ROADWORKS SUMMARY
Hillcrest Drive, SHEFFIELD, S35 0JJ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Hillcrest Drive, S35 0JJ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Hillcrest Drive, SHEFFIELD, S35 0JJ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Hillcrest Drive are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Sheffield City Council logo
LONG TERM
Until
22 Jul 2031
Details
View Map
Share
Follow
North Church Street

Sheffield City Council are carrying out Section 50 on North Church Street, Sheffield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 July 2021 at 08:00 and could run through until 22 July 2031. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 16 Aug 2021 at 14:14.

Sheffield City Council logo
LONG TERM
Until
6 Jan 2025
Details
View Map
Share
Follow
Sackville Road

Sheffield City Council are carrying out Utility asset works on Sackville Road, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 July 2022 at 00:00 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 16 Dec 2024 at 12:13.

Sheffield City Council logo
LONG TERM
Until
6 Jan 2025
Details
View Map
Share
Follow
Romsdal Road

Sheffield City Council are carrying out Utility asset works on Romsdal Road, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 July 2022 at 00:00 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 16 Dec 2024 at 12:13.

Sheffield City Council logo
LONG TERM
Until
6 Jan 2025
Details
View Map
Share
Follow
Newent Lane

Sheffield City Council are carrying out Utility asset works on Newent Lane, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 July 2022 at 00:00 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 16 Dec 2024 at 12:13.

Sheffield City Council logo
LONG TERM
Until
6 Jan 2025
Details
View Map
Share
Follow
Mona Avenue

Sheffield City Council are carrying out Utility asset works on Mona Avenue, Sheffield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 July 2022 at 00:00 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 16 Dec 2024 at 12:13.

Sheffield City Council logo
LONG TERM
Until
6 Jan 2025
Details
View Map
Share
Follow
Leamington Street

Sheffield City Council are carrying out Utility asset works on Leamington Street, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 July 2022 at 00:00 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 16 Dec 2024 at 12:12.

Sheffield City Council logo
LONG TERM
Until
6 Jan 2025
Details
View Map
Share
Follow
Springvale Road

Sheffield City Council are carrying out Utility asset works on Springvale Road, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 July 2022 at 00:00 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 16 Dec 2024 at 12:14.

Sheffield City Council logo
LONG TERM
Until
6 Jan 2025
Details
View Map
Share
Follow
Heavygate Avenue

Sheffield City Council are carrying out Utility asset works on Heavygate Avenue, Sheffield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 July 2022 at 00:00 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 16 Dec 2024 at 12:12.

Sheffield City Council logo
LONG TERM
Until
6 Jan 2025
Details
View Map
Share
Follow
Highton Street

Sheffield City Council are carrying out Utility asset works on Highton Street, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 July 2022 at 00:00 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 16 Dec 2024 at 12:12.

Sheffield City Council logo
LONG TERM
Until
6 Jan 2025
Details
View Map
Share
Follow
Matlock Road

Sheffield City Council are carrying out Utility asset works on Matlock Road, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2023 at 00:00 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 16 Dec 2024 at 12:13.

Sheffield City Council logo
LONG TERM
Until
6 Jan 2025
Details
View Map
Share
Follow
Fir Street

Sheffield City Council are carrying out Utility asset works on Fir Street, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2023 at 00:00 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 16 Dec 2024 at 12:12.

Sheffield City Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Townhead Street

Sheffield City Council are carrying out Highway repair and maintenance works on Townhead Street, Sheffield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 May 2023 at 09:00 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Dec 2024 at 10:31.

Sheffield City Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Broad Lane

Sheffield City Council are carrying out Highway repair and maintenance works on Broad Lane, Sheffield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 May 2023 at 09:00 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Dec 2024 at 10:30.

Sheffield City Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Tenter Street

Sheffield City Council are carrying out Highway repair and maintenance works on Tenter Street, Sheffield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 May 2023 at 09:00 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 19 Dec 2024 at 10:26.

Sheffield City Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Silver Street Head

Sheffield City Council are carrying out Highway repair and maintenance works on Silver Street Head, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 May 2023 at 09:00 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Dec 2024 at 10:29.

