ROADWORKS SUMMARY
Burncross Road, SHEFFIELD, S35 1RX
Introduction
View current and future planned roadworks and road closures for Burncross Road, S35 1RX and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Burncross Road, SHEFFIELD, S35 1RX
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Burncross Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
Today
Sheffield City Council are carrying out Utility asset works on Highton Street, Sheffield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 July 2022 at 00:00 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 18 Nov 2024 at 11:18.
Today
Sheffield City Council are carrying out Utility asset works on Newhall Road, Sheffield.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 June 2023 at 03:36 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 15 Nov 2024 at 10:53.
Today
Sheffield City Council are carrying out Utility asset works on Carlisle Street East, Sheffield.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 July 2023 at 09:13 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 15 Nov 2024 at 10:52.
Saturday
Sheffield City Council are carrying out Highway repair and maintenance works on Mowbray Street, Sheffield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2023 at 09:00 and could run through until 30 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Sheffield City Council on 18 Mar 2024 at 17:30.
Saturday
Sheffield City Council are carrying out Highway repair and maintenance works on Rutland Road, Sheffield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2023 at 09:00 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 18 Mar 2024 at 17:13.
Saturday
Sheffield City Council are carrying out Highway repair and maintenance works on Percy Street, Sheffield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2023 at 09:00 and could run through until 30 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Sheffield City Council on 18 Mar 2024 at 17:22.
Saturday
Sheffield City Council are carrying out Highway repair and maintenance works on Platt Street, Sheffield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2023 at 09:00 and could run through until 30 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Sheffield City Council on 18 Mar 2024 at 17:19.
Saturday
Sheffield City Council are carrying out Highway repair and maintenance works on Hicks Street, Sheffield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2023 at 09:00 and could run through until 30 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Sheffield City Council on 18 Mar 2024 at 17:25.
4 Dec 2024
Sheffield City Council are carrying out Utility asset works on Whitley Lane, Sheffield.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 February 2024 at 00:00 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 10:59.
Today
Yorkshire Water are carrying out Utility repair and maintenance works on Drummond Street, Rotherham Town Centre, Rotherham.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 August 2024 at 08:00 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 22 Nov 2024 at 10:55.
27 Aug 2024 and 20 Jun 2025
Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Wath Road, Elsecar, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 August 2024 and could run through until 20 June 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Yorkshire Water on 7 Aug 2024 at 08:10.
2 Sep and 2 Dec 2024
Sheffield City Council were proposing to carry out Utility asset works on Meadowhall Road, Sheffield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2024 and run through until 2 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 2 Sep 2024 at 09:36.
2 Sep and 2 Dec 2024
Sheffield City Council were proposing to carry out Utility asset works on Meadowhall Road, Sheffield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2024 and run through until 2 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 2 Sep 2024 at 09:36.
9 Sep 2024 and 9 Sep 2025
Sheffield City Council are proposing to carry out Utility asset works on Sheffield Road, Tinsley, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 9 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Sheffield City Council on 7 Jun 2024 at 09:18.
13 Dec 2024
Cadent Gas are carrying out Utility asset works on Wordsworth Avenue, Sheffield.
These works are categorised as Major.
The works started on 23 September 2024 at 08:30 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 08:43.
23 Sep 2024 and 20 Jun 2025
Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Wath Road, Elsecar, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 20 June 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Yorkshire Water on 13 Sep 2024 at 07:10.
Tomorrow
Sheffield City Council were proposing to carry out Utility asset works on Worrall Road, Worrall, Sheffield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 September 2024 and run through until 26 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 26 Sep 2024 at 08:18.
Tomorrow
Sheffield City Council were proposing to carry out Utility asset works on Penistone Road, Grenoside, Sheffield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 September 2024 and run through until 26 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 26 Sep 2024 at 08:18.
Tomorrow
Sheffield City Council were proposing to carry out Utility asset works on Main Road, Wharncliffe Side, Sheffield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 September 2024 and run through until 26 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 26 Sep 2024 at 08:18.
