ROADWORKS SUMMARY
Medlock Road, SHEFFIELD, S13 9AY

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Medlock Road, S13 9AY and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Medlock Road, SHEFFIELD, S13 9AY

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Medlock Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Sheffield City Council logo
LONG TERM
Until
22 Jul 2031
Details
View Map
Share
Follow
North Church Street

Sheffield City Council are carrying out Section 50 on North Church Street, Sheffield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 July 2021 at 08:00 and could run through until 22 July 2031. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 16 Aug 2021 at 14:14.

Sheffield City Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Scarsdale Road

Sheffield City Council are carrying out Utility asset works on Scarsdale Road, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 May 2022 at 00:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 18 Nov 2024 at 11:21.

Sheffield City Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Cherry Street

Sheffield City Council are carrying out Utility asset works on Cherry Street, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 May 2022 at 00:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 18 Nov 2024 at 11:20.

Sheffield City Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Mona Avenue

Sheffield City Council are carrying out Utility asset works on Mona Avenue, Sheffield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 July 2022 at 00:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 18 Nov 2024 at 11:19.

Sheffield City Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Leamington Street

Sheffield City Council are carrying out Utility asset works on Leamington Street, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 July 2022 at 00:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 18 Nov 2024 at 11:18.

Sheffield City Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Little London Road

Sheffield City Council are carrying out Utility asset works on Little London Road, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 July 2022 at 08:34 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 18 Nov 2024 at 11:20.

Sheffield City Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Newhall Road

Sheffield City Council are carrying out Utility asset works on Newhall Road, Sheffield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 June 2023 at 03:36 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 15 Nov 2024 at 10:53.

Sheffield City Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Carlisle Street East

Sheffield City Council are carrying out Utility asset works on Carlisle Street East, Sheffield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 July 2023 at 09:13 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 15 Nov 2024 at 10:52.

Rotherham Metropolitan Borough Council logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
High Street

Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on High Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 October 2023 at 07:00 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 19 Apr 2024 at 11:07.

Sheffield City Council logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Russell Street

Sheffield City Council are carrying out Highway repair and maintenance works on Russell Street, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2023 at 09:00 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 18 Mar 2024 at 17:16.

Sheffield City Council logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Mowbray Street

Sheffield City Council are carrying out Highway repair and maintenance works on Mowbray Street, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2023 at 09:00 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 18 Mar 2024 at 17:30.

Sheffield City Council logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Rutland Road

Sheffield City Council are carrying out Highway repair and maintenance works on Rutland Road, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2023 at 09:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 18 Mar 2024 at 17:13.

Sheffield City Council logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Percy Street

Sheffield City Council are carrying out Highway repair and maintenance works on Percy Street, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2023 at 09:00 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 18 Mar 2024 at 17:22.

Sheffield City Council logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Platt Street

Sheffield City Council are carrying out Highway repair and maintenance works on Platt Street, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2023 at 09:00 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 18 Mar 2024 at 17:19.

Sheffield City Council logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Hicks Street

Sheffield City Council are carrying out Highway repair and maintenance works on Hicks Street, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2023 at 09:00 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 18 Mar 2024 at 17:25.

LONG TERM
Until
15 Jan 2025
Details
View Map
Share
Follow
Park Grange Road

South Yorkshire Passenger Transport Executive are carrying out Statutory Infrastructure Works on Park Grange Road, Sheffield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 00:01 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Yorkshire Passenger Transport Executive on 8 Nov 2024 at 17:28.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
17 Jun 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Frederick Street

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Frederick Street, Catcliffe, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 5 Apr 2024 at 08:21.

Rotherham Metropolitan Borough Council logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Church Lane

Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Church Lane, Treeton, Rotherham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 July 2024 at 15:30 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 3 Oct 2024 at 14:25.

Rotherham Metropolitan Borough Council logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Chesterfield Road

Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Chesterfield Road, Swallownest, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 20:00 and could run through until 31 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 18 Nov 2024 at 08:58.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
19 Aug 2024 and 29 Nov 2025
Details
View Map
Share
Follow
Chesterfield Road

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Chesterfield Road, Swallownest, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2024 and could run through until 29 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 30 Aug 2024 at 13:39.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
23 Aug 2024 and 21 Feb 2025
Details
View Map
Share
Follow
Rotherham Gateway

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Rotherham Gateway, Catcliffe, Rotherham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 August 2024 and could run through until 21 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 21 Aug 2024 at 15:14.

Yorkshire Water logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Drummond Street

Yorkshire Water are carrying out Utility repair and maintenance works on Drummond Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 August 2024 at 08:00 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 15 Nov 2024 at 15:14.

Rotherham Metropolitan Borough Council logo
LONG TERM
Until
21 Feb 2025
Details
View Map
Share
Follow
Rotherham Gateway

Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Rotherham Gateway, Catcliffe, Rotherham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 August 2024 at 20:00 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 20 Sep 2024 at 12:59.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
28 Aug and 30 Dec 2024
Details
View Map
Share
Follow
Bernard Street

Rotherham Metropolitan Borough Council are proposing to carry out Utility repair and maintenance works on Bernard Street, Wellgate, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2024 and could run through until 30 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 8 Aug 2024 at 12:29.

Sheffield City Council logo
LONG TERM
Between
2 Sep and 2 Dec 2024
Details
View Map
Share
Meadowhall Road

Sheffield City Council were proposing to carry out Utility asset works on Meadowhall Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 2 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 2 Sep 2024 at 09:36.

Sheffield City Council logo
LONG TERM
Between
2 Sep and 2 Dec 2024
Details
View Map
Share
Meadowhall Road

Sheffield City Council were proposing to carry out Utility asset works on Meadowhall Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 2 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 2 Sep 2024 at 09:36.

Sheffield City Council logo
LONG TERM
Between
9 Sep 2024 and 9 Sep 2025
Details
View Map
Share
Follow
Sheffield Road

Sheffield City Council are proposing to carry out Utility asset works on Sheffield Road, Tinsley, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 9 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sheffield City Council on 7 Jun 2024 at 09:18.

Sheffield City Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Moss Way

Sheffield City Council are carrying out Utility asset works on Moss Way, Sheffield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 September 2024 at 07:45 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 15 Nov 2024 at 16:50.

Sheffield City Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Arbourthorne Road

Sheffield City Council were proposing to carry out Utility asset works on Arbourthorne Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 September 2024 and run through until 25 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 25 Sep 2024 at 08:23.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
26 Sep 2024 and 29 Nov 2025
Details
View Map
Share
Follow
Chesterfield Road

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Chesterfield Road, Swallownest, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2024 and could run through until 29 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 4 Sep 2024 at 10:25.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
27 Sep 2024 and 12 May 2025
Details
View Map
Share
Follow
Water Lane

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Water Lane, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2024 and could run through until 12 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 5 Jul 2024 at 08:36.

Rotherham Metropolitan Borough Council logo
LONG TERM
Until
12 May 2025
Details
View Map
Share
Follow
Water Lane

Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Water Lane, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 September 2024 at 08:00 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 4 Oct 2024 at 13:50.

Sheffield City Council logo
LONG TERM
Between
30 Sep and 23 Dec 2024
Details
View Map
Share
Follow
Rother Valley Way

Sheffield City Council are proposing to carry out Utility asset works on Rother Valley Way, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sheffield City Council on 16 Sep 2024 at 10:42.

Sheffield City Council logo
LONG TERM
Until
23 Dec 2024
Details
View Map
Share
Follow
Rother Valley Way

Sheffield City Council are carrying out Utility asset works on Rother Valley Way, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 07:36 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 30 Sep 2024 at 08:12.

Sheffield City Council logo
LONG TERM
Between
30 Sep and 23 Dec 2024
Details
View Map
Share
Follow
Meadow Gate Avenue

Sheffield City Council are proposing to carry out Utility asset works on Meadow Gate Avenue, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sheffield City Council on 16 Sep 2024 at 10:42.

