The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to S30 4LY

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Sheffield City Council logo
LONG TERM
Until
20 Nov 2024
Details
View Map
Share
Follow
Whitley Lane

Sheffield City Council are carrying out Utility asset works on Whitley Lane, Sheffield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 February 2024 at 00:00 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 6 Nov 2024 at 12:15.

Yorkshire Water logo
LONG TERM
Between
27 Aug 2024 and 20 Jun 2025
Details
View Map
Share
Follow
Wath Road

Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Wath Road, Elsecar, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2024 and could run through until 20 June 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 7 Aug 2024 at 08:10.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Main Road

Cadent Gas are proposing to carry out Utility asset works on Main Road, Wharncliffe Side, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 18 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 19 Jul 2024 at 15:18.

Cadent Gas logo
LONG TERM
Until
13 Dec 2024
Details
View Map
Share
Follow
Wordsworth Avenue

Cadent Gas are carrying out Utility asset works on Wordsworth Avenue, Sheffield.

These works are categorised as Major.

The works started on 23 September 2024 at 08:30 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 08:43.

Yorkshire Water logo
LONG TERM
Between
23 Sep 2024 and 20 Jun 2025
Details
View Map
Share
Follow
Wath Road

Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Wath Road, Elsecar, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 20 June 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 13 Sep 2024 at 07:10.

Sheffield City Council logo
LONG TERM
Between
26 Sep and 26 Nov 2024
Details
View Map
Share
Worrall Road

Sheffield City Council were proposing to carry out Utility asset works on Worrall Road, Worrall, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 September 2024 and run through until 26 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 26 Sep 2024 at 08:18.

Sheffield City Council logo
LONG TERM
Between
26 Sep and 26 Nov 2024
Details
View Map
Share
Penistone Road

Sheffield City Council were proposing to carry out Utility asset works on Penistone Road, Grenoside, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 September 2024 and run through until 26 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 26 Sep 2024 at 08:18.

Sheffield City Council logo
LONG TERM
Between
26 Sep and 26 Nov 2024
Details
View Map
Share
Main Road

Sheffield City Council were proposing to carry out Utility asset works on Main Road, Wharncliffe Side, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 September 2024 and run through until 26 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 26 Sep 2024 at 08:18.

Sheffield City Council logo
LONG TERM
Between
26 Sep and 26 Nov 2024
Details
View Map
Share
Manchester Road

Sheffield City Council were proposing to carry out Utility asset works on Manchester Road, Stocksbridge, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 September 2024 and run through until 26 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 26 Sep 2024 at 08:18.

Sheffield City Council logo
LONG TERM
Between
26 Sep and 26 Nov 2024
Details
View Map
Share
Market Place

Sheffield City Council were proposing to carry out Utility asset works on Market Place, Chapeltown, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 September 2024 and run through until 26 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 26 Sep 2024 at 08:18.

Sheffield City Council logo
LONG TERM
Between
26 Sep and 26 Nov 2024
Details
View Map
Share
Lound Side

Sheffield City Council were proposing to carry out Utility asset works on Lound Side, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 September 2024 and run through until 26 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 26 Sep 2024 at 08:18.

Sheffield City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Moonshine Lane

Sheffield City Council are carrying out Utility asset works on Moonshine Lane, Sheffield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 07:39 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 8 Nov 2024 at 15:11.

Yorkshire Water logo
LONG TERM
Between
30 Sep 2024 and 27 Jun 2025
Details
View Map
Share
Wath Road

Yorkshire Water were proposing to carry out Statutory Infrastructure Works on Wath Road, Elsecar, Barnsley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2024 and run through until 27 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 13 Sep 2024 at 09:29.

Yorkshire Water logo
LONG TERM
Between
30 Sep 2024 and 27 Jun 2025
Details
View Map
Share
Follow
Wath Road

Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Wath Road, Elsecar, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 27 June 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 16 Sep 2024 at 14:49.

