ROADWORKS SUMMARY
Arms Park Drive, SHEFFIELD, S20 4HR
Introduction
View current and future planned roadworks and road closures for Arms Park Drive, S20 4HR and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Arms Park Drive, SHEFFIELD, S20 4HR
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Arms Park Drive are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
4 Jun 2023 and 25 Jun 2026
Electricity Network Company are proposing to carry out Utility repair and maintenance works on Union Street, Harthill, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2023 and could run through until 25 June 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Electricity Network Company on 16 Mar 2023 at 10:18.
4 Jun 2023 and 25 Jun 2026
Open Fibre Networks are proposing to carry out Utility repair and maintenance works on Union Street, Harthill, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2023 and could run through until 25 June 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Open Fibre Networks on 16 Mar 2023 at 10:20.
22 Apr 2024 and 31 Mar 2025
Yorkshire Water are proposing to carry out New service connection on Station Lane, Old Whittington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 31 March 2025. The works will impact the carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Yorkshire Water on 21 Nov 2024 at 16:30.
17 Jun 2024 and 31 Mar 2025
Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Frederick Street, Catcliffe, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 5 Apr 2024 at 08:21.
31 Jan 2025
Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Church Lane, Treeton, Rotherham.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 July 2024 at 15:30 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 3 Oct 2024 at 14:25.
31 Dec 2024
Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Chesterfield Road, Swallownest, Rotherham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 August 2024 at 20:00 and could run through until 31 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 18 Nov 2024 at 08:58.
19 Aug 2024 and 29 Nov 2025
Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Chesterfield Road, Swallownest, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2024 and could run through until 29 November 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 30 Aug 2024 at 13:39.
9 Sep and 6 Dec 2024
Derbyshire County Council are proposing to carry out Highway improvement works on Inkersall Road, Staveley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Derbyshire County Council on 20 Aug 2024 at 10:55.
16 Sep and 19 Dec 2024
Derbyshire County Council are proposing to carry out Highway improvement works on Inkersall Road, Staveley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Derbyshire County Council on 28 Oct 2024 at 11:02.
16 Sep and 6 Dec 2024
Derbyshire County Council are proposing to carry out Highway improvement works on Inkersall Road, Staveley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Derbyshire County Council on 2 Sep 2024 at 10:47.
Today
Sheffield City Council are carrying out Utility asset works on Moss Way, Sheffield.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 September 2024 at 07:45 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 15 Nov 2024 at 16:50.
Monday
Sheffield City Council were proposing to carry out Utility asset works on Arbourthorne Road, Sheffield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 September 2024 and run through until 25 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 25 Sep 2024 at 08:23.
26 Sep 2024 and 29 Nov 2025
Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Chesterfield Road, Swallownest, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2024 and could run through until 29 November 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 4 Sep 2024 at 10:25.
30 Sep and 23 Dec 2024
Sheffield City Council are proposing to carry out Utility asset works on Rother Valley Way, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 23 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Sheffield City Council on 16 Sep 2024 at 10:42.
23 Dec 2024
Sheffield City Council are carrying out Utility asset works on Rother Valley Way, Sheffield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 07:36 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 30 Sep 2024 at 08:12.
30 Sep and 23 Dec 2024
Sheffield City Council are proposing to carry out Utility asset works on Meadow Gate Avenue, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 23 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Sheffield City Council on 16 Sep 2024 at 10:42.
23 Dec 2024
Sheffield City Council are carrying out Utility asset works on Meadow Gate Avenue, Sheffield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 07:36 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 30 Sep 2024 at 08:12.
Thursday
Cadent Gas are proposing to carry out Utility asset works on Scotia Drive, Sheffield.
These works are categorised as Major.
The works will start on or after 14 October 2024 and could run through until 28 November 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 15:20.
21 Oct 2024 and 23 Oct 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on High Street, Eckington.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 October 2024 and run through until 23 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 10 Oct 2024 at 16:00.
29 Nov 2024
Rotherham Metropolitan Borough Council are carrying out Section 50 on Highfield Spring, Catcliffe, Rotherham.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 08:00 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 15 Nov 2024 at 08:11.
4 and 30 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Adelphi Way, Staveley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Jul 2024 at 13:33.
