ROADWORKS SUMMARY
Styal Road, WILMSLOW, SK9 4AG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Styal Road, SK9 4AG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to Styal Road, WILMSLOW, SK9 4AG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Styal Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cheshire East Council logo
LONG TERM
Between
10 Nov 2023 and 11 Nov 2024
Details
View Map
Share
Follow
Pendleton Way

Cheshire East Council are proposing to carry out Highway repair and maintenance works on Pendleton Way, Wilmslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2023 and could run through until 11 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cheshire East Council on 23 Oct 2023 at 06:36.

Cheshire East Council logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
London Road

Cheshire East Council are carrying out Highway repair and maintenance works on London Road, Adlington, Macclesfield.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 May 2024 at 15:30 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cheshire East Council on 21 Aug 2024 at 16:31.

Cadent Gas logo
LONG TERM
Until
27 Sep 2024
Details
View Map
Share
Follow
Alderley Road

Cadent Gas are carrying out Utility repair and maintenance works on Alderley Road, Wilmslow.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 July 2024 at 11:24 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 12:33.

Cadent Gas logo
LONG TERM
Until
30 Sep 2024
Details
View Map
Share
Follow
Manchester Road

Cadent Gas are carrying out Utility repair and maintenance works on Manchester Road, Wilmslow.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 August 2024 at 15:07 and could run through until 30 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 12:45.

Cadent Gas logo
LONG TERM
Between
21 Aug and 18 Dec 2024
Details
View Map
Share
Kingsway

Cadent Gas were proposing to carry out Utility asset works on Kingsway, Cheadle.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 August 2024 and run through until 18 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 10:16.

Cadent Gas logo
LONG TERM
Between
21 Aug and 13 Nov 2024
Details
View Map
Share
Service Road For 162 To 188 Kingsway

Cadent Gas were proposing to carry out Utility asset works on Service Road For 162 To 188 Kingsway, Gatley, Cheadle.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 August 2024 and run through until 13 November 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 10:16.

Cadent Gas logo
LONG TERM
Until
27 Sep 2024
Details
View Map
Share
Follow
Adlington Road

Cadent Gas are carrying out Utility repair and maintenance works on Adlington Road, Wilmslow.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 August 2024 at 14:24 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 12:33.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Turves Road

Cadent Gas are proposing to carry out Utility asset works on Turves Road, Cheadle Hulme, Cheadle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2024 and could run through until 25 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Jun 2024 at 10:49.

LONG TERM
Between
2 Sep and 25 Oct 2024
Details
View Map
Share
Follow
Broadway

Stockport Metropolitan Borough Council are proposing to carry out Highway improvement works on Broadway, Cheadle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 25 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Stockport Metropolitan Borough Council on 23 Jul 2024 at 14:49.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Marland Avenue

Cadent Gas are proposing to carry out Utility asset works on Marland Avenue, Cheadle Hulme, Cheadle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2024 and could run through until 24 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jun 2024 at 14:27.

United Utilities Water (formerly North West Water) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Alderley Road

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Alderley Road, Wilmslow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 09:05 and could run through until 21 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 17 Sep 2024 at 13:03.

Cadent Gas logo
Until
27 Sep 2024
Details
View Map
Share
Follow
Hampson Crescent

Cadent Gas are carrying out Utility asset works on Hampson Crescent, Wilmslow.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 September 2024 at 07:20 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 07:31.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Grove Lane

Cadent Gas are carrying out Utility repair and maintenance works on Grove Lane, Hale.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 September 2024 at 14:00 and could run through until 25 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 06:56.

Cadent Gas logo
Until
30 Sep 2024
Details
View Map
Share
Follow
Hermitage Road

Cadent Gas are carrying out Utility repair and maintenance works on Hermitage Road, Hale.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2024 at 13:00 and could run through until 30 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 10:41.

Manchester City Council logo
Between
16 Sep and 11 Oct 2024
Details
View Map
Share
Follow
Thorley Lane

Manchester City Council are proposing to carry out Highway improvement works on Thorley Lane, Manchester.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 11 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Manchester City Council on 16 Aug 2024 at 15:36.

