uxbridge Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Uxbridge Road, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 21 Jun 2024 at 10:30.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Follow
Pinewood Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Pinewood Road, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 21 Jun 2024 at 10:32.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Follow
Wood Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Wood Lane, Iver Heath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 21 Jun 2024 at 10:37.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Follow
Uxbridge Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Uxbridge Road, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 5 Jun 2024 at 15:39.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Follow
Slough Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Slough Road, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 21 Jun 2024 at 10:36.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Follow
Church Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Church Road, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 21 Jun 2024 at 10:32.

Eunetworks logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Taplow Common Road

Eunetworks are proposing to carry out Utility asset works on Taplow Common Road, Burnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 7 January 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Eunetworks on 9 Aug 2024 at 12:08.

LONG TERM
Between
2 Dec 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Dundee Road

Optimal Power Networks are proposing to carry out Utility asset works on Dundee Road, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 31 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Optimal Power Networks on 18 Oct 2024 at 11:28.

Cadent Gas logo
LONG TERM
Until
19 Feb 2025
Details
View Map
Share
Follow
Granville Avenue

Cadent Gas are carrying out Utility asset works on Granville Avenue, Slough.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 08:50 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 08:45.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Grange Way

Cadent Gas are proposing to carry out Utility asset works on Grange Way, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 11:38.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Petersfield Avenue

Cadent Gas are carrying out Utility repair and maintenance works on Petersfield Avenue, Slough.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 31 December 2024 at 10:00 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Jan 2025 at 14:16.

Eunetworks logo
Between
1 and 29 Jan 2025
Details
View Map
Share
Follow
Taplow Common Road

Eunetworks are proposing to carry out Utility asset works on Taplow Common Road, Burnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 29 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 10 Oct 2024 at 14:05.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Wexham Road

Cadent Gas are carrying out Utility repair and maintenance works on Wexham Road, Slough.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 January 2025 at 10:00 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 6 Jan 2025 at 11:01.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Clayton Way

Cadent Gas are carrying out Utility repair and maintenance works on Clayton Way, Uxbridge.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 January 2025 at 12:36 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Jan 2025 at 12:49.

BT logo
Between
4 and 26 Jan 2025
Details
View Map
Share
Follow
Bray Road

BT are proposing to carry out Utility asset works on Bray Road, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 27 Sep 2024 at 10:09.

Buckinghamshire Council logo
Finishing
Today
Details
View Map
Share
Follow
Beaconsfield Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Beaconsfield Road, Farnham Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Sep 2024 at 13:13.

Buckinghamshire Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Beaconsfield Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Beaconsfield Road, Farnham Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 20 Sep 2024 at 09:13.

LONG TERM
Between
6 Jan and 24 Jul 2025
Details
View Map
Share
Follow
Holyport Road

Royal Borough Of Windsor And Maidenhead are proposing to carry out Highway improvement works on Holyport Road, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 13 Aug 2024 at 12:05.

LONG TERM
Until
24 Jul 2025
Details
View Map
Share
Follow
Holyport Road

Royal Borough Of Windsor And Maidenhead are carrying out Highway improvement works on Holyport Road, Maidenhead.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 07:30 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 6 Jan 2025 at 08:19.

LONG TERM
Between
6 Jan and 24 Jul 2025
Details
View Map
Share
Follow
Windsor Road

Royal Borough Of Windsor And Maidenhead are proposing to carry out Highway improvement works on Windsor Road, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 13 Aug 2024 at 12:04.

LONG TERM
Until
24 Jul 2025
Details
View Map
Share
Follow
Windsor Road

Royal Borough Of Windsor And Maidenhead are carrying out Highway improvement works on Windsor Road, Maidenhead.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 07:30 and could run through until 24 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 6 Jan 2025 at 08:19.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Huntercombe Lane South

Thames Water are proposing to carry out New service connection on Huntercombe Lane South, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 14:31.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Ray Park Avenue

Cadent Gas are proposing to carry out Utility asset works on Ray Park Avenue, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 14:26.