Today
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Upperthorpe Road, Killamarsh.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 22 Oct 2024 at 10:27.
Wednesday
Western Power Distribution (East Midlands) are carrying out Utility asset works on Upperthorpe Road, Killamarsh.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 17:02 and could run through until 27 November 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 21 Nov 2024 at 16:30.
4 Nov 2024 and 7 Feb 2025
Sheffield City Council were proposing to carry out Utility asset works on Bochum Parkway, Sheffield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 7 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 16 Oct 2024 at 10:56.
4 Nov and 16 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Well Lane, Treeton, Rotherham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 11:02.
Today
Sheffield City Council are carrying out Utility asset works on Retford Road, Sheffield.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 November 2024 at 07:43 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 21 Nov 2024 at 16:09.
11 Nov and 19 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Scotia Drive, Sheffield.
These works are categorised as Major.
The works will start on or after 11 November 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 09:11.
Thursday
Sheffield City Council were proposing to carry out Utility asset works on Mawfa Lane, Sheffield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 November 2024 and run through until 28 November 2024. The works were due to impact the footway and footpath.
This roadwork event was last updated by Sheffield City Council on 24 Sep 2024 at 09:58.
Thursday
Sheffield City Council are proposing to carry out Utility asset works on Mawfa Lane, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 November 2024 and could run through until 28 November 2024. The works will impact the footway and footpath.
This roadwork event was last updated by Sheffield City Council on 3 Oct 2024 at 23:48.
Thursday
Sheffield City Council are carrying out Utility asset works on Mawfa Lane, Sheffield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 November 2024 at 07:44 and could run through until 28 November 2024. The works will impact the footway and footpath.
This roadwork event was last updated by Sheffield City Council on 13 Nov 2024 at 08:00.
Today
Cadent Gas are carrying out Utility repair and maintenance works on Wales Road, Kiveton Park, Rotherham.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 November 2024 at 12:15 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 12:01.
23 Dec 2024
Cadent Gas are carrying out Utility asset works on Bevan Drive, Inkersall.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 07:30 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 07:38.
Tuesday
Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Littlemoor, Eckington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 15 Aug 2024 at 16:30.
18 and 29 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Meetinghouse Lane, Woodhouse, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 17:25.
18 and 29 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Meetinghouse Lane, Woodhouse, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 14:43.
18 and 29 Nov 2024
Cadent Gas were proposing to carry out Utility asset works on Church Lane, Woodhouse, Sheffield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 08:33.
18 Nov and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Windy House Lane, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 15:06.
18 Nov and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Windy House Lane, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 08:12.
18 Nov and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Windy House Lane, Sheffield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 15:08.
18 Nov and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Windy House Lane, Sheffield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 08:13.
18 Nov and 23 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Queen Mary Road, Sheffield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 15:10.
18 Nov and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Queen Mary Road, Sheffield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 16:46.
Wednesday
Yorkshire Water are carrying out Utility repair and maintenance works on Driver Street, Sheffield.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 09:41 and could run through until 27 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 21 Nov 2024 at 11:42.
Wednesday
Yorkshire Water are carrying out Utility repair and maintenance works on Richmond Road, Sheffield.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 12:30 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 21 Nov 2024 at 15:38.
22 Nov 2024 and 21 Feb 2025
Sheffield City Council were proposing to carry out Utility asset works on Jordanthorpe Parkway, Sheffield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 November 2024 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 11 Nov 2024 at 08:07.
22 Nov 2024 and 21 Feb 2025
Sheffield City Council were proposing to carry out Utility asset works on Jordanthorpe Parkway, Sheffield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 November 2024 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 11 Nov 2024 at 08:07.
22 Nov 2024 and 21 Feb 2025
Sheffield City Council were proposing to carry out Utility asset works on Bochum Parkway, Sheffield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 November 2024 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 11 Nov 2024 at 08:07.
22 Nov 2024 and 21 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Bochum Parkway, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 November 2024 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 15 Aug 2024 at 17:49.
22 Nov 2024 and 21 Feb 2025
Sheffield City Council were proposing to carry out Utility asset works on Bochum Parkway, Sheffield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 November 2024 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 11 Nov 2024 at 08:07.