Cadent Gas logo
Until
30 Sep 2024
Details
View Map
Share
Follow
Hermitage Road

Cadent Gas are carrying out Utility repair and maintenance works on Hermitage Road, Hale.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2024 at 08:00 and could run through until 30 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 09:43.

United Utilities Water (formerly North West Water) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Gainford Avenue

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Gainford Avenue, Gatley, Cheadle.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 September 2024 at 11:15 and could run through until 24 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 18 Sep 2024 at 11:33.

Until
27 Sep 2024
Details
View Map
Share
Follow
Manchester East Airport Link

Stockport Metropolitan Borough Council are carrying out Highway repair and maintenance works on Manchester East Airport Link, Cheadle Hulme, Cheadle.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 20 September 2024 at 09:30 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Stockport Metropolitan Borough Council on 19 Sep 2024 at 16:04.

BT logo
Finishing
Today
Details
View Map
Share
Follow
Passageway From Penhale Mews To Dairyground Road

BT are proposing to carry out Utility asset works on Passageway From Penhale Mews To Dairyground Road, Bramhall, Stockport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are in progress during today only. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 4 Sep 2024 at 09:11.

LONG TERM
Between
1 Oct 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Turnfield Road

Stockport Metropolitan Borough Council are proposing to carry out Highway improvement works on Turnfield Road, Cheadle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 1 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Stockport Metropolitan Borough Council on 31 Jul 2024 at 16:40.

LONG TERM
Between
1 Oct 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Schools Hill

Stockport Metropolitan Borough Council are proposing to carry out Highway improvement works on Schools Hill, Cheadle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 1 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Stockport Metropolitan Borough Council on 2 Aug 2024 at 11:42.

LONG TERM
Between
1 Oct 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Schools Hill

Stockport Metropolitan Borough Council are proposing to carry out Highway improvement works on Schools Hill, Cheadle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 1 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Stockport Metropolitan Borough Council on 1 Aug 2024 at 10:56.

LONG TERM
Between
1 Oct 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Schools Hill

Stockport Metropolitan Borough Council are proposing to carry out Highway improvement works on Schools Hill, Cheadle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 1 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Stockport Metropolitan Borough Council on 2 Aug 2024 at 11:43.

LONG TERM
Between
1 Oct 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Schools Hill

Stockport Metropolitan Borough Council are proposing to carry out Highway improvement works on Schools Hill, Cheadle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 1 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Stockport Metropolitan Borough Council on 2 Aug 2024 at 11:44.

LONG TERM
Between
1 Oct 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Handforth Bypass

Stockport Metropolitan Borough Council are proposing to carry out Highway improvement works on Handforth Bypass, Cheadle Hulme, Cheadle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 1 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Stockport Metropolitan Borough Council on 5 Aug 2024 at 11:09.

Cadent Gas logo
Between
7 and 23 Oct 2024
Details
View Map
Share
Follow
Bulkeley Road

Cadent Gas are proposing to carry out Utility asset works on Bulkeley Road, Wilmslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 23 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jul 2024 at 15:32.

Cadent Gas logo
Between
7 and 21 Oct 2024
Details
View Map
Share
Follow
Highfield Road

Cadent Gas are proposing to carry out Utility asset works on Highfield Road, Cheadle Hulme, Cheadle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 21 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Jul 2024 at 08:46.

Cadent Gas logo
Between
7 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Heathbank Road

Cadent Gas are proposing to carry out Utility asset works on Heathbank Road, Cheadle Hulme, Cheadle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Jul 2024 at 09:25.

Network Rail logo
Between
7 and 11 Oct 2024
Details
View Map
Share
Follow
Carrs Road

Network Rail are proposing to carry out Works for Rail Purposes on Carrs Road, Cheadle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 11 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 12 Sep 2024 at 15:19.

Network Rail logo
Between
7 and 11 Oct 2024
Details
View Map
Share
Follow
Carrs Road

Network Rail are proposing to carry out Works for Rail Purposes on Carrs Road, Cheadle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 11 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 Aug 2024 at 12:06.

Cadent Gas logo
Between
9 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Chester Road

Cadent Gas are proposing to carry out Utility asset works on Chester Road, Poynton With Worth, Macclesfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Jun 2024 at 10:43.

