ROADWORKS SUMMARY
Chapel Way, SHEFFIELD, S26 6QU

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Chapel Way, S26 6QU and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Chapel Way, SHEFFIELD, S26 6QU

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Chapel Way are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Electricity Network Company logo
LONG TERM
Between
4 Jun 2023 and 25 Jun 2026
Details
View Map
Share
Follow
Union Street

Electricity Network Company are proposing to carry out Utility repair and maintenance works on Union Street, Harthill, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2023 and could run through until 25 June 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Electricity Network Company on 16 Mar 2023 at 10:18.

LONG TERM
Between
4 Jun 2023 and 25 Jun 2026
Details
View Map
Share
Follow
Union Street

Open Fibre Networks are proposing to carry out Utility repair and maintenance works on Union Street, Harthill, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2023 and could run through until 25 June 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Open Fibre Networks on 16 Mar 2023 at 10:20.

Severn Trent Water logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Worksop Road

Severn Trent Water are carrying out roadworks on Worksop Road, Woodsetts, Rotherham.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 10 January 2024 at 10:00 and could run through until 28 March 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 22 Nov 2024 at 11:40.

Rotherham Metropolitan Borough Council logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Church Lane

Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Church Lane, Treeton, Rotherham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 July 2024 at 15:30 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 3 Oct 2024 at 14:25.

Rotherham Metropolitan Borough Council logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Chesterfield Road

Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Chesterfield Road, Swallownest, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 20:00 and could run through until 31 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 18 Nov 2024 at 08:58.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
19 Aug 2024 and 29 Nov 2025
Details
View Map
Share
Follow
Chesterfield Road

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Chesterfield Road, Swallownest, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2024 and could run through until 29 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 30 Aug 2024 at 13:39.

Sheffield City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Moss Way

Sheffield City Council are carrying out Utility asset works on Moss Way, Sheffield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 September 2024 at 07:45 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 22 Nov 2024 at 16:48.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
26 Sep 2024 and 29 Nov 2025
Details
View Map
Share
Follow
Chesterfield Road

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Chesterfield Road, Swallownest, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2024 and could run through until 29 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 4 Sep 2024 at 10:25.

Sheffield City Council logo
LONG TERM
Between
30 Sep and 23 Dec 2024
Details
View Map
Share
Follow
Rother Valley Way

Sheffield City Council are proposing to carry out Utility asset works on Rother Valley Way, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sheffield City Council on 16 Sep 2024 at 10:42.

Sheffield City Council logo
LONG TERM
Until
23 Dec 2024
Details
View Map
Share
Follow
Rother Valley Way

Sheffield City Council are carrying out Utility asset works on Rother Valley Way, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 07:36 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 30 Sep 2024 at 08:12.

Sheffield City Council logo
LONG TERM
Between
30 Sep and 23 Dec 2024
Details
View Map
Share
Follow
Meadow Gate Avenue

Sheffield City Council are proposing to carry out Utility asset works on Meadow Gate Avenue, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sheffield City Council on 16 Sep 2024 at 10:42.

Sheffield City Council logo
LONG TERM
Until
23 Dec 2024
Details
View Map
Share
Follow
Meadow Gate Avenue

Sheffield City Council are carrying out Utility asset works on Meadow Gate Avenue, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 07:36 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 30 Sep 2024 at 08:12.

Severn Trent Water logo
LONG TERM
Between
21 Oct 2024 and 23 Oct 2025
Details
View Map
Share
High Street

Severn Trent Water were proposing to carry out Utility repair and maintenance works on High Street, Eckington.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 23 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 10 Oct 2024 at 16:00.

Western Power Distribution (East Midlands) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Upperthorpe Road

Western Power Distribution (East Midlands) are carrying out Utility asset works on Upperthorpe Road, Killamarsh.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 17:02 and could run through until 27 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 21 Nov 2024 at 16:30.

Cadent Gas logo
LONG TERM
Between
4 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Well Lane

Cadent Gas are proposing to carry out Utility asset works on Well Lane, Treeton, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 11:02.

Derbyshire County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Littlemoor

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Littlemoor, Eckington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 15 Aug 2024 at 16:30.

