ROADWORKS SUMMARY
Ivanhoe Road, ROTHERHAM, S66 9PY

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Ivanhoe Road, S66 9PY and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Ivanhoe Road, ROTHERHAM, S66 9PY

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Ivanhoe Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Electricity Network Company logo
LONG TERM
Between
4 Jun 2023 and 25 Jun 2026
Details
View Map
Share
Follow
Union Street

Electricity Network Company are proposing to carry out Utility repair and maintenance works on Union Street, Harthill, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2023 and could run through until 25 June 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Electricity Network Company on 16 Mar 2023 at 10:18.

LONG TERM
Between
4 Jun 2023 and 25 Jun 2026
Details
View Map
Share
Follow
Union Street

Open Fibre Networks are proposing to carry out Utility repair and maintenance works on Union Street, Harthill, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2023 and could run through until 25 June 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Open Fibre Networks on 16 Mar 2023 at 10:20.

Rotherham Metropolitan Borough Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
High Street

Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on High Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 October 2023 at 08:00 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 7 Jan 2025 at 11:02.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
17 Jun 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Frederick Street

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Frederick Street, Catcliffe, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 5 Apr 2024 at 08:21.

Rotherham Metropolitan Borough Council logo
LONG TERM
Until
30 Apr 2025
Details
View Map
Share
Follow
Church Lane

Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Church Lane, Treeton, Rotherham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 July 2024 at 15:30 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 20 Jan 2025 at 16:03.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
19 Aug 2024 and 29 Nov 2025
Details
View Map
Share
Follow
Chesterfield Road

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Chesterfield Road, Swallownest, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2024 and could run through until 29 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 30 Aug 2024 at 13:39.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
23 Aug 2024 and 21 Feb 2025
Details
View Map
Share
Follow
Rotherham Gateway

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Rotherham Gateway, Catcliffe, Rotherham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 August 2024 and could run through until 21 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 21 Aug 2024 at 15:14.

Rotherham Metropolitan Borough Council logo
LONG TERM
Until
21 Feb 2025
Details
View Map
Share
Follow
Rotherham Gateway

Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Rotherham Gateway, Catcliffe, Rotherham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 August 2024 at 20:00 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 20 Sep 2024 at 12:59.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
26 Sep 2024 and 29 Nov 2025
Details
View Map
Share
Follow
Chesterfield Road

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Chesterfield Road, Swallownest, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2024 and could run through until 29 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 4 Sep 2024 at 10:25.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
27 Sep 2024 and 12 May 2025
Details
View Map
Share
Follow
Water Lane

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Water Lane, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2024 and could run through until 12 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 5 Jul 2024 at 08:36.

Rotherham Metropolitan Borough Council logo
LONG TERM
Until
12 May 2025
Details
View Map
Share
Follow
Water Lane

Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Water Lane, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 September 2024 at 08:00 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 4 Oct 2024 at 13:50.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
30 Oct 2024 and 6 May 2025
Details
View Map
Share
Follow
Cliff Hill

Rotherham Metropolitan Borough Council are proposing to carry out Utility repair and maintenance works on Cliff Hill, Maltby, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 6 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 24 Oct 2024 at 09:56.

Rotherham Metropolitan Borough Council logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Tickhill Road

Rotherham Metropolitan Borough Council are carrying out Section 50 on Tickhill Road, Maltby, Rotherham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 08:55 and could run through until 16 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 8 Jan 2025 at 12:26.

Rotherham Metropolitan Borough Council logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Tickhill Road Service Road South

Rotherham Metropolitan Borough Council are carrying out Section 50 on Tickhill Road Service Road South, Maltby, Rotherham.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 2 December 2024 at 08:00 and could run through until 16 February 2025. The works will impact the verge only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 8 Jan 2025 at 12:31.

Cadent Gas logo
LONG TERM
Until
7 Mar 2025
Details
View Map
Share
Follow
Treetown Crescent

Cadent Gas are carrying out Utility asset works on Treetown Crescent, Treeton, Rotherham.

These works are categorised as Major.

The works started on 8 January 2025 at 10:30 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 4 Feb 2025 at 10:47.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
13 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Doncaster Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Doncaster Road, Thrybergh, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 Nov 2024 at 12:50.

Northern Powergrid (Yorkshire) logo
LONG TERM
Until
21 Feb 2025
Details
View Map
Share
Follow
Doncaster Road

Northern Powergrid (Yorkshire) are carrying out Utility asset works on Doncaster Road, Thrybergh, Rotherham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 January 2025 at 11:05 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 30 Jan 2025 at 10:13.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
20 Jan and 12 May 2025
Details
View Map
Share
Domine Lane

Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Domine Lane, Rotherham Town Centre, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 12 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 16 Jan 2025 at 15:20.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
20 Jan and 12 May 2025
Details
View Map
Share
Market Street

Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Market Street, Rotherham Town Centre, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 12 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 16 Jan 2025 at 15:22.

Cityfibre Metro Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Belvedere Parade

Cityfibre Metro Networks are carrying out Utility repair and maintenance works on Belvedere Parade, Bramley, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 08:00 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Feb 2025 at 15:00.

Yorkshire Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Herringthorpe Footpath 1

Yorkshire Water are carrying out Utility repair and maintenance works on Herringthorpe Footpath 1, Aldwarke, Rotherham.

The works started on 22 January 2025 at 21:25 and could run through until 19 February 2025. The works will impact the verge only.

This roadwork event was last updated by Yorkshire Water on 11 Feb 2025 at 15:01.

Cadent Gas logo
LONG TERM
Until
7 Mar 2025
Details
View Map
Share
Follow
Well Lane

Cadent Gas are carrying out Utility asset works on Well Lane, Treeton, Rotherham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 11:10 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 27 Jan 2025 at 11:12.

Northern Powergrid (Yorkshire) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Sheffield Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Sheffield Road, Templeborough, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Nov 2024 at 15:40.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
29 Jan and 1 May 2025
Details
View Map
Share
Follow
Hall Road

Rotherham Metropolitan Borough Council are proposing to carry out Utility repair and maintenance works on Hall Road, Aughton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 17 Jan 2025 at 10:23.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
29 Jan and 1 May 2025
Details
View Map
Share
Follow
Hall Road

Rotherham Metropolitan Borough Council are proposing to carry out Utility repair and maintenance works on Hall Road, Aughton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 17 Jan 2025 at 10:26.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Searby Road

Cadent Gas are proposing to carry out Utility asset works on Searby Road, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 15:47.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Searby Road

Cadent Gas are carrying out Utility asset works on Searby Road, Bramley, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 17:00 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Feb 2025 at 09:34.

Sheffield City Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Woodhouse Lane

Sheffield City Council are proposing to carry out Utility asset works on Woodhouse Lane, Beighton, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 13:39.

Sheffield City Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
High Street

Sheffield City Council are proposing to carry out Utility asset works on High Street, Beighton, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Nov 2024 at 09:32.

Sheffield City Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
High Street

Sheffield City Council are carrying out Utility asset works on High Street, Beighton, Sheffield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 January 2025 at 07:55 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 30 Jan 2025 at 08:06.

Sheffield City Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Rotherham Road

Sheffield City Council are proposing to carry out Utility asset works on Rotherham Road, Beighton, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 13:39.

Sheffield City Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Rotherham Road

Sheffield City Council are carrying out Utility asset works on Rotherham Road, Beighton, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 January 2025 at 07:55 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 30 Jan 2025 at 08:06.

