ROADWORKS SUMMARY
Highfield Road, GLOSSOP, SK13 8PE

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Highfield Road, SK13 8PE and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Highfield Road, GLOSSOP, SK13 8PE

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Highfield Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

National Highways logo
LONG TERM
Between
4 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Roe Cross Road

National Highways are proposing to carry out Highway improvement works on Roe Cross Road, Mottram.

These works are categorised as Major.

The works will start on or after 4 November 2024 and could run through until 1 May 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 18 Oct 2024 at 12:33.

National Highways logo
LONG TERM
Between
4 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Roe Cross Road

National Highways are proposing to carry out Highway improvement works on Roe Cross Road, Mottram.

These works are categorised as Major.

The works will start on or after 4 November 2024 and could run through until 1 May 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 29 Oct 2024 at 11:39.

Cadent Gas logo
LONG TERM
Between
2 Dec 2024 and 20 Jan 2025
Details
View Map
Share
Follow
Longhurst Lane

Cadent Gas are proposing to carry out Utility asset works on Longhurst Lane, Mellor, Stockport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 11:31.

Cadent Gas logo
LONG TERM
Between
2 Dec 2024 and 20 Jan 2025
Details
View Map
Share
Follow
Longhurst Lane

Cadent Gas are proposing to carry out Utility asset works on Longhurst Lane, Mellor, Stockport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 14:38.

Cadent Gas logo
LONG TERM
Until
13 Jan 2025
Details
View Map
Share
Follow
Ernocroft Road

Cadent Gas are carrying out Utility asset works on Ernocroft Road, Marple Bridge, Stockport.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 10:00 and could run through until 13 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Dec 2024 at 10:51.

Cadent Gas logo
Between
9 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Ernocroft Road

Cadent Gas are proposing to carry out Utility asset works on Ernocroft Road, Marple Bridge, Stockport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 3 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 11:37.

Cadent Gas logo
LONG TERM
Until
13 Jan 2025
Details
View Map
Share
Follow
Belmont Drive

Cadent Gas are carrying out Utility asset works on Belmont Drive, Marple Bridge, Stockport.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 December 2024 at 08:40 and could run through until 13 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 08:57.

Cadent Gas logo
Between
9 Dec 2024 and 8 Jan 2025
Details
View Map
Share
Follow
Belmont Drive

Cadent Gas are proposing to carry out Utility asset works on Belmont Drive, Marple Bridge, Stockport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 09:58.

Cadent Gas logo
Between
9 Dec 2024 and 8 Jan 2025
Details
View Map
Share
Follow
Belmont Drive

Cadent Gas are proposing to carry out Utility asset works on Belmont Drive, Marple Bridge, Stockport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 09:54.

Cadent Gas logo
Today
Details
View Map
Share
Dinting Vale

Cadent Gas carried out Utility repair and maintenance works on Dinting Vale, Dinting, Glossop.

Multi-way signals were in place for some or all of the period.

The works were originally planned between 19 Dec 2024 and 27 Dec 2024 and were actually completed between 19 Dec 2024 (09:34) and 27 Dec 2024 (15:30). The works impacted the carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 27 Dec 2024 at 15:30.

Electricity North West (NorWeb) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Salisbury Street

Electricity North West (NorWeb) are carrying out Utility repair and maintenance works on Salisbury Street, Hadfield, Glossop.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 December 2024 at 13:00 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 23 Dec 2024 at 14:08.

Electricity North West (NorWeb) logo
Between
8 and 22 Jan 2025
Details
View Map
Share
Bank Street

Electricity North West (NorWeb) were proposing to carry out Diversionary works on Bank Street, Hadfield, Glossop.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 January 2025 and run through until 22 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 18 Nov 2024 at 12:09.

Electricity North West (NorWeb) logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
Station Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Station Road, Hadfield, Glossop.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 20 Dec 2024 at 11:08.

BT logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Roe Cross Road

BT are proposing to carry out Utility repair and maintenance works on Roe Cross Road, Mottram.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 10 Dec 2024 at 16:19.

BT logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Roe Cross Road

BT were proposing to carry out Utility repair and maintenance works on Roe Cross Road, Mottram.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 10 Dec 2024 at 16:29.