Sheffield City Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
West Bar Green

Sheffield City Council are carrying out Highway repair and maintenance works on West Bar Green, Sheffield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 May 2023 at 09:00 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 19 Dec 2024 at 10:27.

Sheffield City Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Corporation Street

Sheffield City Council are carrying out Highway repair and maintenance works on Corporation Street, Sheffield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 May 2023 at 09:00 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 19 Dec 2024 at 10:28.

Sheffield City Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
West Bar

Sheffield City Council are carrying out Highway repair and maintenance works on West Bar, Sheffield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 May 2023 at 09:00 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 19 Dec 2024 at 10:28.

Sheffield City Council logo
LONG TERM
Until
6 Jan 2025
Details
View Map
Share
Follow
Newhall Road

Sheffield City Council are carrying out Utility asset works on Newhall Road, Sheffield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 June 2023 at 03:36 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 16 Dec 2024 at 12:14.

Sheffield City Council logo
LONG TERM
Until
6 Jan 2025
Details
View Map
Share
Follow
Carlisle Street East

Sheffield City Council are carrying out Utility asset works on Carlisle Street East, Sheffield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 July 2023 at 09:13 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 16 Dec 2024 at 12:14.

Sheffield City Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Shalesmoor

Sheffield City Council are carrying out Highway repair and maintenance works on Shalesmoor, Sheffield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 August 2023 at 09:00 and could run through until 31 March 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Sheffield City Council on 19 Dec 2024 at 10:32.

Sheffield City Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Russell Street

Sheffield City Council are carrying out Highway repair and maintenance works on Russell Street, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2023 at 09:00 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 19 Dec 2024 at 10:36.

Sheffield City Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Mowbray Street

Sheffield City Council are carrying out Highway repair and maintenance works on Mowbray Street, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2023 at 09:00 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 19 Dec 2024 at 10:39.

Sheffield City Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Rutland Road

Sheffield City Council are carrying out Highway repair and maintenance works on Rutland Road, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2023 at 09:00 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Dec 2024 at 10:35.

Sheffield City Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Percy Street

Sheffield City Council are carrying out Highway repair and maintenance works on Percy Street, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2023 at 09:00 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 19 Dec 2024 at 10:37.

Sheffield City Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Platt Street

Sheffield City Council are carrying out Highway repair and maintenance works on Platt Street, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2023 at 09:00 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 19 Dec 2024 at 10:37.

Sheffield City Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Hicks Street

Sheffield City Council are carrying out Highway repair and maintenance works on Hicks Street, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2023 at 09:00 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 19 Dec 2024 at 10:38.

Sheffield City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Loxley Road

Sheffield City Council are carrying out Utility asset works on Loxley Road, Sheffield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 September 2024 at 07:42 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Dec 2024 at 12:21.

Sheffield City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Moonshine Lane

Sheffield City Council are carrying out Utility asset works on Moonshine Lane, Sheffield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 07:39 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Dec 2024 at 12:22.

Sheffield City Council logo
LONG TERM
Until
6 Jan 2025
Details
View Map
Share
Follow
Sugworth Road

Sheffield City Council are carrying out Utility asset works on Sugworth Road, Sheffield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 October 2024 at 12:13 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 16 Dec 2024 at 12:06.

Sheffield City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Firshill Crescent

Sheffield City Council are carrying out Utility asset works on Firshill Crescent, Sheffield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:09 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Dec 2024 at 12:29.

Sheffield City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Cedar Road

Sheffield City Council are carrying out Utility asset works on Cedar Road, Sheffield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:00 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Dec 2024 at 12:20.

Sheffield City Council logo
LONG TERM
Between
22 Nov 2024 and 21 Feb 2025
Details
View Map
Share
Cowlishaw Road

Sheffield City Council were proposing to carry out Utility asset works on Cowlishaw Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 November 2024 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Nov 2024 at 08:07.

Sheffield City Council logo
LONG TERM
Between
22 Nov 2024 and 21 Feb 2025
Details
View Map
Share
Junction Road

Sheffield City Council were proposing to carry out Utility asset works on Junction Road, Sharrow, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 November 2024 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Nov 2024 at 08:07.

Sheffield City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Dorset Street

Sheffield City Council are carrying out Utility asset works on Dorset Street, Sheffield.

