ROADWORKS SUMMARY
St. Andrews Rise, CHESTERFIELD, S40 3NJ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for St. Andrews Rise, S40 3NJ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to St. Andrews Rise, CHESTERFIELD, S40 3NJ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for St. Andrews Rise are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Derbyshire County Council logo
LONG TERM
Until
6 Jul 2025
Details
View Map
Share
Follow
Station Back Lane

Derbyshire County Council are carrying out roadworks on Station Back Lane, Chesterfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 October 2023 at 07:10 and could run through until 6 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Derbyshire County Council on 16 Oct 2023 at 07:23.

Derbyshire County Council logo
LONG TERM
Until
23 Oct 2025
Details
View Map
Share
Follow
Commonside Road

Derbyshire County Council are carrying out Highway repair and maintenance works on Commonside Road, Barlow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 October 2023 at 00:00 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 23 Sep 2024 at 16:30.

Derbyshire County Council logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Ashford Avenue

Derbyshire County Council are carrying out roadworks on Ashford Avenue, North Wingfield, Chesterfield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 February 2024 at 09:00 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 19 Feb 2024 at 09:22.

Murphy Power Distribution logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Whiteleas Avenue

Murphy Power Distribution are carrying out Utility asset works on Whiteleas Avenue, North Wingfield, Chesterfield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 April 2024 at 07:40 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Murphy Power Distribution on 15 Nov 2024 at 16:30.

Yorkshire Water logo
LONG TERM
Between
22 Apr 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Station Lane

Yorkshire Water are proposing to carry out New service connection on Station Lane, Old Whittington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 31 March 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 21 Nov 2024 at 16:30.

Derbyshire County Council logo
LONG TERM
Between
20 May 2024 and 3 Apr 2025
Details
View Map
Share
Follow
Station Back Lane

Derbyshire County Council are proposing to carry out Highway improvement works on Station Back Lane, Chesterfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 3 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Derbyshire County Council on 21 May 2024 at 07:31.

Derbyshire County Council logo
LONG TERM
Between
20 May 2024 and 3 Feb 2025
Details
View Map
Share
Follow
Station Back Lane

Derbyshire County Council are proposing to carry out Section 50 on Station Back Lane, Chesterfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 3 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Derbyshire County Council on 21 May 2024 at 07:31.

Derbyshire County Council logo
LONG TERM
Between
9 Sep and 6 Dec 2024
Details
View Map
Share
Follow
Inkersall Road

Derbyshire County Council are proposing to carry out Highway improvement works on Inkersall Road, Staveley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Derbyshire County Council on 20 Aug 2024 at 10:55.

Derbyshire County Council logo
LONG TERM
Between
16 Sep and 6 Dec 2024
Details
View Map
Share
Follow
Inkersall Road

Derbyshire County Council are proposing to carry out Highway improvement works on Inkersall Road, Staveley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Derbyshire County Council on 2 Sep 2024 at 10:47.

Derbyshire County Council logo
LONG TERM
Between
16 Sep and 19 Dec 2024
Details
View Map
Share
Follow
Inkersall Road

Derbyshire County Council are proposing to carry out Highway improvement works on Inkersall Road, Staveley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Derbyshire County Council on 28 Oct 2024 at 11:02.

Network Rail logo
LONG TERM
Between
4 Oct 2024 and 28 Feb 2025
Details
View Map
Share
Crow Lane

Network Rail were proposing to carry out Works for Rail Purposes on Crow Lane, Chesterfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 October 2024 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 30 Sep 2024 at 09:28.

Network Rail logo
LONG TERM
Between
4 Oct 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Crow Lane

Network Rail are proposing to carry out Works for Rail Purposes on Crow Lane, Chesterfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 17 May 2024 at 13:14.

Derbyshire County Council logo
LONG TERM
Between
10 Oct and 6 Dec 2024
Details
View Map
Share
Follow
High Street

Derbyshire County Council are proposing to carry out Highway improvement works on High Street, Clay Cross.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Derbyshire County Council on 25 Jun 2024 at 12:13.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Stretton Road

Cadent Gas are proposing to carry out Utility asset works on Stretton Road, Clay Cross.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jul 2024 at 08:30.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Sheffield Road

Cadent Gas are carrying out Utility asset works on Sheffield Road, Stonegravels, Chesterfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 November 2024 at 08:00 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 08:19.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Sheffield Road

Cadent Gas are proposing to carry out Utility asset works on Sheffield Road, Stonegravels, Chesterfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 09:53.

