ROADWORKS SUMMARY
Thatcher Stanfords Close, ROYSTON, SG8 6DT

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Thatcher Stanfords Close, SG8 6DT and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Thatcher Stanfords Close, ROYSTON, SG8 6DT

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Thatcher Stanfords Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Between
6 Jan and 7 Jul 2025
Details
View Map
Share
Follow
Melbourn Bypass

UK Power Distribution are proposing to carry out Utility asset works on Melbourn Bypass, Melbourn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 July 2025. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Distribution on 11 Nov 2024 at 16:18.

LONG TERM
Between
6 Jan and 7 Jul 2025
Details
View Map
Share
Follow
Melbourn Bypass

UK Power Distribution are proposing to carry out Utility asset works on Melbourn Bypass, Melbourn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 July 2025. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Distribution on 18 Oct 2024 at 14:17.

Cambridge Water Company logo
Finishing
Sunday
Details
View Map
Share
Follow
Church Street

Cambridge Water Company are proposing to carry out Utility asset works on Church Street, Harston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridge Water Company on 12 Feb 2025 at 08:52.

Cambridge Water Company logo
Finishing
Sunday
Details
View Map
Share
Follow
Church Street

Cambridge Water Company are proposing to carry out Utility asset works on Church Street, Harston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridge Water Company on 16 Dec 2024 at 14:05.

Cambridgeshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Chapel Hill

Cambridgeshire County Council are proposing to carry out Highway improvement works on Chapel Hill, Barrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 25 Nov 2024 at 10:06.

Cambridgeshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Haslingfield Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Haslingfield Road, Barrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 25 Nov 2024 at 10:05.

UK Power Networks Eastern & London logo
Between
18 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Fowlmere Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Fowlmere Road, Foxton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 16 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 14:20.

UK Power Networks Eastern & London logo
Between
28 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Hillfield

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Hillfield, Foxton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 14:20.

Hertfordshire County Council logo
Between
3 and 8 Mar 2025
Details
View Map
Share
High Street

Hertfordshire County Council were proposing to carry out Highway improvement works on High Street, Royston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 8 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Hertfordshire County Council on 17 Jan 2025 at 09:02.

Cambridgeshire County Council logo
Between
3 and 8 Mar 2025
Details
View Map
Share
Follow
Royston Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Royston Road, Litlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 3 Jan 2025 at 10:08.

Cambridgeshire County Council logo
Between
3 and 8 Mar 2025
Details
View Map
Share
Follow
Royston Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Royston Road, Litlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 18 Dec 2024 at 15:56.

Hertfordshire County Council logo
Between
10 and 28 Mar 2025
Details
View Map
Share
Burns Road

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Burns Road, Royston.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 28 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 20 Dec 2024 at 07:22.

Hertfordshire County Council logo
Between
10 and 28 Mar 2025
Details
View Map
Share
Follow
Burns Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Burns Road, Royston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 20 Dec 2024 at 08:35.

Hertfordshire County Council logo
Between
10 and 15 Mar 2025
Details
View Map
Share
Follow
High Street

Hertfordshire County Council are proposing to carry out Highway improvement works on High Street, Royston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 15 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hertfordshire County Council on 16 Jan 2025 at 13:06.

Hertfordshire County Council logo
Between
17 and 22 Mar 2025
Details
View Map
Share
Follow
High Street

Hertfordshire County Council are proposing to carry out Highway improvement works on High Street, Royston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 22 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hertfordshire County Council on 17 Jan 2025 at 13:51.

Hertfordshire County Council logo
Between
17 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Burns Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Burns Road, Royston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 12 Feb 2025 at 08:15.

Anglian Water logo
Between
25 Mar and 17 Apr 2025
Details
View Map
Share
Follow
New Road

Anglian Water are proposing to carry out Utility repair and maintenance works on New Road, Haslingfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2025 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 3 Feb 2025 at 14:36.

Hertfordshire County Council logo
Between
26 and 28 Mar 2025
Details
View Map
Share
Follow
Burns Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Burns Road, Royston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 17 Dec 2024 at 11:36.

Hertfordshire County Council logo
Between
1 and 3 Apr 2025
Details
View Map
Share
Follow
Swift Close

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Swift Close, Royston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 3 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 Jan 2025 at 15:02.

