ROADWORKS SUMMARY
Peel Street, STALYBRIDGE, SK15 1PT

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Peel Street, SK15 1PT and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Peel Street, STALYBRIDGE, SK15 1PT

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Peel Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Oldham Metropolitan Borough Council logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Southgate Street

Oldham Metropolitan Borough Council are carrying out Section 50 on Southgate Street, Oldham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 January 2022 at 09:31 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 8 Aug 2023 at 10:14.

National Highways logo
LONG TERM
Until
26 Feb 2025
Details
View Map
Share
Follow
Hyde Road

National Highways are carrying out Highway improvement works on Hyde Road, Denton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 April 2023 at 08:00 and could run through until 26 February 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by National Highways on 24 Oct 2023 at 06:32.

National Highways logo
LONG TERM
Until
26 Feb 2025
Details
View Map
Share
Follow
St Annes Road

National Highways are carrying out Highway improvement works on St Annes Road, Denton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 January 2023 at 09:00 and could run through until 26 February 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by National Highways on 24 Oct 2023 at 07:19.

Oldham Metropolitan Borough Council logo
LONG TERM
Until
24 Dec 2024
Details
View Map
Share
Follow
Ascroft Street

Oldham Metropolitan Borough Council are carrying out Section 50 on Ascroft Street, Oldham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 March 2023 at 09:00 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 17 Jul 2023 at 09:47.

Tameside Metropolitan Borough Council logo
LONG TERM
Until
29 May 2025
Details
View Map
Share
Follow
Broomgrove Lane

Tameside Metropolitan Borough Council are carrying out Section 50 on Broomgrove Lane, Denton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 May 2023 at 09:13 and could run through until 29 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Tameside Metropolitan Borough Council on 1 Jun 2023 at 14:30.

Electricity North West (NorWeb) logo
LONG TERM
Between
8 Jan 2024 and 30 Mar 2025
Details
View Map
Share
Follow
Bank Bridge Road

Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Bank Bridge Road, Manchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2024 and could run through until 30 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Electricity North West (NorWeb) on 17 Aug 2023 at 10:20.

Oldham Metropolitan Borough Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Market Place

Oldham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Market Place, Oldham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 May 2024 at 08:30 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 22 May 2024 at 10:50.

LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Hurstheads Lane

Stockport Metropolitan Borough Council are carrying out Highway improvement works on Hurstheads Lane, Romiley, Stockport.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 July 2024 at 08:00 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Stockport Metropolitan Borough Council on 14 Oct 2024 at 10:42.

Oldham Metropolitan Borough Council logo
LONG TERM
Until
13 Mar 2025
Details
View Map
Share
Follow
Deanshut Road

Oldham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Deanshut Road, Oldham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 July 2024 at 09:30 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 30 Jul 2024 at 10:17.

Cadent Gas logo
LONG TERM
Until
24 Dec 2024
Details
View Map
Share
Follow
Ashworth Lane

Cadent Gas are carrying out Utility asset works on Ashworth Lane, Mottram.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 07:30 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 16:03.

Tameside Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2024 and 1 Apr 2026
Details
View Map
Share
Follow
Fleet Street

Tameside Metropolitan Borough Council are proposing to carry out Section 50 on Fleet Street, Ashton-under-lyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 1 April 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Tameside Metropolitan Borough Council on 20 May 2024 at 12:10.

LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Green Lane

Stockport Metropolitan Borough Council are carrying out Highway improvement works on Green Lane, Romiley, Stockport.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2024 at 09:30 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Stockport Metropolitan Borough Council on 4 Oct 2024 at 11:56.

Oldham Metropolitan Borough Council logo
LONG TERM
Between
30 Sep 2024 and 31 Jan 2025
Details
View Map
Share
High Street

Oldham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on High Street, Oldham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2024 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 11 Oct 2024 at 10:43.

Oldham Metropolitan Borough Council logo
LONG TERM
Between
30 Sep 2024 and 31 Jan 2025
Details
View Map
Share
Yorkshire Street

Oldham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Yorkshire Street, Oldham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2024 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 11 Oct 2024 at 10:42.