Tomorrow
Sheffield City Council were proposing to carry out Utility asset works on Manchester Road, Stocksbridge, Sheffield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 September 2024 and run through until 26 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 26 Sep 2024 at 08:18.
Tomorrow
Sheffield City Council were proposing to carry out Utility asset works on Market Place, Chapeltown, Sheffield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 September 2024 and run through until 26 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 26 Sep 2024 at 08:18.
Tomorrow
Sheffield City Council were proposing to carry out Utility asset works on Lound Side, Sheffield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 September 2024 and run through until 26 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 26 Sep 2024 at 08:18.
Friday
Sheffield City Council are carrying out Utility asset works on Moonshine Lane, Sheffield.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 07:39 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 22 Nov 2024 at 16:40.
30 Sep 2024 and 27 Jun 2025
Yorkshire Water were proposing to carry out Statutory Infrastructure Works on Wath Road, Elsecar, Barnsley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 September 2024 and run through until 27 June 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 13 Sep 2024 at 09:29.
30 Sep 2024 and 27 Jun 2025
Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Wath Road, Elsecar, Barnsley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 27 June 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Yorkshire Water on 16 Sep 2024 at 14:49.
27 Jun 2025
Yorkshire Water are carrying out Statutory Infrastructure Works on Wath Road, Elsecar, Barnsley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 10:00 and could run through until 27 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 22 Nov 2024 at 16:25.
10 Apr 2026
Sheffield City Council are carrying out Utility asset works on Sheffield Road, Tinsley, Sheffield.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 October 2024 at 07:42 and could run through until 10 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 1 Oct 2024 at 07:59.
Today
Sheffield City Council are carrying out Section 50 on Brightside Lane, Sheffield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 October 2024 at 16:00 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 18 Nov 2024 at 13:18.
14 Oct and 20 Dec 2024
Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Cortonwood Drive, Brampton Bierlow, Rotherham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 23 Sep 2024 at 08:30.
20 Dec 2024
Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Cortonwood Drive, Brampton Bierlow, Rotherham.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 14 October 2024 at 19:00 and could run through until 20 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 28 Oct 2024 at 14:53.
14 Oct and 20 Dec 2024
Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Corton Wood, Brampton Bierlow, Rotherham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 23 Sep 2024 at 08:30.
20 Dec 2024
Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Corton Wood, Brampton Bierlow, Rotherham.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 14 October 2024 at 19:00 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 28 Oct 2024 at 14:10.
Thursday
Cadent Gas are carrying out Utility asset works on Longley Hall Road, Sheffield.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 October 2024 at 09:00 and could run through until 28 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 09:46.
Thursday
Cadent Gas are carrying out Utility repair and maintenance works on Elm Lane, Sheffield.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 October 2024 at 08:44 and could run through until 28 November 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 16:00.
Today
Cadent Gas are carrying out Utility asset works on Longley Hall Grove, Sheffield.
These works are categorised as Major.
The works started on 29 October 2024 at 10:00 and could run through until 25 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 08:53.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on Langsett Road North, Sheffield.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 15:16 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 10:51.
Wednesday
Northern Powergrid (Yorkshire) are carrying out New service connection on Studfield Hill, Sheffield.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 November 2024 at 08:05 and could run through until 27 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 22 Nov 2024 at 10:02.
4 Nov and 23 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Wordsworth Avenue, Sheffield.
These works are categorised as Major.
The works will start on or after 4 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 15:31.
4 Nov and 23 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Wordsworth Avenue, Sheffield.
These works are categorised as Major.
The works will start on or after 4 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 15 Aug 2024 at 16:12.
Today
Cadent Gas are proposing to carry out Utility asset works on Lowfield Avenue, Greasbrough, Rotherham.
These works are categorised as Major.
The works will start on or after 4 November 2024 and could run through until 25 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 11:12.
Today
Cadent Gas are proposing to carry out Utility asset works on Lowfield Avenue, Greasbrough, Rotherham.
These works are categorised as Major.
The works will start on or after 4 November 2024 and could run through until 25 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 07:20.
Today
Cadent Gas are proposing to carry out Utility asset works on Lowfield Avenue, Greasbrough, Rotherham.