Quickline Commucations logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Ladyfield Road

Quickline Commucations are carrying out Utility asset works on Ladyfield Road, Thorpe Salvin, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 08:30 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 19 Nov 2024 at 08:34.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Meetinghouse Lane

Cadent Gas are proposing to carry out Utility asset works on Meetinghouse Lane, Woodhouse, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 17:25.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Meetinghouse Lane

Cadent Gas are proposing to carry out Utility asset works on Meetinghouse Lane, Woodhouse, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 14:43.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Church Lane

Cadent Gas were proposing to carry out Utility asset works on Church Lane, Woodhouse, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 08:33.

Yorkshire Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Quarry Lane

Yorkshire Water are carrying out Utility repair and maintenance works on Quarry Lane, North Anston, Rotherham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 08:52 and could run through until 27 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 21 Nov 2024 at 09:44.

Derbyshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Church Street

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Church Street, Barlborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 10 Oct 2024 at 15:22.

Quickline Commucations logo
Finishing
Wednesday
Details
View Map
Share
Follow
Hardwick Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Hardwick Lane, Aston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the verge only.

This roadwork event was last updated by Quickline Commucations on 23 Sep 2024 at 14:18.

Quickline Commucations logo
Finishing
Wednesday
Details
View Map
Share
Follow
Hardwick Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Hardwick Lane, Aston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the verge only.

This roadwork event was last updated by Quickline Commucations on 23 Sep 2024 at 14:34.

Sheffield City Council logo
Between
3 and 18 Dec 2024
Details
View Map
Share
Follow
Beaver Drive

Sheffield City Council are proposing to carry out Utility asset works on Beaver Drive, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 14:08.

Sheffield City Council logo
Between
3 and 18 Dec 2024
Details
View Map
Share
Follow
Beaver Drive

Sheffield City Council are proposing to carry out Utility asset works on Beaver Drive, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 21 Oct 2024 at 11:33.

Sheffield City Council logo
Between
3 and 18 Dec 2024
Details
View Map
Share
Follow
Beaver Close

Sheffield City Council are proposing to carry out Utility asset works on Beaver Close, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 14:08.

Sheffield City Council logo
Between
3 and 18 Dec 2024
Details
View Map
Share
Follow
Beaver Close

Sheffield City Council are proposing to carry out Utility asset works on Beaver Close, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 21 Oct 2024 at 11:33.

Sheffield City Council logo
Between
3 and 18 Dec 2024
Details
View Map
Share
Follow
Beaver Avenue

Sheffield City Council are proposing to carry out Utility asset works on Beaver Avenue, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 14:08.

Sheffield City Council logo
Between
3 and 18 Dec 2024
Details
View Map
Share
Follow
Beaver Avenue

Sheffield City Council are proposing to carry out Utility asset works on Beaver Avenue, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 21 Oct 2024 at 11:33.

Sheffield City Council logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Drake House Lane

Sheffield City Council are proposing to carry out Utility asset works on Drake House Lane, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 15:12.

Sheffield City Council logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Drake House Lane

Sheffield City Council are proposing to carry out Utility asset works on Drake House Lane, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 21 Oct 2024 at 11:35.

Sheffield City Council logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Lilac Road

Sheffield City Council are proposing to carry out Utility asset works on Lilac Road, Beighton, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 14:08.

Sheffield City Council logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Lilac Road

Sheffield City Council are proposing to carry out Utility asset works on Lilac Road, Beighton, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 21 Oct 2024 at 11:35.

Sheffield City Council logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Woodhouse Lane

Sheffield City Council are proposing to carry out Utility asset works on Woodhouse Lane, Beighton, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 14:08.

Sheffield City Council logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Woodhouse Lane

Sheffield City Council are proposing to carry out Utility asset works on Woodhouse Lane, Beighton, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 1 Nov 2024 at 17:44.

Sheffield City Council logo
Between
11 and 23 Dec 2024
Details
View Map
Share
Follow
Streetfields

Sheffield City Council are proposing to carry out Utility asset works on Streetfields, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 14:08.

Sheffield City Council logo
Between
11 and 23 Dec 2024
Details
View Map
Share
Follow
Streetfields

Sheffield City Council are proposing to carry out Utility asset works on Streetfields, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 21 Oct 2024 at 11:38.

Sheffield City Council logo
Between
13 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Sothall Green

Sheffield City Council are proposing to carry out Utility asset works on Sothall Green, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 15:11.

