ROADWORKS SUMMARY
Bawtry Road, ROTHERHAM, S66 1YZ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Bawtry Road, S66 1YZ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Bawtry Road, ROTHERHAM, S66 1YZ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Bawtry Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Rotherham Metropolitan Borough Council logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
High Street

Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on High Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 October 2023 at 07:00 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 19 Apr 2024 at 11:07.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
17 Jun 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Frederick Street

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Frederick Street, Catcliffe, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 5 Apr 2024 at 08:21.

Rotherham Metropolitan Borough Council logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Church Lane

Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Church Lane, Treeton, Rotherham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 July 2024 at 15:30 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 3 Oct 2024 at 14:25.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
23 Aug 2024 and 21 Feb 2025
Details
View Map
Share
Follow
Rotherham Gateway

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Rotherham Gateway, Catcliffe, Rotherham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 August 2024 and could run through until 21 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 21 Aug 2024 at 15:14.

Rotherham Metropolitan Borough Council logo
LONG TERM
Until
21 Feb 2025
Details
View Map
Share
Follow
Rotherham Gateway

Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Rotherham Gateway, Catcliffe, Rotherham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 August 2024 at 20:00 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 20 Sep 2024 at 12:59.

Rotherham Metropolitan Borough Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Bernard Street

Rotherham Metropolitan Borough Council are proposing to carry out Utility repair and maintenance works on Bernard Street, Wellgate, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2024 and could run through until 30 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 8 Aug 2024 at 12:29.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
27 Sep 2024 and 12 May 2025
Details
View Map
Share
Follow
Water Lane

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Water Lane, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2024 and could run through until 12 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 5 Jul 2024 at 08:36.

Rotherham Metropolitan Borough Council logo
LONG TERM
Until
12 May 2025
Details
View Map
Share
Follow
Water Lane

Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Water Lane, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 September 2024 at 08:00 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 4 Oct 2024 at 13:50.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
30 Oct 2024 and 6 May 2025
Details
View Map
Share
Follow
Cliff Hill

Rotherham Metropolitan Borough Council are proposing to carry out Utility repair and maintenance works on Cliff Hill, Maltby, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 6 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 24 Oct 2024 at 09:56.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
2 Dec 2024 and 12 Jan 2025
Details
View Map
Share
Follow
Tickhill Road

Rotherham Metropolitan Borough Council are proposing to carry out Section 50 on Tickhill Road, Maltby, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 12 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 27 Nov 2024 at 16:04.

Rotherham Metropolitan Borough Council logo
LONG TERM
Until
12 Jan 2025
Details
View Map
Share
Follow
Tickhill Road

Rotherham Metropolitan Borough Council are carrying out Section 50 on Tickhill Road, Maltby, Rotherham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 08:55 and could run through until 12 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 2 Dec 2024 at 09:38.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
2 Dec 2024 and 12 Jan 2025
Details
View Map
Share
Follow
Tickhill Road Service Road South

Rotherham Metropolitan Borough Council are proposing to carry out Section 50 on Tickhill Road Service Road South, Maltby, Rotherham.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 2 December 2024 and could run through until 12 January 2025. The works will impact the verge only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 27 Nov 2024 at 16:18.

Rotherham Metropolitan Borough Council logo
Between
10 Dec 2024 and 2 Jan 2025
Details
View Map
Share
Follow
Nursery Drive

Rotherham Metropolitan Borough Council are proposing to carry out Utility repair and maintenance works on Nursery Drive, Catcliffe, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 29 Nov 2024 at 15:40.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
East Bawtry Road

Cadent Gas are carrying out Utility repair and maintenance works on East Bawtry Road, Whiston, Rotherham.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 December 2024 at 10:00 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 20 Dec 2024 at 08:35.

Yorkshire Water logo
Finishing
Friday
Details
View Map
Share
Follow
Winifred Street

Yorkshire Water are carrying out Utility repair and maintenance works on Winifred Street, Masbrough, Rotherham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 December 2024 at 12:12 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 20 Dec 2024 at 10:51.

