ROADWORKS SUMMARY
West Street, ROTHERHAM, S66 9LE
Introduction
View current and future planned roadworks and road closures for West Street, S66 9LE and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to West Street, ROTHERHAM, S66 9LE
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for West Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
4 Jun 2023 and 25 Jun 2026
Electricity Network Company are proposing to carry out Utility repair and maintenance works on Union Street, Harthill, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2023 and could run through until 25 June 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Electricity Network Company on 16 Mar 2023 at 10:18.
4 Jun 2023 and 25 Jun 2026
Open Fibre Networks are proposing to carry out Utility repair and maintenance works on Union Street, Harthill, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2023 and could run through until 25 June 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Open Fibre Networks on 16 Mar 2023 at 10:20.
31 Dec 2024
Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on High Street, Rotherham Town Centre, Rotherham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 October 2023 at 07:00 and could run through until 31 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 19 Apr 2024 at 11:07.
17 Jun 2024 and 31 Mar 2025
Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Frederick Street, Catcliffe, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 5 Apr 2024 at 08:21.
31 Jan 2025
Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Church Lane, Treeton, Rotherham.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 July 2024 at 15:30 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 3 Oct 2024 at 14:25.
31 Dec 2024
Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Chesterfield Road, Swallownest, Rotherham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 August 2024 at 20:00 and could run through until 31 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 18 Nov 2024 at 08:58.
19 Aug 2024 and 29 Nov 2025
Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Chesterfield Road, Swallownest, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2024 and could run through until 29 November 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 30 Aug 2024 at 13:39.
23 Aug 2024 and 21 Feb 2025
Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Rotherham Gateway, Catcliffe, Rotherham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 August 2024 and could run through until 21 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 21 Aug 2024 at 15:14.
21 Feb 2025
Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Rotherham Gateway, Catcliffe, Rotherham.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 28 August 2024 at 20:00 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 20 Sep 2024 at 12:59.
28 Aug and 30 Dec 2024
Rotherham Metropolitan Borough Council are proposing to carry out Utility repair and maintenance works on Bernard Street, Wellgate, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 August 2024 and could run through until 30 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 8 Aug 2024 at 12:29.
26 Sep 2024 and 29 Nov 2025
Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Chesterfield Road, Swallownest, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2024 and could run through until 29 November 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 4 Sep 2024 at 10:25.
27 Sep 2024 and 12 May 2025
Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Water Lane, Rotherham Town Centre, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 September 2024 and could run through until 12 May 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 5 Jul 2024 at 08:36.
12 May 2025
Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Water Lane, Rotherham Town Centre, Rotherham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 September 2024 at 08:00 and could run through until 12 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 4 Oct 2024 at 13:50.
30 Oct 2024 and 6 May 2025
Rotherham Metropolitan Borough Council are proposing to carry out Utility repair and maintenance works on Cliff Hill, Maltby, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2024 and could run through until 6 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 24 Oct 2024 at 09:56.
4 Nov and 16 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Well Lane, Treeton, Rotherham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 11:02.
4 Nov and 20 Dec 2024
Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Pleasley Road, Whiston, Rotherham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 22 Nov 2024 at 13:00.
18 Nov and 13 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Moorlands Crescent, Whiston, Rotherham.
These works were categorised as Major.
The works were originally planned to start 18 November 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 08:11.
Friday
Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on East Bawtry Road, Whiston, Rotherham.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 09:30 and could run through until 6 December 2024. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 3 Dec 2024 at 14:14.
16 Dec 2024
Cadent Gas are carrying out Utility asset works on Chaucer Road, Herringthorpe, Rotherham.
These works are categorised as Major.
The works started on 27 November 2024 at 09:40 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 12:08.
25 Nov and 11 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Spring Street, Rotherham Town Centre, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 8 Aug 2024 at 11:15.
25 Nov and 11 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Spring Street, Rotherham Town Centre, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 13:34.
11 Dec 2024
Cityfibre Metro Networks are carrying out Utility repair and maintenance works on Braithwell Road, Ravenfield, Rotherham.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 08:00 and could run through until 11 December 2024. The works will impact the verge only.