Yorkshire Water logo
LONG TERM
Until
27 Jun 2025
Details
View Map
Share
Follow
Wath Road

Yorkshire Water are carrying out Statutory Infrastructure Works on Wath Road, Elsecar, Barnsley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 10:00 and could run through until 27 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 21 Oct 2024 at 09:16.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Longley Hall Road

Cadent Gas are proposing to carry out Utility asset works on Longley Hall Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 18 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 1 Aug 2024 at 12:25.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Longley Hall Road

Cadent Gas are proposing to carry out Utility asset works on Longley Hall Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 18 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 11:48.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Longley Hall Road

Cadent Gas are proposing to carry out Utility asset works on Longley Hall Road, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 18 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 12:00.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
14 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Cortonwood Drive

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Cortonwood Drive, Brampton Bierlow, Rotherham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 23 Sep 2024 at 08:30.

Rotherham Metropolitan Borough Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Cortonwood Drive

Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Cortonwood Drive, Brampton Bierlow, Rotherham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 19:00 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 28 Oct 2024 at 14:53.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
14 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Corton Wood

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Corton Wood, Brampton Bierlow, Rotherham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 23 Sep 2024 at 08:30.

Rotherham Metropolitan Borough Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Corton Wood

Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Corton Wood, Brampton Bierlow, Rotherham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 19:00 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 28 Oct 2024 at 14:10.

Cadent Gas logo
LONG TERM
Until
28 Nov 2024
Details
View Map
Share
Follow
Longley Hall Road

Cadent Gas are carrying out Utility asset works on Longley Hall Road, Sheffield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 October 2024 at 09:00 and could run through until 28 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 09:46.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Elm Lane

Cadent Gas are carrying out Utility repair and maintenance works on Elm Lane, Sheffield.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 October 2024 at 08:44 and could run through until 15 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 15:39.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Longley Hall Grove

Cadent Gas are carrying out Utility asset works on Longley Hall Grove, Sheffield.

These works are categorised as Major.

The works started on 29 October 2024 at 10:00 and could run through until 18 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 11:05.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Langsett Road North

Cadent Gas are carrying out Utility repair and maintenance works on Langsett Road North, Sheffield.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 15:16 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:50.

Sheffield City Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Birch House Avenue

Sheffield City Council are proposing to carry out Utility asset works on Birch House Avenue, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 14 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 30 Aug 2024 at 13:30.

Sheffield City Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Birch House Avenue

Sheffield City Council are carrying out Utility asset works on Birch House Avenue, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 October 2024 at 07:38 and could run through until 14 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 30 Oct 2024 at 08:07.

Sheffield City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Blackburn Drive

Sheffield City Council are proposing to carry out Utility asset works on Blackburn Drive, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 30 Aug 2024 at 13:30.

Sheffield City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Blackburn Drive

Sheffield City Council are carrying out Utility asset works on Blackburn Drive, Sheffield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 31 October 2024 at 07:43 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 31 Oct 2024 at 08:20.

Sheffield City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Cotswold Avenue

Sheffield City Council are proposing to carry out Utility asset works on Cotswold Avenue, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 30 Aug 2024 at 13:30.

Sheffield City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Cotswold Avenue

Sheffield City Council are carrying out Utility asset works on Cotswold Avenue, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 October 2024 at 07:43 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 31 Oct 2024 at 08:20.

Yorkshire Water logo
Finishing
Today
Details
View Map
Share
Follow
More Hall Lane

Yorkshire Water are carrying out Utility repair and maintenance works on More Hall Lane, Sheffield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 November 2024 at 08:11 and could run through until 13 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 7 Nov 2024 at 12:36.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Middlewood Road North

Cadent Gas are proposing to carry out Utility repair and maintenance works on Middlewood Road North, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 15 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 12:27.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Middlewood Road North

Cadent Gas are proposing to carry out Utility repair and maintenance works on Middlewood Road North, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 15 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 17:00.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Middlewood Road North

Cadent Gas are proposing to carry out Utility repair and maintenance works on Middlewood Road North, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 15 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 11:24.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Middlewood Road North

Cadent Gas are proposing to carry out Utility repair and maintenance works on Middlewood Road North, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 15 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 11:17.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Middlewood Road North

Cadent Gas were proposing to carry out Utility repair and maintenance works on Middlewood Road North, Sheffield.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 15 November 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 13:13.