Cadent Gas logo
Until
24 Jan 2025
Details
View Map
Share
Follow
Ray Park Avenue

Cadent Gas are carrying out Utility asset works on Ray Park Avenue, Maidenhead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 11:06 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Jan 2025 at 11:55.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Ray Park Avenue

Cadent Gas were proposing to carry out Utility asset works on Ray Park Avenue, Maidenhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 10:15.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Ray Park Avenue

Cadent Gas are proposing to carry out Utility asset works on Ray Park Avenue, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 09:04.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Ray Park Avenue

Cadent Gas were proposing to carry out Utility asset works on Ray Park Avenue, Maidenhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 09:01.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Ray Park Avenue

Cadent Gas are proposing to carry out Utility asset works on Ray Park Avenue, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 14:31.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Hitcham Lane

Cadent Gas are proposing to carry out Utility asset works on Hitcham Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 14:40.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Hitcham Lane

Cadent Gas are proposing to carry out Utility asset works on Hitcham Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 11:33.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Hitcham Lane

Cadent Gas are proposing to carry out Utility asset works on Hitcham Lane, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 11:31.

Cadent Gas logo
LONG TERM
Between
6 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Sutton Road

Cadent Gas are proposing to carry out Utility asset works on Sutton Road, Cookham, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Jul 2024 at 12:12.

Cadent Gas logo
LONG TERM
Between
6 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Sutton Road

Cadent Gas are proposing to carry out Utility asset works on Sutton Road, Cookham, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 10:02.

Cadent Gas logo
LONG TERM
Between
6 Jan and 11 Apr 2025
Details
View Map
Share
Follow
Green Lane

Cadent Gas are proposing to carry out Utility asset works on Green Lane, Burnham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 14:59.

Buckinghamshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
Purton Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Purton Lane, Farnham Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 12 Sep 2024 at 15:53.

Buckinghamshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
Black Park Road

Buckinghamshire Council are carrying out Highway repair and maintenance works on Black Park Road, Wexham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:38 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 6 Jan 2025 at 08:38.

Eunetworks logo
Between
6 and 15 Jan 2025
Details
View Map
Share
Follow
Curriers Lane

Eunetworks are proposing to carry out Utility asset works on Curriers Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 16 Aug 2024 at 08:54.

Eunetworks logo
Between
6 and 15 Jan 2025
Details
View Map
Share
Follow
Curriers Lane

Eunetworks are proposing to carry out Utility asset works on Curriers Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 23 Aug 2024 at 16:07.

Eunetworks logo
Between
6 and 15 Jan 2025
Details
View Map
Share
Follow
Curriers Lane

Eunetworks are proposing to carry out Utility asset works on Curriers Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 2 Oct 2024 at 11:38.

Eunetworks logo
Between
7 and 23 Jan 2025
Details
View Map
Share
Follow
Gore Road

Eunetworks are proposing to carry out Utility asset works on Gore Road, Burnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 14 Aug 2024 at 11:35.

Eunetworks logo
Between
7 and 23 Jan 2025
Details
View Map
Share
Follow
Gore Road

Eunetworks are proposing to carry out Utility asset works on Gore Road, Burnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 15:15.

Eunetworks logo
Between
7 and 23 Jan 2025
Details
View Map
Share
Follow
Gore Road

Eunetworks are proposing to carry out Utility asset works on Gore Road, Burnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 9 Oct 2024 at 11:21.

Buckinghamshire Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Plough Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Plough Lane, Stoke Poges.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 10 Dec 2024 at 11:17.

Eunetworks logo
LONG TERM
Between
7 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Wooburn Common Road

Eunetworks are proposing to carry out Utility asset works on Wooburn Common Road, Taplow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 10 Oct 2024 at 14:07.