Cadent Gas logo
Until
2 Jan 2025
Details
View Map
Share
Follow
North Road

Cadent Gas are carrying out Utility repair and maintenance works on North Road, East Dene, Rotherham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 December 2024 at 08:32 and could run through until 2 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 24 Dec 2024 at 08:53.

Cadent Gas logo
Between
3 and 19 Jan 2025
Details
View Map
Share
Follow
Hollowgate

Cadent Gas are proposing to carry out Utility asset works on Hollowgate, Wellgate, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Aug 2024 at 12:59.

Cadent Gas logo
Between
3 and 19 Jan 2025
Details
View Map
Share
Follow
Hollowgate

Cadent Gas are proposing to carry out Utility asset works on Hollowgate, Wellgate, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 14:38.

BT logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
West Lane

BT are proposing to carry out Utility asset works on West Lane, Aughton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 23 Sep 2024 at 08:59.

BT logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
West Lane

BT are proposing to carry out Utility asset works on West Lane, Aughton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 2 Dec 2024 at 14:42.

Cityfibre Metro Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Black Carr Road

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Black Carr Road, Wickersley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Oct 2024 at 10:58.

Cityfibre Metro Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Black Carr Road

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Black Carr Road, Wickersley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Oct 2024 at 09:20.

Cityfibre Metro Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Black Carr Road

Cityfibre Metro Networks were proposing to carry out Utility repair and maintenance works on Black Carr Road, Wickersley, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 28 Oct 2024 at 09:56.

Cityfibre Metro Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Springfield Road

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Springfield Road, Wickersley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Oct 2024 at 10:58.

Cityfibre Metro Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Springfield Road

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Springfield Road, Wickersley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Oct 2024 at 09:12.

Northern Powergrid (Yorkshire) logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Pear Tree Avenue

Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Pear Tree Avenue, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 30 Oct 2024 at 10:27.

Northern Powergrid (Yorkshire) logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Pear Tree Avenue

Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Pear Tree Avenue, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 18 Dec 2024 at 12:27.

Cityfibre Metro Networks logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Paddock Drive

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Paddock Drive, Sunnyside, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Oct 2024 at 10:14.

Cityfibre Metro Networks logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Paddock Drive

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Paddock Drive, Sunnyside, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Oct 2024 at 14:24.

Yorkshire Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Park Lane

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Park Lane, Thrybergh, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 20 Nov 2024 at 09:59.

Quickline Commucations logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Upper Whiston Lane

Quickline Commucations are proposing to carry out Utility asset works on Upper Whiston Lane, Upper Whiston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 26 Nov 2024 at 12:29.

Quickline Commucations logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Upper Whiston Lane

Quickline Commucations are proposing to carry out Utility asset works on Upper Whiston Lane, Upper Whiston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 2 Dec 2024 at 13:44.

Yorkshire Water logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Castle Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Castle Street, Conisbrough, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 10 Dec 2024 at 10:07.

Yorkshire Water logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Castle Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Castle Street, Conisbrough, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 11 Dec 2024 at 09:35.

Quickline Commucations logo
Between
9 and 13 Jan 2025
Details
View Map
Share
Follow
Ulley Lane

Quickline Commucations are proposing to carry out Utility asset works on Ulley Lane, Aston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 13 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 26 Nov 2024 at 14:49.

Quickline Commucations logo
Between
9 and 13 Jan 2025
Details
View Map
Share
Follow
Ulley Lane

Quickline Commucations are proposing to carry out Utility asset works on Ulley Lane, Aston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 13 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 2 Dec 2024 at 13:41.

Northern Powergrid (Yorkshire) logo
Between
9 and 29 Jan 2025
Details
View Map
Share
Follow
Church Street

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Church Street, Mexborough, Doncaster.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 9 Dec 2024 at 10:09.

Northern Powergrid (Yorkshire) logo
Between
9 and 29 Jan 2025
Details
View Map
Share
Follow
Church Street

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Church Street, Mexborough, Doncaster.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 Dec 2024 at 10:22.

Cadent Gas logo
LONG TERM
Between
13 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Treetown Crescent

Cadent Gas are proposing to carry out Utility asset works on Treetown Crescent, Treeton, Rotherham.

These works are categorised as Major.

