ROADWORKS SUMMARY
Pennine Way, CHESTERFIELD, S40 4LP

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Pennine Way, S40 4LP and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Pennine Way, CHESTERFIELD, S40 4LP

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Pennine Way are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Derbyshire County Council logo
LONG TERM
Until
6 Jul 2025
Details
View Map
Share
Follow
Station Back Lane

Derbyshire County Council are carrying out roadworks on Station Back Lane, Chesterfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 October 2023 at 07:10 and could run through until 6 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Derbyshire County Council on 16 Oct 2023 at 07:23.

Derbyshire County Council logo
LONG TERM
Until
23 Oct 2025
Details
View Map
Share
Follow
Commonside Road

Derbyshire County Council are carrying out Highway repair and maintenance works on Commonside Road, Barlow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 October 2023 at 00:00 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 23 Sep 2024 at 16:30.

Yorkshire Water logo
LONG TERM
Between
22 Apr 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Station Lane

Yorkshire Water are proposing to carry out New service connection on Station Lane, Old Whittington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 31 March 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 21 Nov 2024 at 16:30.

Derbyshire County Council logo
LONG TERM
Between
20 May 2024 and 3 Apr 2025
Details
View Map
Share
Follow
Station Back Lane

Derbyshire County Council are proposing to carry out Highway improvement works on Station Back Lane, Chesterfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 3 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Derbyshire County Council on 21 May 2024 at 07:31.

Derbyshire County Council logo
LONG TERM
Between
20 May 2024 and 3 Feb 2025
Details
View Map
Share
Follow
Station Back Lane

Derbyshire County Council are proposing to carry out Section 50 on Station Back Lane, Chesterfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 3 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Derbyshire County Council on 21 May 2024 at 07:31.

Network Rail logo
LONG TERM
Between
4 Oct 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Crow Lane

Network Rail are proposing to carry out Works for Rail Purposes on Crow Lane, Chesterfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 17 May 2024 at 13:14.

Network Rail logo
LONG TERM
Between
4 Oct 2024 and 28 Feb 2025
Details
View Map
Share
Crow Lane

Network Rail were proposing to carry out Works for Rail Purposes on Crow Lane, Chesterfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 October 2024 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 30 Sep 2024 at 09:28.

Derbyshire County Council logo
LONG TERM
Between
4 Nov 2024 and 31 Jul 2025
Details
View Map
Share
Follow
Corporation Street

Derbyshire County Council are proposing to carry out Highway improvement works on Corporation Street, Chesterfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 31 July 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Derbyshire County Council on 14 Mar 2024 at 10:39.

Derbyshire County Council logo
LONG TERM
Between
11 Nov 2024 and 16 Feb 2025
Details
View Map
Share
Follow
Hipper Street

Derbyshire County Council are proposing to carry out Remedial works on Hipper Street, Chesterfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 16 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Derbyshire County Council on 12 Sep 2024 at 09:25.

Northern Powergrid (Yorkshire) logo
Finishing
Monday
Details
View Map
Share
Follow
Ashford Road

Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Ashford Road, Dronfield Woodhouse.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 December 2024 at 09:35 and could run through until 30 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 24 Dec 2024 at 16:30.

Derbyshire County Council logo
Between
2 and 24 Jan 2025
Details
View Map
Share
Follow
Dunston Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Dunston Road, Chesterfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 18 Dec 2024 at 07:19.

Derbyshire County Council logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Chesterfield Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Chesterfield Road, Baslow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Derbyshire County Council on 18 Oct 2024 at 11:53.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Main Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Main Road, Old Brampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 11:56.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Main Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Main Road, Old Brampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 12:20.

Cadent Gas logo
Between
6 and 30 Jan 2025
Details
View Map
Share
Follow
Canal Wharf

Cadent Gas are proposing to carry out Utility asset works on Canal Wharf, Chesterfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 16:30.