Cityfibre Metro Networks logo
Finishing
Thursday
Details
View Map
Share
Follow
Mount Hill Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Mount Hill Lane, Hedgerley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 13 Dec 2024 at 10:51.

Buckinghamshire Council logo
Finishing
Monday
Details
View Map
Share
Follow
Green Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Green Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 16 Oct 2024 at 11:42.

Buckinghamshire Council logo
Finishing
Monday
Details
View Map
Share
Follow
Green Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Green Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Oct 2024 at 09:33.

Eunetworks logo
Between
10 and 24 Jan 2025
Details
View Map
Share
Follow
Gore Road

Eunetworks are proposing to carry out Utility asset works on Gore Road, Burnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 25 Oct 2024 at 09:44.

Eunetworks logo
Between
10 and 24 Jan 2025
Details
View Map
Share
Follow
Gore Road

Eunetworks are proposing to carry out Utility asset works on Gore Road, Burnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 25 Oct 2024 at 13:27.

Cadent Gas logo
LONG TERM
Between
10 Jan and 20 Feb 2025
Details
View Map
Share
Hedgerley Lane

Cadent Gas were proposing to carry out Utility asset works on Hedgerley Lane, Gerrards Cross.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 January 2025 and run through until 20 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 15:17.

Network Rail logo
Finishing
Monday
Details
View Map
Share
Follow
Queens Road

Network Rail are proposing to carry out Works for Rail Purposes on Queens Road, Datchet, Slough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 23 Oct 2024 at 14:54.

Network Rail logo
Finishing
Monday
Details
View Map
Share
Follow
Queens Road

Network Rail are proposing to carry out Works for Rail Purposes on Queens Road, Datchet, Slough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 5 Dec 2024 at 12:17.

Thames Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Middle Green Road

Thames Water are proposing to carry out Utility repair and maintenance works on Middle Green Road, Wexham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Dec 2024 at 12:18.

Scottish Hydro Electric Power Dis logo
Between
13 and 20 Jan 2025
Details
View Map
Share
Follow
Brook Path

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Brook Path, Slough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Oct 2024 at 13:48.

Scottish Hydro Electric Power Dis logo
Between
13 and 20 Jan 2025
Details
View Map
Share
Follow
Brook Path

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Brook Path, Slough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Nov 2024 at 10:24.

Cadent Gas logo
LONG TERM
Between
13 Jan and 24 Feb 2025
Details
View Map
Share
Love Lane

Cadent Gas were proposing to carry out Utility asset works on Love Lane, Iver.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 24 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 09:38.

Buckinghamshire Council logo
Between
13 and 20 Jan 2025
Details
View Map
Share
Follow
Institute Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Institute Road, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 17 Dec 2024 at 14:14.

LONG TERM
Between
13 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Dundee Road

Optimal Power Networks are proposing to carry out Utility asset works on Dundee Road, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Optimal Power Networks on 13 Dec 2024 at 12:03.

Cadent Gas logo
Between
13 and 26 Jan 2025
Details
View Map
Share
Follow
Berry Hill

Cadent Gas are proposing to carry out Utility asset works on Berry Hill, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 26 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 10:00.

Cadent Gas logo
Between
13 and 30 Jan 2025
Details
View Map
Share
Follow
Mill Lane

Cadent Gas are proposing to carry out Utility asset works on Mill Lane, Taplow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 12:38.

Cadent Gas logo
Between
13 and 30 Jan 2025
Details
View Map
Share
Follow
Mill Lane

Cadent Gas are proposing to carry out Utility asset works on Mill Lane, Taplow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Dec 2024 at 10:17.

Thames Water logo
Between
15 and 20 Jan 2025
Details
View Map
Share
Follow
Cippenham Lane

Thames Water are proposing to carry out New service connection on Cippenham Lane, Slough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 20 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 09:45.