Oldham Metropolitan Borough Council logo
LONG TERM
Between
30 Sep 2024 and 31 Jan 2025
Details
View Map
Share
Church Terrace

Oldham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Church Terrace, Oldham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2024 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 11 Oct 2024 at 10:43.

Oldham Metropolitan Borough Council logo
LONG TERM
Between
30 Sep 2024 and 31 Jan 2025
Details
View Map
Share
Church Street

Oldham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Church Street, Oldham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2024 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 11 Oct 2024 at 10:42.

Oldham Metropolitan Borough Council logo
LONG TERM
Between
30 Sep 2024 and 31 Jan 2025
Details
View Map
Share
Curzon Street

Oldham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Curzon Street, Oldham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2024 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 11 Oct 2024 at 10:43.

Cadent Gas logo
LONG TERM
Until
24 Dec 2024
Details
View Map
Share
Follow
Carrbrook Crescent

Cadent Gas are carrying out Utility asset works on Carrbrook Crescent, Stalybridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 October 2024 at 10:00 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 13:15.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Cross Street

Cadent Gas are carrying out Utility asset works on Cross Street, Hyde.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 10:00 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 10:32.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
7 Oct 2024 and 25 Jul 2025
Details
View Map
Share
Follow
Alexandra Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Alexandra Road, Ashton-under-lyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 25 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 26 Jul 2024 at 07:22.

Tameside Metropolitan Borough Council logo
LONG TERM
Between
14 Oct and 18 Nov 2024
Details
View Map
Share
Follow
Clarence Street

Tameside Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Clarence Street, Stalybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Tameside Metropolitan Borough Council on 3 Oct 2024 at 16:06.

Tameside Metropolitan Borough Council logo
LONG TERM
Until
18 Nov 2024
Details
View Map
Share
Follow
Clarence Street

Tameside Metropolitan Borough Council are carrying out Highway repair and maintenance works on Clarence Street, Stalybridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 10:45 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Tameside Metropolitan Borough Council on 16 Oct 2024 at 06:54.

Oldham Metropolitan Borough Council logo
LONG TERM
Between
14 Oct and 9 Dec 2024
Details
View Map
Share
Follow
Tuns Road

Oldham Metropolitan Borough Council are proposing to carry out Section 50 on Tuns Road, Oldham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 9 Oct 2024 at 08:46.

Cadent Gas logo
LONG TERM
Between
17 Oct and 22 Nov 2024
Details
View Map
Share
Follow
Buckton Vale Road

Cadent Gas are proposing to carry out Utility asset works on Buckton Vale Road, Stalybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 10:22.

Cadent Gas logo
LONG TERM
Between
21 Oct and 22 Nov 2024
Details
View Map
Share
Fold Crescent

Cadent Gas were proposing to carry out Utility asset works on Fold Crescent, Stalybridge.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 22 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 14:42.

Cadent Gas logo
LONG TERM
Between
21 Oct and 13 Dec 2024
Details
View Map
Share
Follow
Ashworth Street

Cadent Gas are proposing to carry out Utility asset works on Ashworth Street, Oldham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Jul 2024 at 14:18.

Cadent Gas logo
LONG TERM
Between
24 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Ridge Hill Lane

Cadent Gas are proposing to carry out Utility asset works on Ridge Hill Lane, Stalybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Aug 2024 at 13:30.

Cadent Gas logo
LONG TERM
Between
24 Oct 2024 and 2 Jan 2025
Details
View Map
Share
Follow
Springs Lane

Cadent Gas are proposing to carry out Utility asset works on Springs Lane, Stalybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2024 and could run through until 2 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Aug 2024 at 13:28.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
School Crescent

Cadent Gas are proposing to carry out Utility asset works on School Crescent, Stalybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Aug 2024 at 13:28.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
School Crescent

Cadent Gas were proposing to carry out Utility asset works on School Crescent, Stalybridge.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 October 2024 and run through until 11 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 09:35.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Carrbrook Crescent

Cadent Gas are proposing to carry out Utility asset works on Carrbrook Crescent, Stalybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Aug 2024 at 09:26.

Cadent Gas logo
LONG TERM
Between
24 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Fold Crescent

Cadent Gas are proposing to carry out Utility asset works on Fold Crescent, Stalybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Aug 2024 at 09:36.