These works are categorised as Major.

The works started on 25 November 2024 at 07:48 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Dec 2024 at 12:24.

Cadent Gas logo
LONG TERM
Between
25 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Main Road

Cadent Gas were proposing to carry out Utility asset works on Main Road, Wharncliffe Side, Sheffield.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 08:18.

Sheffield City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Shay House Lane

Sheffield City Council are carrying out Utility asset works on Shay House Lane, Sheffield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 November 2024 at 08:20 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Dec 2024 at 16:10.

Sheffield City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Town End Road

Sheffield City Council are carrying out Utility asset works on Town End Road, Sheffield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 08:01 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 20 Dec 2024 at 10:20.

Sheffield City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Mortimer Road

Sheffield City Council are carrying out Utility asset works on Mortimer Road, Sheffield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 07:58 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Dec 2024 at 11:16.

Sheffield City Council logo
Finishing
Monday
Details
View Map
Share
Follow
Mansel Crescent

Sheffield City Council are proposing to carry out Section 50 on Mansel Crescent, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 30 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 12 Dec 2024 at 16:29.

Sheffield City Council logo
Finishing
Monday
Details
View Map
Share
Follow
Mansel Crescent

Sheffield City Council are proposing to carry out Section 50 on Mansel Crescent, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 30 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 12 Dec 2024 at 16:29.

Yorkshire Water logo
Between
2 and 24 Jan 2025
Details
View Map
Share
Follow
Winchester Avenue

Yorkshire Water are proposing to carry out Utility asset works on Winchester Avenue, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 17 Dec 2024 at 17:58.

Yorkshire Water logo
Between
2 and 24 Jan 2025
Details
View Map
Share
Follow
Winchester Avenue

Yorkshire Water are proposing to carry out Utility asset works on Winchester Avenue, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 18 Dec 2024 at 09:43.

Sheffield City Council logo
Between
2 and 31 Jan 2025
Details
View Map
Share
Follow
Crookesmoor Road

Sheffield City Council are proposing to carry out Utility asset works on Crookesmoor Road, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 3 Dec 2024 at 14:31.

Sheffield City Council logo
Between
2 and 31 Jan 2025
Details
View Map
Share
Follow
Crookesmoor Road

Sheffield City Council are proposing to carry out Utility asset works on Crookesmoor Road, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 9 Dec 2024 at 17:06.

Sheffield City Council logo
Between
2 and 31 Jan 2025
Details
View Map
Share
Follow
Crookesmoor Road

Sheffield City Council are proposing to carry out Utility asset works on Crookesmoor Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 3 Dec 2024 at 14:31.

Sheffield City Council logo
Between
2 and 31 Jan 2025
Details
View Map
Share
Follow
Crookesmoor Road

Sheffield City Council are proposing to carry out Utility asset works on Crookesmoor Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 9 Dec 2024 at 17:06.

Cadent Gas logo
Between
2 and 23 Jan 2025
Details
View Map
Share
Follow
Remington Road

Cadent Gas are proposing to carry out Utility asset works on Remington Road, Sheffield.

These works are categorised as Major.

The works will start on or after 2 January 2025 and could run through until 23 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 15:24.

Cadent Gas logo
LONG TERM
Between
2 Jan and 6 Mar 2025
Details
View Map
Share
Follow
Wordsworth Avenue

Cadent Gas are proposing to carry out Utility asset works on Wordsworth Avenue, Sheffield.

These works are categorised as Major.

The works will start on or after 2 January 2025 and could run through until 6 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 15:35.

Cadent Gas logo
LONG TERM
Between
2 Jan and 6 Mar 2025
Details
View Map
Share
Follow
Wordsworth Avenue

Cadent Gas are proposing to carry out Utility asset works on Wordsworth Avenue, Sheffield.

These works are categorised as Major.

The works will start on or after 2 January 2025 and could run through until 6 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 15 Aug 2024 at 16:12.

Cadent Gas logo
LONG TERM
Between
2 Jan and 6 Mar 2025
Details
View Map
Share
Wordsworth Avenue

Cadent Gas were proposing to carry out Utility asset works on Wordsworth Avenue, Sheffield.

These works were categorised as Major.