Sheffield City Council logo
LONG TERM
Until
23 Dec 2024
Details
View Map
Share
Follow
Meadow Gate Avenue

Sheffield City Council are carrying out Utility asset works on Meadow Gate Avenue, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 07:36 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 30 Sep 2024 at 08:12.

Sheffield City Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Moonshine Lane

Sheffield City Council are carrying out Utility asset works on Moonshine Lane, Sheffield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 07:39 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 15 Nov 2024 at 16:26.

Sheffield City Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Psalter Lane

Sheffield City Council are carrying out Utility asset works on Psalter Lane, Sheffield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 October 2024 at 07:42 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 8 Nov 2024 at 08:38.

Sheffield City Council logo
LONG TERM
Until
10 Apr 2026
Details
View Map
Share
Follow
Sheffield Road

Sheffield City Council are carrying out Utility asset works on Sheffield Road, Tinsley, Sheffield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 October 2024 at 07:42 and could run through until 10 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 1 Oct 2024 at 07:59.

Sheffield City Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Brightside Lane

Sheffield City Council are carrying out Section 50 on Brightside Lane, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 October 2024 at 16:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 18 Nov 2024 at 13:18.

Cadent Gas logo
LONG TERM
Between
14 Oct and 28 Nov 2024
Details
View Map
Share
Follow
Scotia Drive

Cadent Gas are proposing to carry out Utility asset works on Scotia Drive, Sheffield.

These works are categorised as Major.

The works will start on or after 14 October 2024 and could run through until 28 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 15:20.

Cadent Gas logo
LONG TERM
Until
28 Nov 2024
Details
View Map
Share
Follow
Longley Hall Road

Cadent Gas are carrying out Utility asset works on Longley Hall Road, Sheffield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 October 2024 at 09:00 and could run through until 28 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 09:46.

Severn Trent Water logo
LONG TERM
Between
21 Oct 2024 and 23 Oct 2025
Details
View Map
Share
High Street

Severn Trent Water were proposing to carry out Utility repair and maintenance works on High Street, Eckington.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 23 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 10 Oct 2024 at 16:00.

Sheffield City Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Dyche Lane

Sheffield City Council are carrying out Utility asset works on Dyche Lane, Sheffield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 07:38 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 15 Nov 2024 at 08:09.

Sheffield City Council logo
LONG TERM
Until
28 Nov 2024
Details
View Map
Share
Follow
Beaumont Road North

Sheffield City Council are carrying out Section 50 on Beaumont Road North, Sheffield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:00 and could run through until 28 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Sheffield City Council on 12 Nov 2024 at 17:24.

Cadent Gas logo
LONG TERM
Until
28 Nov 2024
Details
View Map
Share
Follow
Elm Lane

Cadent Gas are carrying out Utility repair and maintenance works on Elm Lane, Sheffield.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 October 2024 at 08:44 and could run through until 28 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 16:00.

Rotherham Metropolitan Borough Council logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Highfield Spring

Rotherham Metropolitan Borough Council are carrying out Section 50 on Highfield Spring, Catcliffe, Rotherham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:00 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 15 Nov 2024 at 08:11.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Longley Hall Grove

Cadent Gas are carrying out Utility asset works on Longley Hall Grove, Sheffield.

These works are categorised as Major.

The works started on 29 October 2024 at 10:00 and could run through until 25 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 08:53.

Northern Powergrid (Yorkshire) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Abbey View Road

Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Abbey View Road, Sheffield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 November 2024 at 21:40 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 8 Nov 2024 at 13:21.

Western Power Distribution (East Midlands) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Upperthorpe Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Upperthorpe Road, Killamarsh.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 22 Oct 2024 at 10:27.

Western Power Distribution (East Midlands) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Upperthorpe Road

Western Power Distribution (East Midlands) are carrying out Utility asset works on Upperthorpe Road, Killamarsh.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 17:02 and could run through until 27 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 21 Nov 2024 at 16:30.

Sheffield City Council logo
LONG TERM
Between
4 Nov 2024 and 7 Feb 2025
Details
View Map
Share
Bochum Parkway

Sheffield City Council were proposing to carry out Utility asset works on Bochum Parkway, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 7 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 16 Oct 2024 at 10:56.

Sheffield City Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Psalter Lane

Sheffield City Council are carrying out Utility asset works on Psalter Lane, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 07:40 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 13:03.

Sheffield City Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Norfolk Road

Sheffield City Council are carrying out Utility asset works on Norfolk Road, Sheffield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 07:39 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 15 Nov 2024 at 16:49.

Sheffield City Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Norfolk Road

Sheffield City Council are carrying out Utility asset works on Norfolk Road, Sheffield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 07:38 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 15 Nov 2024 at 16:49.

Cadent Gas logo
LONG TERM
Between
4 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Well Lane

Cadent Gas are proposing to carry out Utility asset works on Well Lane, Treeton, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 11:02.

Sheffield City Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Retford Road

Sheffield City Council are carrying out Utility asset works on Retford Road, Sheffield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 November 2024 at 07:43 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 21 Nov 2024 at 16:09.

Sheffield City Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Herries Road

Sheffield City Council are proposing to carry out Utility asset works on Herries Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Oct 2024 at 14:45.

Sheffield City Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Herries Road

Sheffield City Council are carrying out Utility asset works on Herries Road, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 November 2024 at 07:44 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 7 Nov 2024 at 08:06.

Sheffield City Council logo
Finishing
Tuesday
Details
View Map
Share
Greenland Walk

Sheffield City Council were proposing to carry out Utility asset works on Greenland Walk, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 November 2024 and run through until 26 November 2024. The works were due to impact the footway and footpath.

This roadwork event was last updated by Sheffield City Council on 24 Oct 2024 at 11:54.

Sheffield City Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Greenland Walk

Sheffield City Council are proposing to carry out Utility asset works on Greenland Walk, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 26 November 2024. The works will impact the footway and footpath.

This roadwork event was last updated by Sheffield City Council on 29 Oct 2024 at 10:57.

Sheffield City Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Greenland Walk

Sheffield City Council are carrying out Utility asset works on Greenland Walk, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 07:39 and could run through until 26 November 2024. The works will impact the footway and footpath.

This roadwork event was last updated by Sheffield City Council on 8 Nov 2024 at 07:50.

Sheffield City Council logo
Finishing
Tuesday
Details
View Map
Share
Coleridge Gardens

Sheffield City Council were proposing to carry out Utility asset works on Coleridge Gardens, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 November 2024 and run through until 26 November 2024. The works were due to impact the footway and footpath.

This roadwork event was last updated by Sheffield City Council on 24 Oct 2024 at 11:54.

Sheffield City Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Coleridge Gardens

Sheffield City Council are proposing to carry out Utility asset works on Coleridge Gardens, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 26 November 2024. The works will impact the footway and footpath.

This roadwork event was last updated by Sheffield City Council on 29 Oct 2024 at 10:57.

Sheffield City Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Coleridge Gardens

Sheffield City Council are carrying out Utility asset works on Coleridge Gardens, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 07:40 and could run through until 26 November 2024. The works will impact the footway and footpath.

This roadwork event was last updated by Sheffield City Council on 8 Nov 2024 at 07:50.

Sheffield City Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Bochum Parkway

Sheffield City Council are carrying out Utility asset works on Bochum Parkway, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 07:43 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 18 Nov 2024 at 13:14.

Cadent Gas logo
LONG TERM
Between
11 Nov and 19 Dec 2024
Details
View Map
Share
Follow
Scotia Drive

Cadent Gas are proposing to carry out Utility asset works on Scotia Drive, Sheffield.

These works are categorised as Major.

The works will start on or after 11 November 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 09:11.