Eunetworks logo
Between
16 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Dorney Wood Road

Eunetworks are proposing to carry out Utility asset works on Dorney Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 16 Aug 2024 at 09:07.

Eunetworks logo
Between
16 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Dorney Wood Road

Eunetworks are proposing to carry out Utility asset works on Dorney Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 2 Sep 2024 at 09:58.

Eunetworks logo
Between
16 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Dorney Wood Road

Eunetworks are proposing to carry out Utility asset works on Dorney Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 2 Oct 2024 at 11:36.

Eunetworks logo
Between
16 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Dorney Wood Road

Eunetworks are proposing to carry out Utility asset works on Dorney Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 1 Nov 2024 at 13:37.

Scottish Hydro Electric Power Dis logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Fulmer Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Fulmer Lane, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 10:20.

Scottish Hydro Electric Power Dis logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Fulmer Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Fulmer Lane, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Jan 2025 at 11:05.

Cityfibre Metro Networks logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Bangors Road South

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Bangors Road South, Iver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 29 Oct 2024 at 10:47.

LONG TERM
Between
27 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Dundee Road

Optimal Power Networks are proposing to carry out Utility asset works on Dundee Road, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Optimal Power Networks on 23 Dec 2024 at 13:13.

Thames Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Cliveden Road

Thames Water are proposing to carry out Utility repair and maintenance works on Cliveden Road, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 15:11.

Cadent Gas logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Hitcham Lane

Cadent Gas are proposing to carry out Utility asset works on Hitcham Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 10:54.

Buckinghamshire Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Hedgerley Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Hedgerley Lane, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 13 Dec 2024 at 10:53.

Buckinghamshire Council logo
Between
30 Jan and 1 Feb 2025
Details
View Map
Share
Southlands Road

Buckinghamshire Council were proposing to carry out Highway repair and maintenance works on Southlands Road, Iver.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 January 2025 and run through until 1 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 7 Nov 2024 at 10:19.

LONG TERM
Between
3 Feb and 20 Mar 2025
Details
View Map
Share
Follow
Long Furlong Drive

Optimal Power Networks are proposing to carry out Utility asset works on Long Furlong Drive, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 20 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Optimal Power Networks on 22 May 2024 at 07:28.

Buckinghamshire Council logo
Between
3 and 8 Feb 2025
Details
View Map
Share
Purton Lane

Buckinghamshire Council were proposing to carry out Highway repair and maintenance works on Purton Lane, Farnham Royal.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 8 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 24 Sep 2024 at 11:32.

Eunetworks logo
Between
4 and 11 Feb 2025
Details
View Map
Share
Follow
Dorney Wood Road

Eunetworks are proposing to carry out Utility asset works on Dorney Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 16 Aug 2024 at 09:08.

Eunetworks logo
Between
4 and 11 Feb 2025
Details
View Map
Share
Follow
Dorney Wood Road

Eunetworks are proposing to carry out Utility asset works on Dorney Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 2 Oct 2024 at 11:35.

Eunetworks logo
Between
4 and 11 Feb 2025
Details
View Map
Share
Follow
Dorney Wood Road

Eunetworks are proposing to carry out Utility asset works on Dorney Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 18 Oct 2024 at 09:35.

Cadent Gas logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Hitcham Lane

Cadent Gas are proposing to carry out Utility asset works on Hitcham Lane, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 10:09.

Buckinghamshire Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Black Park Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Black Park Road, Wexham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 13 Nov 2024 at 09:37.

Buckinghamshire Council logo
Between
10 and 15 Feb 2025
Details
View Map
Share
Follow
Oxford Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Oxford Road, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 9 Dec 2024 at 13:39.

Buckinghamshire Council logo
Between
10 and 15 Feb 2025
Details
View Map
Share
Follow
Oxford Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Oxford Road, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 13 Dec 2024 at 11:02.

Eunetworks logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Bath Road

Eunetworks are proposing to carry out Utility asset works on Bath Road, Slough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 18 Dec 2024 at 10:56.