The works were originally planned to start 2 January 2025 and run through until 6 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 07:59.

Sheffield City Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Gorse Lane

Sheffield City Council are proposing to carry out Utility asset works on Gorse Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 23 Nov 2024 at 16:43.

Sheffield City Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Gorse Lane

Sheffield City Council are proposing to carry out Utility asset works on Gorse Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 3 Dec 2024 at 11:44.

Cityfibre Metro Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Exeter Drive

Cityfibre Metro Networks were proposing to carry out Utility repair and maintenance works on Exeter Drive, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 22 Nov 2024 at 08:18.

Sheffield City Council logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Den Bank Avenue

Sheffield City Council are proposing to carry out Utility asset works on Den Bank Avenue, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway only.

This roadwork event was last updated by Sheffield City Council on 2 Dec 2024 at 16:30.

Nexfibre Networks Limited logo
Between
6 and 12 Jan 2025
Details
View Map
Share
Follow
High Matlock Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on High Matlock Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 12 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 26 Nov 2024 at 09:54.

Sheffield City Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Dungworth Green

Sheffield City Council are proposing to carry out Utility asset works on Dungworth Green, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 24 Nov 2024 at 23:48.

Sheffield City Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Dungworth Green

Sheffield City Council are proposing to carry out Utility asset works on Dungworth Green, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 3 Dec 2024 at 12:29.

Cadent Gas logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Green Lane

Cadent Gas are proposing to carry out Utility asset works on Green Lane, Wharncliffe Side, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 17:49.

Cadent Gas logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Green Lane

Cadent Gas are proposing to carry out Utility asset works on Green Lane, Wharncliffe Side, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Dec 2024 at 13:09.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Whitley Lane

Cadent Gas are proposing to carry out Utility asset works on Whitley Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 10:21.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Whitley Lane

Cadent Gas are proposing to carry out Utility asset works on Whitley Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 14:31.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Whitley Lane

Cadent Gas are proposing to carry out Utility asset works on Whitley Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 14:30.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Whitley Lane

Cadent Gas are proposing to carry out Utility asset works on Whitley Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 10:41.

Cadent Gas logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Main Road

Cadent Gas are proposing to carry out Utility asset works on Main Road, Wharncliffe Side, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 17:48.

Cadent Gas logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Main Road

Cadent Gas are proposing to carry out Utility asset works on Main Road, Wharncliffe Side, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Dec 2024 at 13:08.

Cadent Gas logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Main Road

Cadent Gas are proposing to carry out Utility asset works on Main Road, Wharncliffe Side, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 16:15.

Sheffield City Council logo
Between
10 and 13 Jan 2025
Details
View Map
Share
Follow
Lee Lane

Sheffield City Council are proposing to carry out Utility asset works on Lee Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 24 Nov 2024 at 23:48.

Sheffield City Council logo
Between
10 and 13 Jan 2025
Details
View Map
Share
Follow
Lee Lane

Sheffield City Council are proposing to carry out Utility asset works on Lee Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 3 Dec 2024 at 12:26.

Yorkshire Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Huntingtower Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Huntingtower Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 18 Dec 2024 at 10:15.

Nexfibre Networks Limited logo
Between
13 and 19 Jan 2025
Details
View Map
Share
Follow
High Matlock Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on High Matlock Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 5 Dec 2024 at 16:54.

Nexfibre Networks Limited logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
High Matlock Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on High Matlock Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 17 Dec 2024 at 12:07.

Nexfibre Networks Limited logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
High Matlock Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on High Matlock Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 23 Dec 2024 at 10:35.

Cadent Gas logo
Between
13 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Southey Hall Road

Cadent Gas are proposing to carry out Utility asset works on Southey Hall Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 14:48.

Cadent Gas logo
Between
13 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Southey Hall Road

Cadent Gas are proposing to carry out Utility asset works on Southey Hall Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 11:08.

Cadent Gas logo
Between
13 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Southey Hall Road

Cadent Gas are proposing to carry out Utility asset works on Southey Hall Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 10:25.

Northern Powergrid (Yorkshire) logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Main Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Main Road, Wharncliffe Side, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 13 Dec 2024 at 16:55.