Cadent Gas logo
Between
24 Oct and 18 Nov 2024
Details
View Map
Share
Follow
Moorgate Road

Cadent Gas are proposing to carry out Utility asset works on Moorgate Road, Stalybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2024 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Aug 2024 at 09:33.

Cadent Gas logo
Between
24 Oct and 18 Nov 2024
Details
View Map
Share
Follow
Moorgate Drive

Cadent Gas are proposing to carry out Utility asset works on Moorgate Drive, Stalybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2024 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Aug 2024 at 09:31.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Buckton Vale Road

Cadent Gas were proposing to carry out Utility asset works on Buckton Vale Road, Stalybridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 October 2024 and run through until 11 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Aug 2024 at 08:50.

Cadent Gas logo
Between
28 Oct and 22 Nov 2024
Details
View Map
Share
Follow
Belmont Drive

Cadent Gas are proposing to carry out Utility asset works on Belmont Drive, Marple Bridge, Stockport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 11:57.

Cadent Gas logo
Between
28 Oct and 22 Nov 2024
Details
View Map
Share
Follow
Belmont Drive

Cadent Gas are proposing to carry out Utility asset works on Belmont Drive, Marple Bridge, Stockport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 10:51.

Cadent Gas logo
Between
28 Oct and 22 Nov 2024
Details
View Map
Share
Follow
Belmont Drive

Cadent Gas are proposing to carry out Utility asset works on Belmont Drive, Marple Bridge, Stockport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 08:00.

Cadent Gas logo
Between
28 Oct and 22 Nov 2024
Details
View Map
Share
Follow
Belmont Drive

Cadent Gas are proposing to carry out Utility asset works on Belmont Drive, Marple Bridge, Stockport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 09:59.

Tameside Metropolitan Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Manley Grove

Tameside Metropolitan Borough Council are proposing to carry out Highway improvement works on Manley Grove, Mottram.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 15 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Tameside Metropolitan Borough Council on 24 Oct 2024 at 11:39.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Mottram Old Road

Cadent Gas are carrying out Utility asset works on Mottram Old Road, Stalybridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 10:33 and could run through until 15 November 2024. The works will impact the footway only.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 10:30.

LONG TERM
Between
29 Oct and 6 Dec 2024
Details
View Map
Share
Follow
Green Lane

Stockport Metropolitan Borough Council are proposing to carry out Highway improvement works on Green Lane, Romiley, Stockport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Stockport Metropolitan Borough Council on 22 Aug 2024 at 16:06.

Cadent Gas logo
Between
30 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Sandy Lane

Cadent Gas are proposing to carry out Utility asset works on Sandy Lane, Dukinfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Aug 2024 at 13:27.

Cadent Gas logo
Until
29 Nov 2024
Details
View Map
Share
Follow
Sandy Lane

Cadent Gas are carrying out Utility asset works on Sandy Lane, Dukinfield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 November 2024 at 08:30 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 08:52.

Cadent Gas logo
LONG TERM
Between
30 Oct and 9 Dec 2024
Details
View Map
Share
Ridge Hill Lane

Cadent Gas were proposing to carry out Utility asset works on Ridge Hill Lane, Stalybridge.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 October 2024 and run through until 9 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 15:39.

Cadent Gas logo
Between
30 Oct and 20 Nov 2024
Details
View Map
Share
Arlies Lane

Cadent Gas were proposing to carry out Utility asset works on Arlies Lane, Stalybridge.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 October 2024 and run through until 20 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 15:40.

National Highways logo
LONG TERM
Between
4 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Roe Cross Road

National Highways are proposing to carry out Highway improvement works on Roe Cross Road, Mottram.

These works are categorised as Major.

The works will start on or after 4 November 2024 and could run through until 1 May 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by National Highways on 29 Oct 2024 at 11:39.

National Highways logo
LONG TERM
Between
4 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Roe Cross Road

National Highways are proposing to carry out Highway improvement works on Roe Cross Road, Mottram.

These works are categorised as Major.

The works will start on or after 4 November 2024 and could run through until 1 May 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by National Highways on 18 Oct 2024 at 12:33.