Cadent Gas logo
Between
11 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Clifton Mount

Cadent Gas are proposing to carry out Utility asset works on Clifton Mount, Clifton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 6 Aug 2024 at 11:46.

Cadent Gas logo
Until
2 Dec 2024
Details
View Map
Share
Follow
Clifton Mount

Cadent Gas are carrying out Utility asset works on Clifton Mount, Clifton, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:30 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 08:34.

Sheffield City Council logo
Between
13 and 28 Nov 2024
Details
View Map
Share
Mawfa Lane

Sheffield City Council were proposing to carry out Utility asset works on Mawfa Lane, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 November 2024 and run through until 28 November 2024. The works were due to impact the footway and footpath.

This roadwork event was last updated by Sheffield City Council on 24 Sep 2024 at 09:58.

Sheffield City Council logo
Between
13 and 28 Nov 2024
Details
View Map
Share
Follow
Mawfa Lane

Sheffield City Council are proposing to carry out Utility asset works on Mawfa Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 28 November 2024. The works will impact the footway and footpath.

This roadwork event was last updated by Sheffield City Council on 3 Oct 2024 at 23:48.

Sheffield City Council logo
Until
28 Nov 2024
Details
View Map
Share
Follow
Mawfa Lane

Sheffield City Council are carrying out Utility asset works on Mawfa Lane, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 07:44 and could run through until 28 November 2024. The works will impact the footway and footpath.

This roadwork event was last updated by Sheffield City Council on 13 Nov 2024 at 08:00.

Northern Powergrid (Yorkshire) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Attercliffe Common

Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Attercliffe Common, Sheffield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 November 2024 at 08:20 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Nov 2024 at 11:00.

Sheffield City Council logo
Between
15 and 29 Nov 2024
Details
View Map
Share
Follow
Carlisle Street East

Sheffield City Council are proposing to carry out Utility asset works on Carlisle Street East, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 10:15.

Sheffield City Council logo
Between
15 and 29 Nov 2024
Details
View Map
Share
Follow
Carlisle Street East

Sheffield City Council are proposing to carry out Utility asset works on Carlisle Street East, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 15:02.

Sheffield City Council logo
Between
15 and 29 Nov 2024
Details
View Map
Share
Follow
Longley Lane

Sheffield City Council are proposing to carry out Utility asset works on Longley Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 10:15.

Sheffield City Council logo
Until
29 Nov 2024
Details
View Map
Share
Follow
Longley Lane

Sheffield City Council are carrying out Utility asset works on Longley Lane, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 November 2024 at 07:56 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 21 Nov 2024 at 17:43.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Middle Lane

Cadent Gas are carrying out Utility repair and maintenance works on Middle Lane, Clifton, Rotherham.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 November 2024 at 08:42 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 11:48.

Derbyshire County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Littlemoor

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Littlemoor, Eckington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 15 Aug 2024 at 16:30.

Cadent Gas logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
Meetinghouse Lane

Cadent Gas are proposing to carry out Utility asset works on Meetinghouse Lane, Woodhouse, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 17:25.

Cadent Gas logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
Meetinghouse Lane

Cadent Gas are proposing to carry out Utility asset works on Meetinghouse Lane, Woodhouse, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 14:43.

Cadent Gas logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Church Lane

Cadent Gas were proposing to carry out Utility asset works on Church Lane, Woodhouse, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 08:33.

Cadent Gas logo
Between
18 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Windy House Lane

Cadent Gas are proposing to carry out Utility asset works on Windy House Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 15:06.

Cadent Gas logo
Between
18 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Windy House Lane

Cadent Gas are proposing to carry out Utility asset works on Windy House Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 08:12.

Cadent Gas logo
Between
18 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Windy House Lane

Cadent Gas are proposing to carry out Utility asset works on Windy House Lane, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 15:08.

Cadent Gas logo
Between
18 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Windy House Lane

Cadent Gas are proposing to carry out Utility asset works on Windy House Lane, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 08:13.

Cadent Gas logo
LONG TERM
Between
18 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Queen Mary Road

Cadent Gas are proposing to carry out Utility asset works on Queen Mary Road, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 15:10.

Cadent Gas logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Queen Mary Road

Cadent Gas are proposing to carry out Utility asset works on Queen Mary Road, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 16:46.

Sheffield City Council logo
Until
29 Nov 2024
Details
View Map
Share
Follow
Durham Road

Sheffield City Council are carrying out Section 50 on Durham Road, Sheffield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 12:49 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 21 Nov 2024 at 16:43.

Sheffield City Council logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Crookesmoor Road

Sheffield City Council are proposing to carry out Utility asset works on Crookesmoor Road, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 29 Oct 2024 at 15:08.

Sheffield City Council logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Crookesmoor Road

Sheffield City Council are proposing to carry out Utility asset works on Crookesmoor Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 29 Oct 2024 at 15:08.

Northern Powergrid (Yorkshire) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Bates Street

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Bates Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 25 Oct 2024 at 11:00.

Northern Powergrid (Yorkshire) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Bates Street

Northern Powergrid (Yorkshire) are carrying out New service connection on Bates Street, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 10:25 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 18 Nov 2024 at 10:26.

Northern Powergrid (Yorkshire) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Bates Street

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Bates Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 25 Sep 2024 at 10:22.

Northern Powergrid (Yorkshire) logo
Finishing
Tomorrow
Details
View Map
Share
Bates Street

Northern Powergrid (Yorkshire) were proposing to carry out New service connection on Bates Street, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 22 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 1 Oct 2024 at 07:51.

Cadent Gas logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Brinsworth Road

Cadent Gas were proposing to carry out Utility repair and maintenance works on Brinsworth Road, Brinsworth, Rotherham.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 29 November 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 23 Aug 2024 at 08:48.

Cadent Gas logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Brinsworth Road

Cadent Gas were proposing to carry out Utility repair and maintenance works on Brinsworth Road, Brinsworth, Rotherham.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 29 November 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 16:15.

Cadent Gas logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
Brinsworth Road

Cadent Gas are proposing to carry out Utility repair and maintenance works on Brinsworth Road, Brinsworth, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 08:44.

Cadent Gas logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
Brinsworth Road

Cadent Gas are proposing to carry out Utility repair and maintenance works on Brinsworth Road, Brinsworth, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 12:50.

Cadent Gas logo
Until
29 Nov 2024
Details
View Map
Share
Follow
Brinsworth Road

Cadent Gas are carrying out Utility repair and maintenance works on Brinsworth Road, Brinsworth, Rotherham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:34 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 09:17.

Cadent Gas logo
Between
18 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Moorlands Crescent

Cadent Gas are proposing to carry out Utility asset works on Moorlands Crescent, Whiston, Rotherham.

These works are categorised as Major.

The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 13:13.

Rotherham Metropolitan Borough Council logo
Until
6 Dec 2024
Details
View Map
Share
Follow
East Bawtry Road

Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on East Bawtry Road, Whiston, Rotherham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:30 and could run through until 6 December 2024. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 18 Nov 2024 at 14:10.

Northern Powergrid (Yorkshire) logo
Until
28 Nov 2024
Details
View Map
Share
Follow
Midhill Road

Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Midhill Road, Sheffield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 18:00 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 21 Nov 2024 at 10:40.

Northern Powergrid (Yorkshire) logo
Finishing
Monday
Details
View Map
Share
Follow
Hill Street

Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Hill Street, Sheffield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 13:20 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 19 Nov 2024 at 14:29.

Sheffield City Council logo
Between
19 Nov and 4 Dec 2024
Details
View Map
Share
Follow
Carlisle Street East

Sheffield City Council are proposing to carry out Utility asset works on Carlisle Street East, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 10:15.