The works will start on or after 13 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 14:46.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
13 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Doncaster Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Doncaster Road, Thrybergh, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 Nov 2024 at 12:50.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
13 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Doncaster Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Doncaster Road, Thrybergh, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 10 Dec 2024 at 10:53.

Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Castle Hill From Castle Street To Low Road

Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Castle Hill From Castle Street To Low Road, Conisbrough, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Doncaster Metropolitan Borough Council on 17 Sep 2024 at 16:09.

Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Castle Hill From Castle Street To Low Road

Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Castle Hill From Castle Street To Low Road, Conisbrough, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Doncaster Metropolitan Borough Council on 19 Dec 2024 at 10:43.

Northern Powergrid (Yorkshire) logo
Between
13 and 29 Jan 2025
Details
View Map
Share
Follow
Church Street

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Church Street, Mexborough, Doncaster.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 13 Dec 2024 at 13:29.

Quickline Commucations logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Worksop Road

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Worksop Road, Aston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 6 Nov 2024 at 11:42.

Cityfibre Metro Networks logo
Between
14 and 20 Jan 2025
Details
View Map
Share
Follow
Searby Road

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Searby Road, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the footpath only.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 15:28.

Cityfibre Metro Networks logo
Between
14 and 20 Jan 2025
Details
View Map
Share
Follow
Elsham Close

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Elsham Close, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the footway only.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 15:42.

Cityfibre Metro Networks logo
Between
14 and 20 Jan 2025
Details
View Map
Share
Follow
Elsham Close

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Elsham Close, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the footway only.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 08:21.

Cityfibre Metro Networks logo
Between
14 and 20 Jan 2025
Details
View Map
Share
Follow
Grasby Court

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Grasby Court, Bramley, Rotherham.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 15:00.

Cityfibre Metro Networks logo
Between
14 and 20 Jan 2025
Details
View Map
Share
Follow
Grasby Court

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Grasby Court, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 15:29.

Cityfibre Metro Networks logo
Between
14 and 20 Jan 2025
Details
View Map
Share
Follow
Grasby Court

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Grasby Court, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 26 Nov 2024 at 13:49.

Cityfibre Metro Networks logo
Between
14 and 20 Jan 2025
Details
View Map
Share
Follow
Grasby Court

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Grasby Court, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 27 Nov 2024 at 11:00.

Quickline Commucations logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Garden Lane

Quickline Commucations are proposing to carry out Utility asset works on Garden Lane, Ravenfield, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 15 Oct 2024 at 16:35.

Quickline Commucations logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Garden Lane

Quickline Commucations are proposing to carry out Utility asset works on Garden Lane, Ravenfield, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 17 Oct 2024 at 13:36.

Quickline Commucations logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Garden Lane

Quickline Commucations are proposing to carry out Utility asset works on Garden Lane, Ravenfield, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 21 Oct 2024 at 08:46.

Quickline Commucations logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Arbour Lane

Quickline Commucations are proposing to carry out Utility asset works on Arbour Lane, Ravenfield, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 15 Oct 2024 at 10:02.

Quickline Commucations logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Arbour Lane

Quickline Commucations are proposing to carry out Utility asset works on Arbour Lane, Ravenfield, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 17 Oct 2024 at 13:36.

Quickline Commucations logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Arbour Lane

Quickline Commucations are proposing to carry out Utility asset works on Arbour Lane, Ravenfield, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 21 Oct 2024 at 08:44.

Quickline Commucations logo
Between
14 and 20 Jan 2025
Details
View Map
Share
Follow
Common Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Common Lane, Clifton, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 22 Oct 2024 at 11:16.

Quickline Commucations logo
Between
14 and 20 Jan 2025
Details
View Map
Share
Follow
Common Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Common Lane, Clifton, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 22 Oct 2024 at 15:22.

Yorkshire Water logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Harold Croft

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Harold Croft, Greasbrough, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 21 Nov 2024 at 08:06.

Yorkshire Water logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Harold Croft

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Harold Croft, Greasbrough, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 27 Nov 2024 at 12:58.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
20 Jan and 12 May 2025
Details
View Map
Share
Follow
Domine Lane

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Domine Lane, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 12 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 4 Nov 2024 at 14:47.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
20 Jan and 12 May 2025
Details
View Map
Share
Follow
Market Street

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Market Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 12 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 4 Nov 2024 at 14:35.