Cadent Gas logo
Until
24 Nov 2024
Details
View Map
Share
Follow
Mottram Road

Cadent Gas are carrying out Utility asset works on Mottram Road, Stalybridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 13:20 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 14:34.

Cadent Gas logo
Until
25 Nov 2024
Details
View Map
Share
Follow
Early Bank

Cadent Gas are carrying out Utility asset works on Early Bank, Stalybridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 November 2024 at 11:11 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 11:14.

United Utilities Water (formerly North West Water) logo
Between
5 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Western Street

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Western Street, Manchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 14 Aug 2024 at 13:48.

United Utilities Water (formerly North West Water) logo
Between
5 Nov and 3 Dec 2024
Details
View Map
Share
Western Street

United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Western Street, Manchester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 November 2024 and run through until 3 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Oct 2024 at 06:50.

Electricity North West (NorWeb) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Berry Brow

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Berry Brow, Manchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 12 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 14 Aug 2024 at 13:48.

Cadent Gas logo
Between
6 and 21 Nov 2024
Details
View Map
Share
Borrowdale Terrace

Cadent Gas were proposing to carry out Utility asset works on Borrowdale Terrace, Stalybridge.

These works were categorised as Major.

The works were originally planned to start 6 November 2024 and run through until 21 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 15:40.

Cadent Gas logo
Between
11 Nov and 4 Dec 2024
Details
View Map
Share
Follow
Gray Close

Cadent Gas are proposing to carry out Utility asset works on Gray Close, Mottram.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 15:41.

Tameside Metropolitan Borough Council logo
Between
11 and 28 Nov 2024
Details
View Map
Share
Follow
Ashton Hill Lane

Tameside Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Ashton Hill Lane, Droylsden.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Tameside Metropolitan Borough Council on 1 Nov 2024 at 15:19.

Cadent Gas logo
Between
11 and 25 Nov 2024
Details
View Map
Share
Follow
John Heywood Street

Cadent Gas are proposing to carry out Utility asset works on John Heywood Street, Manchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 10:40.

Electricity North West (NorWeb) logo
Finishing
Friday
Details
View Map
Share
Follow
Freeman Avenue

Electricity North West (NorWeb) are proposing to carry out New service connection on Freeman Avenue, Ashton-under-lyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 20 Sep 2024 at 09:24.

Oldham Metropolitan Borough Council logo
Between
11 and 21 Nov 2024
Details
View Map
Share
Follow
Kew Road

Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Kew Road, Failsworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 19 Aug 2024 at 08:37.

United Utilities Water (formerly North West Water) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Hanover Street

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Hanover Street, Mossley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 13 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 1 Oct 2024 at 14:57.

United Utilities Water (formerly North West Water) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Hanover Street

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Hanover Street, Mossley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 13 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 30 Oct 2024 at 15:33.

Tameside Metropolitan Borough Council logo
Between
11 and 29 Nov 2024
Details
View Map
Share
Follow
Stockport Road

Tameside Metropolitan Borough Council are proposing to carry out Section 50 on Stockport Road, Mossley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Tameside Metropolitan Borough Council on 7 Nov 2024 at 16:05.

Oldham Metropolitan Borough Council logo
Between
11 and 21 Nov 2024
Details
View Map
Share
Follow
Drury Lane

Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Drury Lane, Chadderton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 19 Aug 2024 at 08:36.

United Utilities Water (formerly North West Water) logo
Finishing
Thursday
Details
View Map
Share
Follow
Apple Street

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Apple Street, Hyde.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 14 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 1 Oct 2024 at 15:09.

United Utilities Water (formerly North West Water) logo
Finishing
Thursday
Details
View Map
Share
Follow
Apple Street

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Apple Street, Hyde.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 14 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 6 Nov 2024 at 16:08.

Cadent Gas logo
Between
12 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Castle Lane

Cadent Gas are proposing to carry out Utility asset works on Castle Lane, Stalybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 11:10.

Cadent Gas logo
Between
13 and 29 Nov 2024
Details
View Map
Share
Foundry Street

Cadent Gas were proposing to carry out Utility asset works on Foundry Street, Dukinfield.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 13:48.