Derbyshire County Council logo
LONG TERM
Between
4 Nov 2024 and 31 Jul 2025
Details
View Map
Share
Follow
Corporation Street

Derbyshire County Council are proposing to carry out Highway improvement works on Corporation Street, Chesterfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 31 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Derbyshire County Council on 14 Mar 2024 at 10:39.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Stretton Road

Cadent Gas were proposing to carry out Utility asset works on Stretton Road, Clay Cross.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 28 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 14:15.

Murphy Power Distribution logo
Finishing
Friday
Details
View Map
Share
Follow
Sheffield Road

Murphy Power Distribution are carrying out New service connection on Sheffield Road, Stonegravels, Chesterfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 November 2024 at 09:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 26 Nov 2024 at 08:34.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Queen Street

Cadent Gas are proposing to carry out roadworks on Queen Street, Clay Cross.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 16:30.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Church Way

Cadent Gas were proposing to carry out Utility asset works on Church Way, Chesterfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 28 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 13:28.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Church Way

Cadent Gas are proposing to carry out Utility asset works on Church Way, Chesterfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 12:18.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Lordsmill Street

Cadent Gas are proposing to carry out Utility asset works on Lordsmill Street, Chesterfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 10:57.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Stretton Road

Cadent Gas are proposing to carry out roadworks on Stretton Road, Clay Cross.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 16:30.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Clay Lane

Cadent Gas are proposing to carry out roadworks on Clay Lane, Clay Cross.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 16:30.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Thanet Street

Cadent Gas are proposing to carry out roadworks on Thanet Street, Clay Cross.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 16:30.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Clay Cross.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 16:30.

Derbyshire County Council logo
LONG TERM
Between
11 Nov 2024 and 16 Feb 2025
Details
View Map
Share
Follow
Hipper Street

Derbyshire County Council are proposing to carry out Remedial works on Hipper Street, Chesterfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Derbyshire County Council on 12 Sep 2024 at 09:25.

Cadent Gas logo
Until
4 Dec 2024
Details
View Map
Share
Follow
Shirland Street

Cadent Gas are carrying out Utility asset works on Shirland Street, Chesterfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 14:30 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 15:31.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Tapton View Road

Cadent Gas are proposing to carry out Utility asset works on Tapton View Road, Newbold.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 15:26.

Cadent Gas logo
Between
18 Nov and 12 Dec 2024
Details
View Map
Share
Follow
Newbold Road

Cadent Gas are proposing to carry out Utility asset works on Newbold Road, Newbold.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 15:23.

Cadent Gas logo
LONG TERM
Until
23 Dec 2024
Details
View Map
Share
Follow
Bevan Drive

Cadent Gas are carrying out Utility asset works on Bevan Drive, Inkersall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 07:30 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 07:38.

Yorkshire Water logo
LONG TERM
Between
20 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Cutthorpe Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Cutthorpe Road, Cutthorpe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 15 Nov 2024 at 13:46.

Cadent Gas logo
Until
23 Dec 2024
Details
View Map
Share
Follow
Dade Avenue

Cadent Gas are carrying out Utility asset works on Dade Avenue, Inkersall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 07:30 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 07:49.

Cadent Gas logo
Until
11 Dec 2024
Details
View Map
Share
Follow
Jervis Place

Cadent Gas are carrying out Utility asset works on Jervis Place, Inkersall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 07:30 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 07:50.

Cadent Gas logo
Between
25 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Jervis Place

Cadent Gas are proposing to carry out Utility asset works on Jervis Place, Inkersall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 10:13.

Cadent Gas logo
Until
11 Dec 2024
Details
View Map
Share
Follow
Mcmahon Avenue

Cadent Gas are carrying out Utility asset works on Mcmahon Avenue, Inkersall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 07:30 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 07:51.

Cadent Gas logo
Between
25 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Mcmahon Avenue

Cadent Gas are proposing to carry out Utility asset works on Mcmahon Avenue, Inkersall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 10:13.

Derbyshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Brimington Road North

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Brimington Road North, Chesterfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 9 Oct 2024 at 12:03.

Derbyshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Brimington Road North

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Brimington Road North, Chesterfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 9 Oct 2024 at 12:55.

Cadent Gas logo
Between
25 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Newbold Road

Cadent Gas are proposing to carry out Utility asset works on Newbold Road, Newbold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 15:25.

Cadent Gas logo
Between
25 Nov and 12 Dec 2024
Details
View Map
Share
Follow
Lordsmill Street

Cadent Gas are proposing to carry out Utility asset works on Lordsmill Street, Chesterfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 07:21.

Cadent Gas logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Somersall Lane

Cadent Gas were proposing to carry out Utility repair and maintenance works on Somersall Lane, Somersall.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 16:43.

Cadent Gas logo
Between
25 Nov and 12 Dec 2024
Details
View Map
Share
Follow
Old Road

Cadent Gas are proposing to carry out Utility asset works on Old Road, Chesterfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 10:00.