Sheffield City Council logo
Until
4 Dec 2024
Details
View Map
Share
Follow
Carlisle Street East

Sheffield City Council are carrying out Utility asset works on Carlisle Street East, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 17:39 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Nov 2024 at 17:48.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
East Bawtry Road

Cadent Gas are carrying out Utility repair and maintenance works on East Bawtry Road, Whiston, Rotherham.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 14:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 15:12.

Northern Powergrid (Yorkshire) logo
Finishing
Monday
Details
View Map
Share
Follow
Gerard Road

Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Gerard Road, Wellgate, Rotherham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 10:30 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Nov 2024 at 14:15.

Yorkshire Water logo
Finishing
Monday
Details
View Map
Share
Follow
Milton Road

Yorkshire Water are carrying out Utility repair and maintenance works on Milton Road, Eastwood, Rotherham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 12:32 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 19 Nov 2024 at 13:58.

Cityfibre Metro Networks logo
Finishing
Tuesday
Details
View Map
Share
Ecclesall Road

Cityfibre Metro Networks were proposing to carry out Utility repair and maintenance works on Ecclesall Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 November 2024 and run through until 26 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 24 Sep 2024 at 09:26.

Yorkshire Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Arundel Street

Yorkshire Water are carrying out Utility repair and maintenance works on Arundel Street, Sheffield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 09:57 and could run through until 26 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 20 Nov 2024 at 10:46.

Sheffield City Council logo
Between
20 Nov and 10 Dec 2024
Details
View Map
Share
Greenland Walk

Sheffield City Council were proposing to carry out Utility asset works on Greenland Walk, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 November 2024 and run through until 10 December 2024. The works were due to impact the footway and footpath.

This roadwork event was last updated by Sheffield City Council on 13 Nov 2024 at 08:44.

Sheffield City Council logo
Between
20 Nov and 10 Dec 2024
Details
View Map
Share
Follow
Greenland Walk

Sheffield City Council are proposing to carry out Utility asset works on Greenland Walk, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 10 December 2024. The works will impact the footway and footpath.

This roadwork event was last updated by Sheffield City Council on 13 Nov 2024 at 23:01.

Sheffield City Council logo
Until
10 Dec 2024
Details
View Map
Share
Follow
Greenland Walk

Sheffield City Council are carrying out Utility asset works on Greenland Walk, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 09:04 and could run through until 10 December 2024. The works will impact the footway and footpath.

This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 09:11.

Yorkshire Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Driver Street

Yorkshire Water are carrying out Utility repair and maintenance works on Driver Street, Sheffield.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 09:41 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 21 Nov 2024 at 11:42.

Yorkshire Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Richmond Road

Yorkshire Water are carrying out Utility repair and maintenance works on Richmond Road, Sheffield.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 12:30 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 21 Nov 2024 at 15:38.

Sheffield City Council logo
Until
29 Nov 2024
Details
View Map
Share
Follow
Carlisle Street East

Sheffield City Council are carrying out Utility asset works on Carlisle Street East, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 17:57 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 21 Nov 2024 at 18:31.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Bawtry Road

Cadent Gas are carrying out Utility repair and maintenance works on Bawtry Road, Brinsworth, Rotherham.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 14:55 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 15:07.

Yorkshire Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
St Lawrence Road

Yorkshire Water are carrying out Utility repair and maintenance works on St Lawrence Road, Sheffield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 13:37 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 21 Nov 2024 at 15:33.

Sheffield City Council logo
Between
21 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Blackburn Road

Sheffield City Council are proposing to carry out Utility asset works on Blackburn Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 10:16.

Sheffield City Council logo
Until
6 Dec 2024
Details
View Map
Share
Follow
Blackburn Road

Sheffield City Council are carrying out Utility asset works on Blackburn Road, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 17:57 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 21 Nov 2024 at 18:31.

Sheffield City Council logo
LONG TERM
Between
22 Nov 2024 and 21 Feb 2025
Details
View Map
Share
Jordanthorpe Parkway

Sheffield City Council were proposing to carry out Utility asset works on Jordanthorpe Parkway, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 November 2024 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Nov 2024 at 08:07.

Sheffield City Council logo
LONG TERM
Between
22 Nov 2024 and 21 Feb 2025
Details
View Map
Share
Dyche Lane

Sheffield City Council were proposing to carry out Utility asset works on Dyche Lane, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 November 2024 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Nov 2024 at 08:07.

Sheffield City Council logo
LONG TERM
Between
22 Nov 2024 and 21 Feb 2025
Details
View Map
Share
Jordanthorpe Parkway

Sheffield City Council were proposing to carry out Utility asset works on Jordanthorpe Parkway, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 November 2024 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Nov 2024 at 08:07.

Sheffield City Council logo
LONG TERM
Between
22 Nov 2024 and 21 Feb 2025
Details
View Map
Share
Bochum Parkway

Sheffield City Council were proposing to carry out Utility asset works on Bochum Parkway, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 November 2024 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Nov 2024 at 08:07.

Sheffield City Council logo
LONG TERM
Between
22 Nov 2024 and 21 Feb 2025
Details
View Map
Share
Follow
Bochum Parkway

Sheffield City Council are proposing to carry out Utility asset works on Bochum Parkway, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 15 Aug 2024 at 17:49.

Sheffield City Council logo
LONG TERM
Between
22 Nov 2024 and 21 Feb 2025
Details
View Map
Share
Bochum Parkway

Sheffield City Council were proposing to carry out Utility asset works on Bochum Parkway, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 November 2024 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Nov 2024 at 08:07.

Sheffield City Council logo
LONG TERM
Between
22 Nov 2024 and 21 Feb 2025
Details
View Map
Share
Bochum Parkway

Sheffield City Council were proposing to carry out Utility asset works on Bochum Parkway, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 November 2024 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Nov 2024 at 08:07.

Sheffield City Council logo
LONG TERM
Between
22 Nov 2024 and 21 Feb 2025
Details
View Map
Share
Norton Lane

Sheffield City Council were proposing to carry out Utility asset works on Norton Lane, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 November 2024 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Nov 2024 at 08:07.

Sheffield City Council logo
LONG TERM
Between
22 Nov 2024 and 21 Feb 2025
Details
View Map
Share
Norton Avenue

Sheffield City Council were proposing to carry out Utility asset works on Norton Avenue, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 November 2024 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Nov 2024 at 08:07.

Sheffield City Council logo
LONG TERM
Between
22 Nov 2024 and 21 Feb 2025
Details
View Map
Share
Abbey Lane

Sheffield City Council were proposing to carry out Utility asset works on Abbey Lane, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 November 2024 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Nov 2024 at 08:07.

Sheffield City Council logo
LONG TERM
Between
22 Nov 2024 and 21 Feb 2025
Details
View Map
Share
Hemsworth Road

Sheffield City Council were proposing to carry out Utility asset works on Hemsworth Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 November 2024 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Nov 2024 at 08:07.

Sheffield City Council logo
LONG TERM
Between
22 Nov 2024 and 21 Feb 2025
Details
View Map
Share
Archer Road

Sheffield City Council were proposing to carry out Utility asset works on Archer Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 November 2024 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Nov 2024 at 08:07.

Sheffield City Council logo
LONG TERM
Between
22 Nov 2024 and 21 Feb 2025
Details
View Map
Share
Upper Albert Road

Sheffield City Council were proposing to carry out Utility asset works on Upper Albert Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 November 2024 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Nov 2024 at 08:07.

Sheffield City Council logo
LONG TERM
Between
22 Nov 2024 and 21 Feb 2025
Details
View Map
Share
Gleadless Road

Sheffield City Council were proposing to carry out Utility asset works on Gleadless Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 November 2024 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Nov 2024 at 08:07.

Sheffield City Council logo
LONG TERM
Between
22 Nov 2024 and 21 Feb 2025
Details
View Map
Share
Gleadless Road

Sheffield City Council were proposing to carry out Utility asset works on Gleadless Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 November 2024 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Nov 2024 at 08:07.