Hertfordshire County Council logo
Between
1 and 3 Apr 2025
Details
View Map
Share
Follow
Swift Close

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Swift Close, Royston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 3 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 19 Dec 2024 at 14:52.

Hertfordshire County Council logo
Between
1 and 3 Apr 2025
Details
View Map
Share
Follow
Thomas Way

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Thomas Way, Royston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 3 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 19 Dec 2024 at 14:28.

Hertfordshire County Council logo
Between
1 and 3 Apr 2025
Details
View Map
Share
Follow
Larkin Place

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Larkin Place, Royston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 3 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 Jan 2025 at 15:09.

Hertfordshire County Council logo
Between
1 and 3 Apr 2025
Details
View Map
Share
Follow
Thomas Way

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Thomas Way, Royston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 3 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 Jan 2025 at 15:03.

Hertfordshire County Council logo
Between
1 and 3 Apr 2025
Details
View Map
Share
Follow
Betjeman Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Betjeman Road, Royston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 3 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 19 Dec 2024 at 14:48.

Hertfordshire County Council logo
Between
1 and 3 Apr 2025
Details
View Map
Share
Follow
Larkin Place

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Larkin Place, Royston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 3 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 19 Dec 2024 at 14:47.

Hertfordshire County Council logo
Between
1 and 3 Apr 2025
Details
View Map
Share
Follow
Betjeman Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Betjeman Road, Royston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 3 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 Jan 2025 at 15:07.

Hertfordshire County Council logo
Between
1 and 3 Apr 2025
Details
View Map
Share
Follow
Blake Close

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Blake Close, Royston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 3 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 Jan 2025 at 15:09.

Hertfordshire County Council logo
Between
1 and 3 Apr 2025
Details
View Map
Share
Tannery Close

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Tannery Close, Royston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 3 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 19 Dec 2024 at 09:12.

Hertfordshire County Council logo
Between
1 and 3 Apr 2025
Details
View Map
Share
Follow
Blake Close

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Blake Close, Royston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 3 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 19 Dec 2024 at 14:47.

Hertfordshire County Council logo
Between
2 and 4 Apr 2025
Details
View Map
Share
Follow
Burns Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Burns Road, Royston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 12 Feb 2025 at 15:11.

Hertfordshire County Council logo
Between
2 and 4 Apr 2025
Details
View Map
Share
Follow
Newmarket Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Newmarket Road, Royston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 19 Dec 2024 at 14:55.

Hertfordshire County Council logo
Between
2 and 4 Apr 2025
Details
View Map
Share
Follow
Newmarket Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Newmarket Road, Royston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 Jan 2025 at 14:58.

Hertfordshire County Council logo
Between
2 and 4 Apr 2025
Details
View Map
Share
Follow
Tannery Close

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Tannery Close, Royston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 19 Dec 2024 at 14:48.

Hertfordshire County Council logo
Between
2 and 4 Apr 2025
Details
View Map
Share
Follow
Tannery Close

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Tannery Close, Royston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 Jan 2025 at 15:00.

Hertfordshire County Council logo
Between
2 and 4 Apr 2025
Details
View Map
Share
Follow
Woodlands

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Woodlands, Royston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 19 Dec 2024 at 14:54.

Hertfordshire County Council logo
Between
2 and 4 Apr 2025
Details
View Map
Share
Follow
Woodlands

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Woodlands, Royston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 Jan 2025 at 14:59.

Hertfordshire County Council logo
Between
3 and 7 Apr 2025
Details
View Map
Share
Follow
Serby Avenue

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Serby Avenue, Royston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 7 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 19 Dec 2024 at 14:51.

Hertfordshire County Council logo
Between
3 and 7 Apr 2025
Details
View Map
Share
Follow
Serby Avenue

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Serby Avenue, Royston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 7 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 Jan 2025 at 14:55.

Hertfordshire County Council logo
Between
3 and 7 Apr 2025
Details
View Map
Share
Follow
Saffron Street

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Saffron Street, Royston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 7 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 Jan 2025 at 14:55.