Eunetworks logo
Between
15 and 24 Feb 2025
Details
View Map
Share
Follow
Curriers Lane

Eunetworks are proposing to carry out Utility asset works on Curriers Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 10 Oct 2024 at 10:11.

Buckinghamshire Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Rectory Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Rectory Road, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 11 Nov 2024 at 16:16.

Eunetworks logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Wooburn Common Road

Eunetworks were proposing to carry out Utility asset works on Wooburn Common Road, Taplow.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 28 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 16 Oct 2024 at 09:03.

Thames Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
River Road

Thames Water are proposing to carry out Utility repair and maintenance works on River Road, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 15:17.

Thames Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Cippenham Lane

Thames Water are proposing to carry out New service connection on Cippenham Lane, Slough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 24 Dec 2024 at 08:51.

Thames Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Petersfield Avenue

Thames Water were proposing to carry out Utility repair and maintenance works on Petersfield Avenue, Slough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Nov 2024 at 09:06.

Eunetworks logo
Between
20 and 25 Feb 2025
Details
View Map
Share
Follow
Littleworth Road

Eunetworks are proposing to carry out Utility asset works on Littleworth Road, Burnham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 9 Oct 2024 at 15:25.

Buckinghamshire Council logo
Between
24 and 27 Feb 2025
Details
View Map
Share
Follow
Huntercombe Lane South

Buckinghamshire Council are proposing to carry out Highway improvement works on Huntercombe Lane South, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 5 Nov 2024 at 14:13.

Cornerstone Telecommunications Infrastructure logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Lake End Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Lake End Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 25 Nov 2024 at 10:35.

Cornerstone Telecommunications Infrastructure logo
Between
24 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Lake End Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Lake End Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 5 March 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 26 Nov 2024 at 09:56.

Cadent Gas logo
Between
24 Feb and 10 Mar 2025
Details
View Map
Share
Love Green Lane

Cadent Gas were proposing to carry out Utility asset works on Love Green Lane, Iver.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 10 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 09:36.

Cadent Gas logo
LONG TERM
Between
24 Feb and 21 Apr 2025
Details
View Map
Share
Swallow Street

Cadent Gas were proposing to carry out Utility asset works on Swallow Street, Iver.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 21 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 09:34.

LONG TERM
Between
24 Feb and 25 Apr 2025
Details
View Map
Share
Follow
Wentworth Avenue

Optimal Power Networks are proposing to carry out Utility asset works on Wentworth Avenue, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Optimal Power Networks on 2 Sep 2024 at 00:12.

Buckinghamshire Council logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Beaconsfield Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Beaconsfield Road, Farnham Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 13 Nov 2024 at 14:05.

Buckinghamshire Council logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Beaconsfield Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Beaconsfield Road, Farnham Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 4 Dec 2024 at 14:39.

Cadent Gas logo
LONG TERM
Between
28 Feb and 11 Jun 2025
Details
View Map
Share
Follow
Green Lane

Cadent Gas are proposing to carry out Utility asset works on Green Lane, Burnham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 11:17.

BT logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Bruce Walk

BT were proposing to carry out Utility asset works on Bruce Walk, Windsor.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the footway and verge.

This roadwork event was last updated by BT on 2 Dec 2024 at 11:15.

Cadent Gas logo
LONG TERM
Between
3 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Horton Road

Cadent Gas are proposing to carry out Utility asset works on Horton Road, Colnbrook, Slough.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 11:55.

Cityfibre Metro Networks logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Farthing Green Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Farthing Green Lane, Stoke Poges.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 22 Nov 2024 at 15:19.

Cityfibre Metro Networks logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Farthing Green Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Farthing Green Lane, Stoke Poges.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 22 Nov 2024 at 10:41.

Cityfibre Metro Networks logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Farthing Green Lane

Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on Farthing Green Lane, Stoke Poges.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 22 Nov 2024 at 13:18.