Sheffield City Council logo
Between
13 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Sothall Green

Sheffield City Council are proposing to carry out Utility asset works on Sothall Green, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 21 Oct 2024 at 11:36.

Northern Powergrid (Yorkshire) logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Coalbrook Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Coalbrook Road, Woodhouse Mill, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 24 Oct 2024 at 07:40.

Sheffield City Council logo
Between
17 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Winterton Gardens

Sheffield City Council are proposing to carry out Utility asset works on Winterton Gardens, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 15:11.

Sheffield City Council logo
Between
17 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Winterton Gardens

Sheffield City Council are proposing to carry out Utility asset works on Winterton Gardens, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 21 Oct 2024 at 11:38.

Sheffield City Council logo
Between
19 Dec 2024 and 3 Jan 2025
Details
View Map
Share
High Lane

Sheffield City Council were proposing to carry out Utility asset works on High Lane, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 December 2024 and run through until 3 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 15:12.

Sheffield City Council logo
Between
19 Dec 2024 and 3 Jan 2025
Details
View Map
Share
High Lane

Sheffield City Council were proposing to carry out Utility asset works on High Lane, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 December 2024 and run through until 3 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 15:12.

Sheffield City Council logo
Between
19 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
High Lane

Sheffield City Council are proposing to carry out Utility asset works on High Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 15:12.

Sheffield City Council logo
Between
19 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
High Lane

Sheffield City Council are proposing to carry out Utility asset works on High Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 21 Oct 2024 at 11:39.

Network Rail logo
Between
4 and 6 Jan 2025
Details
View Map
Share
Follow
Manor Road

Network Rail are proposing to carry out Works for Rail Purposes on Manor Road, Kiveton Park, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 27 Jun 2024 at 07:13.

Network Rail logo
Between
4 and 6 Jan 2025
Details
View Map
Share
Follow
Manor Road

Network Rail are proposing to carry out Works for Rail Purposes on Manor Road, Kiveton Park, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 20 Nov 2024 at 12:21.

Derbyshire County Council logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Green Lane

Derbyshire County Council are proposing to carry out Permanent reinstatement on Green Lane, Killamarsh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Derbyshire County Council on 20 Nov 2024 at 14:36.

Derbyshire County Council logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Upperthorpe Road

Derbyshire County Council are proposing to carry out Section 50 on Upperthorpe Road, Killamarsh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Derbyshire County Council on 6 Nov 2024 at 14:51.

Nexfibre Networks Limited logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Ullswater Avenue

Nexfibre Networks Limited are proposing to carry out Utility asset works on Ullswater Avenue, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 1 Nov 2024 at 09:39.

BT logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
West Lane

BT are proposing to carry out Utility asset works on West Lane, Aughton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 23 Sep 2024 at 08:59.

Sheffield City Council logo
Between
7 and 22 Jan 2025
Details
View Map
Share
Follow
Moorthorpe Way

Sheffield City Council are proposing to carry out Utility asset works on Moorthorpe Way, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 12:32.

Sheffield City Council logo
Between
7 and 22 Jan 2025
Details
View Map
Share
Follow
Moorthorpe Way

Sheffield City Council are proposing to carry out Utility asset works on Moorthorpe Way, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Nov 2024 at 08:10.

Cityfibre Metro Networks logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Dunedin Grove

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Dunedin Grove, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 21 Nov 2024 at 17:35.

Cityfibre Metro Networks logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Dunedin Grove

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Dunedin Grove, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 22 Nov 2024 at 16:59.

Derbyshire County Council logo
Between
13 and 22 Jan 2025
Details
View Map
Share
Follow
High Street

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on High Street, Killamarsh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 10 Oct 2024 at 15:23.

Quickline Commucations logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Woodall Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Woodall Lane, Woodall, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 6 Nov 2024 at 11:01.

Quickline Commucations logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Woodall Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Woodall Lane, Woodall, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 6 Nov 2024 at 14:19.

Sheffield City Council logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
Moor Farm Avenue

Sheffield City Council are proposing to carry out Utility asset works on Moor Farm Avenue, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 12:32.

Sheffield City Council logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
Moor Farm Avenue

Sheffield City Council are proposing to carry out Utility asset works on Moor Farm Avenue, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 17:31.

Sheffield City Council logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
Moor Farm Garth

Sheffield City Council are proposing to carry out Utility asset works on Moor Farm Garth, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 12:32.