Severn Trent Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Cowley Lane

Severn Trent Water are proposing to carry out New service connection on Cowley Lane, Holmesfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 19 Sep 2024 at 07:58.

Cadent Gas logo
Between
6 and 22 Jan 2025
Details
View Map
Share
Follow
Milldale Close

Cadent Gas are proposing to carry out Utility asset works on Milldale Close, Holme Hall, Chesterfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 22 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 13:11.

Severn Trent Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Cowley Lane

Severn Trent Water are proposing to carry out New service connection on Cowley Lane, Holmesfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 18 Sep 2024 at 14:18.

Cadent Gas logo
Between
6 and 22 Jan 2025
Details
View Map
Share
Follow
Milldale Close

Cadent Gas are proposing to carry out Utility asset works on Milldale Close, Holme Hall, Chesterfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 22 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 12:28.

Cadent Gas logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Linacre Road

Cadent Gas are proposing to carry out Utility asset works on Linacre Road, Holme Hall, Chesterfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 13:11.

Cadent Gas logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Linacre Road

Cadent Gas are proposing to carry out Utility asset works on Linacre Road, Holme Hall, Chesterfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 12:19.

Cadent Gas logo
Between
13 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Holme Hall Crescent

Cadent Gas are proposing to carry out Utility asset works on Holme Hall Crescent, Holme Hall, Chesterfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 6 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 24 Dec 2024 at 07:21.

Cadent Gas logo
Between
13 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Holme Hall Crescent

Cadent Gas are proposing to carry out Utility asset works on Holme Hall Crescent, Holme Hall, Chesterfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 6 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 13:11.

Cadent Gas logo
Between
13 and 30 Jan 2025
Details
View Map
Share
Follow
Old Hall Road

Cadent Gas are proposing to carry out Utility asset works on Old Hall Road, Chesterfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 09:34.

Derbyshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
High Street

Derbyshire County Council are proposing to carry out Highway improvement works on High Street, Chesterfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Derbyshire County Council on 6 Nov 2024 at 09:11.

Severn Trent Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Hallowes Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Hallowes Lane, Dronfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 26 Nov 2024 at 11:40.

Severn Trent Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Hallowes Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Hallowes Lane, Dronfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 10 Dec 2024 at 11:45.

Cadent Gas logo
Between
13 and 30 Jan 2025
Details
View Map
Share
Follow
Old Road

Cadent Gas are proposing to carry out Utility asset works on Old Road, Chesterfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Dec 2024 at 07:27.

Cadent Gas logo
Between
13 and 30 Jan 2025
Details
View Map
Share
Follow
Old Road

Cadent Gas are proposing to carry out Utility asset works on Old Road, Chesterfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 09:35.

Cadent Gas logo
Between
13 and 30 Jan 2025
Details
View Map
Share
Follow
Old Hall Road

Cadent Gas are proposing to carry out Utility asset works on Old Hall Road, Chesterfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Dec 2024 at 07:19.

Nexfibre Networks Limited logo
Between
17 and 19 Jan 2025
Details
View Map
Share
Follow
Longedge Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Longedge Lane, Wingerworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 26 Nov 2024 at 13:41.

Nexfibre Networks Limited logo
Between
17 and 19 Jan 2025
Details
View Map
Share
Follow
Longedge Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Longedge Lane, Wingerworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 3 Dec 2024 at 15:05.

Cadent Gas logo
Between
20 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Lordsmill Street

Cadent Gas are proposing to carry out Utility asset works on Lordsmill Street, Chesterfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 11:22.

Cadent Gas logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Newbold Road

Cadent Gas are proposing to carry out Utility asset works on Newbold Road, Newbold.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 12:22.

Cadent Gas logo
Between
27 Jan and 20 Feb 2025
Details
View Map
Share
Follow
Newbold Road

Cadent Gas are proposing to carry out Utility asset works on Newbold Road, Newbold.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 12:24.

Cadent Gas logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Tapton View Road

Cadent Gas are proposing to carry out Utility asset works on Tapton View Road, Newbold.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 12:27.