These works are categorised as Major.
The works will start on or after 4 November 2024 and could run through until 25 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 13:27.
3 Dec 2024
Cadent Gas are carrying out Utility asset works on Margetson Crescent, Sheffield.
These works are categorised as Major.
The works started on 12 November 2024 at 11:00 and could run through until 3 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 11:10.
Wednesday
Sheffield City Council are carrying out Utility asset works on Penistone Road, Grenoside, Sheffield.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 November 2024 at 07:44 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 18 Nov 2024 at 11:16.
Friday
Sheffield City Council are carrying out Utility asset works on Attercliffe Common, Sheffield.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 14 November 2024 at 07:42 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 22 Nov 2024 at 16:45.
Wednesday
Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Attercliffe Common, Sheffield.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 November 2024 at 08:20 and could run through until 27 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Nov 2024 at 11:00.
Friday
Sheffield City Council are proposing to carry out Utility asset works on Carlisle Street East, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 10:15.
Friday
Sheffield City Council are proposing to carry out Utility asset works on Carlisle Street East, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 15:02.
Friday
Sheffield City Council are proposing to carry out Utility asset works on Longley Lane, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 10:15.
Friday
Sheffield City Council are carrying out Utility asset works on Longley Lane, Sheffield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 November 2024 at 07:56 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 21 Nov 2024 at 17:43.
18 Nov and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Margetson Crescent, Sheffield.
These works are categorised as Major.
The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Sep 2024 at 10:12.
18 Nov and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Margetson Crescent, Sheffield.
These works are categorised as Major.
The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 11:38.
18 Nov and 14 Dec 2024
National Highways are proposing to carry out Works for road purposes on Grange Lane, Ecclesfield, Sheffield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 14 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 8 Nov 2024 at 17:29.
14 Dec 2024
National Highways are carrying out Works for road purposes on Grange Lane, Ecclesfield, Sheffield.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 20:00 and could run through until 14 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 19 Nov 2024 at 07:22.
18 Nov and 13 Dec 2024
National Highways are proposing to carry out Works for road purposes on Grange Lane, Ecclesfield, Sheffield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 1 Nov 2024 at 07:57.
18 Nov and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Hudson Road, Kimberworth Park, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 13:46.
9 Dec 2024
Cadent Gas are carrying out Utility asset works on Hudson Road, Kimberworth Park, Rotherham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 13:30 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 15:16.
18 Nov and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Jewitt Road, Kimberworth Park, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 13:42.
9 Dec 2024
Cadent Gas are carrying out Utility asset works on Jewitt Road, Kimberworth Park, Rotherham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 13:30 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 15:13.
19 Nov and 4 Dec 2024
Sheffield City Council are proposing to carry out Utility asset works on Carlisle Street East, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 10:15.
4 Dec 2024
Sheffield City Council are carrying out Utility asset works on Carlisle Street East, Sheffield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 17:39 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 19 Nov 2024 at 17:48.
Today
Yorkshire Water are carrying out Utility repair and maintenance works on Ellenbro Road, Sheffield.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 11:02 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 19 Nov 2024 at 12:25.
Tomorrow
Yorkshire Water are carrying out Utility repair and maintenance works on Birley Rise Crescent, Sheffield.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 November 2024 at 10:01 and could run through until 26 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 20 Nov 2024 at 11:43.
20 Nov and 5 Dec 2024
Sheffield City Council are proposing to carry out Utility asset works on Penistone Road, Grenoside, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 10:15.
2 Dec 2024
Sheffield City Council are carrying out Utility asset works on Penistone Road, Grenoside, Sheffield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 November 2024 at 18:42 and could run through until 2 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 19:11.
Friday
Sheffield City Council are carrying out Utility asset works on Carlisle Street East, Sheffield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 17:57 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 21 Nov 2024 at 18:31.
Wednesday
Yorkshire Water are carrying out Utility repair and maintenance works on St Lawrence Road, Sheffield.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 13:37 and could run through until 27 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 21 Nov 2024 at 15:33.