Sheffield City Council logo
LONG TERM
Between
22 Nov 2024 and 21 Feb 2025
Details
View Map
Share
Moncrieffe Road

Sheffield City Council were proposing to carry out Utility asset works on Moncrieffe Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 November 2024 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Nov 2024 at 08:07.

Sheffield City Council logo
LONG TERM
Between
22 Nov 2024 and 21 Feb 2025
Details
View Map
Share
Prospect Road

Sheffield City Council were proposing to carry out Utility asset works on Prospect Road, Lowfield, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 November 2024 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Nov 2024 at 08:07.

Sheffield City Council logo
LONG TERM
Between
22 Nov 2024 and 21 Feb 2025
Details
View Map
Share
Cowlishaw Road

Sheffield City Council were proposing to carry out Utility asset works on Cowlishaw Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 November 2024 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Nov 2024 at 08:07.

Sheffield City Council logo
LONG TERM
Between
22 Nov 2024 and 21 Feb 2025
Details
View Map
Share
Junction Road

Sheffield City Council were proposing to carry out Utility asset works on Junction Road, Sharrow, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 November 2024 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Nov 2024 at 08:07.

Cadent Gas logo
Between
24 and 28 Nov 2024
Details
View Map
Share
Follow
Devonshire Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Devonshire Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 08:14.

Cadent Gas logo
Between
24 and 28 Nov 2024
Details
View Map
Share
Follow
Devonshire Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Devonshire Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 09:09.

Cadent Gas logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Longstone Crescent

Cadent Gas are proposing to carry out Remedial works on Longstone Crescent, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 17:07.

Cityfibre Metro Networks logo
Finishing
Wednesday
Details
View Map
Share
St Wilfrid's Road

Cityfibre Metro Networks were proposing to carry out Utility asset works on St Wilfrid's Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 27 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 5 Nov 2024 at 09:17.

Quickline Commucations logo
Finishing
Wednesday
Details
View Map
Share
Follow
Hardwick Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Hardwick Lane, Aston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the verge only.

This roadwork event was last updated by Quickline Commucations on 23 Sep 2024 at 14:18.

Quickline Commucations logo
Finishing
Wednesday
Details
View Map
Share
Follow
Hardwick Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Hardwick Lane, Aston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the verge only.

This roadwork event was last updated by Quickline Commucations on 23 Sep 2024 at 14:34.

Cadent Gas logo
Between
25 Nov and 4 Dec 2024
Details
View Map
Share
Edmund Road

Cadent Gas were proposing to carry out Utility asset works on Edmund Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 4 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 13:04.

Sheffield City Council logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Crookesmoor Road

Sheffield City Council are proposing to carry out Utility asset works on Crookesmoor Road, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 8 Nov 2024 at 13:07.

Sheffield City Council logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Crookesmoor Road

Sheffield City Council are proposing to carry out Utility asset works on Crookesmoor Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 8 Nov 2024 at 11:53.

Network Rail logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Follow
Sussex Street

Network Rail are proposing to carry out Works for Rail Purposes on Sussex Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 30 Aug 2024 at 18:13.

Network Rail logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Follow
Sussex Street

Network Rail are proposing to carry out Works for Rail Purposes on Sussex Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 12 Sep 2024 at 12:22.

Network Rail logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Follow
Sussex Street

Network Rail are proposing to carry out Works for Rail Purposes on Sussex Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 17 Oct 2024 at 11:54.

Sheffield City Council logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Carbrook Hall Road

Sheffield City Council are proposing to carry out Section 50 on Carbrook Hall Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 24 Oct 2024 at 15:58.

Sheffield City Council logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Carbrook Hall Road

Sheffield City Council are proposing to carry out Section 50 on Carbrook Hall Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 24 Oct 2024 at 16:01.

Yorkshire Water logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Follow
Leedham Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Leedham Road, Herringthorpe, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 24 Sep 2024 at 07:35.

Yorkshire Water logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Follow
Leedham Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Leedham Road, Herringthorpe, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 30 Sep 2024 at 12:28.

Cadent Gas logo
Between
25 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Spring Street

Cadent Gas are proposing to carry out Utility asset works on Spring Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 8 Aug 2024 at 11:15.

Cadent Gas logo
Between
25 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Spring Street

Cadent Gas are proposing to carry out Utility asset works on Spring Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 13:34.

Sheffield City Council logo
LONG TERM
Between
28 Nov 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Milton Road

Sheffield City Council are proposing to carry out Utility asset works on Milton Road, Sharrow, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 22 Aug 2024 at 17:47.

Sheffield City Council logo
LONG TERM
Between
28 Nov 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Kenwood Road

Sheffield City Council are proposing to carry out Utility asset works on Kenwood Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 22 Aug 2024 at 17:50.

Sheffield City Council logo
LONG TERM
Between
28 Nov 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Kenwood Park Road

Sheffield City Council are proposing to carry out Utility asset works on Kenwood Park Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 22 Aug 2024 at 16:47.

Sheffield City Council logo
LONG TERM
Between
28 Nov 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Kenwood Road

Sheffield City Council are proposing to carry out Utility asset works on Kenwood Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 22 Aug 2024 at 17:40.

Sheffield City Council logo
LONG TERM
Between
28 Nov 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Kenwood Road

Sheffield City Council are proposing to carry out Utility asset works on Kenwood Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 22 Aug 2024 at 17:48.

Sheffield City Council logo
LONG TERM
Between
28 Nov 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Ribston Road

Sheffield City Council are proposing to carry out Utility asset works on Ribston Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 22 Aug 2024 at 17:45.

Derbyshire County Council logo
Between
2 and 7 Dec 2024
Details
View Map
Share
Follow
Eckington Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Eckington Road, Coal Aston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 24 Oct 2024 at 15:36.

Derbyshire County Council logo
Between
2 and 7 Dec 2024
Details
View Map
Share
Follow
Eckington Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Eckington Road, Coal Aston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 21 Nov 2024 at 16:30.

Yorkshire Water logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Cherry Tree Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Cherry Tree Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 4 Nov 2024 at 16:44.

Yorkshire Water logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Cherry Tree Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Cherry Tree Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 11 Nov 2024 at 08:43.

Yorkshire Water logo
Between
2 and 3 Dec 2024
Details
View Map
Share
Follow
Access Road Between Ecclesall Road And Napier Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Access Road Between Ecclesall Road And Napier Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 5 Nov 2024 at 16:30.

Yorkshire Water logo
Between
2 and 3 Dec 2024
Details
View Map
Share
Follow
Access Road Between Ecclesall Road And Napier Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Access Road Between Ecclesall Road And Napier Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 18 Nov 2024 at 16:30.

Yorkshire Water logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Boyce Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Boyce Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 4 Nov 2024 at 16:46.

Yorkshire Water logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Boyce Street

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Boyce Street, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 4 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 11 Nov 2024 at 07:35.

Sheffield City Council logo
Between
2 and 17 Dec 2024
Details
View Map
Share
Follow
Stanwell Street

Sheffield City Council are proposing to carry out Utility asset works on Stanwell Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 30 Sep 2024 at 10:19.

Sheffield City Council logo
Between
2 and 17 Dec 2024
Details
View Map
Share
Follow
Stanwell Street

Sheffield City Council are proposing to carry out Utility asset works on Stanwell Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 9 Oct 2024 at 12:26.

Sheffield City Council logo
Between
2 and 17 Dec 2024
Details
View Map
Share
Follow
Standon Road

Sheffield City Council are proposing to carry out Utility asset works on Standon Road, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 30 Sep 2024 at 10:19.

Sheffield City Council logo
Between
2 and 17 Dec 2024
Details
View Map
Share
Follow
Standon Road

Sheffield City Council are proposing to carry out Utility asset works on Standon Road, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 9 Oct 2024 at 12:24.