Sheffield City Council logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Broomfield Road

Sheffield City Council are proposing to carry out Section 50 on Broomfield Road, Stocksbridge, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Dec 2024 at 17:04.

Sheffield City Council logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Broomfield Road

Sheffield City Council are proposing to carry out Section 50 on Broomfield Road, Stocksbridge, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Dec 2024 at 17:09.

Sheffield City Council logo
Between
15 and 30 Jan 2025
Details
View Map
Share
Follow
Fulwood Road

Sheffield City Council are proposing to carry out Utility asset works on Fulwood Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 29 Nov 2024 at 12:54.

Sheffield City Council logo
Between
15 and 30 Jan 2025
Details
View Map
Share
Follow
Fulwood Road

Sheffield City Council are proposing to carry out Utility asset works on Fulwood Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 9 Dec 2024 at 15:53.

Sheffield City Council logo
Between
15 and 30 Jan 2025
Details
View Map
Share
Follow
Fulwood Road

Sheffield City Council are proposing to carry out Utility asset works on Fulwood Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 29 Nov 2024 at 12:54.

Sheffield City Council logo
Between
15 and 30 Jan 2025
Details
View Map
Share
Follow
Fulwood Road

Sheffield City Council are proposing to carry out Utility asset works on Fulwood Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 9 Dec 2024 at 15:55.

Sheffield City Council logo
Between
15 and 30 Jan 2025
Details
View Map
Share
Follow
Fulwood Road

Sheffield City Council are proposing to carry out Utility asset works on Fulwood Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 29 Nov 2024 at 12:54.

Sheffield City Council logo
Between
15 and 30 Jan 2025
Details
View Map
Share
Follow
Fulwood Road

Sheffield City Council are proposing to carry out Utility asset works on Fulwood Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 9 Dec 2024 at 15:54.

Northern Powergrid (Yorkshire) logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Lambert Street

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Lambert Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 6 Dec 2024 at 16:38.

Northern Powergrid (Yorkshire) logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Lambert Street

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Lambert Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 18 Dec 2024 at 12:13.

Northern Powergrid (Yorkshire) logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Lambert Street

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Lambert Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 19 Dec 2024 at 11:48.

Northern Powergrid (Yorkshire) logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Sykehouse Lane

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Sykehouse Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 19 Nov 2024 at 12:58.

Northern Powergrid (Yorkshire) logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Sykehouse Lane

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Sykehouse Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 Dec 2024 at 15:04.

Northern Powergrid (Yorkshire) logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Sykehouse Lane

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Sykehouse Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 19 Dec 2024 at 11:45.

Yorkshire Water logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Onslow Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Onslow Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 12 Dec 2024 at 09:50.

Yorkshire Water logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Onslow Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Onslow Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 12 Dec 2024 at 16:47.

Yorkshire Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Huntingtower Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Huntingtower Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 23 Dec 2024 at 13:03.

Yorkshire Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Huntingtower Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Huntingtower Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 23 Dec 2024 at 14:38.

Sheffield City Council logo
Between
27 Jan and 11 Feb 2025
Details
View Map
Share
Brookhouse Hill

Sheffield City Council were proposing to carry out Utility asset works on Brookhouse Hill, Sheffield.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 11 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Dec 2024 at 10:17.

Sheffield City Council logo
Between
27 Jan and 11 Feb 2025
Details
View Map
Share
Brookhouse Hill

Sheffield City Council were proposing to carry out Utility asset works on Brookhouse Hill, Sheffield.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 11 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Dec 2024 at 10:17.

Sheffield City Council logo
Between
27 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Brookhouse Hill

Sheffield City Council are proposing to carry out Utility asset works on Brookhouse Hill, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Dec 2024 at 10:17.

Sheffield City Council logo
Between
27 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Brookhouse Hill

Sheffield City Council are proposing to carry out Utility asset works on Brookhouse Hill, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 13 Dec 2024 at 08:05.

Sheffield City Council logo
Between
27 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Crimicar Lane

Sheffield City Council are proposing to carry out Utility asset works on Crimicar Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Dec 2024 at 08:47.

Sheffield City Council logo
Between
27 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Crimicar Lane

Sheffield City Council are proposing to carry out Utility asset works on Crimicar Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 12 Dec 2024 at 18:01.