This roadwork event was last updated by Cityfibre Metro Networks on 4 Dec 2024 at 08:31.
Tomorrow
Yorkshire Water are carrying out Utility repair and maintenance works on Oldgate Lane, Thrybergh, Rotherham.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 November 2024 at 08:30 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 29 Nov 2024 at 09:28.
Tuesday
Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Alpha Road, East Dene, Rotherham.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 November 2024 at 09:40 and could run through until 10 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 Dec 2024 at 16:55.
2 and 20 Dec 2024
Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on East Bawtry Road, Whiston, Rotherham.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 25 Nov 2024 at 11:30.
2 and 20 Dec 2024
Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on East Bawtry Road, Whiston, Rotherham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 25 Nov 2024 at 14:46.
20 Dec 2024
Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on East Bawtry Road, Whiston, Rotherham.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 3 Dec 2024 at 14:12.
2 and 20 Dec 2024
Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Worry Goose Island Roundabout, Whiston, Rotherham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 25 Nov 2024 at 14:47.
20 Dec 2024
Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Worry Goose Island Roundabout, Whiston, Rotherham.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 09:30 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 3 Dec 2024 at 14:13.
2 Dec 2024 and 12 Jan 2025
Rotherham Metropolitan Borough Council are proposing to carry out Section 50 on Tickhill Road, Maltby, Rotherham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 12 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 27 Nov 2024 at 16:04.
12 Jan 2025
Rotherham Metropolitan Borough Council are carrying out Section 50 on Tickhill Road, Maltby, Rotherham.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 08:55 and could run through until 12 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 2 Dec 2024 at 09:38.
2 Dec 2024 and 12 Jan 2025
Rotherham Metropolitan Borough Council are proposing to carry out Section 50 on Tickhill Road Service Road South, Maltby, Rotherham.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 2 December 2024 and could run through until 12 January 2025. The works will impact the verge only.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 27 Nov 2024 at 16:18.
20 Dec 2024
Cadent Gas are carrying out Utility asset works on Stevenson Drive, Herringthorpe, Rotherham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 09:17.
2 and 18 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Carlisle Street, Rotherham Town Centre, Rotherham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 13:55.
Monday
Yorkshire Water are carrying out Utility repair and maintenance works on Devonshire Drive, North Anston, Rotherham.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 December 2024 at 08:15 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 3 Dec 2024 at 08:27.
3 and 18 Dec 2024
Rotherham Metropolitan Borough Council are proposing to carry out Utility repair and maintenance works on Brampton Road, Thurcroft, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 29 Nov 2024 at 15:32.
18 Dec 2024
Rotherham Metropolitan Borough Council are carrying out Utility repair and maintenance works on Brampton Road, Thurcroft, Rotherham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 December 2024 at 08:00 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 3 Dec 2024 at 11:16.
Monday
Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Central Avenue, East Dene, Rotherham.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 December 2024 at 12:20 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 3 Dec 2024 at 14:32.
9 and 23 Dec 2024
Sheffield City Council are proposing to carry out Utility asset works on Woodhouse Lane, Beighton, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 14:08.
9 and 23 Dec 2024
Sheffield City Council are proposing to carry out Utility asset works on Woodhouse Lane, Beighton, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 1 Nov 2024 at 17:44.
10 Dec 2024 and 2 Jan 2025
Rotherham Metropolitan Borough Council are proposing to carry out Utility repair and maintenance works on Nursery Drive, Catcliffe, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 29 Nov 2024 at 15:40.
10 and 16 Dec 2024
Rotherham Metropolitan Borough Council are proposing to carry out Utility repair and maintenance works on Nursery Drive, Catcliffe, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 29 Nov 2024 at 15:42.
16 and 20 Dec 2024
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Coalbrook Road, Woodhouse Mill, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 24 Oct 2024 at 07:40.
16 and 20 Dec 2024
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Coalbrook Road, Woodhouse Mill, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 Dec 2024 at 11:20.
3 and 19 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Hollowgate, Wellgate, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Aug 2024 at 12:59.