Cadent Gas logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Stevenson Drive

Cadent Gas are proposing to carry out Utility asset works on Stevenson Drive, Herringthorpe, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 11:44.

Cadent Gas logo
Between
2 and 18 Dec 2024
Details
View Map
Share
Follow
Carlisle Street

Cadent Gas are proposing to carry out Utility asset works on Carlisle Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 13:55.

Sheffield City Council logo
Between
3 and 18 Dec 2024
Details
View Map
Share
Follow
Beaver Drive

Sheffield City Council are proposing to carry out Utility asset works on Beaver Drive, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 14:08.

Sheffield City Council logo
Between
3 and 18 Dec 2024
Details
View Map
Share
Follow
Beaver Drive

Sheffield City Council are proposing to carry out Utility asset works on Beaver Drive, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 21 Oct 2024 at 11:33.

Sheffield City Council logo
Between
3 and 18 Dec 2024
Details
View Map
Share
Follow
Beaver Close

Sheffield City Council are proposing to carry out Utility asset works on Beaver Close, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 14:08.

Sheffield City Council logo
Between
3 and 18 Dec 2024
Details
View Map
Share
Follow
Beaver Close

Sheffield City Council are proposing to carry out Utility asset works on Beaver Close, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 21 Oct 2024 at 11:33.

Sheffield City Council logo
Between
3 and 18 Dec 2024
Details
View Map
Share
Follow
Beaver Avenue

Sheffield City Council are proposing to carry out Utility asset works on Beaver Avenue, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 14:08.

Sheffield City Council logo
Between
3 and 18 Dec 2024
Details
View Map
Share
Follow
Beaver Avenue

Sheffield City Council are proposing to carry out Utility asset works on Beaver Avenue, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 21 Oct 2024 at 11:33.

Sheffield City Council logo
Between
4 and 20 Dec 2024
Details
View Map
Share
Follow
Woodbourn Road

Sheffield City Council are proposing to carry out Utility asset works on Woodbourn Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 30 Oct 2024 at 10:50.

Sheffield City Council logo
Between
4 and 20 Dec 2024
Details
View Map
Share
Follow
Woodbourn Road

Sheffield City Council are proposing to carry out Utility asset works on Woodbourn Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 8 Nov 2024 at 12:10.

Between
5 and 8 Dec 2024
Details
View Map
Share
Follow
East Parade

South Yorkshire Passenger Transport Executive are proposing to carry out Remedial works on East Parade, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by South Yorkshire Passenger Transport Executive on 15 Nov 2024 at 18:11.

Between
5 and 8 Dec 2024
Details
View Map
Share
Follow
York Street

South Yorkshire Passenger Transport Executive are proposing to carry out Works for Rail Purposes on York Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by South Yorkshire Passenger Transport Executive on 15 Nov 2024 at 18:11.

Sheffield City Council logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Drake House Lane

Sheffield City Council are proposing to carry out Utility asset works on Drake House Lane, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 15:12.

Sheffield City Council logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Drake House Lane

Sheffield City Council are proposing to carry out Utility asset works on Drake House Lane, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 21 Oct 2024 at 11:35.

Sheffield City Council logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Lilac Road

Sheffield City Council are proposing to carry out Utility asset works on Lilac Road, Beighton, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 14:08.

Sheffield City Council logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Lilac Road

Sheffield City Council are proposing to carry out Utility asset works on Lilac Road, Beighton, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 21 Oct 2024 at 11:35.

T-Mobile (UK) logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Birley Vale Avenue

T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on Birley Vale Avenue, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 16 Sep 2024 at 12:05.

Sheffield City Council logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Woodhouse Lane

Sheffield City Council are proposing to carry out Utility asset works on Woodhouse Lane, Beighton, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 14:08.

Sheffield City Council logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Woodhouse Lane

Sheffield City Council are proposing to carry out Utility asset works on Woodhouse Lane, Beighton, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 1 Nov 2024 at 17:44.

Yorkshire Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Albert Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Albert Road, Heeley, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 4 Nov 2024 at 16:48.

Yorkshire Water logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Stadium Way

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Stadium Way, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 21 Nov 2024 at 17:13.

Yorkshire Water logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Jessell Street

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Jessell Street, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 December 2024 and run through until 12 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 8 Nov 2024 at 10:03.

Sheffield City Council logo
Between
11 and 23 Dec 2024
Details
View Map
Share
Follow
Streetfields

Sheffield City Council are proposing to carry out Utility asset works on Streetfields, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 14:08.

Sheffield City Council logo
Between
11 and 23 Dec 2024
Details
View Map
Share
Follow
Streetfields

Sheffield City Council are proposing to carry out Utility asset works on Streetfields, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 21 Oct 2024 at 11:38.

Sheffield City Council logo
Between
13 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Sothall Green

Sheffield City Council are proposing to carry out Utility asset works on Sothall Green, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 15:11.

Sheffield City Council logo
Between
13 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Sothall Green

Sheffield City Council are proposing to carry out Utility asset works on Sothall Green, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 21 Oct 2024 at 11:36.

Yorkshire Water logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Tyzack Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Tyzack Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 19 Nov 2024 at 09:41.

Northern Powergrid (Yorkshire) logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Coalbrook Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Coalbrook Road, Woodhouse Mill, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 24 Oct 2024 at 07:40.

BT logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Boden Lane

BT are proposing to carry out Utility asset works on Boden Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 10 Oct 2024 at 10:15.

BT logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Boden Lane

BT are proposing to carry out Utility asset works on Boden Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 23 Sep 2024 at 13:24.

BT logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Boden Lane

BT are proposing to carry out Utility asset works on Boden Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 25 Oct 2024 at 17:23.

BT logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Boden Lane

BT are proposing to carry out Utility asset works on Boden Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 30 Sep 2024 at 11:02.

BT logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Rockingham Street

BT are proposing to carry out Utility asset works on Rockingham Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 25 Oct 2024 at 17:21.

BT logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Rockingham Street

BT are proposing to carry out Utility asset works on Rockingham Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 10 Oct 2024 at 10:16.

BT logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Rockingham Street

BT are proposing to carry out Utility asset works on Rockingham Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 23 Sep 2024 at 13:23.

BT logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Rockingham Street

BT are proposing to carry out Utility asset works on Rockingham Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 30 Sep 2024 at 11:02.

Sheffield City Council logo
Between
17 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Winterton Gardens

Sheffield City Council are proposing to carry out Utility asset works on Winterton Gardens, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 15:11.

Sheffield City Council logo
Between
17 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Winterton Gardens

Sheffield City Council are proposing to carry out Utility asset works on Winterton Gardens, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 21 Oct 2024 at 11:38.

Sheffield City Council logo
Between
17 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Ashbourne Grove

Sheffield City Council are proposing to carry out Utility asset works on Ashbourne Grove, Handsworth, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 15:12.

Sheffield City Council logo
Between
17 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Ashbourne Grove

Sheffield City Council are proposing to carry out Utility asset works on Ashbourne Grove, Handsworth, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 21 Oct 2024 at 11:32.

Sheffield City Council logo
Between
17 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Parsley Hay Road

Sheffield City Council are proposing to carry out Utility asset works on Parsley Hay Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 15:11.

Sheffield City Council logo
Between
17 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Parsley Hay Road

Sheffield City Council are proposing to carry out Utility asset works on Parsley Hay Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 21 Oct 2024 at 11:34.

Sheffield City Council logo
Between
18 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Eastern Avenue

Sheffield City Council were proposing to carry out Utility asset works on Eastern Avenue, Sheffield.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 December 2024 and run through until 3 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 15:12.

Sheffield City Council logo
Between
18 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Eastern Avenue

Sheffield City Council were proposing to carry out Utility asset works on Eastern Avenue, Sheffield.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 December 2024 and run through until 3 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 15:12.