Cadent Gas logo
Between
25 Nov and 12 Dec 2024
Details
View Map
Share
Old Hall Road

Cadent Gas were proposing to carry out Utility asset works on Old Hall Road, Chesterfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 12 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 09:50.

Cadent Gas logo
Between
2 and 19 Dec 2024
Details
View Map
Share
Follow
Infirmary Road

Cadent Gas are proposing to carry out Utility asset works on Infirmary Road, Chesterfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 16:30.

Derbyshire County Council logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Main Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Main Road, Wadshelf.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 10 Oct 2024 at 15:23.

Cadent Gas logo
Between
2 and 17 Dec 2024
Details
View Map
Share
Follow
Inkersall Green Road

Cadent Gas are proposing to carry out Utility asset works on Inkersall Green Road, Inkersall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 17 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 16:30.

Cadent Gas logo
Between
2 and 18 Dec 2024
Details
View Map
Share
Follow
Hady Lane

Cadent Gas are proposing to carry out Utility asset works on Hady Lane, Hady.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Aug 2024 at 16:30.

Nexfibre Networks Limited logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Longedge Lane

Nexfibre Networks Limited were proposing to carry out Utility asset works on Longedge Lane, Wingerworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 22 Nov 2024 at 11:34.

Cadent Gas logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Hady Lane

Cadent Gas are proposing to carry out Utility asset works on Hady Lane, Hady.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Aug 2024 at 16:30.

Western Power Distribution (East Midlands) logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Soresby Street

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Soresby Street, Chesterfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 5 Nov 2024 at 13:32.

Western Power Distribution (East Midlands) logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Soresby Street

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Soresby Street, Chesterfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 8 Nov 2024 at 14:54.

Severn Trent Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Cowley Lane

Severn Trent Water are proposing to carry out New service connection on Cowley Lane, Holmesfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 19 Sep 2024 at 07:58.

Cadent Gas logo
Between
6 and 30 Jan 2025
Details
View Map
Share
Follow
Canal Wharf

Cadent Gas are proposing to carry out Utility asset works on Canal Wharf, Chesterfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 16:30.

Severn Trent Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Cowley Lane

Severn Trent Water are proposing to carry out New service connection on Cowley Lane, Holmesfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 18 Sep 2024 at 14:18.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Main Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Main Road, Old Brampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 11:56.

Cadent Gas logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Linacre Road

Cadent Gas are proposing to carry out Utility asset works on Linacre Road, Holme Hall, Chesterfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 13:11.

Cadent Gas logo
Between
6 and 22 Jan 2025
Details
View Map
Share
Follow
Milldale Close

Cadent Gas are proposing to carry out Utility asset works on Milldale Close, Holme Hall, Chesterfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 22 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 13:11.

Cadent Gas logo
Between
13 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Holme Hall Crescent

Cadent Gas are proposing to carry out Utility asset works on Holme Hall Crescent, Holme Hall, Chesterfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 6 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 13:11.

Cadent Gas logo
Between
13 and 30 Jan 2025
Details
View Map
Share
Follow
Old Hall Road

Cadent Gas are proposing to carry out Utility asset works on Old Hall Road, Chesterfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 09:34.

Cadent Gas logo
Between
13 and 30 Jan 2025
Details
View Map
Share
Follow
Old Road

Cadent Gas are proposing to carry out Utility asset works on Old Road, Chesterfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 09:35.

Derbyshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
High Street

Derbyshire County Council are proposing to carry out Highway improvement works on High Street, Chesterfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Derbyshire County Council on 6 Nov 2024 at 09:11.

Nexfibre Networks Limited logo
Between
17 and 19 Jan 2025
Details
View Map
Share
Follow
Longedge Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Longedge Lane, Wingerworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 26 Nov 2024 at 13:41.

Cadent Gas logo
Between
20 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Lordsmill Street

Cadent Gas are proposing to carry out Utility asset works on Lordsmill Street, Chesterfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 11:22.

Cadent Gas logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Tapton View Road

Cadent Gas are proposing to carry out Utility asset works on Tapton View Road, Newbold.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 12:27.

Cadent Gas logo
Between
27 Jan and 20 Feb 2025
Details
View Map
Share
Follow
Newbold Road

Cadent Gas are proposing to carry out Utility asset works on Newbold Road, Newbold.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 12:24.

Derbyshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
High Street

Derbyshire County Council are proposing to carry out Highway improvement works on High Street, Chesterfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Derbyshire County Council on 7 Nov 2024 at 09:53.

Cadent Gas logo
Between
27 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Chesterfield Footpath 74

Cadent Gas are proposing to carry out Utility asset works on Chesterfield Footpath 74, Chesterfield.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 27 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 16:30.