Cityfibre Metro Networks logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Searby Road

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Searby Road, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footpath only.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Dec 2024 at 08:35.

Cityfibre Metro Networks logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
St Andrews Close

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on St Andrews Close, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Oct 2024 at 10:56.

Quickline Commucations logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Holme Hall Lane

Quickline Commucations were proposing to carry out Utility repair and maintenance works on Holme Hall Lane, Stainton, Doncaster.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 16 Oct 2024 at 13:31.

Quickline Commucations logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Holme Hall Lane

Quickline Commucations were proposing to carry out Utility repair and maintenance works on Holme Hall Lane, Stainton, Doncaster.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 21 Oct 2024 at 13:34.

Quickline Commucations logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Holme Hall Lane

Quickline Commucations are proposing to carry out Utility asset works on Holme Hall Lane, Stainton, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 22 Oct 2024 at 11:17.

Quickline Commucations logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Holme Hall Lane

Quickline Commucations are proposing to carry out Utility asset works on Holme Hall Lane, Stainton, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 22 Oct 2024 at 15:23.

Northern Powergrid (Yorkshire) logo
Between
21 and 27 Jan 2025
Details
View Map
Share
Follow
Fernleigh Drive

Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Fernleigh Drive, Brinsworth, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 26 Nov 2024 at 09:09.

Northern Powergrid (Yorkshire) logo
Between
21 and 27 Jan 2025
Details
View Map
Share
Follow
Fernleigh Drive

Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Fernleigh Drive, Brinsworth, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 19 Dec 2024 at 11:27.

Cityfibre Metro Networks logo
Between
21 and 27 Jan 2025
Details
View Map
Share
Follow
Belvedere Parade

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Belvedere Parade, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 15:21.

Cityfibre Metro Networks logo
Between
21 and 27 Jan 2025
Details
View Map
Share
Follow
Belvedere Parade

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Belvedere Parade, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 08:18.

Cityfibre Metro Networks logo
Between
21 and 27 Jan 2025
Details
View Map
Share
Belvedere Parade

Cityfibre Metro Networks were proposing to carry out Utility repair and maintenance works on Belvedere Parade, Bramley, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 January 2025 and run through until 27 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 15:06.

Cityfibre Metro Networks logo
Between
21 and 27 Jan 2025
Details
View Map
Share
Follow
Belvedere Parade

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Belvedere Parade, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 15:25.

Cityfibre Metro Networks logo
Between
21 and 27 Jan 2025
Details
View Map
Share
Follow
Belvedere Parade

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Belvedere Parade, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 08:19.

Cityfibre Metro Networks logo
Between
21 and 27 Jan 2025
Details
View Map
Share
Follow
Grasby Court

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Grasby Court, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Dec 2024 at 08:35.

Cityfibre Metro Networks logo
Between
21 and 27 Jan 2025
Details
View Map
Share
Follow
Belvedere Parade

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Belvedere Parade, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 15:24.

Cityfibre Metro Networks logo
Between
21 and 27 Jan 2025
Details
View Map
Share
Follow
Belvedere Parade

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Belvedere Parade, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 08:19.

Northern Powergrid (Yorkshire) logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Turnshaw Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Turnshaw Road, Ulley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 9 Dec 2024 at 12:41.

Northern Powergrid (Yorkshire) logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Turnshaw Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Turnshaw Road, Ulley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 Dec 2024 at 14:24.

Northern Powergrid (Yorkshire) logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Sheffield Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Sheffield Road, Templeborough, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Nov 2024 at 15:40.

Cadent Gas logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Elder Drive

Cadent Gas are proposing to carry out Utility asset works on Elder Drive, Sunnyside, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 13:13.

Northern Powergrid (Yorkshire) logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Poplar Avenue

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Poplar Avenue, Thrybergh, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 5 Dec 2024 at 10:54.

Northern Powergrid (Yorkshire) logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Poplar Avenue

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Poplar Avenue, Thrybergh, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 5 Dec 2024 at 12:54.