21 Nov and 6 Dec 2024
Sheffield City Council are proposing to carry out Utility asset works on Blackburn Road, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 10:16.
6 Dec 2024
Sheffield City Council are carrying out Utility asset works on Blackburn Road, Sheffield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 17:57 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 21 Nov 2024 at 18:31.
Wednesday
Yorkshire Water are carrying out Utility repair and maintenance works on Harold Croft, Greasbrough, Rotherham.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 12:00 and could run through until 27 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 21 Nov 2024 at 12:25.
Today
Telefonica UK are proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 25 November 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Telefonica UK on 1 Oct 2024 at 09:48.
Today
Telefonica UK are proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 25 November 2024. The works will impact the verge only.
This roadwork event was last updated by Telefonica UK on 1 Oct 2024 at 12:21.
Today
Telefonica UK are proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 25 November 2024. The works will impact the verge only.
This roadwork event was last updated by Telefonica UK on 14 Oct 2024 at 15:07.
Wednesday
Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Mell Avenue, Hoyland, Barnsley.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 08:48 and could run through until 27 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 21 Nov 2024 at 13:02.
Friday
Sheffield City Council are carrying out Utility asset works on Wordsworth Avenue, Sheffield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 November 2024 at 16:12 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 22 Nov 2024 at 16:58.
Friday
Sheffield City Council are proposing to carry out Utility asset works on Cookson Road, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 6 Nov 2024 at 08:11.
Friday
Sheffield City Council are carrying out Utility asset works on Cookson Road, Sheffield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 November 2024 at 16:12 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 22 Nov 2024 at 16:58.
Thursday
Yorkshire Water are carrying out Utility repair and maintenance works on Watson Road, Kimberworth Park, Rotherham.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 November 2024 at 12:45 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 22 Nov 2024 at 13:21.
Tomorrow
Telefonica UK were proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 November 2024 and run through until 26 November 2024. The works were due to impact the verge only.
This roadwork event was last updated by Telefonica UK on 15 Oct 2024 at 09:48.
Tomorrow
Telefonica UK are proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 November 2024 and could run through until 26 November 2024. The works will impact the verge only.
This roadwork event was last updated by Telefonica UK on 21 Oct 2024 at 09:35.
Tomorrow
Telefonica UK are proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 November 2024 and could run through until 26 November 2024. The works will impact the verge only.
This roadwork event was last updated by Telefonica UK on 23 Oct 2024 at 14:53.
Tomorrow
Telefonica UK were proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 November 2024 and run through until 26 November 2024. The works were due to impact the verge only.
This roadwork event was last updated by Telefonica UK on 24 Oct 2024 at 11:14.
Tomorrow
Telefonica UK were proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 November 2024 and run through until 26 November 2024. The works were due to impact the verge only.
This roadwork event was last updated by Telefonica UK on 29 Oct 2024 at 08:34.
Tomorrow
Telefonica UK are proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 November 2024 and could run through until 26 November 2024. The works will impact the footway only.
This roadwork event was last updated by Telefonica UK on 24 Oct 2024 at 11:22.
Tomorrow
Telefonica UK were proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 November 2024 and run through until 26 November 2024. The works were due to impact the footway only.
This roadwork event was last updated by Telefonica UK on 29 Oct 2024 at 14:33.
Friday
Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Hill View Road, Kimberworth, Rotherham.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 November 2024 at 21:56 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 24 Nov 2024 at 08:57.
Wednesday
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hawthorn Road, Hillsborough, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 16 Oct 2024 at 14:06.
Wednesday
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hawthorn Road, Hillsborough, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 31 Oct 2024 at 14:52.
Wednesday
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hawthorn Road, Hillsborough, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 1 Nov 2024 at 08:10.
Friday
Sheffield City Council are proposing to carry out Section 50 on Carbrook Hall Road, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 24 Oct 2024 at 15:58.
Friday
Sheffield City Council are proposing to carry out Section 50 on Carbrook Hall Road, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 24 Oct 2024 at 16:01.