22 Nov 2024 and 21 Feb 2025
Sheffield City Council were proposing to carry out Utility asset works on Bochum Parkway, Sheffield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 November 2024 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 11 Nov 2024 at 08:07.
22 Nov 2024 and 21 Feb 2025
Sheffield City Council were proposing to carry out Utility asset works on Norton Lane, Sheffield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 November 2024 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 11 Nov 2024 at 08:07.
22 Nov 2024 and 21 Feb 2025
Sheffield City Council were proposing to carry out Utility asset works on Norton Avenue, Sheffield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 November 2024 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 11 Nov 2024 at 08:07.
22 Nov 2024 and 21 Feb 2025
Sheffield City Council were proposing to carry out Utility asset works on Hemsworth Road, Sheffield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 November 2024 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 11 Nov 2024 at 08:07.
22 Nov 2024 and 21 Feb 2025
Sheffield City Council were proposing to carry out Utility asset works on Gleadless Road, Sheffield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 November 2024 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 11 Nov 2024 at 08:07.
25 Nov and 11 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Mcmahon Avenue, Inkersall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 10:13.
25 Nov and 11 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Mcmahon Avenue, Inkersall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 07:08.
25 Nov and 11 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Jervis Place, Inkersall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 10:13.
25 Nov and 11 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Jervis Place, Inkersall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 07:07.
25 and 29 Nov 2024
Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Church Street, Barlborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 10 Oct 2024 at 15:22.
25 and 29 Nov 2024
Cadent Gas are proposing to carry out Remedial works on Longstone Crescent, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 17:07.
Wednesday
Quickline Commucations are proposing to carry out Utility repair and maintenance works on Hardwick Lane, Aston, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the verge only.
This roadwork event was last updated by Quickline Commucations on 23 Sep 2024 at 14:18.
Wednesday
Quickline Commucations are proposing to carry out Utility repair and maintenance works on Hardwick Lane, Aston, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the verge only.
This roadwork event was last updated by Quickline Commucations on 23 Sep 2024 at 14:34.
2 and 17 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Inkersall Green Road, Inkersall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 17 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 16:30.
2 and 7 Dec 2024
Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Eckington Road, Coal Aston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 24 Oct 2024 at 15:36.
2 and 7 Dec 2024
Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Eckington Road, Coal Aston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 21 Nov 2024 at 16:30.
3 and 18 Dec 2024
Sheffield City Council are proposing to carry out Utility asset works on Beaver Drive, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 14:08.
3 and 18 Dec 2024
Sheffield City Council are proposing to carry out Utility asset works on Beaver Drive, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 21 Oct 2024 at 11:33.
3 and 18 Dec 2024
Sheffield City Council are proposing to carry out Utility asset works on Beaver Close, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 14:08.
3 and 18 Dec 2024
Sheffield City Council are proposing to carry out Utility asset works on Beaver Close, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 21 Oct 2024 at 11:33.
3 and 18 Dec 2024
Sheffield City Council are proposing to carry out Utility asset works on Beaver Avenue, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 14:08.
3 and 18 Dec 2024
Sheffield City Council are proposing to carry out Utility asset works on Beaver Avenue, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 21 Oct 2024 at 11:33.
9 and 24 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Eckington Road, Staveley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 16:30.
9 and 23 Dec 2024
Sheffield City Council are proposing to carry out Utility asset works on Drake House Lane, Sheffield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 15:12.
9 and 23 Dec 2024
Sheffield City Council are proposing to carry out Utility asset works on Drake House Lane, Sheffield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 21 Oct 2024 at 11:35.
9 and 23 Dec 2024
Sheffield City Council are proposing to carry out Utility asset works on Lilac Road, Beighton, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 14:08.
9 and 23 Dec 2024
Sheffield City Council are proposing to carry out Utility asset works on Lilac Road, Beighton, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 21 Oct 2024 at 11:35.
9 and 13 Dec 2024
T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on Birley Vale Avenue, Sheffield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by T-Mobile (UK) on 16 Sep 2024 at 12:05.
9 and 23 Dec 2024
Sheffield City Council are proposing to carry out Utility asset works on Woodhouse Lane, Beighton, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 14:08.
