ROADWORKS SUMMARY
Chequers Close, ROYSTON, SG8 5UN

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Chequers Close, SG8 5UN and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Chequers Close, ROYSTON, SG8 5UN

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Chequers Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Between
6 Jan and 7 Jul 2025
Details
View Map
Share
Follow
Melbourn Bypass

UK Power Distribution are proposing to carry out Utility asset works on Melbourn Bypass, Melbourn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 July 2025. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Distribution on 18 Oct 2024 at 14:17.

LONG TERM
Between
6 Jan and 7 Jul 2025
Details
View Map
Share
Follow
Melbourn Bypass

UK Power Distribution are proposing to carry out Utility asset works on Melbourn Bypass, Melbourn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 July 2025. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Distribution on 11 Nov 2024 at 16:18.

Anglian Water logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Bourn Bridleway 15

Anglian Water are carrying out Utility repair and maintenance works on Bourn Bridleway 15, Bourn.

These works are categorised as Major.

The works started on 9 January 2025 at 09:00 and could run through until 28 February 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 3 Feb 2025 at 10:22.

Cityfibre Metro Networks logo
Finishing
Wednesday
Details
View Map
Share
Follow
Hines Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Hines Lane, Comberton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 19 February 2025. The works will impact the carriageway, verge and footpath.

This roadwork event was last updated by Cityfibre Metro Networks on 26 Nov 2024 at 11:20.

Cityfibre Metro Networks logo
Finishing
Wednesday
Details
View Map
Share
Follow
Hines Lane

Cityfibre Metro Networks are carrying out Utility asset works on Hines Lane, Comberton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 February 2025 at 08:40 and could run through until 19 February 2025. The works will impact the carriageway, verge and footpath.

This roadwork event was last updated by Cityfibre Metro Networks on 13 Feb 2025 at 08:40.

Cambridgeshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Haslingfield Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Haslingfield Road, Barrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 25 Nov 2024 at 10:05.

Cambridgeshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Chapel Hill

Cambridgeshire County Council are proposing to carry out Highway improvement works on Chapel Hill, Barrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 25 Nov 2024 at 10:06.

Cambridge Water Company logo
Finishing
Sunday
Details
View Map
Share
Follow
Church Street

Cambridge Water Company are proposing to carry out Utility asset works on Church Street, Harston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridge Water Company on 16 Dec 2024 at 14:05.

Cambridge Water Company logo
Finishing
Sunday
Details
View Map
Share
Follow
Church Street

Cambridge Water Company are carrying out Utility asset works on Church Street, Harston.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 09:00 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridge Water Company on 17 Feb 2025 at 09:13.

Cityfibre Metro Networks logo
Finishing
Friday
Details
View Map
Share
Follow
School Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on School Lane, Barton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 25 Oct 2024 at 13:19.

Cityfibre Metro Networks logo
Finishing
Friday
Details
View Map
Share
Follow
School Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on School Lane, Barton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 21 Oct 2024 at 15:46.

Cityfibre Metro Networks logo
Between
18 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Green End

Cityfibre Metro Networks are proposing to carry out Utility asset works on Green End, Comberton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 3 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 26 Nov 2024 at 13:32.

Cityfibre Metro Networks logo
Between
18 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Green End

Cityfibre Metro Networks are proposing to carry out Utility asset works on Green End, Comberton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 3 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 2 Dec 2024 at 10:58.

UK Power Networks Eastern & London logo
Between
18 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Fowlmere Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Fowlmere Road, Foxton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 16 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 14:20.

Cambridgeshire County Council logo
Between
24 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Alms Hill

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Alms Hill, Bourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 21 Jan 2025 at 14:34.

Cambridgeshire County Council logo
Between
24 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Alms Hill

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Alms Hill, Bourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 11 Feb 2025 at 14:23.

Cambridgeshire County Council logo
Between
24 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Alms Hill

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Alms Hill, Bourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 23 Jan 2025 at 15:15.

UK Power Networks Eastern & London logo
Between
28 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Hillfield

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Hillfield, Foxton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 14:20.

Cambridge Water Company logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Caxton End

Cambridge Water Company are proposing to carry out New service connection on Caxton End, Bourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cambridge Water Company on 7 Jan 2025 at 09:37.

Cambridge Water Company logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Caxton End

Cambridge Water Company are proposing to carry out New service connection on Caxton End, Bourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cambridge Water Company on 14 Jan 2025 at 09:19.

Cityfibre Metro Networks logo
Between
5 and 7 Mar 2025
Details
View Map
Share
Follow
South Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on South Street, Comberton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 9 Dec 2024 at 08:46.

Cityfibre Metro Networks logo
Between
5 and 7 Mar 2025
Details
View Map
Share
Follow
South Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on South Street, Comberton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 16 Dec 2024 at 08:51.

Cityfibre Metro Networks logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Barton Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Barton Road, Comberton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 16 Dec 2024 at 10:20.

Cityfibre Metro Networks logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Barton Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Barton Road, Comberton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Dec 2024 at 10:09.