Sheffield City Council logo
Finishing
Tomorrow
Details
View Map
Share
Woodhouse Lane

Sheffield City Council were proposing to carry out Utility asset works on Woodhouse Lane, Beighton, Sheffield.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 January 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Nov 2024 at 09:32.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
2 Feb and 14 May 2025
Details
View Map
Share
Follow
Badsley Moor Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Badsley Moor Lane, Herringthorpe, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 February 2025 and could run through until 14 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 31 Jan 2025 at 11:44.

Cadent Gas logo
LONG TERM
Between
3 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Worksop Road

Cadent Gas are proposing to carry out Utility asset works on Worksop Road, Woodsetts, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 21 Aug 2024 at 14:54.

Cadent Gas logo
LONG TERM
Between
3 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Worksop Road

Cadent Gas are proposing to carry out Utility asset works on Worksop Road, Woodsetts, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 13:45.

Sheffield City Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Beighton Road

Sheffield City Council are proposing to carry out Utility asset works on Beighton Road, Woodhouse, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 23:15.

Sheffield City Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Beighton Road

Sheffield City Council are carrying out Utility asset works on Beighton Road, Woodhouse, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 08:10 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 3 Feb 2025 at 08:35.

The Environment Agency logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Retford Road

The Environment Agency are proposing to carry out Statutory Infrastructure Works on Retford Road, Woodhouse Mill, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by The Environment Agency on 13 Dec 2024 at 10:20.

Cadent Gas logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Well Lane

Cadent Gas are proposing to carry out Utility asset works on Well Lane, Treeton, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 9 Jan 2025 at 09:11.

Independent Water Networks logo
LONG TERM
Between
3 Feb and 11 Apr 2025
Details
View Map
Share
Follow
Tickhill Road

Independent Water Networks are proposing to carry out Utility asset works on Tickhill Road, Maltby, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 11 April 2025. The works will impact the carriageway, verge and footpath.

This roadwork event was last updated by Independent Water Networks on 18 Nov 2024 at 14:26.

Northern Powergrid (Yorkshire) logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Sheffield Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Sheffield Road, Templeborough, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Nov 2024 at 10:04.

Northern Powergrid (Yorkshire) logo
Until
21 Feb 2025
Details
View Map
Share
Follow
Sheffield Road

Northern Powergrid (Yorkshire) are carrying out New service connection on Sheffield Road, Templeborough, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 22:05 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 4 Feb 2025 at 07:50.

Cadent Gas logo
Until
20 Feb 2025
Details
View Map
Share
Follow
Elder Drive

Cadent Gas are carrying out Utility asset works on Elder Drive, Sunnyside, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 February 2025 at 13:00 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Feb 2025 at 13:48.

Cadent Gas logo
Until
21 Feb 2025
Details
View Map
Share
Follow
Main Street

Cadent Gas are carrying out Utility repair and maintenance works on Main Street, Rotherham Town Centre, Rotherham.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 13:00 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Feb 2025 at 14:35.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
3 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Bowen Drive

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Bowen Drive, Thrybergh, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 3 Feb 2025 at 14:19.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
3 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Finch Close

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Finch Close, Thrybergh, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 3 Feb 2025 at 14:20.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
3 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Finch Close

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Finch Close, Thrybergh, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 5 Feb 2025 at 14:03.

Cadent Gas logo
LONG TERM
Until
7 Mar 2025
Details
View Map
Share
Follow
Bole Hill

Cadent Gas are carrying out Utility asset works on Bole Hill, Treeton, Rotherham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 February 2025 at 09:00 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 12 Feb 2025 at 10:02.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Eckington Way

Sheffield City Council are proposing to carry out Utility asset works on Eckington Way, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 23:15.

Sheffield City Council logo
Until
20 Feb 2025
Details
View Map
Share
Follow
Eckington Way

Sheffield City Council are carrying out Utility asset works on Eckington Way, Sheffield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 February 2025 at 07:49 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Feb 2025 at 07:56.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Eckington Way

Sheffield City Council are proposing to carry out Utility asset works on Eckington Way, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 15:28.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Drake House Lane

Sheffield City Council are proposing to carry out Utility asset works on Drake House Lane, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 12:31.

Sheffield City Council logo
Until
20 Feb 2025
Details
View Map
Share
Follow
Drake House Lane

Sheffield City Council are carrying out Utility asset works on Drake House Lane, Sheffield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 February 2025 at 07:50 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Feb 2025 at 07:56.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Eckington Way

Sheffield City Council are proposing to carry out Utility asset works on Eckington Way, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 23:15.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Eckington Way

Sheffield City Council are proposing to carry out Utility asset works on Eckington Way, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 13:16.

Sheffield City Council logo
Until
20 Feb 2025
Details
View Map
Share
Follow
Eckington Way

Sheffield City Council are carrying out Utility asset works on Eckington Way, Sheffield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 February 2025 at 07:49 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Feb 2025 at 07:56.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Waterthorpe Greenway

Sheffield City Council are proposing to carry out Utility asset works on Waterthorpe Greenway, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 13:17.

Sheffield City Council logo
Until
20 Feb 2025
Details
View Map
Share
Follow
Waterthorpe Greenway

Sheffield City Council are carrying out Utility asset works on Waterthorpe Greenway, Sheffield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 February 2025 at 07:50 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Feb 2025 at 07:56.

Sheffield City Council logo
Until
20 Feb 2025
Details
View Map
Share
Follow
Eckington Way

Sheffield City Council are carrying out Utility asset works on Eckington Way, Sheffield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 February 2025 at 07:50 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Feb 2025 at 07:56.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Sevenairs Road

Sheffield City Council are proposing to carry out Utility asset works on Sevenairs Road, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 13:16.

Sheffield City Council logo
Until
20 Feb 2025
Details
View Map
Share
Follow
Sevenairs Road

Sheffield City Council are carrying out Utility asset works on Sevenairs Road, Sheffield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 February 2025 at 07:50 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Feb 2025 at 07:56.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Eckington Way

Sheffield City Council are proposing to carry out Utility asset works on Eckington Way, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 23:15.

Sheffield City Council logo
Until
20 Feb 2025
Details
View Map
Share
Follow
Eckington Way

Sheffield City Council are carrying out Utility asset works on Eckington Way, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 February 2025 at 07:50 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Feb 2025 at 07:56.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Eckington Way

Sheffield City Council are proposing to carry out Utility asset works on Eckington Way, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 23:15.

Sheffield City Council logo
Until
20 Feb 2025
Details
View Map
Share
Follow
Eckington Way

Sheffield City Council are carrying out Utility asset works on Eckington Way, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 February 2025 at 07:49 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Feb 2025 at 07:56.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Mosborough Parkway

Sheffield City Council are proposing to carry out Utility asset works on Mosborough Parkway, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 23:15.

Sheffield City Council logo
Until
20 Feb 2025
Details
View Map
Share
Follow
Mosborough Parkway

Sheffield City Council are carrying out Utility asset works on Mosborough Parkway, Sheffield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 February 2025 at 07:50 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Feb 2025 at 07:56.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
5 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Howard Street

Rotherham Metropolitan Borough Council are proposing to carry out Highway improvement works on Howard Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 5 Feb 2025 at 15:17.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
5 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Howard Street

Rotherham Metropolitan Borough Council are proposing to carry out Highway improvement works on Howard Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 5 Feb 2025 at 15:17.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
6 Feb and 6 May 2025
Details
View Map
Share
Main Street

Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Main Street, Bramley, Rotherham.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 February 2025 and run through until 6 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 28 Nov 2024 at 16:50.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
6 Feb and 6 May 2025
Details
View Map
Share
Brook Lane

Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Brook Lane, Bramley, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 February 2025 and run through until 6 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 28 Nov 2024 at 16:47.