Eunetworks logo
Between
3 and 27 Mar 2025
Details
View Map
Share
Follow
Taplow Common Road

Eunetworks are proposing to carry out Utility asset works on Taplow Common Road, Burnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 27 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 15 Nov 2024 at 13:54.

Eunetworks logo
LONG TERM
Between
3 Mar and 3 Apr 2025
Details
View Map
Share
Follow
Wooburn Common Road

Eunetworks are proposing to carry out Utility asset works on Wooburn Common Road, Taplow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 3 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 16 Aug 2024 at 09:10.

Eunetworks logo
LONG TERM
Between
3 Mar and 3 Apr 2025
Details
View Map
Share
Follow
Wooburn Common Road

Eunetworks are proposing to carry out Utility asset works on Wooburn Common Road, Taplow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 3 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 2 Sep 2024 at 10:02.

Thames Water logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Cippenham Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Cippenham Lane, Slough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Dec 2024 at 12:37.

Thames Water logo
Between
11 and 14 Mar 2025
Details
View Map
Share
Follow
Berry Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Berry Hill, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Dec 2024 at 12:35.

Buckinghamshire Council logo
Between
16 and 19 Mar 2025
Details
View Map
Share
Follow
Bangors Road South

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Bangors Road South, Iver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 March 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 13 Dec 2024 at 10:30.

LONG TERM
Between
17 Mar and 16 May 2025
Details
View Map
Share
Follow
Farnham Lane

Optimal Power Networks are proposing to carry out Utility asset works on Farnham Lane, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Optimal Power Networks on 23 May 2024 at 14:30.

LONG TERM
Between
17 Mar and 16 May 2025
Details
View Map
Share
Follow
Farnham Lane

Optimal Power Networks are proposing to carry out Utility asset works on Farnham Lane, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Optimal Power Networks on 13 Aug 2024 at 16:30.

Buckinghamshire Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Deans Close

Buckinghamshire Council are proposing to carry out Highway improvement works on Deans Close, Stoke Poges.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 19 Dec 2024 at 15:29.

National Highways logo
Between
17 and 29 Mar 2025
Details
View Map
Share
Follow
Oxford Road

National Highways are proposing to carry out Highway improvement works on Oxford Road, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 29 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 20 Dec 2024 at 10:47.

National Highways logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Oxford Road

National Highways are proposing to carry out Works for road purposes on Oxford Road, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 15 Nov 2024 at 14:02.

Buckinghamshire Council logo
Between
17 and 25 Mar 2025
Details
View Map
Share
Follow
Windsor Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Windsor Road, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 25 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 13 Dec 2024 at 11:01.

Thames Water logo
Between
19 and 21 Mar 2025
Details
View Map
Share
Follow
Hitcham Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Hitcham Lane, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 20 Dec 2024 at 10:49.

Buckinghamshire Council logo
Between
20 and 24 Mar 2025
Details
View Map
Share
Follow
Blackpond Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Blackpond Lane, Farnham Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 March 2025 and could run through until 24 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 17 Oct 2024 at 10:10.

Eunetworks logo
Between
20 and 25 Mar 2025
Details
View Map
Share
Littleworth Road

Eunetworks were proposing to carry out Utility asset works on Littleworth Road, Burnham.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 March 2025 and run through until 25 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 19 Nov 2024 at 09:23.

Buckinghamshire Council logo
Between
23 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Hawkswood Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Hawkswood Lane, Fulmer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 14 Oct 2024 at 11:11.

Thames Water logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Lydford Avenue

Thames Water are proposing to carry out New service connection on Lydford Avenue, Slough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Dec 2024 at 12:25.

Cornerstone Telecommunications Infrastructure logo
Between
24 and 30 Mar 2025
Details
View Map
Share
Dropmore Road

Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Dropmore Road, Burnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 30 March 2025. The works were due to impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 23 Dec 2024 at 10:02.