9 and 23 Dec 2024
Sheffield City Council are proposing to carry out Utility asset works on Woodhouse Lane, Beighton, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 1 Nov 2024 at 17:44.
11 and 23 Dec 2024
Sheffield City Council are proposing to carry out Utility asset works on Streetfields, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 14:08.
11 and 23 Dec 2024
Sheffield City Council are proposing to carry out Utility asset works on Streetfields, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 21 Oct 2024 at 11:38.
13 Dec 2024 and 3 Jan 2025
Sheffield City Council are proposing to carry out Utility asset works on Sothall Green, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 15:11.
13 Dec 2024 and 3 Jan 2025
Sheffield City Council are proposing to carry out Utility asset works on Sothall Green, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 21 Oct 2024 at 11:36.
16 and 20 Dec 2024
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Coalbrook Road, Woodhouse Mill, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 24 Oct 2024 at 07:40.
17 Dec 2024 and 3 Jan 2025
Sheffield City Council are proposing to carry out Utility asset works on Winterton Gardens, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 15:11.
17 Dec 2024 and 3 Jan 2025
Sheffield City Council are proposing to carry out Utility asset works on Winterton Gardens, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 21 Oct 2024 at 11:38.
17 Dec 2024 and 3 Jan 2025
Sheffield City Council are proposing to carry out Utility asset works on Ashbourne Grove, Handsworth, Sheffield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 15:12.
17 Dec 2024 and 3 Jan 2025
Sheffield City Council are proposing to carry out Utility asset works on Ashbourne Grove, Handsworth, Sheffield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 21 Oct 2024 at 11:32.
17 Dec 2024 and 3 Jan 2025
Sheffield City Council are proposing to carry out Utility asset works on Parsley Hay Road, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 15:11.
17 Dec 2024 and 3 Jan 2025
Sheffield City Council are proposing to carry out Utility asset works on Parsley Hay Road, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 21 Oct 2024 at 11:34.
18 Dec 2024 and 3 Jan 2025
Sheffield City Council were proposing to carry out Utility asset works on Eastern Avenue, Sheffield.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 December 2024 and run through until 3 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 15:12.
18 Dec 2024 and 3 Jan 2025
Sheffield City Council were proposing to carry out Utility asset works on Eastern Avenue, Sheffield.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 December 2024 and run through until 3 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 15:12.
18 Dec 2024 and 3 Jan 2025
Sheffield City Council are proposing to carry out Utility asset works on Arbourthorne Road, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 15:11.
18 Dec 2024 and 3 Jan 2025
Sheffield City Council are proposing to carry out Utility asset works on Arbourthorne Road, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 1 Nov 2024 at 17:38.
19 Dec 2024 and 3 Jan 2025
Sheffield City Council were proposing to carry out Utility asset works on High Lane, Sheffield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 December 2024 and run through until 3 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 15:12.
19 Dec 2024 and 3 Jan 2025
Sheffield City Council were proposing to carry out Utility asset works on High Lane, Sheffield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 December 2024 and run through until 3 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 15:12.
19 Dec 2024 and 3 Jan 2025
Sheffield City Council are proposing to carry out Utility asset works on High Lane, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 15:12.
19 Dec 2024 and 3 Jan 2025
Sheffield City Council are proposing to carry out Utility asset works on High Lane, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 21 Oct 2024 at 11:39.
2 and 30 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Stradbroke Drive, Sheffield.
These works are categorised as Major.
The works will start on or after 2 January 2025 and could run through until 30 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 11:15.
2 and 30 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Stradbroke Drive, Sheffield.
These works are categorised as Major.
The works will start on or after 2 January 2025 and could run through until 30 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 11:08.
4 and 6 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Manor Road, Kiveton Park, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 27 Jun 2024 at 07:13.
4 and 6 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Manor Road, Kiveton Park, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 20 Nov 2024 at 12:21.
6 and 17 Jan 2025
Derbyshire County Council are proposing to carry out Permanent reinstatement on Green Lane, Killamarsh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Derbyshire County Council on 20 Nov 2024 at 14:36.