Cadent Gas logo
Between
27 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Chesterfield Footpath 74

Cadent Gas are proposing to carry out Utility asset works on Chesterfield Footpath 74, Chesterfield.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 27 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 16:30.

Cadent Gas logo
Between
27 Jan and 18 Feb 2025
Details
View Map
Share
Follow
Newland Dale

Cadent Gas are proposing to carry out Utility asset works on Newland Dale, Newbold.

These works are categorised as Major.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 27 January 2025 and could run through until 18 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 16:30.

Western Power Distribution (East Midlands) logo
Between
27 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Hall Lane

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Hall Lane, Staveley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 12 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 18 Dec 2024 at 07:18.

Cadent Gas logo
Between
27 Jan and 16 Feb 2025
Details
View Map
Share
Church Way

Cadent Gas were proposing to carry out Utility asset works on Church Way, Chesterfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 16 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 12:00.

Derbyshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
High Street

Derbyshire County Council are proposing to carry out Highway improvement works on High Street, Chesterfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Derbyshire County Council on 7 Nov 2024 at 09:53.

Cadent Gas logo
Between
3 and 19 Feb 2025
Details
View Map
Share
Follow
Newbold Road

Cadent Gas are proposing to carry out Utility asset works on Newbold Road, Newbold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 12:58.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
5 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Unnamed Section Of B6050

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Unnamed Section Of B6050, Cutthorpe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 26 Nov 2024 at 14:08.

Derbyshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Main Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Main Road, Cutthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 2 Dec 2024 at 12:12.

Severn Trent Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Bradshaw Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Bradshaw Lane, Wadshelf.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 15:40.

Severn Trent Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Bradshaw Lane

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Bradshaw Lane, Wadshelf.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 12 February 2025. The works were due to impact the verge only.

This roadwork event was last updated by Severn Trent Water on 23 Dec 2024 at 08:28.

Yorkshire Water logo
Between
17 and 27 Feb 2025
Details
View Map
Share
Follow
Barton Crescent

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Barton Crescent, Holme Hall, Chesterfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 12 Dec 2024 at 14:39.

Severn Trent Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Alexandra Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Alexandra Road, Dronfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 26 Nov 2024 at 13:20.

Severn Trent Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Alexandra Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Alexandra Road, Dronfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 10 Dec 2024 at 13:03.

Derbyshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Nethermoor Road

Derbyshire County Council are proposing to carry out Highway improvement works on Nethermoor Road, New Tupton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 13 Dec 2024 at 14:56.

Derbyshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Nethermoor Road

Derbyshire County Council are proposing to carry out Highway improvement works on Nethermoor Road, New Tupton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 12 Dec 2024 at 10:47.

Derbyshire County Council logo
Between
17 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Somersall Lane

Derbyshire County Council are proposing to carry out Section 50 on Somersall Lane, Somersall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Derbyshire County Council on 22 Oct 2024 at 09:33.

Severn Trent Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Bradshaw Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Bradshaw Lane, Wadshelf.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 13 Nov 2024 at 09:23.

Severn Trent Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Bradshaw Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Bradshaw Lane, Wadshelf.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 10 Dec 2024 at 11:28.

BT logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Unthank Lane

BT are proposing to carry out Utility repair and maintenance works on Unthank Lane, Holmesfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 3 Dec 2024 at 15:16.

Cadent Gas logo
Between
24 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Piccadilly Road

Cadent Gas are proposing to carry out Utility asset works on Piccadilly Road, Chesterfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 24 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 12:36.

Western Power Distribution (East Midlands) logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Spitewinter Lane

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Spitewinter Lane, Barlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 26 Nov 2024 at 11:37.

Cadent Gas logo
Between
24 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Crow Lane

Cadent Gas are proposing to carry out Utility asset works on Crow Lane, Chesterfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 13 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 13:13.