Cadent Gas logo
Between
9 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Nursery Drive

Cadent Gas are proposing to carry out Utility asset works on Nursery Drive, Poynton With Worth, Macclesfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Jun 2024 at 10:43.

Between
11 and 19 Oct 2024
Details
View Map
Share
Follow
Manor Road

Stockport Metropolitan Borough Council are proposing to carry out Highway improvement works on Manor Road, Cheadle Hulme, Cheadle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2024 and could run through until 19 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Stockport Metropolitan Borough Council on 11 Sep 2024 at 16:17.

Between
11 and 18 Oct 2024
Details
View Map
Share
Follow
Park Road

Stockport Metropolitan Borough Council are proposing to carry out Highway improvement works on Park Road, Cheadle Hulme, Cheadle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2024 and could run through until 18 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Stockport Metropolitan Borough Council on 13 Sep 2024 at 10:29.

Cadent Gas logo
Between
16 Oct and 5 Nov 2024
Details
View Map
Share
Follow
Bramhall Lane South

Cadent Gas are proposing to carry out Utility asset works on Bramhall Lane South, Bramhall, Stockport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2024 and could run through until 5 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 10:06.

Cadent Gas logo
Between
16 and 30 Oct 2024
Details
View Map
Share
Follow
Styal Road Icw Manchester Road

Cadent Gas are proposing to carry out Utility asset works on Styal Road Icw Manchester Road, Wilmslow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2024 and could run through until 30 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jul 2024 at 09:11.

Cadent Gas logo
Between
16 Oct and 5 Nov 2024
Details
View Map
Share
Follow
Manchester Road

Cadent Gas are proposing to carry out Utility asset works on Manchester Road, Wilmslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2024 and could run through until 5 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jul 2024 at 16:38.

Cadent Gas logo
Between
16 Oct and 5 Nov 2024
Details
View Map
Share
Follow
Bramhall Lane South

Cadent Gas are proposing to carry out Utility asset works on Bramhall Lane South, Bramhall, Stockport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2024 and could run through until 5 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 12:50.

BT logo
Between
23 and 25 Oct 2024
Details
View Map
Share
Follow
Old Road

BT are proposing to carry out Utility repair and maintenance works on Old Road, Wilmslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2024 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 6 Aug 2024 at 11:41.

BT logo
Between
23 and 25 Oct 2024
Details
View Map
Share
Follow
Old Road

BT are proposing to carry out Utility repair and maintenance works on Old Road, Wilmslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2024 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 30 Jul 2024 at 11:07.

Cadent Gas logo
Between
23 Oct and 6 Nov 2024
Details
View Map
Share
Follow
Henbury Road

Cadent Gas are proposing to carry out Utility asset works on Henbury Road, Wilmslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2024 and could run through until 6 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jul 2024 at 15:48.

Cadent Gas logo
Between
23 Oct and 6 Nov 2024
Details
View Map
Share
Follow
Spath Lane

Cadent Gas are proposing to carry out Utility asset works on Spath Lane, Wilmslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2024 and could run through until 6 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jul 2024 at 15:48.

United Utilities Water (formerly North West Water) logo
Between
28 Oct and 8 Nov 2024
Details
View Map
Share
Alderley Road

United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Alderley Road, Wilmslow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 8 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 7 Aug 2024 at 14:52.

Cadent Gas logo
Between
31 Oct and 4 Nov 2024
Details
View Map
Share
Follow
Mottram Road

Cadent Gas are proposing to carry out New service connection on Mottram Road, Alderley Edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 4 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 14:44.

Cadent Gas logo
LONG TERM
Between
1 Nov and 6 Dec 2024
Details
View Map
Share
Edgeley Road

Cadent Gas were proposing to carry out Utility asset works on Edgeley Road, Edgeley, Stockport.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 November 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 08:57.

United Utilities Water (formerly North West Water) logo
Between
4 and 15 Nov 2024
Details
View Map
Share
Follow
Alderley Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Alderley Road, Wilmslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 21 Aug 2024 at 11:28.

United Utilities Water (formerly North West Water) logo
Between
4 and 15 Nov 2024
Details
View Map
Share
Follow
Alderley Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Alderley Road, Wilmslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 12 Aug 2024 at 12:12.