Cityfibre Metro Networks logo
Between
17 and 28 Mar 2025
Details
View Map
Share
Follow
Swaynes Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Swaynes Lane, Comberton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 16 Dec 2024 at 10:21.

Cityfibre Metro Networks logo
Between
17 and 28 Mar 2025
Details
View Map
Share
Follow
Swaynes Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Swaynes Lane, Comberton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Dec 2024 at 09:13.

Cityfibre Metro Networks logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Footpath Off Barrons Way

Cityfibre Metro Networks are proposing to carry out Utility asset works on Footpath Off Barrons Way, Comberton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Cityfibre Metro Networks on 13 Feb 2025 at 14:59.

Cityfibre Metro Networks logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Footpath Between Westlands And Barrons Way

Cityfibre Metro Networks are proposing to carry out Utility asset works on Footpath Between Westlands And Barrons Way, Comberton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Cityfibre Metro Networks on 16 Dec 2024 at 10:09.

Cityfibre Metro Networks logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Footpath Between Westlands And Barrons Way

Cityfibre Metro Networks are proposing to carry out Utility asset works on Footpath Between Westlands And Barrons Way, Comberton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Dec 2024 at 13:37.

Cityfibre Metro Networks logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Footpath Off Barrons Way

Cityfibre Metro Networks are proposing to carry out Utility asset works on Footpath Off Barrons Way, Comberton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Cityfibre Metro Networks on 16 Dec 2024 at 10:09.

Anglian Water logo
Between
25 Mar and 17 Apr 2025
Details
View Map
Share
Follow
New Road

Anglian Water are proposing to carry out Utility repair and maintenance works on New Road, Haslingfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2025 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 3 Feb 2025 at 14:36.

Cityfibre Metro Networks logo
Between
30 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Swaynes Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Swaynes Lane, Comberton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 March 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Dec 2024 at 10:55.

Cambridgeshire County Council logo
LONG TERM
Between
31 Mar and 13 Jun 2025
Details
View Map
Share
Follow
New Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on New Road, Barton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 2 Feb 2025 at 19:38.

Cambridgeshire County Council logo
LONG TERM
Between
31 Mar and 16 May 2025
Details
View Map
Share
Follow
New Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on New Road, Barton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 16 May 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Cambridgeshire County Council on 2 Feb 2025 at 19:22.

Between
5 and 13 Apr 2025
Details
View Map
Share
Follow
Melbourn Bypass

UK Power Distribution are proposing to carry out New service connection on Melbourn Bypass, Melbourn.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 13 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Distribution on 13 Feb 2025 at 15:19.

Cityfibre Metro Networks logo
Between
7 and 18 Apr 2025
Details
View Map
Share
Follow
Swaynes Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Swaynes Lane, Comberton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 18 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Dec 2024 at 15:07.

Cambridgeshire County Council logo
Between
7 and 17 Apr 2025
Details
View Map
Share
Follow
Haslingfield Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Haslingfield Road, Barrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 17 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 13 Jan 2025 at 15:21.

UK Power Networks Eastern & London logo
Between
7 and 21 Apr 2025
Details
View Map
Share
Follow
Fowlmere Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Fowlmere Road, Foxton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 21 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Jan 2025 at 15:32.

Cambridgeshire County Council logo
Between
8 and 11 Apr 2025
Details
View Map
Share
Follow
Kings Grove

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Kings Grove, Barton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 22 Jan 2025 at 14:57.

Cambridge Water Company logo
Between
9 and 11 Apr 2025
Details
View Map
Share
Follow
High Street

Cambridge Water Company are proposing to carry out New service connection on High Street, Shepreth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cambridge Water Company on 27 Jan 2025 at 15:56.

Cityfibre Metro Networks logo
Between
14 and 16 Apr 2025
Details
View Map
Share
Follow
South Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on South Street, Comberton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Dec 2024 at 15:01.

UK Power Networks Eastern & London logo
Between
5 and 7 May 2025
Details
View Map
Share
New Road

UK Power Networks Eastern & London were proposing to carry out New service connection on New Road, Haslingfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 7 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 12:43.

UK Power Networks Eastern & London logo
Between
6 and 8 May 2025
Details
View Map
Share
Follow
New Road

UK Power Networks Eastern & London are proposing to carry out New service connection on New Road, Haslingfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 12:57.

Anglian Water logo
Between
6 and 8 May 2025
Details
View Map
Share
Follow
Meldreth Road

Anglian Water are proposing to carry out Remedial works on Meldreth Road, Shepreth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 11 Feb 2025 at 11:52.


Roadworks Map near to Chequers Close, ROYSTON, SG8 5UN

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 17 Feb 2025 10:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Chequers Close, ROYSTON, SG8 5UN (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cambridgeshire County Council logo
CAMBRIDGE ROAD 
(0.3 miles)
Cambridgeshire County Council
Highway repair and maintenance works - Carriageway - Two-way signals
Planned
Scheduled: 17 Feb 2025 - 18 Feb 2025
0.3
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.