4 and 6 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Manor Road, Kiveton Park, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 27 Jun 2024 at 07:13.
4 and 6 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Manor Road, Kiveton Park, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 20 Nov 2024 at 12:21.
6 and 10 Jan 2025
BT are proposing to carry out Utility asset works on West Lane, Aughton, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 23 Sep 2024 at 08:59.
6 and 10 Jan 2025
BT are proposing to carry out Utility asset works on West Lane, Aughton, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 2 Dec 2024 at 14:42.
6 and 10 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Black Carr Road, Wickersley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 17 Oct 2024 at 10:58.
6 and 10 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Black Carr Road, Wickersley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 18 Oct 2024 at 09:20.
6 and 10 Jan 2025
Cityfibre Metro Networks were proposing to carry out Utility repair and maintenance works on Black Carr Road, Wickersley, Rotherham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 28 Oct 2024 at 09:56.
6 and 10 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Springfield Road, Wickersley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 17 Oct 2024 at 10:58.
6 and 10 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Springfield Road, Wickersley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 18 Oct 2024 at 09:12.
6 and 10 Jan 2025
Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Pear Tree Avenue, Bramley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 30 Oct 2024 at 10:27.
6 and 17 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Paddock Drive, Sunnyside, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 17 Oct 2024 at 10:14.
6 and 17 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Paddock Drive, Sunnyside, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 17 Oct 2024 at 14:24.
6 and 10 Jan 2025
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Park Lane, Thrybergh, Rotherham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 20 Nov 2024 at 09:59.
7 and 9 Jan 2025
Quickline Commucations are proposing to carry out Utility asset works on Manor Road, Kiveton Park, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 2 Dec 2024 at 13:11.
7 and 9 Jan 2025
Quickline Commucations are proposing to carry out Utility asset works on Upper Whiston Lane, Upper Whiston, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Quickline Commucations on 26 Nov 2024 at 12:29.
7 and 9 Jan 2025
Quickline Commucations are proposing to carry out Utility asset works on Upper Whiston Lane, Upper Whiston, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Quickline Commucations on 2 Dec 2024 at 13:44.
9 and 13 Jan 2025
Quickline Commucations are proposing to carry out Utility asset works on Ulley Lane, Aston, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 13 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 26 Nov 2024 at 14:49.
9 and 13 Jan 2025
Quickline Commucations are proposing to carry out Utility asset works on Ulley Lane, Aston, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 13 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 2 Dec 2024 at 13:41.
13 Jan and 21 Feb 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Doncaster Road, Thrybergh, Rotherham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 Nov 2024 at 12:50.
14 and 16 Jan 2025
Quickline Commucations are proposing to carry out Utility repair and maintenance works on Worksop Road, Aston, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Quickline Commucations on 6 Nov 2024 at 11:42.
14 and 20 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Searby Road, Bramley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the footpath only.
This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 15:28.
14 and 20 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Searby Road, Bramley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the footpath only.
This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 08:20.
14 and 20 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Elsham Close, Bramley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the footway only.
This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 15:42.
14 and 20 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Elsham Close, Bramley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the footway only.
This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 08:21.
14 and 20 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Grasby Court, Bramley, Rotherham.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 15:00.
14 and 20 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Grasby Court, Bramley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 15:29.
14 and 20 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Grasby Court, Bramley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 26 Nov 2024 at 13:49.
14 and 20 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Grasby Court, Bramley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 27 Nov 2024 at 11:00.
14 and 20 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Grasby Court, Bramley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 27 Nov 2024 at 11:10.
14 and 16 Jan 2025
Quickline Commucations are proposing to carry out Utility asset works on Garden Lane, Ravenfield, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 15 Oct 2024 at 16:35.
14 and 16 Jan 2025
Quickline Commucations are proposing to carry out Utility asset works on Garden Lane, Ravenfield, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 17 Oct 2024 at 13:36.
14 and 16 Jan 2025
Quickline Commucations are proposing to carry out Utility asset works on Garden Lane, Ravenfield, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 21 Oct 2024 at 08:46.