Cadent Gas logo
LONG TERM
Between
4 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Wordsworth Avenue

Cadent Gas are proposing to carry out Utility asset works on Wordsworth Avenue, Sheffield.

These works are categorised as Major.

The works will start on or after 4 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 15:31.

Cadent Gas logo
LONG TERM
Between
4 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Wordsworth Avenue

Cadent Gas are proposing to carry out Utility asset works on Wordsworth Avenue, Sheffield.

These works are categorised as Major.

The works will start on or after 4 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 15 Aug 2024 at 16:12.

Sheffield City Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Freeman Gardens

Sheffield City Council are carrying out Utility asset works on Freeman Gardens, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 07:47 and could run through until 19 November 2024. The works will impact the footway and footpath.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 08:28.

Barnsley Metropolitan Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Westwood New Road

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Westwood New Road, Howbrook, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 4 Nov 2024 at 10:40.

Barnsley Metropolitan Borough Council logo
Until
22 Nov 2024
Details
View Map
Share
Follow
Westwood New Road

Barnsley Metropolitan Borough Council are carrying out Highway repair and maintenance works on Westwood New Road, Howbrook, Barnsley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 10:00 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 8 Nov 2024 at 12:29.

Barnsley Metropolitan Borough Council logo
Between
6 and 20 Nov 2024
Details
View Map
Share
Follow
Sheffield Road

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Sheffield Road, Wortley, Barnsley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 20 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 29 Oct 2024 at 11:23.

Barnsley Metropolitan Borough Council logo
Between
6 and 20 Nov 2024
Details
View Map
Share
Follow
Halifax Road

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Halifax Road, Thurgoland, Barnsley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 20 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 29 Oct 2024 at 11:18.

Sheffield City Council logo
Between
7 and 22 Nov 2024
Details
View Map
Share
Follow
Herries Road

Sheffield City Council are proposing to carry out Utility asset works on Herries Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Oct 2024 at 14:45.

Sheffield City Council logo
Until
22 Nov 2024
Details
View Map
Share
Follow
Herries Road

Sheffield City Council are carrying out Utility asset works on Herries Road, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 November 2024 at 07:44 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 7 Nov 2024 at 08:06.

Yorkshire Water logo
Finishing
Friday
Details
View Map
Share
Follow
Lyminster Road

Yorkshire Water are carrying out Utility repair and maintenance works on Lyminster Road, Sheffield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 November 2024 at 07:49 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 11 Nov 2024 at 09:03.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Bower Hill Road

Cadent Gas are proposing to carry out Utility asset works on Bower Hill Road, Oxspring, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 08:34.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Bower Hill Road

Cadent Gas are carrying out Utility asset works on Bower Hill Road, Oxspring, Barnsley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 08:49.

Barnsley Metropolitan Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Kings Road

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Kings Road, Wombwell, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 16 Oct 2024 at 12:25.

Barnsley Metropolitan Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Kings Road

Barnsley Metropolitan Borough Council are carrying out Highway repair and maintenance works on Kings Road, Wombwell, Barnsley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 09:00 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 11 Nov 2024 at 09:09.

Yorkshire Water logo
Finishing
Monday
Details
View Map
Share
Follow
Vere Road

Yorkshire Water are carrying out Utility repair and maintenance works on Vere Road, Sheffield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 November 2024 at 09:27 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 12 Nov 2024 at 11:23.

Cadent Gas logo
Until
3 Dec 2024
Details
View Map
Share
Follow
Margetson Crescent

Cadent Gas are carrying out Utility asset works on Margetson Crescent, Sheffield.

These works are categorised as Major.

The works started on 12 November 2024 at 11:00 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 11:10.

Cadent Gas logo
Between
18 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Margetson Crescent

Cadent Gas are proposing to carry out Utility asset works on Margetson Crescent, Sheffield.

These works are categorised as Major.

The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2024 at 10:12.