25 Nov and 15 Dec 2024
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Main Road, Wharncliffe Side, Sheffield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 18 Nov 2024 at 15:04.
25 Nov 2024 and 31 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Main Road, Wharncliffe Side, Sheffield.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 08:18.
Friday
Telefonica UK were proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 29 November 2024. The works were due to impact the footway only.
This roadwork event was last updated by Telefonica UK on 29 Oct 2024 at 14:35.
Friday
Telefonica UK are proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and verge.
This roadwork event was last updated by Telefonica UK on 4 Nov 2024 at 12:30.
Friday
Telefonica UK are proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and verge.
This roadwork event was last updated by Telefonica UK on 6 Nov 2024 at 10:48.
29 Nov and 13 Dec 2024
Sheffield City Council are proposing to carry out Utility asset works on Fox Hill Road, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 30 Sep 2024 at 10:19.
29 Nov and 13 Dec 2024
Sheffield City Council are proposing to carry out Utility asset works on Fox Hill Road, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 9 Oct 2024 at 12:20.
2 and 4 Dec 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Boyce Street, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 4 Nov 2024 at 16:46.
2 and 4 Dec 2024
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Boyce Street, Sheffield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 4 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 11 Nov 2024 at 07:35.
2 and 17 Dec 2024
Sheffield City Council are proposing to carry out Utility asset works on Stanwell Street, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 30 Sep 2024 at 10:19.
2 and 17 Dec 2024
Sheffield City Council are proposing to carry out Utility asset works on Stanwell Street, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 9 Oct 2024 at 12:26.
2 and 17 Dec 2024
Sheffield City Council are proposing to carry out Utility asset works on Standon Road, Sheffield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 30 Sep 2024 at 10:19.
2 and 17 Dec 2024
Sheffield City Council are proposing to carry out Utility asset works on Standon Road, Sheffield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 9 Oct 2024 at 12:24.
2 and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Main Road, Wharncliffe Side, Sheffield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 16:54.
2 and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Main Road, Wharncliffe Side, Sheffield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 14:56.
2 and 4 Dec 2024
Sheffield City Council are proposing to carry out Utility asset works on Stanley Road, Burncross, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 19 Nov 2024 at 15:21.
2 and 4 Dec 2024
Sheffield City Council are proposing to carry out Utility asset works on Stanley Road, Burncross, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 19 Nov 2024 at 15:21.
2 and 6 Dec 2024
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Westwood Road, High Green, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 1 Nov 2024 at 08:08.
2 and 6 Dec 2024
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Westwood Road, High Green, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 12 Nov 2024 at 17:55.
2 and 6 Dec 2024
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Westwood Road, High Green, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 18 Nov 2024 at 12:42.
2 and 6 Dec 2024
Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Aldham House Lane, Wombwell, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 18 Nov 2024 at 16:17.
2 and 6 Dec 2024
Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Aldham House Lane, Wombwell, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 22 Nov 2024 at 15:02.
5 and 11 Dec 2024
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Crofton Avenue, Sheffield.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 December 2024 and run through until 11 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 13 Nov 2024 at 14:38.
5 and 11 Dec 2024
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Crofton Avenue, Sheffield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 December 2024 and run through until 11 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 20 Nov 2024 at 12:09.
5 and 11 Dec 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Crofton Avenue, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 21 Nov 2024 at 15:37.
9 and 13 Dec 2024
Telefonica UK are proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and verge.
This roadwork event was last updated by Telefonica UK on 6 Nov 2024 at 13:09.
9 and 13 Dec 2024
Telefonica UK are proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and verge.
This roadwork event was last updated by Telefonica UK on 14 Nov 2024 at 09:27.
9 and 13 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Wentworth Road, Blacker Hill, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 12:02.
9 and 13 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Wentworth Road, Blacker Hill, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the verge only.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 09:48.
17 and 19 Dec 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Barlow Road, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 18 Nov 2024 at 14:00.
17 and 19 Dec 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Broomfield Road, Stocksbridge, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 11 Nov 2024 at 16:58.