14 and 16 Jan 2025
Quickline Commucations are proposing to carry out Utility asset works on Arbour Lane, Ravenfield, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 15 Oct 2024 at 10:02.
14 and 16 Jan 2025
Quickline Commucations are proposing to carry out Utility asset works on Arbour Lane, Ravenfield, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 17 Oct 2024 at 13:36.
14 and 16 Jan 2025
Quickline Commucations are proposing to carry out Utility asset works on Arbour Lane, Ravenfield, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 21 Oct 2024 at 08:44.
14 and 20 Jan 2025
Quickline Commucations are proposing to carry out Utility repair and maintenance works on Common Lane, Clifton, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 22 Oct 2024 at 11:16.
14 and 20 Jan 2025
Quickline Commucations are proposing to carry out Utility repair and maintenance works on Common Lane, Clifton, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 22 Oct 2024 at 15:22.
15 and 30 Jan 2025
Sheffield City Council are proposing to carry out Utility asset works on Robin Lane, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 12:33.
15 and 30 Jan 2025
Sheffield City Council are proposing to carry out Utility asset works on Robin Lane, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 5 Nov 2024 at 08:13.
15 and 30 Jan 2025
Sheffield City Council are proposing to carry out Utility asset works on Woodhouse Lane, Beighton, Sheffield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 14:55.
15 and 30 Jan 2025
Sheffield City Council are proposing to carry out Utility asset works on Woodhouse Lane, Beighton, Sheffield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 5 Nov 2024 at 08:20.
20 Jan and 12 May 2025
Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Domine Lane, Rotherham Town Centre, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 12 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 4 Nov 2024 at 14:47.
20 Jan and 12 May 2025
Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Market Street, Rotherham Town Centre, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 12 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 4 Nov 2024 at 14:35.
20 and 31 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on St Andrews Close, Bramley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 17 Oct 2024 at 10:56.
20 and 24 Jan 2025
Quickline Commucations were proposing to carry out Utility repair and maintenance works on Holme Hall Lane, Stainton, Doncaster.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 16 Oct 2024 at 13:31.
20 and 24 Jan 2025
Quickline Commucations were proposing to carry out Utility repair and maintenance works on Holme Hall Lane, Stainton, Doncaster.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 21 Oct 2024 at 13:34.
20 and 24 Jan 2025
Quickline Commucations are proposing to carry out Utility asset works on Holme Hall Lane, Stainton, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 22 Oct 2024 at 11:17.
20 and 24 Jan 2025
Quickline Commucations are proposing to carry out Utility asset works on Holme Hall Lane, Stainton, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 22 Oct 2024 at 15:23.
21 and 27 Jan 2025
Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Fernleigh Drive, Brinsworth, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 26 Nov 2024 at 09:09.
21 and 27 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Belvedere Parade, Bramley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 15:21.
21 and 27 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Belvedere Parade, Bramley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 08:18.
21 and 27 Jan 2025
Cityfibre Metro Networks were proposing to carry out Utility repair and maintenance works on Belvedere Parade, Bramley, Rotherham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 January 2025 and run through until 27 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 15:06.
21 and 27 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Belvedere Parade, Bramley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 15:25.
21 and 27 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Belvedere Parade, Bramley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 08:19.
21 and 27 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Belvedere Parade, Bramley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 15:24.
21 and 27 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Belvedere Parade, Bramley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 08:19.
24 Jan and 7 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Junction Road, Woodhouse, Sheffield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 14:55.
24 Jan and 7 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Junction Road, Woodhouse, Sheffield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 5 Nov 2024 at 08:03.
24 Jan and 7 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Furnace Lane, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 13:38.
24 Jan and 7 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Furnace Lane, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 17:06.
24 Jan and 7 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Furnace Lane, Sheffield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 14:55.
24 Jan and 7 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Furnace Lane, Sheffield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 17:08.
27 and 30 Jan 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Ryton Road, Rotherham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 30 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 11 Oct 2024 at 14:27.
27 Jan and 14 Feb 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Sheffield Road, Templeborough, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Nov 2024 at 15:40.
27 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Elder Drive, Sunnyside, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 13:13.
29 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Searby Road, Bramley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 15:47.