Cadent Gas logo
Between
13 Nov and 4 Dec 2024
Details
View Map
Share
Springs Lane

Cadent Gas were proposing to carry out Utility asset works on Springs Lane, Stalybridge.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 November 2024 and run through until 4 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 15:45.

Manchester City Council logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
Yeadon Road

Manchester City Council are proposing to carry out Highway improvement works on Yeadon Road, Manchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Manchester City Council on 15 Oct 2024 at 08:40.

United Utilities Water (formerly North West Water) logo
Between
18 and 20 Nov 2024
Details
View Map
Share
Follow
Caroline Street

United Utilities Water (formerly North West Water) are proposing to carry out Remedial works on Caroline Street, Stalybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 1 Oct 2024 at 13:26.

Cadent Gas logo
Between
18 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Carr Rise

Cadent Gas are proposing to carry out Utility asset works on Carr Rise, Carrbrook, Stalybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 11:40.

Cadent Gas logo
Between
20 Nov and 20 Dec 2024
Details
View Map
Share
Mottram Road

Cadent Gas were proposing to carry out Utility asset works on Mottram Road, Stalybridge.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 November 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 11:07.

Manchester City Council logo
Between
21 and 26 Nov 2024
Details
View Map
Share
Follow
Cornwall Street

Manchester City Council are proposing to carry out Highway improvement works on Cornwall Street, Manchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Manchester City Council on 2 Aug 2024 at 09:21.

Electricity North West (NorWeb) logo
Between
3 and 9 Dec 2024
Details
View Map
Share
Follow
Freeman Avenue

Electricity North West (NorWeb) are proposing to carry out New service connection on Freeman Avenue, Ashton-under-lyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 13 Sep 2024 at 09:47.

Cadent Gas logo
Between
9 Dec 2024 and 8 Jan 2025
Details
View Map
Share
Follow
Belmont Drive

Cadent Gas are proposing to carry out Utility asset works on Belmont Drive, Marple Bridge, Stockport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 10:40.

Cadent Gas logo
Between
9 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Ernocroft Road

Cadent Gas are proposing to carry out Utility asset works on Ernocroft Road, Marple Bridge, Stockport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 3 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 11:37.

Manchester City Council logo
Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
Fernwood Avenue

Manchester City Council are proposing to carry out Highway improvement works on Fernwood Avenue, Manchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Manchester City Council on 2 Aug 2024 at 09:20.

Manchester City Council logo
Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
Parkstone Avenue

Manchester City Council are proposing to carry out Highway improvement works on Parkstone Avenue, Manchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Manchester City Council on 2 Aug 2024 at 09:12.

Electricity North West (NorWeb) logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Taylor Street

Electricity North West (NorWeb) are proposing to carry out New service connection on Taylor Street, Stalybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 24 Oct 2024 at 08:38.

Electricity North West (NorWeb) logo
Between
9 and 18 Dec 2024
Details
View Map
Share
Follow
Carrhill Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Carrhill Road, Mossley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 16 Sep 2024 at 16:19.

Manchester City Council logo
Between
10 and 13 Dec 2024
Details
View Map
Share
Follow
Green Lane

Manchester City Council are proposing to carry out Highway improvement works on Green Lane, Manchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Manchester City Council on 2 Aug 2024 at 09:21.

Between
16 and 21 Dec 2024
Details
View Map
Share
Follow
Glossop Road

Stockport Metropolitan Borough Council are proposing to carry out Highway improvement works on Glossop Road, Marple Bridge, Stockport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Stockport Metropolitan Borough Council on 17 Sep 2024 at 15:14.

Nexfibre Networks Limited logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Lees Road

Nexfibre Networks Limited are proposing to carry out Utility repair and maintenance works on Lees Road, Mossley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 1 Oct 2024 at 12:53.

Cadent Gas logo
Between
16 and 31 Dec 2024
Details
View Map
Share
Follow
Ladhill Lane

Cadent Gas are proposing to carry out Utility asset works on Ladhill Lane, Greenfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 09:30.

Cadent Gas logo
Between
16 and 31 Dec 2024
Details
View Map
Share
Follow
Ladhill Lane

Cadent Gas are proposing to carry out Utility asset works on Ladhill Lane, Greenfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 14:33.