Northern Powergrid (Yorkshire) logo
Between
8 and 27 Feb 2025
Details
View Map
Share
Follow
New Orchard Lane

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on New Orchard Lane, Thurcroft, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 21 Jan 2025 at 08:37.

Northern Powergrid (Yorkshire) logo
Until
27 Feb 2025
Details
View Map
Share
Follow
New Orchard Lane

Northern Powergrid (Yorkshire) are carrying out New service connection on New Orchard Lane, Thurcroft, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 February 2025 at 08:00 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 8 Feb 2025 at 08:21.

Sheffield City Council logo
Between
10 and 25 Feb 2025
Details
View Map
Share
Follow
Eckington Road

Sheffield City Council are proposing to carry out Utility asset works on Eckington Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 23:14.

Sheffield City Council logo
Between
10 and 25 Feb 2025
Details
View Map
Share
Follow
West Street

Sheffield City Council are proposing to carry out Utility asset works on West Street, Beighton, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 23:14.

Sheffield City Council logo
Until
25 Feb 2025
Details
View Map
Share
Follow
West Street

Sheffield City Council are carrying out Utility asset works on West Street, Beighton, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 07:55 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 10 Feb 2025 at 08:59.

Sheffield City Council logo
Between
10 and 25 Feb 2025
Details
View Map
Share
Follow
Drake House Way

Sheffield City Council are proposing to carry out Utility asset works on Drake House Way, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 23:15.

Sheffield City Council logo
Until
25 Feb 2025
Details
View Map
Share
Follow
Drake House Way

Sheffield City Council are carrying out Utility asset works on Drake House Way, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 07:55 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 10 Feb 2025 at 08:59.

Cadent Gas logo
Between
10 and 27 Feb 2025
Details
View Map
Share
Follow
Waleswood View

Cadent Gas are proposing to carry out Utility asset works on Waleswood View, Aston, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jan 2025 at 13:44.

Cadent Gas logo
Between
10 and 27 Feb 2025
Details
View Map
Share
Follow
Waleswood View

Cadent Gas are proposing to carry out Utility asset works on Waleswood View, Aston, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Jan 2025 at 08:54.

Cadent Gas logo
Between
10 and 27 Feb 2025
Details
View Map
Share
Follow
Waleswood View

Cadent Gas are proposing to carry out Utility asset works on Waleswood View, Aston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Jan 2025 at 11:37.

Cadent Gas logo
Until
27 Feb 2025
Details
View Map
Share
Follow
Waleswood View

Cadent Gas are carrying out Utility asset works on Waleswood View, Aston, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 07:50 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Feb 2025 at 07:51.

Cadent Gas logo
LONG TERM
Between
10 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Windsor Rise

Cadent Gas are proposing to carry out Utility asset works on Windsor Rise, Aston, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jan 2025 at 13:41.

Cadent Gas logo
LONG TERM
Between
10 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Windsor Rise

Cadent Gas are proposing to carry out Utility asset works on Windsor Rise, Aston, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Jan 2025 at 08:49.

Cadent Gas logo
LONG TERM
Between
10 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Windsor Rise

Cadent Gas are proposing to carry out Utility asset works on Windsor Rise, Aston, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Jan 2025 at 11:37.

Cadent Gas logo
LONG TERM
Until
24 Mar 2025
Details
View Map
Share
Follow
Windsor Rise

Cadent Gas are carrying out Utility asset works on Windsor Rise, Aston, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 07:50 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Feb 2025 at 07:52.

Cadent Gas logo
Between
10 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Marlborough Rise

Cadent Gas are proposing to carry out Utility asset works on Marlborough Rise, Aston, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jan 2025 at 13:44.

Cadent Gas logo
Between
10 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Marlborough Rise

Cadent Gas are proposing to carry out Utility asset works on Marlborough Rise, Aston, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Jan 2025 at 08:51.

Cadent Gas logo
Between
10 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Marlborough Rise

Cadent Gas are proposing to carry out Utility asset works on Marlborough Rise, Aston, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Jan 2025 at 11:36.

Cadent Gas logo
Until
3 Mar 2025
Details
View Map
Share
Follow
Marlborough Rise

Cadent Gas are carrying out Utility asset works on Marlborough Rise, Aston, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 07:50 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Feb 2025 at 07:53.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
10 Feb and 30 Mar 2025
Details
View Map
Share
Follow
Monksbridge Road

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Monksbridge Road, Dinnington, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 30 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 10 Jan 2025 at 12:20.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
10 Feb and 30 Mar 2025
Details
View Map
Share
Follow
Nobel Way

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Nobel Way, Dinnington, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 30 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 10 Jan 2025 at 12:17.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
10 Feb and 30 Mar 2025
Details
View Map
Share
Outgang Lane

Rotherham Metropolitan Borough Council were proposing to carry out Works for road purposes on Outgang Lane, Dinnington, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 30 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 10 Jan 2025 at 11:37.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
10 Feb and 30 Mar 2025
Details
View Map
Share
Follow
Monksbridge Road Roundabout

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Monksbridge Road Roundabout, Dinnington, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 30 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 10 Jan 2025 at 12:20.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
10 Feb and 30 Mar 2025
Details
View Map
Share
Follow
Common Road

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Common Road, Dinnington, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 30 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 10 Jan 2025 at 12:20.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
10 Feb and 30 Mar 2025
Details
View Map
Share
Follow
Outgang Lane

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Outgang Lane, Dinnington, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 30 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 10 Jan 2025 at 12:19.

Cadent Gas logo
Between
10 and 24 Feb 2025
Details
View Map
Share
Follow
Mill Lane

Cadent Gas are proposing to carry out Utility asset works on Mill Lane, Treeton, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 13:30.

Cadent Gas logo
Between
10 and 24 Feb 2025
Details
View Map
Share
Mill Lane

Cadent Gas were proposing to carry out Utility asset works on Mill Lane, Treeton, Rotherham.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 24 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Jan 2025 at 10:20.

Cadent Gas logo
Between
10 and 24 Feb 2025
Details
View Map
Share
Follow
Mill Lane

Cadent Gas are proposing to carry out Utility asset works on Mill Lane, Treeton, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Jan 2025 at 11:00.

Cadent Gas logo
Between
10 and 24 Feb 2025
Details
View Map
Share
Mill Lane

Cadent Gas were proposing to carry out Utility asset works on Mill Lane, Treeton, Rotherham.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 24 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Jan 2025 at 11:11.

Cadent Gas logo
Until
26 Feb 2025
Details
View Map
Share
Follow
Mill Lane

Cadent Gas are carrying out Utility asset works on Mill Lane, Treeton, Rotherham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 February 2025 at 09:45 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Feb 2025 at 09:45.

Cadent Gas logo
Between
10 and 24 Feb 2025
Details
View Map
Share
Follow
Treeton Lane

Cadent Gas are proposing to carry out Utility asset works on Treeton Lane, Treeton, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 13:30.

Cadent Gas logo
Between
10 and 24 Feb 2025
Details
View Map
Share
Treeton Lane

Cadent Gas were proposing to carry out Utility asset works on Treeton Lane, Treeton, Rotherham.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 24 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Jan 2025 at 10:04.