United Utilities Water (formerly North West Water) logo
Between
4 and 14 Nov 2024
Details
View Map
Share
Follow
Alderley Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Alderley Road, Wilmslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 14 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 9 Sep 2024 at 07:01.

Cadent Gas logo
Between
18 Nov and 5 Dec 2024
Details
View Map
Share
Follow
Bulkeley Road

Cadent Gas are proposing to carry out Utility asset works on Bulkeley Road, Wilmslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 14:27.

Cadent Gas logo
Between
18 Nov and 5 Dec 2024
Details
View Map
Share
Follow
Bulkeley Road

Cadent Gas are proposing to carry out Utility asset works on Bulkeley Road, Wilmslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Aug 2024 at 11:43.

Cadent Gas logo
Between
18 Nov and 5 Dec 2024
Details
View Map
Share
Follow
Bulkeley Road

Cadent Gas are proposing to carry out Utility asset works on Bulkeley Road, Wilmslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Aug 2024 at 14:55.

Cadent Gas logo
Between
18 Nov and 5 Dec 2024
Details
View Map
Share
Follow
Bulkeley Road

Cadent Gas are proposing to carry out Utility asset works on Bulkeley Road, Wilmslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 15:11.

Manchester City Council logo
LONG TERM
Between
25 Nov 2024 and 25 Apr 2025
Details
View Map
Share
Follow
Thorley Lane

Manchester City Council are proposing to carry out Highway improvement works on Thorley Lane, Manchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Manchester City Council on 5 Sep 2024 at 15:18.

Manchester City Council logo
LONG TERM
Between
25 Nov 2024 and 25 Apr 2025
Details
View Map
Share
Follow
Runger Lane

Manchester City Council are proposing to carry out Highway improvement works on Runger Lane, Manchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Manchester City Council on 5 Sep 2024 at 15:18.

Manchester City Council logo
LONG TERM
Between
25 Nov 2024 and 25 Apr 2025
Details
View Map
Share
Follow
Thorley Lane

Manchester City Council are proposing to carry out Highway improvement works on Thorley Lane, Manchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Manchester City Council on 5 Sep 2024 at 15:31.

Manchester City Council logo
Between
26 and 28 Nov 2024
Details
View Map
Share
Follow
Kingsway

Manchester City Council are proposing to carry out Highway improvement works on Kingsway, Manchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Manchester City Council on 2 Aug 2024 at 09:18.

BT logo
Between
4 and 10 Dec 2024
Details
View Map
Share
Follow
Passageway Rear Of 1 - 20 Greenvale Drive

BT are proposing to carry out Utility repair and maintenance works on Passageway Rear Of 1 - 20 Greenvale Drive, Cheadle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 10 December 2024. The works will impact the footway only.

This roadwork event was last updated by BT on 11 Sep 2024 at 11:35.

Cadent Gas logo
Between
11 and 27 Dec 2024
Details
View Map
Share
Follow
Royon Drive

Cadent Gas are proposing to carry out Utility asset works on Royon Drive, Cheadle Heath, Stockport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 10:00.

Cadent Gas logo
Between
11 Dec 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Norbreck Avenue

Cadent Gas are proposing to carry out Utility asset works on Norbreck Avenue, Cheadle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 1 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 10:30.

Cadent Gas logo
Between
11 Dec 2024 and 9 Jan 2025
Details
View Map
Share
Follow
Bird Hall Lane

Cadent Gas are proposing to carry out Utility asset works on Bird Hall Lane, Cheadle Heath, Stockport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 10:30.

Cadent Gas logo
Between
11 Dec 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Normanton Road

Cadent Gas are proposing to carry out Utility asset works on Normanton Road, Cheadle Heath, Stockport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 1 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 10:30.

LONG TERM
Between
16 Dec 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Wensleydale Avenue

Stockport Metropolitan Borough Council are proposing to carry out Highway improvement works on Wensleydale Avenue, Cheadle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Stockport Metropolitan Borough Council on 17 Sep 2024 at 01:43.