Sheffield City Council logo
Between
18 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Arbourthorne Road

Sheffield City Council are proposing to carry out Utility asset works on Arbourthorne Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 15:11.

Sheffield City Council logo
Between
18 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Arbourthorne Road

Sheffield City Council are proposing to carry out Utility asset works on Arbourthorne Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 1 Nov 2024 at 17:38.

Sheffield City Council logo
Between
18 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Ribston Road

Sheffield City Council are proposing to carry out Utility asset works on Ribston Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 21 Oct 2024 at 10:04.

Sheffield City Council logo
Between
19 Dec 2024 and 3 Jan 2025
Details
View Map
Share
High Lane

Sheffield City Council were proposing to carry out Utility asset works on High Lane, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 December 2024 and run through until 3 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 15:12.

Sheffield City Council logo
Between
19 Dec 2024 and 3 Jan 2025
Details
View Map
Share
High Lane

Sheffield City Council were proposing to carry out Utility asset works on High Lane, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 December 2024 and run through until 3 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 15:12.

Sheffield City Council logo
Between
19 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
High Lane

Sheffield City Council are proposing to carry out Utility asset works on High Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 17 Oct 2024 at 15:12.

Sheffield City Council logo
Between
19 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
High Lane

Sheffield City Council are proposing to carry out Utility asset works on High Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 21 Oct 2024 at 11:39.

Cadent Gas logo
Between
2 and 30 Jan 2025
Details
View Map
Share
Follow
Stradbroke Drive

Cadent Gas are proposing to carry out Utility asset works on Stradbroke Drive, Sheffield.

These works are categorised as Major.

The works will start on or after 2 January 2025 and could run through until 30 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 11:15.

Cadent Gas logo
Between
2 and 30 Jan 2025
Details
View Map
Share
Follow
Stradbroke Drive

Cadent Gas are proposing to carry out Utility asset works on Stradbroke Drive, Sheffield.

These works are categorised as Major.

The works will start on or after 2 January 2025 and could run through until 30 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 11:08.

Cadent Gas logo
Between
3 and 19 Jan 2025
Details
View Map
Share
Follow
Hollowgate

Cadent Gas are proposing to carry out Utility asset works on Hollowgate, Wellgate, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Aug 2024 at 12:59.

Network Rail logo
Between
5 and 11 Jan 2025
Details
View Map
Share
Follow
Little London Road

Network Rail are proposing to carry out Works for Rail Purposes on Little London Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 11 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 Nov 2024 at 10:54.

Network Rail logo
Between
5 and 11 Jan 2025
Details
View Map
Share
Follow
Little London Road

Network Rail are proposing to carry out Works for Rail Purposes on Little London Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 11 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 18 Nov 2024 at 17:10.

Network Rail logo
Between
5 and 11 Jan 2025
Details
View Map
Share
Follow
Little London Road

Network Rail are proposing to carry out Works for Rail Purposes on Little London Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 11 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 20 Nov 2024 at 11:08.

Network Rail logo
Between
5 and 11 Jan 2025
Details
View Map
Share
Little London Road

Network Rail were proposing to carry out Works for Rail Purposes on Little London Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 January 2025 and run through until 11 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 7 Nov 2024 at 13:56.

Network Rail logo
Between
5 and 11 Jan 2025
Details
View Map
Share
Saxon Road

Network Rail were proposing to carry out Works for Rail Purposes on Saxon Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 January 2025 and run through until 11 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 21 Oct 2024 at 13:50.

Network Rail logo
Between
5 and 11 Jan 2025
Details
View Map
Share
Saxon Road

Network Rail were proposing to carry out Works for Rail Purposes on Saxon Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 January 2025 and run through until 11 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 7 Nov 2024 at 13:55.

Network Rail logo
Between
5 and 11 Jan 2025
Details
View Map
Share
Follow
Gleadless Road

Network Rail are proposing to carry out Works for Rail Purposes on Gleadless Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 11 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 Nov 2024 at 11:18.

Network Rail logo
Between
5 and 11 Jan 2025
Details
View Map
Share
Follow
Gleadless Road

Network Rail are proposing to carry out Works for Rail Purposes on Gleadless Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 11 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 11 Nov 2024 at 08:38.

Derbyshire County Council logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Green Lane

Derbyshire County Council are proposing to carry out Permanent reinstatement on Green Lane, Killamarsh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Derbyshire County Council on 20 Nov 2024 at 14:36.

Derbyshire County Council logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Upperthorpe Road

Derbyshire County Council are proposing to carry out Section 50 on Upperthorpe Road, Killamarsh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Derbyshire County Council on 6 Nov 2024 at 14:51.

Nexfibre Networks Limited logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Ullswater Avenue

Nexfibre Networks Limited are proposing to carry out Utility asset works on Ullswater Avenue, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 1 Nov 2024 at 09:39.

Yorkshire Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Albert Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Albert Road, Heeley, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 12 Nov 2024 at 15:20.

BT logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
West Lane

BT are proposing to carry out Utility asset works on West Lane, Aughton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 23 Sep 2024 at 08:59.

Cityfibre Metro Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Exeter Drive

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Exeter Drive, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 21 Nov 2024 at 17:23.

Yorkshire Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Willow Drive

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Willow Drive, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 31 Oct 2024 at 14:50.

Yorkshire Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Willow Drive

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Willow Drive, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 31 Oct 2024 at 15:23.

Sheffield City Council logo
Between
7 and 22 Jan 2025
Details
View Map
Share
Follow
Moorthorpe Way

Sheffield City Council are proposing to carry out Utility asset works on Moorthorpe Way, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 12:32.

Sheffield City Council logo
Between
7 and 22 Jan 2025
Details
View Map
Share
Follow
Moorthorpe Way

Sheffield City Council are proposing to carry out Utility asset works on Moorthorpe Way, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Nov 2024 at 08:10.

Sheffield City Council logo
LONG TERM
Between
12 Jan and 16 May 2025
Details
View Map
Share
Follow
Handsworth Road

Sheffield City Council are proposing to carry out Utility asset works on Handsworth Road, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 January 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 15 Nov 2024 at 16:54.

Cityfibre Metro Networks logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Dunedin Grove

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Dunedin Grove, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 21 Nov 2024 at 17:35.

Derbyshire County Council logo
Between
13 and 22 Jan 2025
Details
View Map
Share
Follow
High Street

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on High Street, Killamarsh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 10 Oct 2024 at 15:23.

Sheffield City Council logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
Moor Farm Avenue

Sheffield City Council are proposing to carry out Utility asset works on Moor Farm Avenue, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 12:32.

Sheffield City Council logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
Moor Farm Avenue

Sheffield City Council are proposing to carry out Utility asset works on Moor Farm Avenue, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 17:31.

Sheffield City Council logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
Moor Farm Garth

Sheffield City Council are proposing to carry out Utility asset works on Moor Farm Garth, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 12:32.

Sheffield City Council logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
Moor Farm Garth

Sheffield City Council are proposing to carry out Utility asset works on Moor Farm Garth, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 17:30.

Sheffield City Council logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
Moss Way

Sheffield City Council are proposing to carry out Utility asset works on Moss Way, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 12:32.

Sheffield City Council logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
Moss Way

Sheffield City Council are proposing to carry out Utility asset works on Moss Way, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Nov 2024 at 08:11.

Northern Powergrid (Yorkshire) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Newstead Way

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Newstead Way, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 18 Nov 2024 at 12:20.

Cadent Gas logo
Between
13 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Stradbroke Road

Cadent Gas are proposing to carry out Utility asset works on Stradbroke Road, Sheffield.

These works are categorised as Major.

The works will start on or after 13 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 10:29.

Cadent Gas logo
Between
13 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Windy House Lane

Cadent Gas are proposing to carry out Utility asset works on Windy House Lane, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 14:30.

Yorkshire Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
John Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on John Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 19 Nov 2024 at 12:52.