Cadent Gas logo
Between
10 and 24 Feb 2025
Details
View Map
Share
Treeton Lane

Cadent Gas were proposing to carry out Utility asset works on Treeton Lane, Treeton, Rotherham.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 24 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Jan 2025 at 10:06.

Cadent Gas logo
Between
10 and 24 Feb 2025
Details
View Map
Share
Treeton Lane

Cadent Gas were proposing to carry out Utility asset works on Treeton Lane, Treeton, Rotherham.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 24 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Jan 2025 at 10:08.

Cadent Gas logo
Until
26 Feb 2025
Details
View Map
Share
Follow
Treeton Lane

Cadent Gas are carrying out Utility asset works on Treeton Lane, Treeton, Rotherham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 February 2025 at 09:45 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Feb 2025 at 09:48.

Rotherham Metropolitan Borough Council logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Herringthorpe Valley Road

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Herringthorpe Valley Road, Herringthorpe, Rotherham.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 27 Jan 2025 at 07:47.

Quickline Commucations logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Thrybergh Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Thrybergh Lane, Thrybergh, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 4 Dec 2024 at 08:48.

Yorkshire Water logo
Finishing
Monday
Details
View Map
Share
Follow
Brunswick Road

Yorkshire Water are carrying out Utility repair and maintenance works on Brunswick Road, Moorgate, Rotherham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 February 2025 at 08:33 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 11 Feb 2025 at 09:57.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Don Street

Cadent Gas are carrying out Utility repair and maintenance works on Don Street, Rotherham Town Centre, Rotherham.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 February 2025 at 11:54 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Feb 2025 at 12:33.

Yorkshire Water logo
Finishing
Monday
Details
View Map
Share
Follow
Spencer Drive

Yorkshire Water are carrying out Utility repair and maintenance works on Spencer Drive, Ravenfield, Rotherham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 February 2025 at 14:49 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 12 Feb 2025 at 07:43.

Quickline Commucations logo
Finishing
Today
Details
View Map
Share
Follow
Arbour Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Arbour Lane, Ravenfield, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 21 Jan 2025 at 11:58.

Quickline Commucations logo
Finishing
Today
Details
View Map
Share
Follow
Arbour Lane

Quickline Commucations are carrying out Utility repair and maintenance works on Arbour Lane, Ravenfield, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 February 2025 at 10:00 and could run through until 13 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 11 Feb 2025 at 10:13.

Rotherham Metropolitan Borough Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Park View

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Park View, Kiveton Park, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 5 Feb 2025 at 09:39.

Rotherham Metropolitan Borough Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Park View

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Park View, Kiveton Park, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 5 Feb 2025 at 09:40.

Cadent Gas logo
Between
12 and 28 Feb 2025
Details
View Map
Share
Follow
Holmes Crescent

Cadent Gas are proposing to carry out Utility asset works on Holmes Crescent, Treeton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 12:06.

Cadent Gas logo
Between
12 and 28 Feb 2025
Details
View Map
Share
Follow
Holmes Crescent

Cadent Gas are proposing to carry out Utility asset works on Holmes Crescent, Treeton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 11:21.

Northern Powergrid (Yorkshire) logo
Until
25 Feb 2025
Details
View Map
Share
Follow
Spinneyfield

Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Spinneyfield, Moorgate, Rotherham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2025 at 12:00 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 12 Feb 2025 at 12:20.

Yorkshire Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Broomfield Grove

Yorkshire Water are carrying out Utility repair and maintenance works on Broomfield Grove, Broom, Rotherham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2025 at 12:20 and could run through until 18 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 12 Feb 2025 at 12:46.

Yorkshire Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Westfield Road

Yorkshire Water are carrying out Utility repair and maintenance works on Westfield Road, Bramley, Rotherham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2025 at 08:41 and could run through until 18 February 2025. The works will impact the verge only.

This roadwork event was last updated by Yorkshire Water on 12 Feb 2025 at 08:59.

Rotherham Metropolitan Borough Council logo
Finishing
Monday
Details
View Map
Share
Follow
Netherthorpe Way

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Netherthorpe Way, North Anston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 5 Feb 2025 at 10:53.

Severn Trent Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Woodall Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Woodall Lane, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 11 Oct 2024 at 11:36.

Severn Trent Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Woodall Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Woodall Lane, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 24 Oct 2024 at 09:45.

Sheffield City Council logo
Between
17 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Eckington Road

Sheffield City Council are proposing to carry out Utility asset works on Eckington Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 22:09.

Sheffield City Council logo
Between
17 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Eckington Road

Sheffield City Council are proposing to carry out Utility asset works on Eckington Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Nov 2024 at 13:04.

Cadent Gas logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Worksop Road

Cadent Gas are proposing to carry out Utility asset works on Worksop Road, Woodsetts, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 29 Jan 2025 at 14:14.

Cadent Gas logo
LONG TERM
Between
17 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Worksop Road

Cadent Gas are proposing to carry out Utility asset works on Worksop Road, Woodsetts, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 29 Jan 2025 at 14:15.

The Environment Agency logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Retford Road

The Environment Agency are proposing to carry out Statutory Infrastructure Works on Retford Road, Woodhouse Mill, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by The Environment Agency on 20 Dec 2024 at 11:14.

The Environment Agency logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Retford Road

The Environment Agency are proposing to carry out Statutory Infrastructure Works on Retford Road, Woodhouse Mill, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by The Environment Agency on 4 Feb 2025 at 09:57.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
17 Feb and 30 Apr 2025
Details
View Map
Share
Follow
Poplar Way

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Poplar Way, Catcliffe, Rotherham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 7 Feb 2025 at 08:01.

Cadent Gas logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Tickhill Road

Cadent Gas are proposing to carry out Utility asset works on Tickhill Road, Maltby, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jan 2025 at 08:21.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
17 Feb and 30 May 2025
Details
View Map
Share
Follow
Badsley Moor Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Badsley Moor Lane, Herringthorpe, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 4 Feb 2025 at 08:38.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
17 Feb and 30 May 2025
Details
View Map
Share
Follow
Badsley Moor Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Badsley Moor Lane, Herringthorpe, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 10 Feb 2025 at 15:05.

Rotherham Metropolitan Borough Council logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Dukeries Drive

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Dukeries Drive, North Anston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 5 Feb 2025 at 12:50.

Rotherham Metropolitan Borough Council logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Dukeries Drive

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Dukeries Drive, North Anston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 5 Feb 2025 at 12:51.

Cadent Gas logo
Between
19 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Clumber Rise

Cadent Gas are proposing to carry out Utility asset works on Clumber Rise, Aston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Jan 2025 at 11:36.

Cadent Gas logo
Between
19 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Clumber Rise

Cadent Gas are proposing to carry out Utility asset works on Clumber Rise, Aston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Feb 2025 at 09:10.

Cadent Gas logo
Between
19 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Tickhill Road

Cadent Gas are proposing to carry out Utility asset works on Tickhill Road, Maltby, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jan 2025 at 14:46.

Cadent Gas logo
Between
19 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Tickhill Road

Cadent Gas are proposing to carry out Utility asset works on Tickhill Road, Maltby, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 09:34.

Rotherham Metropolitan Borough Council logo
Between
20 and 24 Feb 2025
Details
View Map
Share
Follow
Leeds Avenue

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Leeds Avenue, North Anston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 5 Feb 2025 at 12:45.

Rotherham Metropolitan Borough Council logo
Between
21 and 25 Feb 2025
Details
View Map
Share
Follow
Coke Hill

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Coke Hill, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 5 Feb 2025 at 10:16.