Cadent Gas logo
Between
29 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Searby Road

Cadent Gas are proposing to carry out Utility asset works on Searby Road, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 15:47.

Quickline Commucations logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Hardwick Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Hardwick Lane, Aston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the verge only.

This roadwork event was last updated by Quickline Commucations on 3 Dec 2024 at 15:41.

Quickline Commucations logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Hardwick Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Hardwick Lane, Aston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the verge only.

This roadwork event was last updated by Quickline Commucations on 4 Dec 2024 at 09:39.

Independent Water Networks logo
LONG TERM
Between
3 Feb and 11 Apr 2025
Details
View Map
Share
Follow
Tickhill Road

Independent Water Networks are proposing to carry out Utility asset works on Tickhill Road, Maltby, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 11 April 2025. The works will impact the carriageway, verge and footpath.

This roadwork event was last updated by Independent Water Networks on 18 Nov 2024 at 14:26.

Northern Powergrid (Yorkshire) logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Sheffield Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Sheffield Road, Templeborough, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Nov 2024 at 10:04.

Northern Powergrid (Yorkshire) logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Sheffield Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Sheffield Road, Templeborough, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 19 Dec 2024 at 11:03.

Quickline Commucations logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
The Green

Quickline Commucations are proposing to carry out Utility repair and maintenance works on The Green, Old Denaby, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 9 Dec 2024 at 15:34.

Quickline Commucations logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
The Green

Quickline Commucations are proposing to carry out Utility repair and maintenance works on The Green, Old Denaby, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 10 Dec 2024 at 14:57.

Quickline Commucations logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
Turnshaw Road

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Turnshaw Road, Ulley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 4 Dec 2024 at 15:25.

Quickline Commucations logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
Turnshaw Road

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Turnshaw Road, Ulley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 5 Dec 2024 at 09:09.

Quickline Commucations logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
Turnshaw Road

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Turnshaw Road, Ulley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 5 Dec 2024 at 13:27.

Quickline Commucations logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Turnshaw Road

Quickline Commucations were proposing to carry out Utility repair and maintenance works on Turnshaw Road, Ulley, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 February 2025 and run through until 7 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 6 Dec 2024 at 13:36.

Quickline Commucations logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
Micklebring Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Micklebring Lane, Micklebring, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 9 Dec 2024 at 15:50.

Quickline Commucations logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
Micklebring Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Micklebring Lane, Micklebring, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 10 Dec 2024 at 15:55.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
6 Feb and 6 May 2025
Details
View Map
Share
Main Street

Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Main Street, Bramley, Rotherham.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 February 2025 and run through until 6 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 28 Nov 2024 at 16:50.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
6 Feb and 6 May 2025
Details
View Map
Share
Brook Lane

Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Brook Lane, Bramley, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 February 2025 and run through until 6 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 28 Nov 2024 at 16:47.

Quickline Commucations logo
Between
7 and 11 Feb 2025
Details
View Map
Share
Follow
Cockhill Field Lane Ru138

Quickline Commucations are proposing to carry out Utility asset works on Cockhill Field Lane Ru138, Braithwell, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 11 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 26 Nov 2024 at 11:56.

Quickline Commucations logo
Between
7 and 11 Feb 2025
Details
View Map
Share
Follow
Cockhill Field Lane Ru138

Quickline Commucations are proposing to carry out Utility asset works on Cockhill Field Lane Ru138, Braithwell, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 11 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 29 Nov 2024 at 12:02.

Quickline Commucations logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Thrybergh Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Thrybergh Lane, Thrybergh, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 4 Dec 2024 at 08:48.

Quickline Commucations logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Thrybergh Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Thrybergh Lane, Thrybergh, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 4 Dec 2024 at 10:03.

Quickline Commucations logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Crossland Street

Quickline Commucations were proposing to carry out Utility repair and maintenance works on Crossland Street, Swinton, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 12 Dec 2024 at 12:05.

Cadent Gas logo
Between
12 and 28 Feb 2025
Details
View Map
Share
Follow
Holmes Crescent

Cadent Gas are proposing to carry out Utility asset works on Holmes Crescent, Treeton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 12:06.