LONG TERM
Between
16 Dec 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Wensley Road

Stockport Metropolitan Borough Council are proposing to carry out Highway improvement works on Wensley Road, Cheadle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Stockport Metropolitan Borough Council on 17 Sep 2024 at 01:34.

LONG TERM
Between
16 Dec 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Richmond Hill Road

Stockport Metropolitan Borough Council are proposing to carry out Highway improvement works on Richmond Hill Road, Cheadle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Stockport Metropolitan Borough Council on 17 Sep 2024 at 01:40.

LONG TERM
Between
16 Dec 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Chadvil Road

Stockport Metropolitan Borough Council are proposing to carry out Highway improvement works on Chadvil Road, Cheadle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Stockport Metropolitan Borough Council on 17 Sep 2024 at 01:28.

LONG TERM
Between
16 Dec 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Milton Crescent

Stockport Metropolitan Borough Council are proposing to carry out Highway improvement works on Milton Crescent, Cheadle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Stockport Metropolitan Borough Council on 16 Sep 2024 at 17:31.

LONG TERM
Between
16 Dec 2024 and 31 Jan 2025
Details
View Map
Share
Follow
High Grove Road

Stockport Metropolitan Borough Council are proposing to carry out Highway improvement works on High Grove Road, Cheadle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Stockport Metropolitan Borough Council on 16 Sep 2024 at 17:25.

LONG TERM
Between
16 Dec 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Barcheston Road

Stockport Metropolitan Borough Council are proposing to carry out Highway improvement works on Barcheston Road, Cheadle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Stockport Metropolitan Borough Council on 16 Sep 2024 at 17:05.


Roadworks Map near to Styal Road, WILMSLOW, SK9 4AG

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 20 Sep 2024 01:58
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Styal Road, WILMSLOW, SK9 4AG (8 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
United Utilities Water (formerly North West Water) logo
LACEY GREEN 
(0.2 miles)
United Utilities Water (formerly North West Water)
New service connection - Footway, Carriageway - Give and take
Planned
Scheduled: 20 Sep 2024 - 24 Sep 2024
0.2
Details
Share
Follow
2
Cadent Gas logo
EMERGENCY
  
MANCHESTER ROAD 
(0.3 miles)
Cadent Gas
Utility repair and maintenance works - Footway, Carriageway - Multi-way signals
In Progress
Since: 20 Aug 2024 15:07
(Scheduled: 20 Aug 2024 - 30 Sep 2024)
0.3
Details
Share
Follow
3
United Utilities Water (formerly North West Water) logo
MANCHESTER ROAD 
(0.4 miles)
United Utilities Water (formerly North West Water)
New service connection - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 18 Sep 2024 14:00
(Scheduled: 18 Sep 2024 - 24 Sep 2024)
0.4
Details
Share
Follow
4
Cadent Gas logo
BUCKINGHAM ROAD 
(0.7 miles)
Cadent Gas
Disconnection or alteration of supply - Footway - Some carriageway incursion
Cancelled
(Scheduled: 19 Sep 2024 - 23 Sep 2024)
0.7
Details
Share
5
Cadent Gas logo
EMERGENCY
  
ALDERLEY ROAD 
(0.9 miles)
Cadent Gas
Utility repair and maintenance works - Carriageway - Multi-way signals
In Progress
Since: 29 Jul 2024 11:24
(Scheduled: 29 Jul 2024 - 27 Sep 2024)
0.9
Details
Share
Follow
6
Cheshire East Council logo
MACCLESFIELD ROAD 
(0.9 miles)
Cheshire East Council
Highway repair and maintenance works - Carriageway - Stop/go boards
Planned
Scheduled: 16 Sep 2024 - 20 Sep 2024
0.9
Details
Share
Follow
7
United Utilities Water (formerly North West Water) logo
MAJOR
  
ALDERLEY ROAD 
(1.0 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Carriageway - Road closure
In Progress
Since: 9 Sep 2024 09:05
(Scheduled: 9 Sep 2024 - 21 Sep 2024)
1.0
Details
Share
Follow
8
Nexfibre Networks Limited logo
BRACKENWOOD MEWS 
(1.0 miles)
Nexfibre Networks Limited
Utility asset works - Footway, Carriageway - Give and take
In Progress
Since: 16 Sep 2024 11:15