Cadent Gas logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Rotherham Baulk

Cadent Gas were proposing to carry out Utility repair and maintenance works on Rotherham Baulk, Gildingwells, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 20 Jan 2025 at 15:36.

Cadent Gas logo
Between
24 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Bole Hill

Cadent Gas are proposing to carry out Utility asset works on Bole Hill, Treeton, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 09:26.

Cadent Gas logo
Between
24 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Spa Well Crescent

Cadent Gas are proposing to carry out Utility asset works on Spa Well Crescent, Treeton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 09:27.

Cadent Gas logo
Between
24 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Spa Well Crescent

Cadent Gas are proposing to carry out Utility asset works on Spa Well Crescent, Treeton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 7 Feb 2025 at 08:49.

Quickline Commucations logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Maltby Lane

Quickline Commucations are proposing to carry out Utility asset works on Maltby Lane, Braithwell, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 13 Jan 2025 at 14:21.

Quickline Commucations logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Maltby Lane

Quickline Commucations are proposing to carry out Utility asset works on Maltby Lane, Braithwell, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 27 Jan 2025 at 15:35.

Rotherham Metropolitan Borough Council logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Follow
Coke Lane

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Coke Lane, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 5 Feb 2025 at 10:15.

Yorkshire Water logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Follow
Russell Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Russell Street, Eastwood, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 23 Dec 2024 at 13:32.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
27 Feb and 27 May 2025
Details
View Map
Share
Follow
Main Street

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Main Street, Bramley, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 27 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 28 Nov 2024 at 16:53.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
27 Feb and 27 May 2025
Details
View Map
Share
Follow
Flanderwell Lane

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Flanderwell Lane, Sunnyside, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 27 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 28 Nov 2024 at 16:45.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
27 Feb and 27 May 2025
Details
View Map
Share
Follow
Brook Lane

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Brook Lane, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 27 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 28 Nov 2024 at 16:50.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
27 Feb and 31 Mar 2025
Details
View Map
Share
Follow
East Road

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on East Road, East Dene, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 3 Feb 2025 at 13:35.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
27 Feb and 31 Mar 2025
Details
View Map
Share
Follow
East Road

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on East Road, East Dene, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 4 Feb 2025 at 07:38.

Cadent Gas logo
Between
3 and 24 Mar 2025
Details
View Map
Share
Follow
Woodpecker Close

Cadent Gas are proposing to carry out Utility asset works on Woodpecker Close, Aston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Jan 2025 at 11:12.

Cadent Gas logo
Between
3 and 20 Mar 2025
Details
View Map
Share
Follow
Finch Rise

Cadent Gas are proposing to carry out Utility asset works on Finch Rise, Aston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 20 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 6 Jan 2025 at 11:10.

Cadent Gas logo
Between
3 and 20 Mar 2025
Details
View Map
Share
Follow
Finch Rise

Cadent Gas are proposing to carry out Utility asset works on Finch Rise, Aston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 20 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 6 Jan 2025 at 12:45.

Cadent Gas logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Cramfit Road

Cadent Gas are proposing to carry out Utility asset works on Cramfit Road, North Anston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 08:46.

Cadent Gas logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Cramfit Road

Cadent Gas are proposing to carry out Utility asset works on Cramfit Road, North Anston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 31 Jan 2025 at 08:43.

Rotherham Metropolitan Borough Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Ulley Lane

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Ulley Lane, Ulley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 24 Jan 2025 at 13:50.

Rotherham Metropolitan Borough Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Ulley Lane

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Ulley Lane, Ulley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 27 Jan 2025 at 11:56.

Cadent Gas logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Follow
Mill Lane

Cadent Gas are proposing to carry out Utility asset works on Mill Lane, Treeton, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Jan 2025 at 12:30.

Cadent Gas logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Follow
Treeton Lane

Cadent Gas are proposing to carry out Utility asset works on Treeton Lane, Treeton, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Jan 2025 at 12:30.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
3 Mar and 30 Jun 2025
Details
View Map
Share
Follow
Steadfolds Lane

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Steadfolds Lane, Thurcroft, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 4 Dec 2024 at 13:52.

Cadent Gas logo
Between
3 and 24 Mar 2025
Details
View Map
Share
Follow
Moorlands Crescent

Cadent Gas are proposing to carry out Utility asset works on Moorlands Crescent, Whiston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Jan 2025 at 12:01.

Cadent Gas logo
Between
3 and 24 Mar 2025
Details
View Map
Share
Follow
Middlefields Drive

Cadent Gas are proposing to carry out Utility asset works on Middlefields Drive, Whiston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Jan 2025 at 11:59.

Rotherham Metropolitan Borough Council logo
Between
3 and 31 Mar 2025
Details
View Map
Share
Follow
Herringthorpe Grove

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Herringthorpe Grove, Herringthorpe, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 4 Feb 2025 at 07:51.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
3 Mar and 30 May 2025
Details
View Map
Share
Follow
Herringthorpe Grove

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Herringthorpe Grove, Herringthorpe, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 5 Feb 2025 at 14:48.

Quickline Commucations logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Bawtry Road

Quickline Commucations are proposing to carry out Utility asset works on Bawtry Road, Wickersley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 16 Jan 2025 at 11:58.

Rotherham Metropolitan Borough Council logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Wilfred Street

Rotherham Metropolitan Borough Council are proposing to carry out Remedial works on Wilfred Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 5 Feb 2025 at 14:45.

Yorkshire Water logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Russell Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Russell Street, Eastwood, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 2 Jan 2025 at 09:15.

Yorkshire Water logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Russell Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Russell Street, Eastwood, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 6 Jan 2025 at 09:23.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
3 Mar and 30 May 2025
Details
View Map
Share
Follow
Bowen Drive

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Bowen Drive, Thrybergh, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 5 Feb 2025 at 14:00.

Rotherham Metropolitan Borough Council logo
Between
3 and 31 Mar 2025
Details
View Map
Share
Follow
St Leonards Avenue

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on St Leonards Avenue, Thrybergh, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 4 Feb 2025 at 09:18.

Rotherham Metropolitan Borough Council logo
Between
3 and 31 Mar 2025
Details
View Map
Share
Follow
St Leonards Avenue

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on St Leonards Avenue, Thrybergh, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 4 Feb 2025 at 09:18.

Rotherham Metropolitan Borough Council logo
Between
3 and 31 Mar 2025
Details
View Map
Share
Follow
St Leonards Avenue

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on St Leonards Avenue, Thrybergh, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 4 Feb 2025 at 09:20.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
3 Mar and 30 May 2025
Details
View Map
Share
Follow
St Leonards Avenue

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on St Leonards Avenue, Thrybergh, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 4 Feb 2025 at 09:21.

Quickline Commucations logo
Between
4 and 6 Mar 2025
Details
View Map
Share
Follow
School Lane

Quickline Commucations are proposing to carry out Utility asset works on School Lane, Stainton, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 17 Jan 2025 at 14:48.

Quickline Commucations logo
Between
4 and 6 Mar 2025
Details
View Map
Share
Follow
School Lane

Quickline Commucations are proposing to carry out Utility asset works on School Lane, Stainton, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 20 Jan 2025 at 15:21.

Sheffield City Council logo
Between
7 and 21 Mar 2025
Details
View Map
Share
Follow
Eckington Road

Sheffield City Council are proposing to carry out Utility asset works on Eckington Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Dec 2024 at 14:33.

Cadent Gas logo
LONG TERM
Between
10 Mar and 5 May 2025
Details
View Map
Share
Follow
The Chase

Cadent Gas are proposing to carry out Utility asset works on The Chase, Aston, Rotherham.