Cadent Gas logo
Between
24 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Bole Hill

Cadent Gas are proposing to carry out Utility asset works on Bole Hill, Treeton, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 09:26.

Cadent Gas logo
Between
24 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Spa Well Crescent

Cadent Gas are proposing to carry out Utility asset works on Spa Well Crescent, Treeton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 09:27.

Yorkshire Water logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Follow
Russell Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Russell Street, Eastwood, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 23 Dec 2024 at 13:32.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
27 Feb and 27 May 2025
Details
View Map
Share
Follow
Main Street

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Main Street, Bramley, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 27 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 28 Nov 2024 at 16:53.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
27 Feb and 27 May 2025
Details
View Map
Share
Follow
Flanderwell Lane

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Flanderwell Lane, Sunnyside, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 27 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 28 Nov 2024 at 16:45.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
27 Feb and 27 May 2025
Details
View Map
Share
Follow
Brook Lane

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Brook Lane, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 27 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 28 Nov 2024 at 16:50.

LONG TERM
Between
28 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Lichfield Gardens

Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Lichfield Gardens, Edlington, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Doncaster Metropolitan Borough Council on 23 Dec 2024 at 10:10.

LONG TERM
Between
28 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Grainger Close

Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Grainger Close, Edlington, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Doncaster Metropolitan Borough Council on 23 Dec 2024 at 10:08.

LONG TERM
Between
28 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Bower Vale

Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Bower Vale, Edlington, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Doncaster Metropolitan Borough Council on 23 Dec 2024 at 10:09.

LONG TERM
Between
28 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Crookhill Close

Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Crookhill Close, Edlington, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Doncaster Metropolitan Borough Council on 23 Dec 2024 at 10:07.

LONG TERM
Between
28 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Thornlea Court

Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Thornlea Court, Edlington, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Doncaster Metropolitan Borough Council on 23 Dec 2024 at 10:06.

Cadent Gas logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Cramfit Road

Cadent Gas are proposing to carry out Utility asset works on Cramfit Road, North Anston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 08:46.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
3 Mar and 30 Jun 2025
Details
View Map
Share
Follow
Steadfolds Lane

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Steadfolds Lane, Thurcroft, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 4 Dec 2024 at 13:52.

Cadent Gas logo
Between
10 and 24 Mar 2025
Details
View Map
Share
Follow
Treeton Lane

Cadent Gas are proposing to carry out Utility asset works on Treeton Lane, Treeton, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 09:35.

Cadent Gas logo
LONG TERM
Between
10 Mar and 21 Apr 2025
Details
View Map
Share
Follow
Well Lane

Cadent Gas are proposing to carry out Utility asset works on Well Lane, Treeton, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 12:41.

Cadent Gas logo
LONG TERM
Between
10 Mar and 21 Apr 2025
Details
View Map
Share
Follow
Well Lane

Cadent Gas are proposing to carry out Utility asset works on Well Lane, Treeton, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 09:25.

Cadent Gas logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Pocket Handkerchief Lane

Cadent Gas are proposing to carry out Utility asset works on Pocket Handkerchief Lane, Todwick, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 09:19.


Roadworks Map near to Bawtry Road, ROTHERHAM, S66 1YZ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 25 Dec 2024 06:23
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Bawtry Road, ROTHERHAM, S66 1YZ (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Yorkshire Water logo
URGENT
  
WAYFORD AVENUE, BRAMLEY 
(0.3 miles)
Yorkshire Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
19 Dec 2024 13:07 - 16:36
0.3
Details
Share
2
Northern Powergrid (Yorkshire) logo
URGENT
  
SANDBECK WAY, HELLABY 
(0.4 miles)
Northern Powergrid (Yorkshire)
Utility repair and maintenance works - Footway, Carriageway - Give and take
Complete
16 Dec 2024 08:35 - 20 Dec 2024 08:00
0.4
Details
Share
3
Yorkshire Water logo
URGENT
  
GOOSE LANE, WICKERSLEY 
(0.8 miles)
Yorkshire Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
23 Dec 2024 09:40 - 16:53
0.8
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.