ROADWORKS SUMMARY
Barugh Green Road, BARNSLEY, S75 1HH
Introduction
View current and future planned roadworks and road closures for Barugh Green Road, S75 1HH and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Barugh Green Road, BARNSLEY, S75 1HH
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Barugh Green Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
12 Aug 2025
South Yorkshire Passenger Transport Executive are carrying out Works for road purposes on Old Mill Lane, Barnsley.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 April 2024 at 00:01 and could run through until 12 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by South Yorkshire Passenger Transport Executive on 8 Apr 2024 at 06:57.
1 Dec 2024
Barnsley Metropolitan Borough Council are carrying out Highway repair and maintenance works on Barugh Green Road, Barugh Green, Barnsley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 August 2024 at 08:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 15 Oct 2024 at 12:07.
16 Sep and 18 Nov 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Higham Common Road, Higham, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 18 November 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Yorkshire Water on 21 Aug 2024 at 09:12.
19 Nov 2024
Yorkshire Water are carrying out Utility repair and maintenance works on Higham Common Road, Higham, Barnsley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2024 at 11:00 and could run through until 19 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 28 Oct 2024 at 15:53.
8 Nov 2024
Barnsley Metropolitan Borough Council are carrying out Highway improvement works on High Street, Shafton, Barnsley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 September 2024 at 14:00 and could run through until 8 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 28 Oct 2024 at 12:06.
11 Nov 2024
Barnsley Metropolitan Borough Council are carrying out Highway improvement works on Brierley Road, Shafton, Barnsley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 September 2024 at 14:00 and could run through until 11 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 28 Oct 2024 at 12:06.
11 Nov 2024
Barnsley Metropolitan Borough Council are carrying out Highway improvement works on Pontefract Road, Shafton, Barnsley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 September 2024 at 14:00 and could run through until 11 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 28 Oct 2024 at 12:07.
11 Nov 2024
Barnsley Metropolitan Borough Council are carrying out Highway improvement works on Tollgate Close, Shafton, Barnsley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 September 2024 at 14:00 and could run through until 11 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 28 Oct 2024 at 12:07.
5 Dec 2024
Northern Gas Networks are carrying out Utility repair and maintenance works on Summer Lane, Royston, Barnsley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 October 2024 at 08:00 and could run through until 5 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 11 Oct 2024 at 08:00.
7 Oct and 29 Nov 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Summer Lane, Royston, Barnsley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 12 Aug 2024 at 10:03.
21 Oct and 1 Dec 2024
Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Barugh Green Road, Barugh Green, Barnsley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 1 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 25 Sep 2024 at 09:39.
Tomorrow
Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Ibberson Avenue, Mapplewell, Barnsley.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 October 2024 at 14:00 and could run through until 31 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 28 Oct 2024 at 09:57.
Friday
Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Royston Road, Cudworth, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 16 Aug 2024 at 08:47.
Friday
Barnsley Metropolitan Borough Council are carrying out Highway repair and maintenance works on Newlyn Drive, Monk Bretton, Barnsley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 07:30 and could run through until 1 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 28 Oct 2024 at 07:41.
Friday
Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Newlyn Drive, Monk Bretton, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 26 Sep 2024 at 09:50.
Friday
Barnsley Metropolitan Borough Council are carrying out Highway repair and maintenance works on Royston Road, Cudworth, Barnsley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 07:30 and could run through until 1 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 28 Oct 2024 at 07:43.
28 Oct 2024 and 31 Jan 2025
Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Higham Common Road, Higham, Barnsley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 25 Sep 2024 at 14:21.
28 Oct 2024 and 31 Jan 2025
Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Higham Common Road, Higham, Barnsley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 25 Sep 2024 at 14:20.
Today
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hollin Moor Lane, Thurgoland, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 4 Oct 2024 at 10:00.
Today
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hollin Moor Lane, Thurgoland, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 4 Oct 2024 at 07:52.
28 Oct and 8 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Rotherham Road, Cundy Cross, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 14:59.
Monday
Yorkshire Water are carrying out Utility repair and maintenance works on Woodhouse Lane, Emley, Huddersfield.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 October 2024 at 12:23 and could run through until 4 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 30 Oct 2024 at 07:02.
Monday
Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Bank End Avenue, Worsbrough Dale, Barnsley.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 October 2024 at 12:20 and could run through until 4 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 29 Oct 2024 at 13:37.
1 and 7 Nov 2024
Nexfibre Networks Limited are proposing to carry out Utility asset works on Barnsley Road C155, Hoylandswaine, Barnsley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 7 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 23 Sep 2024 at 14:07.
1 and 7 Nov 2024
Nexfibre Networks Limited are proposing to carry out Utility asset works on Barnsley Road C155, Hoylandswaine, Barnsley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 7 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 24 Sep 2024 at 09:39.
1 and 28 Nov 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Clayton West, Huddersfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 30 Oct 2024 at 08:24.
4 and 15 Nov 2024
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Barnsley Road C155, Hoylandswaine, Barnsley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 15 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 18 Oct 2024 at 14:18.