Severn Trent Water logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Ashgate Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Ashgate Road, Chesterfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 4 Dec 2024 at 15:01.

Cadent Gas logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Newbridge Lane

Cadent Gas are proposing to carry out Utility asset works on Newbridge Lane, Old Whittington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 16:30.

Cadent Gas logo
Between
24 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Layton Drive

Cadent Gas are proposing to carry out Utility asset works on Layton Drive, Old Whittington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 16:30.

Severn Trent Water logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Ashgate Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Ashgate Road, Chesterfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 12 Dec 2024 at 08:32.

Cadent Gas logo
Between
3 and 20 Mar 2025
Details
View Map
Share
Follow
Swaddale Avenue

Cadent Gas are proposing to carry out Utility asset works on Swaddale Avenue, Tapton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 07:20.

Cadent Gas logo
Between
3 and 18 Mar 2025
Details
View Map
Share
Follow
Newbridge Street

Cadent Gas are proposing to carry out roadworks on Newbridge Street, Old Whittington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 16:30.

Cadent Gas logo
Between
3 and 18 Mar 2025
Details
View Map
Share
Follow
Newbridge Lane

Cadent Gas are proposing to carry out Utility asset works on Newbridge Lane, Old Whittington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 16:30.

Cadent Gas logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Follow
Whitting Valley Road

Cadent Gas are proposing to carry out Utility asset works on Whitting Valley Road, Old Whittington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 16:30.

Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Tom Lane

GTC Pipelines are proposing to carry out New service connection on Tom Lane, Duckmanton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by GTC Pipelines on 28 Nov 2024 at 11:37.

Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Tom Lane

GTC Pipelines are proposing to carry out New service connection on Tom Lane, Duckmanton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by GTC Pipelines on 2 Dec 2024 at 09:41.

Cadent Gas logo
LONG TERM
Between
3 Mar and 14 Apr 2025
Details
View Map
Share
Follow
Brimington Road

Cadent Gas are proposing to carry out Utility asset works on Brimington Road, Tapton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 07:24.

Derbyshire County Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Cutthorpe Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Cutthorpe Road, Cutthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 18 Dec 2024 at 07:15.

Cadent Gas logo
Between
10 and 30 Mar 2025
Details
View Map
Share
Follow
Church Way

Cadent Gas are proposing to carry out Utility asset works on Church Way, Chesterfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 30 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 12:41.

Derbyshire County Council logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Markham Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Markham Road, Chesterfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 21 Aug 2024 at 11:01.

Derbyshire County Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Main Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Main Road, Cutthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 18 Dec 2024 at 07:16.

Derbyshire County Council logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Malkin Street

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Malkin Street, Chesterfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 19 Aug 2024 at 16:30.

Cadent Gas logo
Between
17 Mar and 3 Apr 2025
Details
View Map
Share
Follow
Lockoford Lane

Cadent Gas are proposing to carry out Utility asset works on Lockoford Lane, Tapton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 3 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 07:21.

Severn Trent Water logo
Between
17 and 20 Mar 2025
Details
View Map
Share
Follow
Wilson Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Wilson Road, Coal Aston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 23 Dec 2024 at 07:05.

Western Power Distribution (East Midlands) logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Maple Street

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Maple Street, Hollingwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 24 Dec 2024 at 07:32.

Severn Trent Water logo
Between
24 and 26 Mar 2025
Details
View Map
Share
Follow
Barrack Road

Severn Trent Water are proposing to carry out New service connection on Barrack Road, Apperknowle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 20 Dec 2024 at 13:59.

Severn Trent Water logo
Between
24 and 26 Mar 2025
Details
View Map
Share
Follow
Barrack Road

Severn Trent Water are proposing to carry out New service connection on Barrack Road, Apperknowle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 23 Dec 2024 at 10:48.


Roadworks Map near to Pennine Way, CHESTERFIELD, S40 4LP

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 28 Dec 2024 02:54
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Pennine Way, CHESTERFIELD, S40 4LP (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.