6 and 31 Jan 2025
Derbyshire County Council are proposing to carry out Section 50 on Upperthorpe Road, Killamarsh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Derbyshire County Council on 6 Nov 2024 at 14:51.
6 and 10 Jan 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Ullswater Avenue, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 1 Nov 2024 at 09:39.
6 and 10 Jan 2025
BT are proposing to carry out Utility asset works on West Lane, Aughton, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 23 Sep 2024 at 08:59.
6 and 10 Jan 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Willow Drive, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 31 Oct 2024 at 14:50.
6 and 10 Jan 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Willow Drive, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 31 Oct 2024 at 15:23.
7 and 22 Jan 2025
Sheffield City Council are proposing to carry out Utility asset works on Moorthorpe Way, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 12:32.
7 and 22 Jan 2025
Sheffield City Council are proposing to carry out Utility asset works on Moorthorpe Way, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 5 Nov 2024 at 08:10.
12 Jan and 16 May 2025
Sheffield City Council are proposing to carry out Utility asset works on Handsworth Road, Sheffield.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 January 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 15 Nov 2024 at 16:54.
13 and 17 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Dunedin Grove, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 21 Nov 2024 at 17:35.
13 and 22 Jan 2025
Derbyshire County Council are proposing to carry out Highway repair and maintenance works on High Street, Killamarsh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 10 Oct 2024 at 15:23.
13 and 15 Jan 2025
Quickline Commucations are proposing to carry out Utility repair and maintenance works on Woodall Lane, Woodall, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Quickline Commucations on 6 Nov 2024 at 11:01.
13 and 15 Jan 2025
Quickline Commucations are proposing to carry out Utility repair and maintenance works on Woodall Lane, Woodall, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Quickline Commucations on 6 Nov 2024 at 14:19.
13 and 28 Jan 2025
Sheffield City Council are proposing to carry out Utility asset works on Moor Farm Avenue, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 12:32.
13 and 28 Jan 2025
Sheffield City Council are proposing to carry out Utility asset works on Moor Farm Avenue, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 17:31.
13 and 28 Jan 2025
Sheffield City Council are proposing to carry out Utility asset works on Moor Farm Garth, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 12:32.
13 and 28 Jan 2025
Sheffield City Council are proposing to carry out Utility asset works on Moor Farm Garth, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 17:30.
13 and 28 Jan 2025
Sheffield City Council are proposing to carry out Utility asset works on Moss Way, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 12:32.
13 and 28 Jan 2025
Sheffield City Council are proposing to carry out Utility asset works on Moss Way, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 5 Nov 2024 at 08:11.
13 and 17 Jan 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Newstead Way, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 18 Nov 2024 at 12:20.
13 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Stradbroke Road, Sheffield.
These works are categorised as Major.
The works will start on or after 13 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 10:29.
13 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Windy House Lane, Sheffield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 14:30.
13 Jan and 16 May 2025
Sheffield City Council are proposing to carry out Utility asset works on Sheffield Parkway, Sheffield.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 9 Jul 2024 at 16:58.
13 Jan and 16 May 2025
Sheffield City Council are proposing to carry out Utility asset works on Handsworth Road, Sheffield.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 5 Jul 2024 at 09:04.
13 Jan and 16 May 2025
Sheffield City Council are proposing to carry out Utility asset works on Handsworth Road, Sheffield.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 9 Jul 2024 at 17:09.
13 Jan and 16 May 2025
Sheffield City Council are proposing to carry out Utility asset works on Sheffield Parkway, Sheffield.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 9 Jul 2024 at 16:58.
13 Jan and 16 May 2025
Sheffield City Council are proposing to carry out Utility asset works on Handsworth Road, Sheffield.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 5 Jul 2024 at 09:05.
13 Jan and 16 May 2025
Sheffield City Council are proposing to carry out Utility asset works on Handsworth Road, Sheffield.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 9 Jul 2024 at 17:09.
14 and 16 Jan 2025
Quickline Commucations are proposing to carry out Utility repair and maintenance works on Worksop Road, Aston, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Quickline Commucations on 6 Nov 2024 at 11:42.
15 and 30 Jan 2025
Sheffield City Council are proposing to carry out Utility asset works on Robin Lane, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 12:33.