These works are categorised as Major.

The works will start on or after 10 March 2025 and could run through until 5 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Jan 2025 at 08:52.

Cadent Gas logo
LONG TERM
Between
10 Mar and 5 May 2025
Details
View Map
Share
Follow
The Chase

Cadent Gas are proposing to carry out Utility asset works on The Chase, Aston, Rotherham.

These works are categorised as Major.

The works will start on or after 10 March 2025 and could run through until 5 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Jan 2025 at 11:37.

Cadent Gas logo
Between
10 and 24 Mar 2025
Details
View Map
Share
Treeton Lane

Cadent Gas were proposing to carry out Utility asset works on Treeton Lane, Treeton, Rotherham.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 24 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Jan 2025 at 08:15.

Cadent Gas logo
LONG TERM
Between
10 Mar and 21 Apr 2025
Details
View Map
Share
Follow
Well Lane

Cadent Gas are proposing to carry out Utility asset works on Well Lane, Treeton, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 12:41.

Cadent Gas logo
LONG TERM
Between
10 Mar and 21 Apr 2025
Details
View Map
Share
Follow
Well Lane

Cadent Gas are proposing to carry out Utility asset works on Well Lane, Treeton, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 09:25.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
10 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Brinsworth Lane

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Brinsworth Lane, Brinsworth, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 21 Jan 2025 at 11:33.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
10 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Brinsworth Lane

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Brinsworth Lane, Brinsworth, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 21 Jan 2025 at 15:57.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
10 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Brinsworth Lane

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Brinsworth Lane, Brinsworth, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 22 Jan 2025 at 10:14.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
10 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Brinsworth Lane

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Brinsworth Lane, Brinsworth, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 5 Feb 2025 at 14:52.

Cadent Gas logo
Between
10 and 24 Mar 2025
Details
View Map
Share
Follow
Manor Drive

Cadent Gas are proposing to carry out Utility asset works on Manor Drive, Whiston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Jan 2025 at 12:08.

Cadent Gas logo
Between
10 and 26 Mar 2025
Details
View Map
Share
Hall Close Avenue

Cadent Gas were proposing to carry out Utility asset works on Hall Close Avenue, Whiston, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 26 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Jan 2025 at 15:46.

Sheffield City Council logo
Between
11 and 26 Mar 2025
Details
View Map
Share
Follow
Orchard Lane

Sheffield City Council are proposing to carry out Utility asset works on Orchard Lane, Beighton, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Dec 2024 at 14:33.

Sheffield City Council logo
Between
11 and 26 Mar 2025
Details
View Map
Share
Follow
West Street

Sheffield City Council are proposing to carry out Utility asset works on West Street, Beighton, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Dec 2024 at 14:31.

Sheffield City Council logo
Between
13 and 28 Mar 2025
Details
View Map
Share
Follow
Junction Road

Sheffield City Council are proposing to carry out Utility asset works on Junction Road, Woodhouse, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Dec 2024 at 15:04.

Sheffield City Council logo
Between
13 and 28 Mar 2025
Details
View Map
Share
Follow
Furnace Lane

Sheffield City Council are proposing to carry out Utility asset works on Furnace Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Dec 2024 at 14:59.

Sheffield City Council logo
Between
13 and 28 Mar 2025
Details
View Map
Share
Follow
Furnace Lane

Sheffield City Council are proposing to carry out Utility asset works on Furnace Lane, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Dec 2024 at 14:59.

Cadent Gas logo
Between
17 Mar and 7 Apr 2025
Details
View Map
Share
Follow
Robin Place

Cadent Gas are proposing to carry out Utility asset works on Robin Place, Aston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Jan 2025 at 11:39.

Cadent Gas logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Pocket Handkerchief Lane

Cadent Gas are proposing to carry out Utility asset works on Pocket Handkerchief Lane, Todwick, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 09:19.

Yorkshire Water logo
Between
18 and 21 Mar 2025
Details
View Map
Share
Follow
Turnshaw Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Turnshaw Road, Ulley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 14 Jan 2025 at 14:18.

Yorkshire Water logo
Between
18 and 21 Mar 2025
Details
View Map
Share
Follow
Turnshaw Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Turnshaw Road, Ulley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 16 Jan 2025 at 11:48.

Yorkshire Water logo
Between
18 and 21 Mar 2025
Details
View Map
Share
Follow
Turnshaw Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Turnshaw Road, Ulley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 17 Jan 2025 at 15:44.

Northern Powergrid (Yorkshire) logo
Between
19 Mar and 1 Apr 2025
Details
View Map
Share
Follow
Arnold Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Arnold Road, Herringthorpe, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 1 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 31 Jan 2025 at 11:33.

Northern Powergrid (Yorkshire) logo
Between
19 Mar and 1 Apr 2025
Details
View Map
Share
Follow
Arnold Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Arnold Road, Herringthorpe, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 1 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 3 Feb 2025 at 14:40.

Northern Powergrid (Yorkshire) logo
Between
19 Mar and 1 Apr 2025
Details
View Map
Share
Follow
Arnold Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Arnold Road, Herringthorpe, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 1 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 7 Feb 2025 at 08:08.

Cadent Gas logo
Between
24 Mar and 14 Apr 2025
Details
View Map
Share
Follow
Swallow Lane

Cadent Gas are proposing to carry out Utility asset works on Swallow Lane, Aston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 14 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Jan 2025 at 11:39.

Northern Powergrid (Yorkshire) logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Birchall Avenue

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Birchall Avenue, Whiston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 28 Jan 2025 at 11:30.

Northern Powergrid (Yorkshire) logo
Between
26 Mar and 10 Apr 2025
Details
View Map
Share
Follow
Goldsmith Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Goldsmith Road, Herringthorpe, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 10 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 31 Jan 2025 at 11:28.

Northern Powergrid (Yorkshire) logo
Between
26 Mar and 10 Apr 2025
Details
View Map
Share
Goldsmith Road

Northern Powergrid (Yorkshire) were proposing to carry out Utility asset works on Goldsmith Road, Herringthorpe, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 March 2025 and run through until 10 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 7 Feb 2025 at 08:47.

Northern Powergrid (Yorkshire) logo
Between
26 Mar and 10 Apr 2025
Details
View Map
Share
Follow
Goldsmith Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Goldsmith Road, Herringthorpe, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 10 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 7 Feb 2025 at 08:19.

Northern Powergrid (Yorkshire) logo
Between
26 Mar and 10 Apr 2025
Details
View Map
Share
Follow
Goldsmith Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Goldsmith Road, Herringthorpe, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 10 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Feb 2025 at 09:15.

Northern Powergrid (Yorkshire) logo
Between
26 Mar and 24 Apr 2025
Details
View Map
Share
Follow
Moor Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Moor Road, East Dene, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 5 Feb 2025 at 15:02.

Northern Powergrid (Yorkshire) logo
Between
26 Mar and 24 Apr 2025
Details
View Map
Share
Follow
Moor Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Moor Road, East Dene, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Feb 2025 at 09:14.

Northern Powergrid (Yorkshire) logo
Between
30 Mar and 29 Apr 2025
Details
View Map
Share
Follow
Central Avenue

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Central Avenue, East Dene, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 March 2025 and could run through until 29 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 4 Feb 2025 at 10:04.

Northern Powergrid (Yorkshire) logo
Between
30 Mar and 29 Apr 2025
Details
View Map
Share
Follow
Central Avenue

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Central Avenue, East Dene, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 March 2025 and could run through until 29 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 7 Feb 2025 at 07:46.