Hertfordshire County Council logo
Between
3 and 7 Apr 2025
Details
View Map
Share
Follow
Saffron Street

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Saffron Street, Royston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 7 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 19 Dec 2024 at 14:47.

Between
5 and 13 Apr 2025
Details
View Map
Share
Follow
Melbourn Bypass

UK Power Distribution are proposing to carry out New service connection on Melbourn Bypass, Melbourn.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 13 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Distribution on 13 Feb 2025 at 15:19.

UK Power Networks Eastern & London logo
Between
7 and 21 Apr 2025
Details
View Map
Share
Follow
Fowlmere Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Fowlmere Road, Foxton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 21 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Jan 2025 at 15:32.

Cambridgeshire County Council logo
Between
7 and 17 Apr 2025
Details
View Map
Share
Follow
Haslingfield Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Haslingfield Road, Barrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 17 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 13 Jan 2025 at 15:21.

Cambridge Water Company logo
Between
9 and 11 Apr 2025
Details
View Map
Share
Follow
High Street

Cambridge Water Company are proposing to carry out New service connection on High Street, Shepreth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cambridge Water Company on 27 Jan 2025 at 15:56.

Affinity Water logo
Between
29 Apr and 1 May 2025
Details
View Map
Share
Follow
Sun Hill

Affinity Water are proposing to carry out Utility repair and maintenance works on Sun Hill, Royston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 21 Jan 2025 at 09:29.

Affinity Water logo
Between
29 Apr and 1 May 2025
Details
View Map
Share
Follow
Sun Hill

Affinity Water are proposing to carry out Utility repair and maintenance works on Sun Hill, Royston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 21 Jan 2025 at 09:21.

UK Power Networks Eastern & London logo
Between
5 and 7 May 2025
Details
View Map
Share
New Road

UK Power Networks Eastern & London were proposing to carry out New service connection on New Road, Haslingfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 7 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 12:43.

Anglian Water logo
Between
6 and 8 May 2025
Details
View Map
Share
Follow
Meldreth Road

Anglian Water are proposing to carry out Remedial works on Meldreth Road, Shepreth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 11 Feb 2025 at 11:52.

UK Power Networks Eastern & London logo
Between
6 and 8 May 2025
Details
View Map
Share
Follow
New Road

UK Power Networks Eastern & London are proposing to carry out New service connection on New Road, Haslingfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 12:57.

Hertfordshire County Council logo
Between
11 and 13 May 2025
Details
View Map
Share
Follow
Picknage Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Picknage Road, Barley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 May 2025 and could run through until 13 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 10 Dec 2024 at 11:17.

Cambridgeshire County Council logo
Between
16 and 19 May 2025
Details
View Map
Share
Follow
Little Chishill Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Little Chishill Road, Little Chishill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 7 Feb 2025 at 14:48.

Cambridgeshire County Council logo
Between
16 and 19 May 2025
Details
View Map
Share
Follow
May Street

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on May Street, Great Chishill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 16 Jan 2025 at 09:52.


Roadworks Map near to Thatcher Stanfords Close, ROYSTON, SG8 6DT

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 17 Feb 2025 08:34
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Thatcher Stanfords Close, ROYSTON, SG8 6DT (4 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
MAJOR
  
MELBOURN BYPASS 
(0.2 miles)
UK Power Distribution
Utility asset works - Footway, Carriageway, Verge, Footpath - Multi-way signals
Planned
Scheduled: 6 Jan 2025 - 7 Jul 2025
0.2
Details
Share
Follow
2
MAJOR
  
MELBOURN BYPASS 
(0.2 miles)
UK Power Distribution
Utility asset works - Footway, Carriageway, Verge, Footpath - Multi-way signals
Planned
Scheduled: 6 Jan 2025 - 7 Jul 2025
0.2
Details
Share
Follow
3
THE MOOR 
(0.3 miles)
UK Power Distribution
New service connection - Carriageway - Give and take
Planned
Scheduled: 17 Feb 2025 - 23 Feb 2025
0.3
Details
Share
Follow
4
MOAT LANE 
(0.3 miles)
UK Power Distribution
Permanent reinstatement - Carriageway - Give and take
Planned
Scheduled: 17 Feb 2025 - 23 Feb 2025
0.3
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.