Cadent Gas logo
Between
18 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Margetson Crescent

Cadent Gas are proposing to carry out Utility asset works on Margetson Crescent, Sheffield.

These works are categorised as Major.

The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 11:38.

National Highways logo
Between
18 Nov and 14 Dec 2024
Details
View Map
Share
Follow
Grange Lane

National Highways are proposing to carry out Works for road purposes on Grange Lane, Ecclesfield, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 8 Nov 2024 at 17:29.

National Highways logo
Between
18 Nov and 14 Dec 2024
Details
View Map
Share
Follow
Grange Lane

National Highways are proposing to carry out Works for road purposes on Grange Lane, Ecclesfield, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 11 Nov 2024 at 17:30.

National Highways logo
Between
18 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Grange Lane

National Highways are proposing to carry out Works for road purposes on Grange Lane, Ecclesfield, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 1 Nov 2024 at 07:57.

Cadent Gas logo
Between
18 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Hudson Road

Cadent Gas are proposing to carry out Utility asset works on Hudson Road, Kimberworth Park, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 13:46.

Cadent Gas logo
Between
18 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Hudson Road

Cadent Gas are proposing to carry out Utility asset works on Hudson Road, Kimberworth Park, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 09:26.

Cadent Gas logo
Between
18 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Jewitt Road

Cadent Gas are proposing to carry out Utility asset works on Jewitt Road, Kimberworth Park, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 13:42.

Cadent Gas logo
Between
18 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Jewitt Road

Cadent Gas are proposing to carry out Utility asset works on Jewitt Road, Kimberworth Park, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 09:25.

Barnsley Metropolitan Borough Council logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
New Road

Barnsley Metropolitan Borough Council are proposing to carry out Works for road purposes on New Road, Pilley, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 22 Oct 2024 at 14:43.

Barnsley Metropolitan Borough Council logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
New Road

Barnsley Metropolitan Borough Council are proposing to carry out Works for road purposes on New Road, Pilley, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 5 Nov 2024 at 11:36.

Barnsley Metropolitan Borough Council logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Tankersley Lane

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Tankersley Lane, Hoyland Common, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 5 Nov 2024 at 11:41.

Barnsley Metropolitan Borough Council logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Tankersley Lane

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Tankersley Lane, Hoyland Common, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 22 Oct 2024 at 14:45.

Telefonica UK logo
Between
21 and 25 Nov 2024
Details
View Map
Share
Follow
Tankersley Lane

Telefonica UK are proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 25 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Telefonica UK on 1 Oct 2024 at 09:48.

Telefonica UK logo
Between
21 and 25 Nov 2024
Details
View Map
Share
Follow
Tankersley Lane

Telefonica UK are proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 25 November 2024. The works will impact the verge only.

This roadwork event was last updated by Telefonica UK on 1 Oct 2024 at 12:21.

Telefonica UK logo
Between
21 and 25 Nov 2024
Details
View Map
Share
Follow
Tankersley Lane

Telefonica UK are proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 25 November 2024. The works will impact the verge only.

This roadwork event was last updated by Telefonica UK on 14 Oct 2024 at 15:07.

Sheffield City Council logo
Between
22 and 29 Nov 2024
Details
View Map
Share
Follow
Wordsworth Avenue

Sheffield City Council are proposing to carry out Utility asset works on Wordsworth Avenue, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 1 Nov 2024 at 12:32.

Sheffield City Council logo
Between
22 and 29 Nov 2024
Details
View Map
Share
Follow
Cookson Road

Sheffield City Council are proposing to carry out Utility asset works on Cookson Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 6 Nov 2024 at 08:11.

Sheffield City Council logo
Between
22 and 29 Nov 2024
Details
View Map
Share
Follow
Cookson Road

Sheffield City Council are proposing to carry out Utility asset works on Cookson Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 6 Nov 2024 at 08:11.

Telefonica UK logo
Between
22 and 26 Nov 2024
Details
View Map
Share
Tankersley Lane

Telefonica UK were proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 November 2024 and run through until 26 November 2024. The works were due to impact the verge only.