Rotherham Metropolitan Borough Council logo
Between
31 Mar and 18 Apr 2025
Details
View Map
Share
Follow
Dowcarr Lane

Rotherham Metropolitan Borough Council are proposing to carry out Utility repair and maintenance works on Dowcarr Lane, Harthill, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 18 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 28 Jan 2025 at 14:35.

Rotherham Metropolitan Borough Council logo
Between
31 Mar and 18 Apr 2025
Details
View Map
Share
Follow
Killamarsh Lane

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Killamarsh Lane, Woodall, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 24 Jan 2025 at 09:03.

Rotherham Metropolitan Borough Council logo
Between
31 Mar and 18 Apr 2025
Details
View Map
Share
Follow
Woodall Lane

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Woodall Lane, Woodall, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 24 Jan 2025 at 09:05.

Rotherham Metropolitan Borough Council logo
Between
31 Mar and 18 Apr 2025
Details
View Map
Share
Follow
Walseker Lane

Rotherham Metropolitan Borough Council are proposing to carry out Utility repair and maintenance works on Walseker Lane, Harthill, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 18 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 28 Jan 2025 at 14:34.

Rotherham Metropolitan Borough Council logo
Between
31 Mar and 18 Apr 2025
Details
View Map
Share
Follow
Woodall Lane

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Woodall Lane, Harthill, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 24 Jan 2025 at 09:04.

Rotherham Metropolitan Borough Council logo
Between
31 Mar and 18 Apr 2025
Details
View Map
Share
Follow
Thorpe Road

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Thorpe Road, Harthill, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 24 Jan 2025 at 09:06.

Rotherham Metropolitan Borough Council logo
Between
31 Mar and 18 Apr 2025
Details
View Map
Share
Follow
Hard Lane

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Hard Lane, Kiveton Park, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 24 Jan 2025 at 09:02.

Cadent Gas logo
Between
31 Mar and 14 Apr 2025
Details
View Map
Share
Follow
Bluebird Hill

Cadent Gas are proposing to carry out Utility asset works on Bluebird Hill, Aston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 14 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Jan 2025 at 12:03.

Cadent Gas logo
LONG TERM
Between
31 Mar and 26 May 2025
Details
View Map
Share
Follow
Rotherham Road

Cadent Gas are proposing to carry out Utility asset works on Rotherham Road, Dinnington, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 26 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 13:35.

Cadent Gas logo
LONG TERM
Between
31 Mar and 26 May 2025
Details
View Map
Share
Follow
Rotherham Road

Cadent Gas are proposing to carry out Utility asset works on Rotherham Road, Dinnington, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 26 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Jan 2025 at 13:48.

Independent Water Networks logo
LONG TERM
Between
31 Mar and 30 May 2025
Details
View Map
Share
Follow
Tickhill Road

Independent Water Networks are proposing to carry out Utility asset works on Tickhill Road, Maltby, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Independent Water Networks on 10 Feb 2025 at 08:31.

Rotherham Metropolitan Borough Council logo
Between
31 Mar and 27 Apr 2025
Details
View Map
Share
Follow
Cumwell Lane

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Cumwell Lane, Hellaby, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 10 Jan 2025 at 13:22.

Rotherham Metropolitan Borough Council logo
Between
31 Mar and 27 Apr 2025
Details
View Map
Share
Follow
Bawtry Road

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Bawtry Road, Hellaby, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 10 Jan 2025 at 13:22.

Rotherham Metropolitan Borough Council logo
Between
31 Mar and 27 Apr 2025
Details
View Map
Share
Follow
Bawtry Road

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Bawtry Road, Hellaby, Rotherham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 5 Feb 2025 at 09:33.

Rotherham Metropolitan Borough Council logo
Between
31 Mar and 27 Apr 2025
Details
View Map
Share
Follow
Hellaby Roundabout

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Hellaby Roundabout, Hellaby, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 10 Jan 2025 at 13:21.

Rotherham Metropolitan Borough Council logo
Between
31 Mar and 27 Apr 2025
Details
View Map
Share
Follow
Bawtry Road

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Bawtry Road, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 10 Jan 2025 at 13:24.

Yorkshire Water logo
Between
31 Mar and 6 Apr 2025
Details
View Map
Share
Follow
Rawmarsh Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Rawmarsh Road, Northfield, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 6 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 4 Feb 2025 at 08:16.

Quickline Commucations logo
Between
1 and 3 Apr 2025
Details
View Map
Share
Follow
Manor Road

Quickline Commucations are proposing to carry out Utility asset works on Manor Road, Wales, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 3 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 6 Feb 2025 at 14:43.

Quickline Commucations logo
Between
1 and 3 Apr 2025
Details
View Map
Share
Follow
Manor Road

Quickline Commucations are proposing to carry out Utility asset works on Manor Road, Wales, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 3 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 6 Feb 2025 at 15:57.

Cadent Gas logo
Between
7 and 28 Apr 2025
Details
View Map
Share
Follow
Partridge Place

Cadent Gas are proposing to carry out Utility asset works on Partridge Place, Aston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Jan 2025 at 12:05.

Cadent Gas logo
Between
7 and 22 Apr 2025
Details
View Map
Share
Baker Street

Cadent Gas were proposing to carry out Utility asset works on Baker Street, Laughton Common, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 22 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 9 Jan 2025 at 10:35.

Cadent Gas logo
Between
7 and 22 Apr 2025
Details
View Map
Share
Follow
Baker Street

Cadent Gas are proposing to carry out Utility asset works on Baker Street, Laughton Common, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 22 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Jan 2025 at 13:48.

Cadent Gas logo
Between
7 and 23 Apr 2025
Details
View Map
Share
Laughton Meadows

Cadent Gas were proposing to carry out Utility asset works on Laughton Meadows, Laughton Common, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 23 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 9 Jan 2025 at 10:34.

Cadent Gas logo
Between
7 and 22 Apr 2025
Details
View Map
Share
Follow
Laughton Meadows

Cadent Gas are proposing to carry out Utility asset works on Laughton Meadows, Laughton Common, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 22 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Jan 2025 at 14:11.

Sheffield City Council logo
LONG TERM
Between
10 Apr and 10 Jun 2025
Details
View Map
Share
Follow
Collingbourne Avenue

Sheffield City Council are proposing to carry out Utility asset works on Collingbourne Avenue, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 9 Jan 2025 at 09:35.

Sheffield City Council logo
LONG TERM
Between
10 Apr and 10 Jun 2025
Details
View Map
Share
Follow
Drake House Lane

Sheffield City Council are proposing to carry out Utility asset works on Drake House Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 9 Jan 2025 at 09:36.

Sheffield City Council logo
LONG TERM
Between
10 Apr and 10 Jun 2025
Details
View Map
Share
Follow
High Street

Sheffield City Council are proposing to carry out Utility asset works on High Street, Beighton, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 9 Jan 2025 at 09:42.

Sheffield City Council logo
LONG TERM
Between
10 Apr and 10 Jun 2025
Details
View Map
Share
Follow
Ivy Lane

Sheffield City Council are proposing to carry out Highway improvement works on Ivy Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 9 Jan 2025 at 17:03.

Sheffield City Council logo
LONG TERM
Between
10 Apr and 10 Jun 2025
Details
View Map
Share
Follow
Vicar Lane

Sheffield City Council are proposing to carry out Highway improvement works on Vicar Lane, Woodhouse, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 9 Jan 2025 at 17:06.

