ROADWORKS SUMMARY
Hady Lane, CHESTERFIELD, S41 0DH
Introduction
View current and future planned roadworks and road closures for Hady Lane, S41 0DH and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Hady Lane, CHESTERFIELD, S41 0DH
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Hady Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
6 Jul 2025
Derbyshire County Council are carrying out roadworks on Station Back Lane, Chesterfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 October 2023 at 07:10 and could run through until 6 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Derbyshire County Council on 16 Oct 2023 at 07:23.
23 Oct 2025
Derbyshire County Council are carrying out Highway repair and maintenance works on Commonside Road, Barlow.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 October 2023 at 00:00 and could run through until 23 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 23 Sep 2024 at 16:30.
31 Dec 2024
Derbyshire County Council are carrying out roadworks on Ashford Avenue, North Wingfield, Chesterfield.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 February 2024 at 09:00 and could run through until 31 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 19 Feb 2024 at 09:22.
29 Nov 2024
Murphy Power Distribution are carrying out Utility asset works on Whiteleas Avenue, North Wingfield, Chesterfield.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 April 2024 at 07:40 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Murphy Power Distribution on 15 Nov 2024 at 16:30.
22 Apr 2024 and 31 Mar 2025
Yorkshire Water are proposing to carry out New service connection on Station Lane, Old Whittington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 31 March 2025. The works will impact the carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Yorkshire Water on 21 Nov 2024 at 16:30.
20 May 2024 and 3 Feb 2025
Derbyshire County Council are proposing to carry out Section 50 on Station Back Lane, Chesterfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 3 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Derbyshire County Council on 21 May 2024 at 07:31.
20 May 2024 and 3 Apr 2025
Derbyshire County Council are proposing to carry out Highway improvement works on Station Back Lane, Chesterfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 3 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Derbyshire County Council on 21 May 2024 at 07:31.
9 Sep and 6 Dec 2024
Derbyshire County Council are proposing to carry out Highway improvement works on Inkersall Road, Staveley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Derbyshire County Council on 20 Aug 2024 at 10:55.
16 Sep and 6 Dec 2024
Derbyshire County Council are proposing to carry out Highway improvement works on Inkersall Road, Staveley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Derbyshire County Council on 2 Sep 2024 at 10:47.
16 Sep and 19 Dec 2024
Derbyshire County Council are proposing to carry out Highway improvement works on Inkersall Road, Staveley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Derbyshire County Council on 28 Oct 2024 at 11:02.
29 Nov 2024
Yorkshire Water are carrying out Utility asset works on Postmans Lane, Temple Normanton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 September 2024 at 09:00 and could run through until 29 November 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 29 Oct 2024 at 16:30.
4 Oct 2024 and 28 Feb 2025
Network Rail were proposing to carry out Works for Rail Purposes on Crow Lane, Chesterfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 October 2024 and run through until 28 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 30 Sep 2024 at 09:28.
4 Oct 2024 and 28 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Crow Lane, Chesterfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 October 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Network Rail on 17 May 2024 at 13:14.
10 Oct and 6 Dec 2024
Derbyshire County Council are proposing to carry out Highway improvement works on High Street, Clay Cross.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 October 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Derbyshire County Council on 25 Jun 2024 at 12:13.
Monday
Derbyshire County Council are proposing to carry out Works for road purposes on Sheffield Road, Whittington Moor.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Derbyshire County Council on 7 Oct 2024 at 12:21.
Monday
Derbyshire County Council are proposing to carry out Permanent reinstatement on Sheffield Road, Whittington Moor.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 22 Oct 2024 at 09:20.
28 Oct and 2 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Stretton Road, Clay Cross.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Jul 2024 at 08:30.
4 and 28 Nov 2024
Cadent Gas were proposing to carry out Utility asset works on Stretton Road, Clay Cross.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 28 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 14:15.
4 Nov 2024 and 31 Jul 2025
Derbyshire County Council are proposing to carry out Highway improvement works on Corporation Street, Chesterfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 31 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Derbyshire County Council on 14 Mar 2024 at 10:39.
4 and 28 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Sheffield Road, Stonegravels, Chesterfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 09:53.
28 Nov 2024
Cadent Gas are carrying out Utility asset works on Sheffield Road, Stonegravels, Chesterfield.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 November 2024 at 08:00 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 08:19.
Today
Cadent Gas are proposing to carry out Utility asset works on High Street, Clay Cross.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 21 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 13:01.
4 and 30 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Adelphi Way, Staveley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Jul 2024 at 13:33.
6 Dec 2024
Cadent Gas are carrying out Utility asset works on Stretton Road, Clay Cross.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 07:30 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 07:39.
29 Nov 2024
Murphy Power Distribution are carrying out New service connection on Sheffield Road, Stonegravels, Chesterfield.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 November 2024 at 09:00 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 15 Nov 2024 at 16:30.
Monday
Cadent Gas are proposing to carry out Utility asset works on Newbold Road, Newbold.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 15:21.
Monday
Cadent Gas are proposing to carry out Utility asset works on Vicarage Gardens, Clay Cross.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 16:30.
11 and 28 Nov 2024
Cadent Gas were proposing to carry out Utility asset works on Church Way, Chesterfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 28 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 13:28.
11 and 28 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on High Street, Clay Cross.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 16:30.
Wednesday
Cadent Gas are proposing to carry out roadworks on Queen Street, Clay Cross.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 16:30.
11 and 28 Nov 2024
Cadent Gas are proposing to carry out roadworks on Stretton Road, Clay Cross.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 16:30.
11 and 28 Nov 2024
Cadent Gas are proposing to carry out roadworks on Clay Lane, Clay Cross.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 16:30.