This roadwork event was last updated by Telefonica UK on 15 Oct 2024 at 09:48.

Telefonica UK logo
Between
22 and 26 Nov 2024
Details
View Map
Share
Follow
Tankersley Lane

Telefonica UK are proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 26 November 2024. The works will impact the verge only.

This roadwork event was last updated by Telefonica UK on 21 Oct 2024 at 09:35.

Telefonica UK logo
Between
22 and 26 Nov 2024
Details
View Map
Share
Follow
Tankersley Lane

Telefonica UK are proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 26 November 2024. The works will impact the verge only.

This roadwork event was last updated by Telefonica UK on 23 Oct 2024 at 14:53.

Telefonica UK logo
Between
22 and 26 Nov 2024
Details
View Map
Share
Tankersley Lane

Telefonica UK were proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 November 2024 and run through until 26 November 2024. The works were due to impact the verge only.

This roadwork event was last updated by Telefonica UK on 24 Oct 2024 at 11:14.

Telefonica UK logo
Between
22 and 26 Nov 2024
Details
View Map
Share
Tankersley Lane

Telefonica UK were proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 November 2024 and run through until 26 November 2024. The works were due to impact the verge only.

This roadwork event was last updated by Telefonica UK on 29 Oct 2024 at 08:34.

Telefonica UK logo
Between
22 and 26 Nov 2024
Details
View Map
Share
Follow
Tankersley Lane

Telefonica UK are proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 26 November 2024. The works will impact the footway only.

This roadwork event was last updated by Telefonica UK on 24 Oct 2024 at 11:22.

Telefonica UK logo
Between
22 and 26 Nov 2024
Details
View Map
Share
Tankersley Lane

Telefonica UK were proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 November 2024 and run through until 26 November 2024. The works were due to impact the footway only.

This roadwork event was last updated by Telefonica UK on 29 Oct 2024 at 14:33.

Northern Powergrid (Yorkshire) logo
Between
25 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Main Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Main Road, Wharncliffe Side, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 6 Nov 2024 at 13:20.

Cadent Gas logo
LONG TERM
Between
25 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Main Road

Cadent Gas were proposing to carry out Utility asset works on Main Road, Wharncliffe Side, Sheffield.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 08:18.

Telefonica UK logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Tankersley Lane

Telefonica UK were proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 29 November 2024. The works were due to impact the footway only.

This roadwork event was last updated by Telefonica UK on 29 Oct 2024 at 14:35.

Telefonica UK logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Tankersley Lane

Telefonica UK are proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and verge.

This roadwork event was last updated by Telefonica UK on 4 Nov 2024 at 12:30.

Telefonica UK logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Tankersley Lane

Telefonica UK are proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and verge.

This roadwork event was last updated by Telefonica UK on 6 Nov 2024 at 10:48.

Sheffield City Council logo
Between
29 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Fox Hill Road

Sheffield City Council are proposing to carry out Utility asset works on Fox Hill Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 30 Sep 2024 at 10:19.

Sheffield City Council logo
Between
29 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Fox Hill Road

Sheffield City Council are proposing to carry out Utility asset works on Fox Hill Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 9 Oct 2024 at 12:20.

Sheffield City Council logo
Between
2 and 17 Dec 2024
Details
View Map
Share
Follow
Stanwell Street

Sheffield City Council are proposing to carry out Utility asset works on Stanwell Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 30 Sep 2024 at 10:19.

Sheffield City Council logo
Between
2 and 17 Dec 2024
Details
View Map
Share
Follow
Stanwell Street

Sheffield City Council are proposing to carry out Utility asset works on Stanwell Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 9 Oct 2024 at 12:26.

Sheffield City Council logo
Between
2 and 17 Dec 2024
Details
View Map
Share
Follow
Standon Road

Sheffield City Council are proposing to carry out Utility asset works on Standon Road, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 30 Sep 2024 at 10:19.

Sheffield City Council logo
Between
2 and 17 Dec 2024
Details
View Map
Share
Follow
Standon Road

Sheffield City Council are proposing to carry out Utility asset works on Standon Road, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 9 Oct 2024 at 12:24.