Sheffield City Council logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
Moor Farm Garth

Sheffield City Council are proposing to carry out Utility asset works on Moor Farm Garth, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 17:30.

Sheffield City Council logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
Moss Way

Sheffield City Council are proposing to carry out Utility asset works on Moss Way, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 12:32.

Sheffield City Council logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
Moss Way

Sheffield City Council are proposing to carry out Utility asset works on Moss Way, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Nov 2024 at 08:11.

Quickline Commucations logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Worksop Road

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Worksop Road, Aston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 6 Nov 2024 at 11:42.

Sheffield City Council logo
Between
15 and 30 Jan 2025
Details
View Map
Share
Follow
Robin Lane

Sheffield City Council are proposing to carry out Utility asset works on Robin Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 12:33.

Sheffield City Council logo
Between
15 and 30 Jan 2025
Details
View Map
Share
Follow
Robin Lane

Sheffield City Council are proposing to carry out Utility asset works on Robin Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Nov 2024 at 08:13.

Sheffield City Council logo
Between
15 and 30 Jan 2025
Details
View Map
Share
Follow
Woodhouse Lane

Sheffield City Council are proposing to carry out Utility asset works on Woodhouse Lane, Beighton, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 14:55.

Sheffield City Council logo
Between
15 and 30 Jan 2025
Details
View Map
Share
Follow
Woodhouse Lane

Sheffield City Council are proposing to carry out Utility asset works on Woodhouse Lane, Beighton, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Nov 2024 at 08:20.

Sheffield City Council logo
Between
21 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Orchard Lane

Sheffield City Council are proposing to carry out Utility asset works on Orchard Lane, Beighton, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 12:33.

Sheffield City Council logo
Between
21 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Orchard Lane

Sheffield City Council are proposing to carry out Utility asset works on Orchard Lane, Beighton, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 17:32.

Sheffield City Council logo
Between
21 Jan and 5 Feb 2025
Details
View Map
Share
Follow
West Street

Sheffield City Council are proposing to carry out Utility asset works on West Street, Beighton, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 14:55.

Sheffield City Council logo
Between
21 Jan and 5 Feb 2025
Details
View Map
Share
Follow
West Street

Sheffield City Council are proposing to carry out Utility asset works on West Street, Beighton, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Nov 2024 at 08:14.

Sheffield City Council logo
Between
22 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Beaver Hill Road

Sheffield City Council are proposing to carry out Utility asset works on Beaver Hill Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 12:33.

Sheffield City Council logo
Between
22 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Beaver Hill Road

Sheffield City Council are proposing to carry out Utility asset works on Beaver Hill Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Nov 2024 at 07:53.

Sheffield City Council logo
Between
22 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Beaver Hill Road

Sheffield City Council are proposing to carry out Utility asset works on Beaver Hill Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 12:33.

Sheffield City Council logo
Between
22 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Beaver Hill Road

Sheffield City Council are proposing to carry out Utility asset works on Beaver Hill Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Nov 2024 at 07:54.

Sheffield City Council logo
Between
24 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Junction Road

Sheffield City Council are proposing to carry out Utility asset works on Junction Road, Woodhouse, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 14:55.

Sheffield City Council logo
Between
24 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Junction Road

Sheffield City Council are proposing to carry out Utility asset works on Junction Road, Woodhouse, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Nov 2024 at 08:03.

Sheffield City Council logo
Between
24 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Furnace Lane

Sheffield City Council are proposing to carry out Utility asset works on Furnace Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 13:38.

Sheffield City Council logo
Between
24 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Furnace Lane

Sheffield City Council are proposing to carry out Utility asset works on Furnace Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 17:06.

Sheffield City Council logo
Between
24 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Furnace Lane

Sheffield City Council are proposing to carry out Utility asset works on Furnace Lane, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 14:55.

Sheffield City Council logo
Between
24 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Furnace Lane

Sheffield City Council are proposing to carry out Utility asset works on Furnace Lane, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 17:08.

Severn Trent Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Woodall Lane

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Woodall Lane, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 10 Oct 2024 at 10:23.

Severn Trent Water logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Ryton Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Ryton Road, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 30 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 11 Oct 2024 at 14:27.

Sheffield City Council logo
Between
27 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Retford Road

Sheffield City Council are proposing to carry out Utility asset works on Retford Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 13:38.