Cadent Gas logo
Between
14 and 29 Apr 2025
Details
View Map
Share
Follow
Paddington Close

Cadent Gas are proposing to carry out Utility asset works on Paddington Close, Laughton Common, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 13:21.

Cadent Gas logo
Between
14 and 29 Apr 2025
Details
View Map
Share
Follow
Paddington Close

Cadent Gas are proposing to carry out Utility asset works on Paddington Close, Laughton Common, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Jan 2025 at 14:11.

Cadent Gas logo
Between
21 Apr and 6 May 2025
Details
View Map
Share
Follow
Meadow Street

Cadent Gas are proposing to carry out Utility asset works on Meadow Street, Laughton Common, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 6 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 13:22.

Cadent Gas logo
Between
21 Apr and 6 May 2025
Details
View Map
Share
Follow
Meadow Street

Cadent Gas are proposing to carry out Utility asset works on Meadow Street, Laughton Common, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 6 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Jan 2025 at 14:11.

Quickline Commucations logo
Between
22 and 25 Apr 2025
Details
View Map
Share
Hooton Lane

Quickline Commucations were proposing to carry out Utility asset works on Hooton Lane, Laughton-en-le-morthen, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 April 2025 and run through until 25 April 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 4 Feb 2025 at 11:13.

Quickline Commucations logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
Mill Hills

Quickline Commucations are proposing to carry out Utility asset works on Mill Hills, Todwick, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 4 Feb 2025 at 14:09.

Quickline Commucations logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
Mill Hills

Quickline Commucations are proposing to carry out Utility asset works on Mill Hills, Todwick, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 4 Feb 2025 at 14:50.

Quickline Commucations logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
The Meadows

Quickline Commucations are proposing to carry out Utility asset works on The Meadows, Todwick, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 11 Feb 2025 at 08:19.

Quickline Commucations logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
The Meadows

Quickline Commucations are proposing to carry out Utility asset works on The Meadows, Todwick, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 11 Feb 2025 at 12:17.

Rotherham Metropolitan Borough Council logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
East Field Lane

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on East Field Lane, Laughton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 7 Feb 2025 at 13:59.

Rotherham Metropolitan Borough Council logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
New Road

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on New Road, Firbeck, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 10 Feb 2025 at 12:25.

Rotherham Metropolitan Borough Council logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
New Road

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on New Road, Firbeck, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 10 Feb 2025 at 12:26.

Rotherham Metropolitan Borough Council logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
Kingswood Lane

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Kingswood Lane, Firbeck, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 7 Feb 2025 at 14:01.

Rotherham Metropolitan Borough Council logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
Kingswood Lane

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Kingswood Lane, Firbeck, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 7 Feb 2025 at 14:01.

Rotherham Metropolitan Borough Council logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
Morthen Lane

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Morthen Lane, Morthen, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 10 Feb 2025 at 13:33.

Rotherham Metropolitan Borough Council logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
Morthen Lane

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Morthen Lane, Morthen, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 10 Feb 2025 at 13:34.

Rotherham Metropolitan Borough Council logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
Royds Moor Hill

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Royds Moor Hill, Whiston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 10 Feb 2025 at 13:38.

Rotherham Metropolitan Borough Council logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
Royds Moor Hill

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Royds Moor Hill, Whiston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 10 Feb 2025 at 13:38.

Rotherham Metropolitan Borough Council logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
Little Common Lane

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Little Common Lane, Whiston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 10 Feb 2025 at 13:41.

Quickline Commucations logo
Between
27 Apr and 4 May 2025
Details
View Map
Share
Hooton Lane

Quickline Commucations were proposing to carry out Utility asset works on Hooton Lane, Laughton-en-le-morthen, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 April 2025 and run through until 4 May 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 4 Feb 2025 at 13:37.

Quickline Commucations logo
Between
27 Apr and 4 May 2025
Details
View Map
Share
Follow
Hooton Lane

Quickline Commucations are proposing to carry out Utility asset works on Hooton Lane, Laughton-en-le-morthen, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 April 2025 and could run through until 4 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 4 Feb 2025 at 14:01.

Quickline Commucations logo
Between
27 Apr and 4 May 2025
Details
View Map
Share
Follow
Hooton Lane

Quickline Commucations are proposing to carry out Utility asset works on Hooton Lane, Laughton-en-le-morthen, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 April 2025 and could run through until 4 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 4 Feb 2025 at 14:51.

Cadent Gas logo
Between
28 Apr and 12 May 2025
Details
View Map
Share
Follow
Princess Street

Cadent Gas are proposing to carry out Utility asset works on Princess Street, Laughton Common, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 12 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 13:24.

Cadent Gas logo
Between
28 Apr and 12 May 2025
Details
View Map
Share
Follow
Princess Street

Cadent Gas are proposing to carry out Utility asset works on Princess Street, Laughton Common, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 12 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Jan 2025 at 14:10.

Cadent Gas logo
Between
28 Apr and 12 May 2025
Details
View Map
Share
Follow
Kieran Close

Cadent Gas are proposing to carry out Utility asset works on Kieran Close, Laughton Common, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 12 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 13:21.

Cadent Gas logo
Between
28 Apr and 12 May 2025
Details
View Map
Share
Follow
Kieran Close

Cadent Gas are proposing to carry out Utility asset works on Kieran Close, Laughton Common, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 12 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Jan 2025 at 14:10.

BT logo
Between
5 and 8 May 2025
Details
View Map
Share
Follow
Ringwood Crescent

BT are proposing to carry out Utility asset works on Ringwood Crescent, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 8 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 10 Feb 2025 at 14:13.

Cadent Gas logo
Between
6 and 19 May 2025
Details
View Map
Share
Follow
Park Lane

Cadent Gas are proposing to carry out Utility asset works on Park Lane, Dinnington, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 13:22.

Cadent Gas logo
Between
6 and 19 May 2025
Details
View Map
Share
Follow
Park Lane

Cadent Gas are proposing to carry out Utility asset works on Park Lane, Dinnington, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Jan 2025 at 14:11.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
12 May and 31 Oct 2025
Details
View Map
Share
Corporation Street

Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Corporation Street, Rotherham Town Centre, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 31 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 16 Jan 2025 at 15:17.


Roadworks Map near to Ivanhoe Road, ROTHERHAM, S66 9PY (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 13 Feb 2025 03:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Ivanhoe Road, ROTHERHAM, S66 9PY (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Northern Powergrid (Yorkshire) logo
MAJOR
  
NEW ORCHARD LANE, THURCROFT 
(0.7 miles)
Northern Powergrid (Yorkshire)
New service connection - Carriageway - Road closure
Planned
Scheduled: 8 Feb 2025 - 27 Feb 2025
0.7
Details
Share
Follow
2
Northern Powergrid (Yorkshire) logo
MAJOR
  
NEW ORCHARD LANE, THURCROFT 
(0.7 miles)
Northern Powergrid (Yorkshire)
New service connection - Carriageway - Road closure
In Progress
Since: 8 Feb 2025 08:00
(Scheduled: 8 Feb 2025 - 27 Feb 2025)
0.7
Details
Share
Follow
3
Yorkshire Water logo
URGENT
  
PENNY HILL LANE, ULLEY 
(0.8 miles)
Yorkshire Water
Utility repair and maintenance works - Carriageway, Verge - Two-way signals
Complete
7 Feb 2025 12:05 - 12 Feb 2025 10:00
0.8
Details