30 Jan and 14 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Woodhouse Lane, Beighton, Sheffield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 13:39.
30 Jan and 14 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on High Street, Beighton, Sheffield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 5 Nov 2024 at 09:32.
30 Jan and 14 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on High Street, Beighton, Sheffield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 18 Nov 2024 at 15:02.
30 Jan and 14 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Rotherham Road, Beighton, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 13:39.
30 Jan and 14 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Rotherham Road, Beighton, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 17:38.
30 Jan and 14 Feb 2025
Sheffield City Council were proposing to carry out Utility asset works on Woodhouse Lane, Beighton, Sheffield.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 January 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 5 Nov 2024 at 09:32.
3 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Worksop Road, Woodsetts, Rotherham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 21 Aug 2024 at 14:53.
3 Feb and 21 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Worksop Road, Woodsetts, Rotherham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 21 Aug 2024 at 14:54.
3 Feb and 21 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Worksop Road, Woodsetts, Rotherham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 13:45.
3 and 7 Feb 2025
Quickline Commucations are proposing to carry out Utility repair and maintenance works on Hardwick Lane, Aston, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the verge only.
This roadwork event was last updated by Quickline Commucations on 3 Dec 2024 at 15:41.
3 and 7 Feb 2025
Quickline Commucations are proposing to carry out Utility repair and maintenance works on Hardwick Lane, Aston, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the verge only.
This roadwork event was last updated by Quickline Commucations on 4 Dec 2024 at 08:42.
3 Feb and 11 Apr 2025
Independent Water Networks are proposing to carry out Utility asset works on Tickhill Road, Maltby, Rotherham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 11 April 2025. The works will impact the carriageway, verge and footpath.
This roadwork event was last updated by Independent Water Networks on 18 Nov 2024 at 14:26.
3 and 21 Feb 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Sheffield Road, Templeborough, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Nov 2024 at 10:04.
6 Feb and 6 May 2025
Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Main Street, Bramley, Rotherham.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 February 2025 and run through until 6 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 28 Nov 2024 at 16:50.
6 Feb and 6 May 2025
Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Brook Lane, Bramley, Rotherham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 February 2025 and run through until 6 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 28 Nov 2024 at 16:47.
7 and 11 Feb 2025
Quickline Commucations are proposing to carry out Utility asset works on Cockhill Field Lane Ru138, Braithwell, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 11 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 26 Nov 2024 at 11:56.
7 and 11 Feb 2025
Quickline Commucations are proposing to carry out Utility asset works on Cockhill Field Lane Ru138, Braithwell, Doncaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 11 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 29 Nov 2024 at 12:02.
10 Feb and 17 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Treetown Crescent, Treeton, Rotherham.
These works are categorised as Major.
The works will start on or after 10 February 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 12:59.
10 and 14 Feb 2025
Quickline Commucations are proposing to carry out Utility repair and maintenance works on Thrybergh Lane, Thrybergh, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 4 Dec 2024 at 08:48.
24 Feb and 21 Mar 2025
Cadent Gas are proposing to carry out Utility repair and maintenance works on Rotherham Baulk, Gildingwells, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 08:39.
27 Feb and 27 May 2025
Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Main Street, Bramley, Rotherham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 February 2025 and could run through until 27 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 28 Nov 2024 at 16:53.
27 Feb and 27 May 2025
Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Flanderwell Lane, Sunnyside, Rotherham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 February 2025 and could run through until 27 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 28 Nov 2024 at 16:45.
27 Feb and 27 May 2025
Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Brook Lane, Bramley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 February 2025 and could run through until 27 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 28 Nov 2024 at 16:50.
3 and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Cramfit Road, North Anston, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 08:46.
Roadworks Map near to West Street, ROTHERHAM, S66 9LE
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to West Street, ROTHERHAM, S66 9LE (5 Events)
(Scheduled Dates)
(miles)
(Scheduled: 1 Dec 2024 - 6 Dec 2024)
(Scheduled: 3 Dec 2024 - 18 Dec 2024)
Contains public sector information licensed under the Open Government Licence v3.0.