ROADWORKS SUMMARY
George Street, WORKSOP, S80 1QL

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for George Street, S80 1QL and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to George Street, WORKSOP, S80 1QL

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for George Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Severn Trent Water logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Worksop Road

Severn Trent Water are carrying out roadworks on Worksop Road, Woodsetts, Rotherham.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 10 January 2024 at 10:00 and could run through until 28 March 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 22 Nov 2024 at 11:40.

Derbyshire County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Green Lane

Derbyshire County Council are proposing to carry out Section 50 on Green Lane, Hodthorpe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Derbyshire County Council on 25 Oct 2024 at 16:45.

Derbyshire County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Green Lane

Derbyshire County Council are proposing to carry out Section 50 on Green Lane, Hodthorpe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Derbyshire County Council on 25 Oct 2024 at 11:09.

Derbyshire County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Broad Place

Derbyshire County Council are proposing to carry out Section 50 on Broad Place, Hodthorpe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Derbyshire County Council on 25 Oct 2024 at 16:45.

Derbyshire County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Queens Road

Derbyshire County Council are proposing to carry out Section 50 on Queens Road, Hodthorpe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 25 Oct 2024 at 16:45.

Derbyshire County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Broad Place

Derbyshire County Council are proposing to carry out Section 50 on Broad Place, Hodthorpe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Derbyshire County Council on 25 Oct 2024 at 11:09.

Derbyshire County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Queens Road

Derbyshire County Council are proposing to carry out Section 50 on Queens Road, Hodthorpe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 25 Oct 2024 at 11:10.

Western Power Distribution (East Midlands) logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Worksop Bypass

Western Power Distribution (East Midlands) are carrying out New service connection on Worksop Bypass, Worksop.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 31 October 2024 at 17:08 and could run through until 2 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 20 Nov 2024 at 14:23.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
4 Nov and 8 Dec 2024
Details
View Map
Share
Follow
Newgate Street

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Newgate Street, Worksop.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 23 Oct 2024 at 08:12.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
4 Nov and 8 Dec 2024
Details
View Map
Share
Follow
Park Street

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Park Street, Worksop.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 25 Oct 2024 at 14:52.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
4 Nov and 8 Dec 2024
Details
View Map
Share
Follow
Park Street

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Park Street, Worksop.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 29 Oct 2024 at 10:15.

Nexfibre Networks Limited logo
Between
5 and 20 Dec 2024
Details
View Map
Share
Primrose Way

Nexfibre Networks Limited were proposing to carry out Utility asset works on Primrose Way, Worksop.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 December 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and footpath.

This roadwork event was last updated by Nexfibre Networks Limited on 5 Nov 2024 at 08:39.

Nexfibre Networks Limited logo
Between
5 and 27 Dec 2024
Details
View Map
Share
Primrose Way

Nexfibre Networks Limited were proposing to carry out Utility asset works on Primrose Way, Worksop.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 December 2024 and run through until 27 December 2024. The works were due to impact the footway, carriageway and footpath.

This roadwork event was last updated by Nexfibre Networks Limited on 27 Sep 2024 at 12:43.

Nottinghamshire County Council logo
Between
6 and 11 Dec 2024
Details
View Map
Share
Colsterdale

Nottinghamshire County Council were proposing to carry out Works for road purposes on Colsterdale, Worksop.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 December 2024 and run through until 11 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 18 Nov 2024 at 16:00.

Severn Trent Water logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Stubbing Lane

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Stubbing Lane, Worksop.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 18 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 1 Oct 2024 at 15:18.

Nottinghamshire County Council logo
LONG TERM
Between
6 Jan and 4 Apr 2025
Details
View Map
Share
Follow
Mansfield Road

Nottinghamshire County Council are proposing to carry out Highway improvement works on Mansfield Road, Worksop.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Nottinghamshire County Council on 4 Oct 2024 at 15:19.

Nottinghamshire County Council logo
LONG TERM
Between
6 Jan and 4 Apr 2025
Details
View Map
Share
Follow
Mansfield Road

Nottinghamshire County Council are proposing to carry out Highway improvement works on Mansfield Road, Worksop.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 April 2025. The works will impact the footway, verge and footpath.

This roadwork event was last updated by Nottinghamshire County Council on 4 Oct 2024 at 13:31.

Nottinghamshire County Council logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Buckingham Rise

Nottinghamshire County Council are proposing to carry out Works for road purposes on Buckingham Rise, Worksop.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 28 Aug 2024 at 15:19.

Nottinghamshire County Council logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Buckingham Rise

Nottinghamshire County Council were proposing to carry out Works for road purposes on Buckingham Rise, Worksop.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 16 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 26 Nov 2024 at 12:43.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
20 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Rayton Lane

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Rayton Lane, Worksop.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 26 Nov 2024 at 11:25.