BT logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Roe Cross Road

BT are proposing to carry out Utility repair and maintenance works on Roe Cross Road, Mottram.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 10 Dec 2024 at 16:19.

Voneus logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Kinder Road

Voneus are proposing to carry out Utility asset works on Kinder Road, Hayfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Voneus on 20 Nov 2024 at 07:44.

Voneus logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Kinder Road

Voneus are proposing to carry out Utility asset works on Kinder Road, Hayfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Voneus on 13 Nov 2024 at 16:00.

Voneus logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Sycamore Road

Voneus are proposing to carry out Utility asset works on Sycamore Road, Birch Vale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Voneus on 18 Nov 2024 at 13:12.

Voneus logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Sycamore Road

Voneus are proposing to carry out Utility asset works on Sycamore Road, Birch Vale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Voneus on 13 Nov 2024 at 16:02.

Voneus logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Spinnerbottom

Voneus are proposing to carry out Utility asset works on Spinnerbottom, Birch Vale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Voneus on 18 Nov 2024 at 13:11.

Voneus logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Spinnerbottom

Voneus are proposing to carry out Utility asset works on Spinnerbottom, Birch Vale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Voneus on 13 Nov 2024 at 16:01.

BT logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Roe Cross Road

BT are proposing to carry out Utility repair and maintenance works on Roe Cross Road, Mottram.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 16 Dec 2024 at 14:20.

Electricity North West (NorWeb) logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
Bank Street

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Bank Street, Hadfield, Glossop.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 20 Dec 2024 at 09:45.

Voneus logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Valley Road

Voneus are proposing to carry out Utility asset works on Valley Road, Hayfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Voneus on 20 Nov 2024 at 07:48.

BT logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
A57 From J A6018/start Of Dualling To J A628/end Of Dualling E

BT are proposing to carry out Utility repair and maintenance works on A57 From J A6018/start Of Dualling To J A628/end Of Dualling E, Tameside.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 20 Dec 2024 at 09:02.

BT logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
A57 From J A6018/start Of Dualling To J A628/end Of Dualling E

BT are proposing to carry out Utility repair and maintenance works on A57 From J A6018/start Of Dualling To J A628/end Of Dualling E, Tameside.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 20 Dec 2024 at 08:41.

BT logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
A57 From J A6018/start Of Dualling To J A628/end Of Dualling E

BT are proposing to carry out Utility repair and maintenance works on A57 From J A6018/start Of Dualling To J A628/end Of Dualling E, Tameside.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 29 Nov 2024 at 16:28.

Electricity North West (NorWeb) logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Harrop Edge Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Harrop Edge Road, Mottram.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 24 Dec 2024 at 07:48.

Voneus logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Valley Road

Voneus are proposing to carry out Utility asset works on Valley Road, Hayfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Voneus on 14 Nov 2024 at 08:07.

Voneus logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Highgate Road

Voneus are proposing to carry out Utility asset works on Highgate Road, Hayfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Voneus on 14 Nov 2024 at 08:13.

Electricity North West (NorWeb) logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Harrop Edge Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Harrop Edge Road, Mottram.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 18 Dec 2024 at 14:17.

Voneus logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Highgate Road

Voneus are proposing to carry out Utility asset works on Highgate Road, Hayfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Voneus on 20 Nov 2024 at 11:06.

Voneus logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Thornsett

Voneus are proposing to carry out Utility asset works on Thornsett, Birch Vale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Voneus on 14 Nov 2024 at 08:11.

Voneus logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Thornsett

Voneus are proposing to carry out Utility asset works on Thornsett, Birch Vale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Voneus on 18 Nov 2024 at 13:13.

Cadent Gas logo
LONG TERM
Between
22 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Mottram Road

Cadent Gas are proposing to carry out Utility asset works on Mottram Road, Stalybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 10:35.

Electricity North West (NorWeb) logo
Between
22 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Edge Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Edge Lane, Mottram.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 2 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 18 Dec 2024 at 14:16.

Electricity North West (NorWeb) logo
Between
22 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Edge Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Edge Lane, Mottram.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 2 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 24 Dec 2024 at 07:48.

Derbyshire County Council logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Padfield Main Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Padfield Main Road, Padfield, Glossop.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 9 Oct 2024 at 19:38.