Cadent Gas logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Main Road

Cadent Gas are proposing to carry out Utility asset works on Main Road, Wharncliffe Side, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 16:54.

Northern Powergrid (Yorkshire) logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Westwood Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Westwood Road, High Green, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 1 Nov 2024 at 08:08.

Northern Powergrid (Yorkshire) logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Westwood Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Westwood Road, High Green, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 12 Nov 2024 at 17:55.

Sheffield City Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
New Hall Lane

Sheffield City Council are proposing to carry out Utility asset works on New Hall Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 7 Nov 2024 at 09:33.

Sheffield City Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
New Hall Lane

Sheffield City Council are proposing to carry out Utility asset works on New Hall Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 7 Nov 2024 at 09:33.

Telefonica UK logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Tankersley Lane

Telefonica UK are proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and verge.

This roadwork event was last updated by Telefonica UK on 6 Nov 2024 at 13:09.

Telefonica UK logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Tankersley Lane

Telefonica UK are proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and verge.

This roadwork event was last updated by Telefonica UK on 8 Nov 2024 at 11:23.

Cadent Gas logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Wentworth Road

Cadent Gas are proposing to carry out Utility asset works on Wentworth Road, Blacker Hill, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 12:02.

Cadent Gas logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Wentworth Road

Cadent Gas are proposing to carry out Utility asset works on Wentworth Road, Blacker Hill, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the verge only.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 09:48.

Barnsley Metropolitan Borough Council logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Mount Vernon Avenue

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Mount Vernon Avenue, Worsbrough Common, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 8 Nov 2024 at 14:24.

Barnsley Metropolitan Borough Council logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Dickinson Road

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Dickinson Road, Worsbrough Common, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 8 Nov 2024 at 14:23.

Yorkshire Water logo
Between
17 and 19 Dec 2024
Details
View Map
Share
Follow
Broomfield Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Broomfield Road, Stocksbridge, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 11 Nov 2024 at 16:58.

Yorkshire Water logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Broomfield Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Broomfield Road, Stocksbridge, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 12 Nov 2024 at 08:23.

Northern Powergrid (Yorkshire) logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Hollin Moor Lane

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Hollin Moor Lane, Thurgoland, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 12 Nov 2024 at 08:32.

Northern Powergrid (Yorkshire) logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Hollin Moor Lane

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Hollin Moor Lane, Thurgoland, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 12 Nov 2024 at 11:09.

Cadent Gas logo
Between
2 and 23 Jan 2025
Details
View Map
Share
Follow
Remington Road

Cadent Gas are proposing to carry out Utility asset works on Remington Road, Sheffield.

These works are categorised as Major.

The works will start on or after 2 January 2025 and could run through until 23 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 15:24.

Cadent Gas logo
LONG TERM
Between
2 Jan and 6 Mar 2025
Details
View Map
Share
Follow
Wordsworth Avenue

Cadent Gas are proposing to carry out Utility asset works on Wordsworth Avenue, Sheffield.

These works are categorised as Major.

The works will start on or after 2 January 2025 and could run through until 6 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 15:35.

Cadent Gas logo
LONG TERM
Between
2 Jan and 6 Mar 2025
Details
View Map
Share
Follow
Wordsworth Avenue

Cadent Gas are proposing to carry out Utility asset works on Wordsworth Avenue, Sheffield.

These works are categorised as Major.

The works will start on or after 2 January 2025 and could run through until 6 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 15 Aug 2024 at 16:12.

Cadent Gas logo
LONG TERM
Between
2 Jan and 6 Mar 2025
Details
View Map
Share
Follow
Wordsworth Avenue

Cadent Gas are proposing to carry out Utility asset works on Wordsworth Avenue, Sheffield.

These works are categorised as Major.

The works will start on or after 2 January 2025 and could run through until 6 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 16 Aug 2024 at 16:49.