BT logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Gateford Road

BT were proposing to carry out Utility asset works on Gateford Road, Worksop.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 22 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 22 Oct 2024 at 14:09.

BT logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Ashes Park Avenue

BT were proposing to carry out Utility asset works on Ashes Park Avenue, Worksop.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 22 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 22 Oct 2024 at 14:09.

Cadent Gas logo
LONG TERM
Between
3 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Worksop Road

Cadent Gas are proposing to carry out Utility asset works on Worksop Road, Woodsetts, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 13:45.

Severn Trent Water logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Portland Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Portland Street, Whitwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 15 Oct 2024 at 13:26.

Severn Trent Water logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Portland Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Portland Street, Whitwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 11 Oct 2024 at 09:44.

Cadent Gas logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Worksop Road

Cadent Gas are proposing to carry out Utility asset works on Worksop Road, Woodsetts, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 21 Aug 2024 at 14:53.

Cadent Gas logo
LONG TERM
Between
3 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Worksop Road

Cadent Gas are proposing to carry out Utility asset works on Worksop Road, Woodsetts, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 21 Aug 2024 at 14:54.

Cadent Gas logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Rotherham Baulk

Cadent Gas are proposing to carry out Utility repair and maintenance works on Rotherham Baulk, Gildingwells, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 18:58.

Nottinghamshire County Council logo
Between
24 Feb and 8 Mar 2025
Details
View Map
Share
Follow
Newcastle Street

Nottinghamshire County Council are proposing to carry out Works for road purposes on Newcastle Street, Worksop.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 16 Oct 2024 at 11:49.

Nottinghamshire County Council logo
Between
24 Feb and 8 Mar 2025
Details
View Map
Share
Follow
Newcastle Avenue

Nottinghamshire County Council are proposing to carry out Works for road purposes on Newcastle Avenue, Worksop.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 16 Oct 2024 at 11:46.


Roadworks Map near to George Street, WORKSOP, S80 1QL

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Nov 2024 07:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to George Street, WORKSOP, S80 1QL (28 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Nottinghamshire County Council logo
MAJOR
  
SANDY LANE 
(0.3 miles)
Nottinghamshire County Council
Section 50 - Footway - No carriageway incursion
Planned
Scheduled: 7 Oct 2024 - 9 Dec 2024
0.3
Details
Share
Follow
2
Severn Trent Water logo
SUNNYBANK 
(0.3 miles)
Severn Trent Water
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 27 Nov 2024
0.3
Details
Share
Follow
3
Severn Trent Water logo
SUNFIELD AVENUE 
(0.4 miles)
Severn Trent Water
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 27 Nov 2024
0.4
Details
Share
Follow
4
BT logo
POTTER STREET 
(0.5 miles)
BT
Utility asset works - Carriageway - Two-way signals
Planned
Scheduled: 27 Nov 2024
0.5
Details
Share
Follow
5
Nottinghamshire County Council logo
WESTGATE 
(0.6 miles)
Nottinghamshire County Council
Works for road purposes - Carriageway - Multi-way signals
Planned
Scheduled: 26 Nov 2024 - 27 Nov 2024
0.6
Details
Share
Follow
6
Western Power Distribution (East Midlands) logo
MAJOR
  
PARK STREET 
(0.6 miles)
Western Power Distribution (East Midlands)
Utility asset works - Footway, Carriageway - Two-way signals
Planned
Scheduled: 4 Nov 2024 - 8 Dec 2024
0.6
Details
Share
Follow
7
Western Power Distribution (East Midlands) logo
MAJOR
  
PARK STREET 
(0.6 miles)
Western Power Distribution (East Midlands)
Utility asset works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 4 Nov 2024 - 8 Dec 2024
0.6
Details
Share
Follow
8
Western Power Distribution (East Midlands) logo
MAJOR
  
PARK STREET 
(0.6 miles)
Western Power Distribution (East Midlands)
Utility asset works - Footway, Carriageway - Multi-way signals
Complete
4 Nov 2024 11:57 - 8 Nov 2024 09:30
0.6
Details
Share
9
Western Power Distribution (East Midlands) logo
MAJOR
  
NEWGATE STREET 
(0.6 miles)
Western Power Distribution (East Midlands)
Utility asset works - Footway, Carriageway - Road closure
Planned
Scheduled: 4 Nov 2024 - 8 Dec 2024
0.6
Details
Share
Follow
10
Western Power Distribution (East Midlands) logo
MAJOR
  
NEWGATE STREET 
(0.6 miles)
Western Power Distribution (East Midlands)
Utility asset works - Footway, Carriageway - Road closure
Complete
4 Nov 2024 11:57 - 8 Nov 2024 09:30
0.6
Details
Share
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.