Sheffield City Council logo
Between
27 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Crimicar Lane

Sheffield City Council are proposing to carry out Utility asset works on Crimicar Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Dec 2024 at 08:47.

Sheffield City Council logo
Between
27 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Crimicar Lane

Sheffield City Council are proposing to carry out Utility asset works on Crimicar Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 12 Dec 2024 at 18:00.

Northern Powergrid (Yorkshire) logo
Between
27 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Mansel Road

Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Mansel Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 Dec 2024 at 09:55.

Northern Powergrid (Yorkshire) logo
Between
27 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Mansel Road

Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Mansel Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 23 Dec 2024 at 10:33.

Sheffield City Council logo
LONG TERM
Between
28 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Thompson Road

Sheffield City Council are proposing to carry out Utility asset works on Thompson Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 24 Oct 2024 at 14:58.

Sheffield City Council logo
LONG TERM
Between
28 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Bernard Street

Sheffield City Council are proposing to carry out Utility asset works on Bernard Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 24 Oct 2024 at 14:54.

Sheffield City Council logo
LONG TERM
Between
28 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Sandbed Road

Sheffield City Council are proposing to carry out Utility asset works on Sandbed Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 24 Oct 2024 at 14:55.

Sheffield City Council logo
LONG TERM
Between
28 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Halifax Road

Sheffield City Council are proposing to carry out Utility asset works on Halifax Road, Wadsley Bridge, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 24 Oct 2024 at 14:56.

Yorkshire Water logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
Whitley Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Whitley Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 17 Dec 2024 at 10:04.

Yorkshire Water logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
Whitley Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Whitley Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 17 Dec 2024 at 16:33.

Sheffield City Council logo
LONG TERM
Between
29 Jan 2025 and 30 Jun 2026
Details
View Map
Share
Follow
Pinstone Street

Sheffield City Council are proposing to carry out Highway repair and maintenance works on Pinstone Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 30 June 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Dec 2024 at 11:34.

Sheffield City Council logo
LONG TERM
Between
29 Jan 2025 and 30 Jun 2026
Details
View Map
Share
Follow
Furnival Gate

Sheffield City Council are proposing to carry out Highway repair and maintenance works on Furnival Gate, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 30 June 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Dec 2024 at 11:35.

Sheffield City Council logo
LONG TERM
Between
29 Jan 2025 and 30 Jun 2026
Details
View Map
Share
Follow
Charles Street

Sheffield City Council are proposing to carry out Highway repair and maintenance works on Charles Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 30 June 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Dec 2024 at 11:34.

Sheffield City Council logo
LONG TERM
Between
29 Jan 2025 and 30 Jun 2026
Details
View Map
Share
Follow
Cross Burgess Street

Sheffield City Council are proposing to carry out Highway repair and maintenance works on Cross Burgess Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 30 June 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Dec 2024 at 11:33.

Sheffield City Council logo
LONG TERM
Between
29 Jan 2025 and 30 Jun 2026
Details
View Map
Share
Follow
Surrey Street

Sheffield City Council are proposing to carry out Highway repair and maintenance works on Surrey Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 30 June 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Dec 2024 at 11:35.

Sheffield City Council logo
LONG TERM
Between
29 Jan 2025 and 30 Jun 2026
Details
View Map
Share
Follow
Arundel Gate

Sheffield City Council are proposing to carry out Highway repair and maintenance works on Arundel Gate, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 30 June 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Dec 2024 at 11:35.

Sheffield City Council logo
Between
29 Jan and 13 Feb 2025
Details
View Map
Share
Follow
Padley Walk

Sheffield City Council are proposing to carry out Utility asset works on Padley Walk, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 13 February 2025. The works will impact the footway and footpath.

This roadwork event was last updated by Sheffield City Council on 2 Dec 2024 at 11:30.

Sheffield City Council logo
Between
29 Jan and 13 Feb 2025
Details
View Map
Share
Follow
Padley Walk

Sheffield City Council are proposing to carry out Utility asset works on Padley Walk, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 13 February 2025. The works will impact the footway and footpath.

This roadwork event was last updated by Sheffield City Council on 2 Dec 2024 at 16:38.

Cadent Gas logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Follow
Green Lane

Cadent Gas are proposing to carry out Utility asset works on Green Lane, Wharncliffe Side, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 16:18.