Sheffield City Council logo
Between
27 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Retford Road

Sheffield City Council are proposing to carry out Utility asset works on Retford Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 17:12.

Sheffield City Council logo
Between
30 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Woodhouse Lane

Sheffield City Council are proposing to carry out Utility asset works on Woodhouse Lane, Beighton, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 13:39.

Sheffield City Council logo
Between
30 Jan and 14 Feb 2025
Details
View Map
Share
Follow
High Street

Sheffield City Council are proposing to carry out Utility asset works on High Street, Beighton, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Nov 2024 at 09:32.

Sheffield City Council logo
Between
30 Jan and 14 Feb 2025
Details
View Map
Share
Follow
High Street

Sheffield City Council are proposing to carry out Utility asset works on High Street, Beighton, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 18 Nov 2024 at 15:02.

Sheffield City Council logo
Between
30 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Rotherham Road

Sheffield City Council are proposing to carry out Utility asset works on Rotherham Road, Beighton, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 13:39.

Sheffield City Council logo
Between
30 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Rotherham Road

Sheffield City Council are proposing to carry out Utility asset works on Rotherham Road, Beighton, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 17:38.

Sheffield City Council logo
Between
30 Jan and 14 Feb 2025
Details
View Map
Share
Woodhouse Lane

Sheffield City Council were proposing to carry out Utility asset works on Woodhouse Lane, Beighton, Sheffield.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 January 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Nov 2024 at 09:32.

Severn Trent Water logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Portland Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Portland Street, Whitwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 11 Oct 2024 at 09:44.

Severn Trent Water logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Portland Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Portland Street, Whitwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 15 Oct 2024 at 13:26.

Cadent Gas logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Worksop Road

Cadent Gas are proposing to carry out Utility asset works on Worksop Road, Woodsetts, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 21 Aug 2024 at 14:53.

Cadent Gas logo
LONG TERM
Between
3 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Worksop Road

Cadent Gas are proposing to carry out Utility asset works on Worksop Road, Woodsetts, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 21 Aug 2024 at 14:54.

Cadent Gas logo
LONG TERM
Between
3 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Worksop Road

Cadent Gas are proposing to carry out Utility asset works on Worksop Road, Woodsetts, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 13:45.

Sheffield City Council logo
Between
3 and 18 Feb 2025
Details
View Map
Share
Follow
Beighton Road

Sheffield City Council are proposing to carry out Utility asset works on Beighton Road, Woodhouse, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 23:15.

Sheffield City Council logo
Between
3 and 18 Feb 2025
Details
View Map
Share
Follow
Beighton Road

Sheffield City Council are proposing to carry out Utility asset works on Beighton Road, Woodhouse, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Nov 2024 at 09:59.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Eckington Way

Sheffield City Council are proposing to carry out Utility asset works on Eckington Way, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 23:15.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Eckington Way

Sheffield City Council are proposing to carry out Utility asset works on Eckington Way, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 16:46.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Eckington Way

Sheffield City Council are proposing to carry out Utility asset works on Eckington Way, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 15:28.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Drake House Lane

Sheffield City Council are proposing to carry out Utility asset works on Drake House Lane, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 12:31.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Drake House Lane

Sheffield City Council are proposing to carry out Utility asset works on Drake House Lane, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 12:31.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Eckington Way

Sheffield City Council are proposing to carry out Utility asset works on Eckington Way, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 23:15.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Eckington Way

Sheffield City Council are proposing to carry out Utility asset works on Eckington Way, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 13:16.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Eckington Way

Sheffield City Council are proposing to carry out Utility asset works on Eckington Way, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 13:16.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Waterthorpe Greenway

Sheffield City Council are proposing to carry out Utility asset works on Waterthorpe Greenway, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 13:17.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Waterthorpe Greenway

Sheffield City Council are proposing to carry out Utility asset works on Waterthorpe Greenway, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 13:17.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Eckington Way

Sheffield City Council are proposing to carry out Utility asset works on Eckington Way, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 15:44.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Sevenairs Road

Sheffield City Council are proposing to carry out Utility asset works on Sevenairs Road, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 13:16.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Sevenairs Road

Sheffield City Council are proposing to carry out Utility asset works on Sevenairs Road, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 13:17.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Eckington Way

Sheffield City Council are proposing to carry out Utility asset works on Eckington Way, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 23:15.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Eckington Way

Sheffield City Council are proposing to carry out Utility asset works on Eckington Way, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Nov 2024 at 10:10.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Eckington Way

Sheffield City Council are proposing to carry out Utility asset works on Eckington Way, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 23:15.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Eckington Way

Sheffield City Council are proposing to carry out Utility asset works on Eckington Way, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Nov 2024 at 13:04.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Mosborough Parkway

Sheffield City Council are proposing to carry out Utility asset works on Mosborough Parkway, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 23:15.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Mosborough Parkway

Sheffield City Council are proposing to carry out Utility asset works on Mosborough Parkway, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Nov 2024 at 10:05.