15 and 30 Jan 2025
Sheffield City Council are proposing to carry out Utility asset works on Robin Lane, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 5 Nov 2024 at 08:13.
15 and 30 Jan 2025
Sheffield City Council are proposing to carry out Utility asset works on Woodhouse Lane, Beighton, Sheffield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 14:55.
15 and 30 Jan 2025
Sheffield City Council are proposing to carry out Utility asset works on Woodhouse Lane, Beighton, Sheffield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 5 Nov 2024 at 08:20.
20 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Windy House Lane, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 15:00.
20 Jan and 24 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Queen Mary Road, Sheffield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 14:30.
20 Jan and 10 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Smelter Wood Road, Sheffield.
These works are categorised as Major.
The works will start on or after 20 January 2025 and could run through until 10 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 11:03.
21 Jan and 5 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Orchard Lane, Beighton, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 12:33.
21 Jan and 5 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Orchard Lane, Beighton, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 17:32.
21 Jan and 5 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on West Street, Beighton, Sheffield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 14:55.
21 Jan and 5 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on West Street, Beighton, Sheffield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 5 Nov 2024 at 08:14.
22 Jan and 6 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Beaver Hill Road, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 12:33.
22 Jan and 6 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Beaver Hill Road, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 5 Nov 2024 at 07:53.
22 Jan and 6 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Beaver Hill Road, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 12:33.
22 Jan and 6 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Beaver Hill Road, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 5 Nov 2024 at 07:54.
24 Jan and 7 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Junction Road, Woodhouse, Sheffield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 14:55.
24 Jan and 7 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Junction Road, Woodhouse, Sheffield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 5 Nov 2024 at 08:03.
24 Jan and 7 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Furnace Lane, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 13:38.
24 Jan and 7 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Furnace Lane, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 17:06.
24 Jan and 7 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Furnace Lane, Sheffield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 14:55.
24 Jan and 7 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Furnace Lane, Sheffield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 17:08.
27 and 31 Jan 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Woodall Lane, Rotherham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 10 Oct 2024 at 10:23.
27 Jan and 14 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Silkstone Road, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 15 Nov 2024 at 08:50.
27 Jan and 14 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Silkstone Road, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 15 Nov 2024 at 08:50.
27 Jan and 11 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Retford Road, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 13:38.
27 Jan and 11 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Retford Road, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 17:12.
28 Jan and 28 Mar 2025
Sheffield City Council are proposing to carry out Utility asset works on Archdale Road, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 24 Oct 2024 at 14:42.
28 Jan and 28 Mar 2025
Sheffield City Council are proposing to carry out Utility asset works on Hastilar Road, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 24 Oct 2024 at 14:40.
28 Jan and 28 Mar 2025
Sheffield City Council are proposing to carry out Utility asset works on Archdale Close, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 24 Oct 2024 at 14:43.
30 Jan and 14 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Norton Avenue, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 13:39.
30 Jan and 14 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Norton Avenue, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 17:17.
30 Jan and 14 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Ridgeway Road, Sheffield.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 13:39.
30 Jan and 14 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Ridgeway Road, Sheffield.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 17:19.
30 Jan and 14 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Woodhouse Lane, Beighton, Sheffield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 13:39.
30 Jan and 14 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on High Street, Beighton, Sheffield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 5 Nov 2024 at 09:32.
30 Jan and 14 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on High Street, Beighton, Sheffield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 18 Nov 2024 at 15:02.
30 Jan and 14 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Rotherham Road, Beighton, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 13:39.
30 Jan and 14 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Rotherham Road, Beighton, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 17:38.
30 Jan and 14 Feb 2025
Sheffield City Council were proposing to carry out Utility asset works on Woodhouse Lane, Beighton, Sheffield.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 January 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 5 Nov 2024 at 09:32.
31 Jan and 14 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Mosborough Parkway, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 13:39.
31 Jan and 14 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Mosborough Parkway, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 17:39.
31 Jan and 14 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Mosborough Parkway, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 13:39.
31 Jan and 14 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Mosborough Parkway, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 17:39.
3 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Station Lane, Old Whittington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 16:30.
3 and 17 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Bower Farm Road, Old Whittington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 16:30.