Cadent Gas logo
Between
16 and 26 Dec 2024
Details
View Map
Share
Ladhill Lane

Cadent Gas were proposing to carry out Utility asset works on Ladhill Lane, Greenfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 26 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 08:31.

Cadent Gas logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Retiro Street

Cadent Gas are proposing to carry out New service connection on Retiro Street, Oldham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Sep 2024 at 14:40.

Cadent Gas logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Retiro Street

Cadent Gas are proposing to carry out New service connection on Retiro Street, Oldham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 09:58.

Electricity North West (NorWeb) logo
Between
18 and 24 Dec 2024
Details
View Map
Share
Follow
Leyburn Grove

Electricity North West (NorWeb) are proposing to carry out New service connection on Leyburn Grove, Romiley, Stockport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 26 Sep 2024 at 18:19.

Electricity North West (NorWeb) logo
Between
18 and 24 Dec 2024
Details
View Map
Share
Town Lane

Electricity North West (NorWeb) were proposing to carry out New service connection on Town Lane, Charlesworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 December 2024 and run through until 24 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 18 Oct 2024 at 15:15.

Cadent Gas logo
LONG TERM
Between
19 Dec 2024 and 3 Feb 2025
Details
View Map
Share
Follow
Cross Street

Cadent Gas are proposing to carry out Utility asset works on Cross Street, Hyde.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 11:38.

Between
20 and 24 Dec 2024
Details
View Map
Share
Follow
Redhouse Lane

Stockport Metropolitan Borough Council are proposing to carry out Highway improvement works on Redhouse Lane, Bredbury, Stockport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 December 2024 and could run through until 24 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Stockport Metropolitan Borough Council on 26 Sep 2024 at 10:15.

Cadent Gas logo
Between
23 and 31 Dec 2024
Details
View Map
Share
Follow
Guywood Lane

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Guywood Lane, Romiley, Stockport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 12:01.

Cadent Gas logo
Between
23 and 31 Dec 2024
Details
View Map
Share
Follow
Guywood Lane

Cadent Gas are proposing to carry out New service connection on Guywood Lane, Romiley, Stockport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 15:30.

Electricity North West (NorWeb) logo
Between
1 and 8 Jan 2025
Details
View Map
Share
Follow
Guildford Drive

Electricity North West (NorWeb) are proposing to carry out New service connection on Guildford Drive, Ashton-under-lyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 5 Nov 2024 at 09:18.

Manchester City Council logo
LONG TERM
Between
2 Jan and 6 Oct 2025
Details
View Map
Share
Follow
Moston Lane East

Manchester City Council are proposing to carry out Highway improvement works on Moston Lane East, Manchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 6 October 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Manchester City Council on 8 Jul 2024 at 11:37.

Manchester City Council logo
LONG TERM
Between
2 Jan and 6 Oct 2025
Details
View Map
Share
Follow
Broadway

Manchester City Council are proposing to carry out Highway improvement works on Broadway, Manchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 6 October 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Manchester City Council on 8 Jul 2024 at 11:37.

Cadent Gas logo
Between
2 and 17 Jan 2025
Details
View Map
Share
Follow
Oaklands Road

Cadent Gas are proposing to carry out Utility asset works on Oaklands Road, Grasscroft.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Aug 2024 at 14:50.

Cadent Gas logo
Between
2 and 17 Jan 2025
Details
View Map
Share
Follow
Oldham Road

Cadent Gas are proposing to carry out Utility asset works on Oldham Road, Grasscroft.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Aug 2024 at 14:51.

Cadent Gas logo
Between
3 and 17 Jan 2025
Details
View Map
Share
Follow
Culcheth Lane

Cadent Gas are proposing to carry out Utility asset works on Culcheth Lane, Manchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 09:22.

LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Birch Avenue

Stockport Metropolitan Borough Council are proposing to carry out Highway improvement works on Birch Avenue, Romiley, Stockport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Stockport Metropolitan Borough Council on 7 Nov 2024 at 13:04.

LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Compstall Road

Stockport Metropolitan Borough Council are proposing to carry out Highway improvement works on Compstall Road, Romiley, Stockport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Stockport Metropolitan Borough Council on 7 Nov 2024 at 13:03.

LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Compstall Road

Stockport Metropolitan Borough Council are proposing to carry out Highway improvement works on Compstall Road, Romiley, Stockport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Stockport Metropolitan Borough Council on 4 Nov 2024 at 13:14.

Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Mill Street

Stockport Metropolitan Borough Council are proposing to carry out Highway improvement works on Mill Street, Woodley, Stockport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Stockport Metropolitan Borough Council on 11 Oct 2024 at 10:40.

Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Northumberland Road

Stockport Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Northumberland Road, Brinnington, Stockport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Stockport Metropolitan Borough Council on 8 Oct 2024 at 11:29.

Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Riversdale View

Stockport Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Riversdale View, Woodley, Stockport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Stockport Metropolitan Borough Council on 1 Nov 2024 at 09:05.

Between
6 and 15 Jan 2025
Details
View Map
Share
Follow
Cromwell Road

Stockport Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Cromwell Road, Bredbury, Stockport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Stockport Metropolitan Borough Council on 1 Nov 2024 at 08:33.

Cadent Gas logo
LONG TERM
Between
6 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Pottinger Street

Cadent Gas are proposing to carry out Utility asset works on Pottinger Street, Ashton-under-lyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 15:18.

Cadent Gas logo
LONG TERM
Between
6 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Crowthorn Road

Cadent Gas are proposing to carry out Utility asset works on Crowthorn Road, Ashton-under-lyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 15:18.

United Utilities Water (formerly North West Water) logo
Between
6 and 26 Jan 2025
Details
View Map
Share
Follow
Union Street

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Union Street, Ashton-under-lyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 26 Sep 2024 at 16:30.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
6 Jan and 25 Jul 2025
Details
View Map
Share
Follow
Turner Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Turner Lane, Ashton-under-lyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 6 Aug 2024 at 13:13.

Cornerstone Telecommunications Infrastructure logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Droylsden Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Droylsden Road, Manchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 7 Nov 2024 at 12:11.

Manchester City Council logo
Between
8 and 13 Jan 2025
Details
View Map
Share
Follow
Wayland Road South

Manchester City Council are proposing to carry out Highway improvement works on Wayland Road South, Manchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Manchester City Council on 2 Aug 2024 at 09:09.

Cadent Gas logo
Between
15 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Pottinger Street

Cadent Gas are proposing to carry out Utility asset works on Pottinger Street, Ashton-under-lyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 12:58.

Cadent Gas logo
LONG TERM
Between
15 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Castle Lane

Cadent Gas are proposing to carry out Utility asset works on Castle Lane, Stalybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 15:08.

United Utilities Water (formerly North West Water) logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
High Lane

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on High Lane, Woodley, Stockport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 25 Oct 2024 at 12:01.

United Utilities Water (formerly North West Water) logo
Between
21 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Western Street

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Western Street, Manchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 31 Oct 2024 at 09:29.

Cadent Gas logo
LONG TERM
Between
22 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Mottram Road

Cadent Gas are proposing to carry out Utility asset works on Mottram Road, Stalybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 10:35.

Cadent Gas logo
Between
22 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Carr Rise

Cadent Gas are proposing to carry out Utility asset works on Carr Rise, Carrbrook, Stalybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 15:10.

Cadent Gas logo
Between
23 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Huddersfield Road

Cadent Gas are proposing to carry out Utility asset works on Huddersfield Road, Mossley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 15:30.

Cadent Gas logo
Between
23 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Moorlands Drive

Cadent Gas are proposing to carry out Utility asset works on Moorlands Drive, Mossley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 16:00.

Cadent Gas logo
Between
24 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Roaches Way

Cadent Gas are proposing to carry out Utility asset works on Roaches Way, Mossley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 15:00.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
27 Jan and 27 Oct 2025
Details
View Map
Share
Follow
Alexandra Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Alexandra Road, Ashton-under-lyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 1 Oct 2024 at 15:31.

Network Rail logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Spring Bank Lane

Network Rail are proposing to carry out Works for Rail Purposes on Spring Bank Lane, Stalybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 23 Oct 2024 at 14:58.

Cadent Gas logo
Between
29 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Huddersfield Road

Cadent Gas are proposing to carry out Utility asset works on Huddersfield Road, Mossley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 15:30.