4 and 15 Nov 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Barnsley Road A628, Hoylandswaine, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 4 Oct 2024 at 11:30.
4 and 15 Nov 2024
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Barnsley Road A628, Hoylandswaine, Barnsley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 15 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 8 Oct 2024 at 12:51.
4 and 8 Nov 2024
Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Tennyson Road, Monk Bretton, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 25 Oct 2024 at 12:07.
4 and 8 Nov 2024
Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Tennyson Road, Monk Bretton, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 26 Sep 2024 at 09:49.
4 and 15 Nov 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Barnsley Road A628, Hoylandswaine, Barnsley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 25 Oct 2024 at 11:40.
4 and 28 Nov 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Barnsley Road A628, Hoylandswaine, Barnsley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 25 Oct 2024 at 12:01.
4 and 8 Nov 2024
Nexfibre Networks Limited are proposing to carry out Utility asset works on Haigh Head Road, Hoylandswaine, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Nexfibre Networks Limited on 23 Sep 2024 at 14:45.
4 and 8 Nov 2024
Nexfibre Networks Limited are proposing to carry out Utility asset works on Haigh Head Road, Hoylandswaine, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Nexfibre Networks Limited on 26 Sep 2024 at 08:42.
6 and 20 Nov 2024
Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Halifax Road, Thurgoland, Barnsley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2024 and could run through until 20 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 29 Oct 2024 at 14:15.
6 and 20 Nov 2024
Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Halifax Road, Thurgoland, Barnsley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2024 and could run through until 20 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 29 Oct 2024 at 11:18.
11 and 28 Nov 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Noblethorpe Lane, Silkstone, Barnsley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 25 Oct 2024 at 13:01.
11 and 15 Nov 2024
Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Birthwaite Road, Kexbrough, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 22 Oct 2024 at 14:34.
11 and 15 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Bower Hill Road, Oxspring, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 08:40.
11 and 15 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Bower Hill Road, Oxspring, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 08:34.
11 and 25 Nov 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Applehaigh View, Royston, Barnsley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 12 Aug 2024 at 10:11.
11 and 15 Nov 2024
Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Ballfield Lane, Kexbrough, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 22 Oct 2024 at 14:35.
11 and 25 Nov 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Applehaigh View, Royston, Barnsley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 28 Oct 2024 at 09:21.
11 and 15 Nov 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Barnsley Road C155, Hoylandswaine, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 18 Oct 2024 at 14:06.
12 and 15 Nov 2024
Northern Powergrid (Yorkshire) were proposing to carry out New service connection on Westfield Street, Barnsley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 November 2024 and run through until 15 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 30 Sep 2024 at 13:33.
12 and 15 Nov 2024
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Westfield Street, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 Oct 2024 at 08:55.
12 and 15 Nov 2024
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Westfield Street, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 30 Sep 2024 at 14:41.
18 and 29 Nov 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Cooper Lane, Hoylandswaine, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 25 Oct 2024 at 12:16.
18 and 29 Nov 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Cooper Lane, Hoylandswaine, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 7 Oct 2024 at 16:42.
18 and 29 Nov 2024
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Cooper Lane, Hoylandswaine, Barnsley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 25 Oct 2024 at 12:05.
19 Nov 2024
BT are proposing to carry out Utility asset works on Upperfield Lane, High Hoyland, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 19 November 2024 and are due to last for only one day. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 14 Oct 2024 at 09:44.
19 Nov 2024
BT are proposing to carry out Utility asset works on Upperfield Lane, High Hoyland, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 19 November 2024 and are due to last for only one day. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 4 Sep 2024 at 10:39.
25 Nov 2024 and 14 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckingham Way, Royston, Barnsley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 13 Aug 2024 at 09:22.
25 Nov 2024 and 14 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckingham Way, Royston, Barnsley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 10 Sep 2024 at 14:16.
9 and 13 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Wentworth Road, Blacker Hill, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the verge only.
This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 12:30.
9 and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Rotherham Road, Cundy Cross, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 08:26.
9 and 12 Dec 2024
Quickline Commucations are proposing to carry out Utility asset works on Lee Lane, Royston, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 28 Oct 2024 at 11:19.
9 and 13 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Wentworth Road, Blacker Hill, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 12:02.
18 and 20 Dec 2024
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Hollin Moor Lane, Thurgoland, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 23 Oct 2024 at 15:10.
Roadworks Map near to Barugh Green Road, BARNSLEY, S75 1HH
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Barugh Green Road, BARNSLEY, S75 1HH (10 Events)
(Scheduled Dates)
(miles)
(Scheduled: 13 Aug 2024 - 1 Dec 2024)
(Scheduled: 16 Sep 2024 - 19 Nov 2024)
(Scheduled: 2 Jul 2024 - 7 Mar 2025)
(Scheduled: 28 Oct 2024 - 1 Nov 2024)
Contains public sector information licensed under the Open Government Licence v3.0.