Sheffield City Council logo
Between
10 and 25 Feb 2025
Details
View Map
Share
Follow
Eckington Road

Sheffield City Council are proposing to carry out Utility asset works on Eckington Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 23:14.

Sheffield City Council logo
Between
10 and 25 Feb 2025
Details
View Map
Share
Follow
Eckington Road

Sheffield City Council are proposing to carry out Utility asset works on Eckington Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Nov 2024 at 10:07.

Sheffield City Council logo
Between
10 and 25 Feb 2025
Details
View Map
Share
Follow
West Street

Sheffield City Council are proposing to carry out Utility asset works on West Street, Beighton, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 23:14.

Sheffield City Council logo
Between
10 and 25 Feb 2025
Details
View Map
Share
Follow
West Street

Sheffield City Council are proposing to carry out Utility asset works on West Street, Beighton, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 22 Nov 2024 at 17:04.

Sheffield City Council logo
Between
10 and 25 Feb 2025
Details
View Map
Share
Follow
Drake House Way

Sheffield City Council are proposing to carry out Utility asset works on Drake House Way, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 23:15.

Sheffield City Council logo
Between
10 and 25 Feb 2025
Details
View Map
Share
Follow
Drake House Way

Sheffield City Council are proposing to carry out Utility asset works on Drake House Way, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Nov 2024 at 10:00.

Cadent Gas logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Vicar Lane

Cadent Gas were proposing to carry out Utility asset works on Vicar Lane, Woodhouse, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 09:12.

Cadent Gas logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Vicar Lane

Cadent Gas are proposing to carry out Utility asset works on Vicar Lane, Woodhouse, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 10:33.

Cadent Gas logo
LONG TERM
Between
10 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Treetown Crescent

Cadent Gas are proposing to carry out Utility asset works on Treetown Crescent, Treeton, Rotherham.

These works are categorised as Major.

The works will start on or after 10 February 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 12:59.

Severn Trent Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Woodall Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Woodall Lane, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 11 Oct 2024 at 11:36.

Severn Trent Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Woodall Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Woodall Lane, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 24 Oct 2024 at 09:45.

Sheffield City Council logo
Between
17 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Queen Street

Sheffield City Council are proposing to carry out Utility asset works on Queen Street, Mosborough, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 22:09.

Sheffield City Council logo
Between
17 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Queen Street

Sheffield City Council are proposing to carry out Utility asset works on Queen Street, Mosborough, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 22:09.

Sheffield City Council logo
Between
17 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Eckington Road

Sheffield City Council are proposing to carry out Utility asset works on Eckington Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 22:09.

Sheffield City Council logo
Between
17 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Eckington Road

Sheffield City Council are proposing to carry out Utility asset works on Eckington Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Nov 2024 at 13:04.


Roadworks Map near to Chapel Way, SHEFFIELD, S26 6QU

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 24 Nov 2024 07:27
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Chapel Way, SHEFFIELD, S26 6QU (4 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Virgin Media logo
LAMBRELL GREEN, KIVETON PARK 
(0.2 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 25 Nov 2024 - 27 Nov 2024
0.2
Details
Share
Follow
2
Quickline Commucations logo
MILL FIELDS, TODWICK 
(0.9 miles)
Quickline Commucations
Utility asset works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 19 Nov 2024 - 25 Nov 2024
0.9
Details
Share
Follow
3
BT logo
URGENT
  
THE MEADOWS, TODWICK 
(0.9 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
22 Nov 2024 07:47 - 12:51
0.9
Details
Share
4
Quickline Commucations logo
MILL CLOSE, TODWICK 
(0.9 miles)
Quickline Commucations
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 22 Nov 2024 - 26 Nov 2024
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.