3 and 17 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on High Street, Old Whittington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 16:30.
3 and 18 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Beighton Road, Woodhouse, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 23:15.
3 and 18 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Beighton Road, Woodhouse, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 19 Nov 2024 at 09:59.
5 and 20 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Eckington Way, Sheffield.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 23:15.
5 and 20 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Eckington Way, Sheffield.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 16:46.
5 and 20 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Eckington Way, Sheffield.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 15:28.
5 and 20 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Drake House Lane, Sheffield.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 12:31.
5 and 20 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Drake House Lane, Sheffield.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 12:31.
5 and 20 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Eckington Way, Sheffield.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 23:15.
5 and 20 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Eckington Way, Sheffield.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 13:16.
5 and 20 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Eckington Way, Sheffield.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 13:16.
5 and 20 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Waterthorpe Greenway, Sheffield.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 13:17.
5 and 20 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Waterthorpe Greenway, Sheffield.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 13:17.
5 and 20 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Eckington Way, Sheffield.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 15:44.
5 and 20 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Sevenairs Road, Sheffield.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 13:16.
5 and 20 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Sevenairs Road, Sheffield.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 13:17.
5 and 20 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Eckington Way, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 23:15.
5 and 20 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Eckington Way, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 19 Nov 2024 at 10:10.
5 and 20 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Eckington Way, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 23:15.
5 and 20 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Eckington Way, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 19 Nov 2024 at 13:04.
5 and 20 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Mosborough Parkway, Sheffield.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 23:15.
5 and 20 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Mosborough Parkway, Sheffield.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 19 Nov 2024 at 10:05.
10 and 26 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Gypsy Lane, Old Whittington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 16:30.
10 and 25 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Eckington Road, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 23:14.
10 and 25 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Eckington Road, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 19 Nov 2024 at 10:07.
10 and 25 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on West Street, Beighton, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 23:14.
10 and 25 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on West Street, Beighton, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 23:14.
10 and 25 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Drake House Way, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 23:15.
10 and 25 Feb 2025
Sheffield City Council are proposing to carry out Utility asset works on Drake House Way, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 19 Nov 2024 at 10:00.
10 and 14 Feb 2025
Cadent Gas are proposing to carry out Remedial works on Longstone Crescent, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 16:45.
10 and 14 Feb 2025
Cadent Gas are proposing to carry out Remedial works on Longstone Crescent, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 17:18.
10 and 12 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Vicar Lane, Woodhouse, Sheffield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 09:12.
10 and 12 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Vicar Lane, Woodhouse, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 10:33.
10 Feb and 17 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Treetown Crescent, Treeton, Rotherham.
These works are categorised as Major.
The works will start on or after 10 February 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 12:59.
17 and 21 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Woodall Lane, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 11 Oct 2024 at 11:36.
17 and 21 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Woodall Lane, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 24 Oct 2024 at 09:45.
17 Feb and 4 Mar 2025
Sheffield City Council are proposing to carry out Utility asset works on Queen Street, Mosborough, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 22:09.
17 Feb and 4 Mar 2025
Sheffield City Council are proposing to carry out Utility asset works on Queen Street, Mosborough, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 22:09.
17 Feb and 4 Mar 2025
Sheffield City Council are proposing to carry out Utility asset works on Eckington Road, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 22:09.
17 Feb and 4 Mar 2025
Sheffield City Council are proposing to carry out Utility asset works on Eckington Road, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sheffield City Council on 19 Nov 2024 at 13:04.
17 Feb and 14 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Ravenscroft Road, Sheffield.
These works are categorised as Major.
The works will start on or after 17 February 2025 and could run through until 14 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 11:32.
Roadworks Map near to Arms Park Drive, SHEFFIELD, S20 4HR
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Arms Park Drive, SHEFFIELD, S20 4HR (35 Events)
(Scheduled Dates)
(miles)
(Scheduled: 14 Nov 2024 - 27 Nov 2024)
(Scheduled: 20 Nov 2024 - 25 Nov 2024)
(Scheduled: 20 Nov 2024 - 22 Nov 2024)
Contains public sector information licensed under the Open Government Licence v3.0.