Derbyshire County Council logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Padfield Main Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Padfield Main Road, Padfield, Glossop.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 10 Oct 2024 at 10:57.

Electricity North West (NorWeb) logo
Between
5 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Hadfield Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Hadfield Road, Hadfield, Glossop.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 20 Dec 2024 at 09:48.

Cadent Gas logo
LONG TERM
Between
18 Feb and 31 Mar 2025
Details
View Map
Share
Follow
A57 From J A628/start Of Dualling To J A6018/end Of Dualling W

Cadent Gas are proposing to carry out Utility asset works on A57 From J A628/start Of Dualling To J A6018/end Of Dualling W, Tameside.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 07:32.

Cadent Gas logo
LONG TERM
Between
24 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Woolley Bridge Road

Cadent Gas are proposing to carry out Utility asset works on Woolley Bridge Road, Hadfield, Glossop.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 11:13.

Cadent Gas logo
LONG TERM
Between
5 Mar and 9 Apr 2025
Details
View Map
Share
Follow
Woolley Bridge Road

Cadent Gas are proposing to carry out Utility asset works on Woolley Bridge Road, Hadfield, Glossop.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 14:02.

Cadent Gas logo
Between
10 and 31 Mar 2025
Details
View Map
Share
Follow
Hadfield Road

Cadent Gas are proposing to carry out Utility asset works on Hadfield Road, Hadfield, Glossop.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 11:14.

Cadent Gas logo
Between
12 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Hadfield Road

Cadent Gas are proposing to carry out Utility asset works on Hadfield Road, Hadfield, Glossop.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 2 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 14:03.

Tameside Metropolitan Borough Council logo
Between
12 Mar and 9 Apr 2025
Details
View Map
Share
Follow
Old Road

Tameside Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Old Road, Mottram.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 9 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Tameside Metropolitan Borough Council on 18 Dec 2024 at 15:53.

Electricity North West (NorWeb) logo
Between
13 and 30 Mar 2025
Details
View Map
Share
Follow
Bank Street

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Bank Street, Hadfield, Glossop.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 30 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 26 Nov 2024 at 15:36.

BT logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Woodseats Lane

BT are proposing to carry out Utility repair and maintenance works on Woodseats Lane, Charlesworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 23 Dec 2024 at 11:08.

Cadent Gas logo
Between
24 Mar and 14 Apr 2025
Details
View Map
Share
Follow
Lower Fold

Cadent Gas are proposing to carry out Utility asset works on Lower Fold, Marple Bridge, Stockport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 14 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 12:00.

Electricity North West (NorWeb) logo
Between
24 Mar and 6 Apr 2025
Details
View Map
Share
Follow
Railway Street

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Railway Street, Hadfield, Glossop.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 6 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 20 Dec 2024 at 09:49.


Roadworks Map near to Highfield Road, GLOSSOP, SK13 8PE

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Dec 2024 22:21
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Highfield Road, GLOSSOP, SK13 8PE (5 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
United Utilities Water (formerly North West Water) logo
URGENT
  
UPLANDS ROAD 
(0.1 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
19 Dec 2024 09:11 - 23 Dec 2024 10:14
0.1
Details
Share
2
Electricity North West (NorWeb) logo
URGENT
  
LORD STREET 
(0.5 miles)
Electricity North West (NorWeb)
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
19 Dec 2024 14:30 - 27 Dec 2024 14:00
0.5
Details
Share
3
United Utilities Water (formerly North West Water) logo
URGENT
  
SPIRE HOLLIN 
(0.6 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway, Carriageway - Give and take
In Progress
Since: 26 Dec 2024 16:32
(Scheduled: 26 Dec 2024 - 3 Jan 2025)
0.6
Details
Share
Follow
4
Cadent Gas logo
URGENT
  
HIGH STREET WEST 
(0.7 miles)
Cadent Gas
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 20 Dec 2024 15:22
(Scheduled: 20 Dec 2024 - 31 Dec 2024)
0.7
Details
Share
Follow
5
Cadent Gas logo
EMERGENCY
  
HIGH STREET WEST 
(0.7 miles)
Cadent Gas
Utility repair and maintenance works - Footpath - Some carriageway incursion
In Progress
Since: 20 Dec 2024 12:50
(Scheduled: 20 Dec 2024 - 6 Jan 2025)
0.7
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.