Cadent Gas logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Newbold Road

Cadent Gas are proposing to carry out Utility asset works on Newbold Road, Newbold.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 12:22.

Cadent Gas logo
LONG TERM
Between
3 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Station Lane

Cadent Gas are proposing to carry out Utility asset works on Station Lane, Old Whittington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 16:30.

Cadent Gas logo
Between
3 and 17 Feb 2025
Details
View Map
Share
Follow
Bower Farm Road

Cadent Gas are proposing to carry out Utility asset works on Bower Farm Road, Old Whittington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 16:30.

Cadent Gas logo
Between
3 and 17 Feb 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Old Whittington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 16:30.

Cadent Gas logo
Between
3 and 19 Feb 2025
Details
View Map
Share
Follow
Newbold Road

Cadent Gas are proposing to carry out Utility asset works on Newbold Road, Newbold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 12:58.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
5 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Unnamed Section Of B6050

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Unnamed Section Of B6050, Cutthorpe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 26 Nov 2024 at 14:08.

Cadent Gas logo
Between
10 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Newland Dale

Cadent Gas are proposing to carry out Utility asset works on Newland Dale, Newbold.

These works are categorised as Major.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 10 February 2025 and could run through until 4 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 16:30.

Cadent Gas logo
Between
10 and 26 Feb 2025
Details
View Map
Share
Follow
Gypsy Lane

Cadent Gas are proposing to carry out Utility asset works on Gypsy Lane, Old Whittington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 16:30.

Severn Trent Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Bradshaw Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Bradshaw Lane, Wadshelf.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 15:40.

Severn Trent Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Bradshaw Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Bradshaw Lane, Wadshelf.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 13 Nov 2024 at 09:23.

Derbyshire County Council logo
Between
17 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Somersall Lane

Derbyshire County Council are proposing to carry out Section 50 on Somersall Lane, Somersall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Derbyshire County Council on 22 Oct 2024 at 09:33.

Western Power Distribution (East Midlands) logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Spitewinter Lane

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Spitewinter Lane, Barlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 26 Nov 2024 at 11:37.

Cadent Gas logo
Between
24 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Hilltop Road

Cadent Gas are proposing to carry out Utility asset works on Hilltop Road, Old Whittington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 16:30.


Roadworks Map near to St. Andrews Rise, CHESTERFIELD, S40 3NJ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Nov 2024 06:25
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to St. Andrews Rise, CHESTERFIELD, S40 3NJ (10 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Virgin Media logo
CAERNARVON CLOSE 
(0.3 miles)
Virgin Media
Utility asset works - Footway - Give and take
Planned
Scheduled: 27 Nov 2024 - 29 Nov 2024
0.3
Details
Share
Follow
2
BT logo
SOMERSBY AVENUE 
(0.4 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 27 Nov 2024 - 29 Nov 2024
0.4
Details
Share
Follow
3
Severn Trent Water logo
LING ROAD 
(0.4 miles)
Severn Trent Water
Remedial works - Footway - Give and take
Cancelled
(Scheduled: 27 Nov 2024 - 28 Nov 2024)
0.4
Details
Share
4
Cadent Gas logo
MAJOR
  
SOMERSALL LANE 
(0.6 miles)
Cadent Gas
Utility repair and maintenance works - Footway, Carriageway, Verge - Two-way signals
Cancelled
(Scheduled: 25 Nov 2024 - 20 Dec 2024)
0.6
Details
Share
5
Cadent Gas logo
MAJOR
  
OLD HALL ROAD 
(0.8 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Road closure
Cancelled
(Scheduled: 25 Nov 2024 - 12 Dec 2024)
0.8
Details
Share
6
Cadent Gas logo
MAJOR
  
OLD ROAD 
(0.8 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Two-way signals
Planned
Scheduled: 25 Nov 2024 - 12 Dec 2024
0.8
Details
Share
Follow
7
Derbyshire County Council logo
STORRS ROAD 
(0.8 miles)
Derbyshire County Council
Core Sampling - Carriageway - Stop/go boards
Planned
Scheduled: 27 Nov 2024
0.8
Details
Share
Follow
8
Severn Trent Water logo
SYCAMORE AVENUE 
(0.9 miles)
Severn Trent Water
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 27 Nov 2024
0.9
Details
Share
Follow
9
Severn Trent Water logo
HUNLOKE AVENUE 
(0.9 miles)
Severn Trent Water
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 27 Nov 2024
0.9
Details
Share
Follow
10
Western Power Distribution (East Midlands) logo
OLD ROAD 
(1.0 miles)
Western Power Distribution (East Midlands)
Utility repair and maintenance works - Footway - Give and take
Planned
Scheduled: 28 Nov 2024 - 4 Dec 2024
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.