Cadent Gas logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Follow
Green Lane

Cadent Gas are proposing to carry out Utility asset works on Green Lane, Wharncliffe Side, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 07:52.

Cadent Gas logo
LONG TERM
Between
3 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Main Road

Cadent Gas are proposing to carry out Utility asset works on Main Road, Wharncliffe Side, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 07:50.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Redmires Road

Sheffield City Council are proposing to carry out Utility asset works on Redmires Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 17 Dec 2024 at 09:38.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Redmires Road

Sheffield City Council are proposing to carry out Utility asset works on Redmires Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Dec 2024 at 08:47.

Vodafone logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
Grange Lane

Vodafone are proposing to carry out Utility asset works on Grange Lane, Thorpe Hesley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 24 Oct 2024 at 09:56.

Vodafone logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
Grange Lane

Vodafone are proposing to carry out Utility asset works on Grange Lane, Thorpe Hesley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 19 Dec 2024 at 12:13.

Yorkshire Water logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Greeton Drive

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Greeton Drive, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 23 Dec 2024 at 14:23.

Yorkshire Water logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Greeton Drive

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Greeton Drive, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 24 Dec 2024 at 07:32.

Cadent Gas logo
LONG TERM
Between
17 Feb and 1 Aug 2025
Details
View Map
Share
Follow
Manchester Road

Cadent Gas are proposing to carry out Utility asset works on Manchester Road, Stocksbridge, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 29 Nov 2024 at 13:25.

Sheffield City Council logo
Between
28 Feb and 28 Mar 2025
Details
View Map
Share
Egerton Walk

Sheffield City Council were proposing to carry out Utility asset works on Egerton Walk, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 February 2025 and run through until 28 March 2025. The works were due to impact the footway and footpath.

This roadwork event was last updated by Sheffield City Council on 12 Dec 2024 at 12:23.

Sheffield City Council logo
Between
28 Feb and 28 Mar 2025
Details
View Map
Share
Padley Walk

Sheffield City Council were proposing to carry out Utility asset works on Padley Walk, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 February 2025 and run through until 28 March 2025. The works were due to impact the footway and footpath.

This roadwork event was last updated by Sheffield City Council on 27 Nov 2024 at 12:03.

Northern Powergrid (Yorkshire) logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Station Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Station Road, Deepcar, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 13 Dec 2024 at 13:44.

Northern Powergrid (Yorkshire) logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Station Road

Northern Powergrid (Yorkshire) were proposing to carry out Utility repair and maintenance works on Station Road, Deepcar, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 10 Dec 2024 at 07:26.

Telefonica UK logo
Between
11 and 13 Mar 2025
Details
View Map
Share
Follow
Sheffield Road

Telefonica UK are proposing to carry out Utility asset works on Sheffield Road, Hoyland, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the verge only.

This roadwork event was last updated by Telefonica UK on 11 Dec 2024 at 13:35.


Roadworks Map near to Hillcrest Drive, SHEFFIELD, S35 0JJ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 28 Dec 2024 02:54
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Hillcrest Drive, SHEFFIELD, S35 0JJ (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Sheffield City Council logo
EMERGENCY
  
LANGSETT ROAD SOUTH 
(0.3 miles)
Sheffield City Council
Utility asset works - Footway - Some carriageway incursion
In Progress
Since: 19 Mar 2024 00:00
(Scheduled: 19 Mar 2024 - 6 Jan 2025)
0.3
Details
Share
Follow
2
Sheffield City Council logo
EMERGENCY
  
WORRALL ROAD, WORRALL 
(0.7 miles)
Sheffield City Council
Utility asset works - Verge - No carriageway incursion
In Progress
Since: 18 Dec 2024 00:00
(Scheduled: 18 Dec 2024 - 6 Jan 2025)
0.7
Details
Share
Follow
3
Sheffield City Council logo
MAJOR
  
FAIRHOLME HEIGHTS 
(0.7 miles)
Sheffield City Council
Utility asset works - Carriageway - Give and take
In Progress
Since: 16 Dec 2024 07:46
(Scheduled: 16 Dec 2024 - 3 Jan 2025)
0.7
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.