Cadent Gas logo
Between
31 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Buckton Vale Road

Cadent Gas are proposing to carry out Utility asset works on Buckton Vale Road, Stalybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 14:00.

Manchester City Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Greenlea Avenue

Manchester City Council are proposing to carry out Highway improvement works on Greenlea Avenue, Manchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Manchester City Council on 1 Nov 2024 at 09:30.

Derbyshire County Council logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Padfield Main Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Padfield Main Road, Padfield, Glossop.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 9 Oct 2024 at 19:38.

Derbyshire County Council logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Padfield Main Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Padfield Main Road, Padfield, Glossop.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 10 Oct 2024 at 10:57.

Tameside Metropolitan Borough Council logo
LONG TERM
Between
3 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Tame Street

Tameside Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Tame Street, Stalybridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Tameside Metropolitan Borough Council on 25 Oct 2024 at 11:05.

Cadent Gas logo
Between
5 and 28 Feb 2025
Details
View Map
Share
Follow
Crowthorn Road

Cadent Gas are proposing to carry out Utility asset works on Crowthorn Road, Ashton-under-lyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 13:00.


Roadworks Map near to Peel Street, STALYBRIDGE, SK15 1PT

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 10 Nov 2024 03:39
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Peel Street, STALYBRIDGE, SK15 1PT (32 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cadent Gas logo
EMERGENCY
  
BAYLEY STREET 
(0.1 miles)
Cadent Gas
Utility repair and maintenance works - Carriageway - Some carriageway incursion
In Progress
Since: 17 Oct 2024 10:32
(Scheduled: 17 Oct 2024 - 15 Nov 2024)
0.1
Details
Share
Follow
2
Cadent Gas logo
MAJOR
  
BELVEDERE DRIVE 
(0.2 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 6 Nov 2024 - 29 Nov 2024
0.2
Details
Share
Follow
3
Cadent Gas logo
BELVEDERE DRIVE 
(0.3 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 8 Nov 2024 10:40
(Scheduled: 5 Nov 2024 - 21 Nov 2024)
0.3
Details
Share
Follow
4
Electricity North West (NorWeb) logo
CLARENCE STREET 
(0.3 miles)
Electricity North West (NorWeb)
New service connection - Footway, Carriageway - Two-way signals
Planned
Scheduled: 11 Nov 2024 - 17 Nov 2024
0.3
Details
Share
Follow
5
Electricity North West (NorWeb) logo
MAJOR
  
CLARENCE STREET 
(0.3 miles)
Electricity North West (NorWeb)
New service connection - Footway, Carriageway - Road closure
Planned
Scheduled: 9 Nov 2024 - 10 Nov 2024
0.3
Details
Share
Follow
6
Electricity North West (NorWeb) logo
MAJOR
  
CLARENCE STREET 
(0.3 miles)
Electricity North West (NorWeb)
New service connection - Footway, Carriageway - Road closure
Planned
Scheduled: 9 Nov 2024 - 10 Nov 2024
0.3
Details
Share
Follow
7
Cadent Gas logo
SANDY LANE 
(0.4 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
Cancelled
(Scheduled: 5 Nov 2024 - 18 Nov 2024)
0.4
Details
Share
8
Tameside Metropolitan Borough Council logo
MAJOR
  
CLARENCE STREET 
(0.4 miles)
Tameside Metropolitan Borough Council
Highway repair and maintenance works - Footway, Carriageway - Road closure
In Progress
Since: 14 Oct 2024 10:45
(Scheduled: 14 Oct 2024 - 18 Nov 2024)
0.4
Details
Share
Follow
9
Tameside Metropolitan Borough Council logo
MAJOR
  
CLARENCE STREET 
(0.4 miles)
Tameside Metropolitan Borough Council
Highway repair and maintenance works - Footway, Carriageway - Road closure
Planned
Scheduled: 14 Oct 2024 - 18 Nov 2024
0.4
Details
Share
Follow
10
Tameside Metropolitan Borough Council logo
TOWER STREET 
(0.4 miles)
Tameside Metropolitan Borough Council
Highway repair and maintenance works - Footway - Give and take
Planned
Scheduled: 11 Nov 2024 - 13 Nov 2024
0.4
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.