Cornerstone Telecommunications Infrastructure logo
Between
24 and 30 Mar 2025
Details
View Map
Share
Follow
Service Road Off Dropmore Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Service Road Off Dropmore Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 30 March 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 23 Dec 2024 at 10:07.

Buckinghamshire Council logo
Between
24 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Hawkswood Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Hawkswood Lane, Fulmer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 14 Oct 2024 at 15:30.

Buckinghamshire Council logo
Between
25 and 27 Mar 2025
Details
View Map
Share
Follow
Collinswood Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Collinswood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 17 Oct 2024 at 10:15.

Thames Water logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Slough Road

Thames Water are proposing to carry out Utility repair and maintenance works on Slough Road, Datchet, Slough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Dec 2024 at 10:24.

Buckinghamshire Council logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Hedgerley Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Hedgerley Lane, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 3 Dec 2024 at 13:46.

Buckinghamshire Council logo
Between
3 and 12 Apr 2025
Details
View Map
Share
Follow
Windsor Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Windsor Road, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 12 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 3 Dec 2024 at 13:43.

Buckinghamshire Council logo
Between
6 and 11 Apr 2025
Details
View Map
Share
Follow
Approach Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Approach Road, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 13 Dec 2024 at 11:09.


Roadworks Map near to Elliman Avenue, SLOUGH, SL2 5BG

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 7 Jan 2025 02:49
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Elliman Avenue, SLOUGH, SL2 5BG (32 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cityfibre Metro Networks logo
STOKE ROAD 
(0.1 miles)
Cityfibre Metro Networks
Statutory Infrastructure Works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 6 Jan 2025 - 8 Jan 2025
0.1
Details
Share
Follow
2
Cityfibre Metro Networks logo
SHAGGY CALF LANE 
(0.2 miles)
Cityfibre Metro Networks
Statutory Infrastructure Works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 6 Jan 2025 - 8 Jan 2025
0.2
Details
Share
Follow
3
Thames Water logo
GILLIAT ROAD 
(0.2 miles)
Thames Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Cancelled
(Scheduled: 3 Jan 2025 - 7 Jan 2025)
0.2
Details
Share
4
Thames Water logo
LITTLEDOWN ROAD 
(0.2 miles)
Thames Water
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 8 Jan 2025 - 10 Jan 2025
0.2
Details
Share
Follow
5
Thames Water logo
ELLIMAN AVENUE 
(0.3 miles)
Thames Water
Utility repair and maintenance works - Carriageway - Multi-way signals
Cancelled
(Scheduled: 7 Jan 2025 - 9 Jan 2025)
0.3
Details
Share
6
Thames Water logo
ELLIMAN AVENUE 
(0.3 miles)
Thames Water
Utility repair and maintenance works - Carriageway - Multi-way signals
Planned
Scheduled: 7 Jan 2025 - 9 Jan 2025
0.3
Details
Share
Follow
7
Virgin Media logo
GILLIAT ROAD 
(0.3 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 7 Jan 2025 - 8 Jan 2025
0.3
Details
Share
Follow
8
BT logo
STANLEY COTTAGES 
(0.3 miles)
BT
Utility asset works - Footway, Verge - Some carriageway incursion
Planned
Scheduled: 8 Jan 2025 - 9 Jan 2025
0.3
Details
Share
Follow
9
Cadent Gas logo
PETERSFIELD AVENUE 
(0.4 miles)
Cadent Gas
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 8 Jan 2025 - 9 Jan 2025
0.4
Details
Share
Follow
10
Cadent Gas logo
EMERGENCY
  
PETERSFIELD AVENUE 
(0.6 miles)
Cadent Gas
Utility repair and maintenance works - Carriageway - Multi-way signals
In Progress
Since: 31 Dec 2024 10:00
(Scheduled: 31 Dec 2024 - 10 Jan 2025)
0.6
Details
Share
Follow
  • ...