11 and 28 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Lordsmill Street, Chesterfield.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 10:57.
11 and 28 Nov 2024
Cadent Gas are proposing to carry out roadworks on Thanet Street, Clay Cross.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 16:30.
11 and 28 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Church Way, Chesterfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 12:18.
11 Nov 2024 and 16 Feb 2025
Derbyshire County Council are proposing to carry out Remedial works on Hipper Street, Chesterfield.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 16 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Derbyshire County Council on 12 Sep 2024 at 09:25.
18 Nov and 2 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Tapton View Road, Newbold.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 15:26.
4 Dec 2024
Cadent Gas are carrying out Utility asset works on Shirland Street, Chesterfield.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 November 2024 at 14:30 and could run through until 4 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 15:31.
Tomorrow
Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Brimington Road North, Chesterfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 9 Oct 2024 at 12:04.
18 Nov and 12 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Newbold Road, Newbold.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 15:23.
23 Dec 2024
Cadent Gas are carrying out Utility asset works on Bevan Drive, Inkersall.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 07:30 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 07:38.
20 Nov and 20 Dec 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Cutthorpe Road, Cutthorpe.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 15 Nov 2024 at 13:46.
25 and 29 Nov 2024
Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Brimington Road North, Chesterfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 9 Oct 2024 at 12:03.
25 Nov and 12 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Old Hall Road, Chesterfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 12 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 09:50.
25 and 29 Nov 2024
Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Brimington Road North, Chesterfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 9 Oct 2024 at 12:55.
25 Nov and 11 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Newbold Road, Newbold.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 15:25.
25 Nov and 20 Dec 2024
Cadent Gas are proposing to carry out Utility repair and maintenance works on Somersall Lane, Somersall.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 30 Apr 2024 at 14:21.
25 Nov and 12 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Infirmary Road, Chesterfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 07:13.
25 Nov and 11 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Mcmahon Avenue, Inkersall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 10:13.
25 Nov and 12 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Old Road, Chesterfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 10:00.
25 Nov and 11 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Mcmahon Avenue, Inkersall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 07:08.
25 Nov and 11 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Jervis Place, Inkersall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 10:13.
25 Nov and 12 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Lordsmill Street, Chesterfield.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 07:21.
25 Nov and 11 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Jervis Place, Inkersall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 07:07.
2 and 17 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Inkersall Green Road, Inkersall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 17 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 16:30.
2 and 24 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Newland Dale, Newbold.
These works are categorised as Major.
There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.
The works will start on or after 2 December 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 16:30.
2 and 18 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Hady Lane, Hady.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Aug 2024 at 16:30.
4 and 6 Dec 2024
Nexfibre Networks Limited are proposing to carry out Utility asset works on Longedge Lane, Wingerworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 4 Nov 2024 at 14:29.
9 and 23 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Hady Lane, Hady.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Aug 2024 at 16:30.
9 and 24 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Eckington Road, Staveley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 16:30.
18 and 20 Dec 2024
Western Power Distribution (East Midlands) are proposing to carry out New service connection on Soresby Street, Chesterfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 8 Nov 2024 at 14:54.
18 and 20 Dec 2024
Western Power Distribution (East Midlands) are proposing to carry out New service connection on Soresby Street, Chesterfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 5 Nov 2024 at 13:32.
6 and 22 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Milldale Close, Holme Hall, Chesterfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 22 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 13:11.
6 and 27 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Linacre Road, Holme Hall, Chesterfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 13:11.
6 and 30 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Canal Wharf, Chesterfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 16:30.
6 and 10 Jan 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Main Road, Old Brampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 11:56.
13 and 17 Jan 2025
Derbyshire County Council are proposing to carry out Highway improvement works on High Street, Chesterfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Derbyshire County Council on 6 Nov 2024 at 09:11.
13 Jan and 6 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Holme Hall Crescent, Holme Hall, Chesterfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 6 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 13:11.
13 and 30 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Old Road, Chesterfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 09:35.
13 and 30 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Old Hall Road, Chesterfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 09:34.
13 and 24 Jan 2025
Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Hawking Lane, Stainsby.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 11 Nov 2024 at 10:04.
20 Jan and 6 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Lordsmill Street, Chesterfield.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 11:22.
27 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Tapton View Road, Newbold.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 12:27.
27 Jan and 20 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Newbold Road, Newbold.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 12:24.
27 Jan and 11 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Chesterfield Footpath 74, Chesterfield.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 27 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 16:30.
27 and 31 Jan 2025
Derbyshire County Council are proposing to carry out Highway improvement works on High Street, Chesterfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Derbyshire County Council on 7 Nov 2024 at 09:53.
27 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Newbold Road, Newbold.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 12:22.
3 and 19 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Newbold Road, Newbold.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 12:58.
3 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Station Lane, Old Whittington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 16:30.
3 and 17 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Bower Farm Road, Old Whittington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 16:30.
3 and 17 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on High Street, Old Whittington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 16:30.
10 and 26 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Gypsy Lane, Old Whittington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 16:30.
17 Feb and 17 Mar 2025
Derbyshire County Council are proposing to carry out Section 50 on Somersall Lane, Somersall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Derbyshire County Council on 22 Oct 2024 at 09:33.
Roadworks Map near to Hady Lane, CHESTERFIELD, S41 0DH
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Hady Lane, CHESTERFIELD, S41 0DH (17 Events)
(Scheduled Dates)
(miles)
(Scheduled: 20 Nov 2024 - 26 Nov 2024)
Contains public sector information licensed under the Open Government Licence v3.0.