Cadent Gas logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Green Lane

Cadent Gas are proposing to carry out Utility asset works on Green Lane, Wharncliffe Side, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 17:49.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Whitley Lane

Cadent Gas are proposing to carry out Utility asset works on Whitley Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 10:21.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Whitley Lane

Cadent Gas are proposing to carry out Utility asset works on Whitley Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 14:31.

Cadent Gas logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Main Road

Cadent Gas are proposing to carry out Utility asset works on Main Road, Wharncliffe Side, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 17:48.

Cadent Gas logo
Between
13 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Southey Hall Road

Cadent Gas are proposing to carry out Utility asset works on Southey Hall Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 13:30.

Sheffield City Council logo
LONG TERM
Between
28 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Halifax Road

Sheffield City Council are proposing to carry out Utility asset works on Halifax Road, Wadsley Bridge, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 24 Oct 2024 at 14:56.

Vodafone logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
Grange Lane

Vodafone are proposing to carry out Utility asset works on Grange Lane, Thorpe Hesley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 24 Oct 2024 at 09:56.


Roadworks Map near to S30 4LY

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 13 Nov 2024 07:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to S30 4LY (32 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Yorkshire Water logo
URGENT
  
WORTLEY ROAD, HIGH GREEN 
(0.3 miles)
Yorkshire Water
Utility repair and maintenance works - Footway - Two-way signals
In Progress
Since: 12 Nov 2024 08:00
(Scheduled: 12 Nov 2024 - 18 Nov 2024)
0.3
Details
Share
Follow
2
Nexfibre Networks Limited logo
ANNAT PLACE 
(0.5 miles)
Nexfibre Networks Limited
Utility asset works - Footway, Carriageway, Footpath - Multi-way signals
Planned
Scheduled: 14 Nov 2024 - 18 Nov 2024
0.5
Details
Share
Follow
3
Nexfibre Networks Limited logo
ANNAT PLACE 
(0.5 miles)
Nexfibre Networks Limited
Utility asset works - Footway, Carriageway, Footpath - Multi-way signals
Planned
Scheduled: 14 Nov 2024 - 18 Nov 2024
0.5
Details
Share
Follow
4
Nexfibre Networks Limited logo
ANNAT PLACE 
(0.5 miles)
Nexfibre Networks Limited
Utility asset works - Footway, Carriageway, Footpath - Multi-way signals
Planned
Scheduled: 14 Nov 2024 - 18 Nov 2024
0.5
Details
Share
Follow
5
Sheffield City Council logo
GREENGATE LANE, HIGH GREEN 
(0.6 miles)
Sheffield City Council
Utility asset works - Carriageway - Multi-way signals
Planned
Scheduled: 13 Nov 2024 - 14 Nov 2024
0.6
Details
Share
Follow
6
Sheffield City Council logo
MAJOR
  
BRIARY AVENUE 
(0.6 miles)
Sheffield City Council
Utility asset works - Footway, Footpath - Road closure
Cancelled
(Scheduled: 4 Nov 2024 - 19 Nov 2024)
0.6
Details
Share
7
Sheffield City Council logo
MAJOR
  
BRIARY AVENUE 
(0.6 miles)
Sheffield City Council
Utility asset works - Footway, Footpath - Road closure
In Progress
Since: 4 Nov 2024 07:48
(Scheduled: 4 Nov 2024 - 19 Nov 2024)
0.6
Details
Share
Follow
8
Sheffield City Council logo
MAJOR
  
BRIARY AVENUE 
(0.6 miles)
Sheffield City Council
Utility asset works - Footway, Footpath - Road closure
Planned
Scheduled: 4 Nov 2024 - 19 Nov 2024
0.6
Details
Share
Follow
9
Nexfibre Networks Limited logo
MORTOMLEY LANE 
(0.6 miles)
Nexfibre Networks Limited
Utility repair and maintenance works - Footway - Give and take
Planned
Scheduled: 13 Nov 2024 - 15 Nov 2024
0.6
Details
Share
Follow
10
Nexfibre Networks Limited logo
MORTOMLEY LANE 
(0.6 miles)
Nexfibre Networks Limited
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 13 Nov 2024 - 15 Nov 2024
0.6
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.