18 and 20 Dec 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Broomfield Road, Stocksbridge, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 18 Nov 2024 at 17:13.
18 and 20 Dec 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Broomfield Road, Stocksbridge, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 19 Nov 2024 at 07:40.
18 and 20 Dec 2024
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Hollin Moor Lane, Thurgoland, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 12 Nov 2024 at 08:32.
18 and 20 Dec 2024
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Hollin Moor Lane, Thurgoland, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 12 Nov 2024 at 11:09.
2 and 23 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Remington Road, Sheffield.
These works are categorised as Major.
The works will start on or after 2 January 2025 and could run through until 23 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 15:24.
2 Jan and 6 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Wordsworth Avenue, Sheffield.
These works are categorised as Major.
The works will start on or after 2 January 2025 and could run through until 6 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 15:35.
2 Jan and 6 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Wordsworth Avenue, Sheffield.
These works are categorised as Major.
The works will start on or after 2 January 2025 and could run through until 6 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 15 Aug 2024 at 16:12.
2 Jan and 6 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Wordsworth Avenue, Sheffield.
These works were categorised as Major.
The works were originally planned to start 2 January 2025 and run through until 6 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 07:59.
2 and 30 Jan 2025
Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Symonds Avenue, Rawmarsh, Rotherham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 21 Nov 2024 at 12:06.
6 and 27 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Green Lane, Wharncliffe Side, Sheffield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 17:49.
6 and 27 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Green Lane, Wharncliffe Side, Sheffield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 10:00.
6 and 10 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Whitley Lane, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 10:21.
6 and 10 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Whitley Lane, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 14:31.
6 Jan and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Main Road, Wharncliffe Side, Sheffield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 17:48.
6 Jan and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Main Road, Wharncliffe Side, Sheffield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 09:30.
13 Jan and 2 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Weedon Street, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 08:06.
13 Jan and 2 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Weedon Street, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 17:37.
13 Jan and 2 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Weedon Street, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 11:00.
13 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Southey Hall Road, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 14:48.
13 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Southey Hall Road, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 15:30.
15 and 17 Jan 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Harold Croft, Greasbrough, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 21 Nov 2024 at 08:06.
16 and 21 Jan 2025
Quickline Commucations are proposing to carry out Utility asset works on Mill Lane, Wath-upon-dearne, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 21 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 21 Oct 2024 at 07:50.
16 and 21 Jan 2025
Quickline Commucations are proposing to carry out Utility asset works on Mill Lane, Wath-upon-dearne, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 21 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 28 Oct 2024 at 13:55.
27 Jan and 14 Feb 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Sheffield Road, Templeborough, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Nov 2024 at 15:40.
27 Jan and 24 Feb 2025
Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Mansel Road, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Nov 2024 at 11:14.
28 Jan and 28 Mar 2025
Sheffield City Council are proposing to carry out Utility asset works on Sandbed Road, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 24 Oct 2024 at 14:55.
28 Jan and 28 Mar 2025
Sheffield City Council are proposing to carry out Utility asset works on Halifax Road, Wadsley Bridge, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 24 Oct 2024 at 14:56.
3 and 21 Feb 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Sheffield Road, Templeborough, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Nov 2024 at 10:04.
5 and 7 Feb 2025
Vodafone are proposing to carry out Utility asset works on Grange Lane, Thorpe Hesley, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Vodafone on 24 Oct 2024 at 09:56.
17 Feb and 1 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Manchester Road, Stocksbridge, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 11:00.
Roadworks Map near to Burncross Road, SHEFFIELD, S35 1RX
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Burncross Road, SHEFFIELD, S35 1RX (35 Events)
(Scheduled Dates)
(miles)
(Scheduled: 21 Nov 2024 - 26 Nov 2024)
(Scheduled: 21 Nov 2024 - 26 Nov 2024)
(Scheduled: 22 Nov 2024 - 28 Nov 2024)
(Scheduled: 21 Nov 2024 - 26 Nov 2024)
(Scheduled: 21 Nov 2024 - 26 Nov 2024)
Contains public sector information licensed under the Open Government Licence v3.0.