Sheffield City Council logo
LONG TERM
Between
13 Jan and 16 May 2025
Details
View Map
Share
Follow
Sheffield Parkway

Sheffield City Council are proposing to carry out Utility asset works on Sheffield Parkway, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 9 Jul 2024 at 16:58.

Sheffield City Council logo
LONG TERM
Between
13 Jan and 16 May 2025
Details
View Map
Share
Follow
Handsworth Road

Sheffield City Council are proposing to carry out Utility asset works on Handsworth Road, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Jul 2024 at 09:04.

Sheffield City Council logo
LONG TERM
Between
13 Jan and 16 May 2025
Details
View Map
Share
Follow
Handsworth Road

Sheffield City Council are proposing to carry out Utility asset works on Handsworth Road, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 9 Jul 2024 at 17:09.

Sheffield City Council logo
LONG TERM
Between
13 Jan and 16 May 2025
Details
View Map
Share
Follow
Sheffield Parkway

Sheffield City Council are proposing to carry out Utility asset works on Sheffield Parkway, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 9 Jul 2024 at 16:58.

Sheffield City Council logo
LONG TERM
Between
13 Jan and 16 May 2025
Details
View Map
Share
Follow
Handsworth Road

Sheffield City Council are proposing to carry out Utility asset works on Handsworth Road, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Jul 2024 at 09:05.

Sheffield City Council logo
LONG TERM
Between
13 Jan and 16 May 2025
Details
View Map
Share
Follow
Handsworth Road

Sheffield City Council are proposing to carry out Utility asset works on Handsworth Road, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 9 Jul 2024 at 17:09.

Yorkshire Water logo
LONG TERM
Between
13 Jan and 30 Apr 2025
Details
View Map
Share
Follow
Cricket Inn Crescent

Yorkshire Water are proposing to carry out Utility asset works on Cricket Inn Crescent, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 30 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 31 Oct 2024 at 14:56.

Cadent Gas logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Weedon Street

Cadent Gas are proposing to carry out Utility asset works on Weedon Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 08:06.

Cadent Gas logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Weedon Street

Cadent Gas are proposing to carry out Utility asset works on Weedon Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 17:37.

Cadent Gas logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Weedon Street

Cadent Gas are proposing to carry out Utility asset works on Weedon Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 11:00.

Cadent Gas logo
Between
13 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Southey Hall Road

Cadent Gas are proposing to carry out Utility asset works on Southey Hall Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 14:48.

Cadent Gas logo
Between
13 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Southey Hall Road

Cadent Gas are proposing to carry out Utility asset works on Southey Hall Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 15:30.

Quickline Commucations logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Worksop Road

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Worksop Road, Aston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 6 Nov 2024 at 11:42.

Sheffield City Council logo
Between
15 and 30 Jan 2025
Details
View Map
Share
Follow
Robin Lane

Sheffield City Council are proposing to carry out Utility asset works on Robin Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 12:33.

Sheffield City Council logo
Between
15 and 30 Jan 2025
Details
View Map
Share
Follow
Robin Lane

Sheffield City Council are proposing to carry out Utility asset works on Robin Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Nov 2024 at 08:13.

Sheffield City Council logo
Between
15 and 30 Jan 2025
Details
View Map
Share
Follow
Woodhouse Lane

Sheffield City Council are proposing to carry out Utility asset works on Woodhouse Lane, Beighton, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 14:55.

Sheffield City Council logo
Between
15 and 30 Jan 2025
Details
View Map
Share
Follow
Woodhouse Lane

Sheffield City Council are proposing to carry out Utility asset works on Woodhouse Lane, Beighton, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Nov 2024 at 08:20.

Cadent Gas logo
Between
20 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Windy House Lane

Cadent Gas are proposing to carry out Utility asset works on Windy House Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 15:00.

Cadent Gas logo
LONG TERM
Between
20 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Queen Mary Road

Cadent Gas are proposing to carry out Utility asset works on Queen Mary Road, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 14:30.

Cadent Gas logo
LONG TERM
Between
20 Jan and 10 Mar 2025
Details
View Map
Share
Follow
Smelter Wood Road

Cadent Gas are proposing to carry out Utility asset works on Smelter Wood Road, Sheffield.

These works are categorised as Major.

The works will start on or after 20 January 2025 and could run through until 10 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 11:03.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
20 Jan and 12 May 2025
Details
View Map
Share
Follow
Domine Lane

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Domine Lane, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 12 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 4 Nov 2024 at 14:47.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
20 Jan and 12 May 2025
Details
View Map
Share
Follow
Market Street

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Market Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 12 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 4 Nov 2024 at 14:35.

Sheffield City Council logo
Between
21 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Orchard Lane

Sheffield City Council are proposing to carry out Utility asset works on Orchard Lane, Beighton, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 12:33.

Sheffield City Council logo
Between
21 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Orchard Lane

Sheffield City Council are proposing to carry out Utility asset works on Orchard Lane, Beighton, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 17:32.

Sheffield City Council logo
Between
21 Jan and 5 Feb 2025
Details
View Map
Share
Follow
West Street

Sheffield City Council are proposing to carry out Utility asset works on West Street, Beighton, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 14:55.

Sheffield City Council logo
Between
21 Jan and 5 Feb 2025
Details
View Map
Share
Follow
West Street

Sheffield City Council are proposing to carry out Utility asset works on West Street, Beighton, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Nov 2024 at 08:14.

Sheffield City Council logo
Between
22 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Beaver Hill Road

Sheffield City Council are proposing to carry out Utility asset works on Beaver Hill Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 12:33.

Sheffield City Council logo
Between
22 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Beaver Hill Road

Sheffield City Council are proposing to carry out Utility asset works on Beaver Hill Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Nov 2024 at 07:53.

Sheffield City Council logo
Between
22 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Beaver Hill Road

Sheffield City Council are proposing to carry out Utility asset works on Beaver Hill Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 12:33.

Sheffield City Council logo
Between
22 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Beaver Hill Road

Sheffield City Council are proposing to carry out Utility asset works on Beaver Hill Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Nov 2024 at 07:54.

Sheffield City Council logo
Between
24 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Junction Road

Sheffield City Council are proposing to carry out Utility asset works on Junction Road, Woodhouse, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 14:55.

Sheffield City Council logo
Between
24 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Junction Road

Sheffield City Council are proposing to carry out Utility asset works on Junction Road, Woodhouse, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Nov 2024 at 08:03.

Sheffield City Council logo
Between
24 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Furnace Lane

Sheffield City Council are proposing to carry out Utility asset works on Furnace Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 13:38.

Sheffield City Council logo
Between
24 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Furnace Lane

Sheffield City Council are proposing to carry out Utility asset works on Furnace Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 17:06.

Sheffield City Council logo
Between
24 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Furnace Lane

Sheffield City Council are proposing to carry out Utility asset works on Furnace Lane, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 14:55.

Sheffield City Council logo
Between
24 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Furnace Lane

Sheffield City Council are proposing to carry out Utility asset works on Furnace Lane, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 17:08.

Sheffield City Council logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Silkstone Road

Sheffield City Council are proposing to carry out Utility asset works on Silkstone Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 15 Nov 2024 at 08:50.

Sheffield City Council logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Silkstone Road

Sheffield City Council are proposing to carry out Utility asset works on Silkstone Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 15 Nov 2024 at 08:50.

Sheffield City Council logo
Between
27 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Retford Road

Sheffield City Council are proposing to carry out Utility asset works on Retford Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 13:38.

Sheffield City Council logo
Between
27 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Retford Road

Sheffield City Council are proposing to carry out Utility asset works on Retford Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 17:12.

Northern Powergrid (Yorkshire) logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Sheffield Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Sheffield Road, Templeborough, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Nov 2024 at 15:40.

Sheffield City Council logo
LONG TERM
Between
28 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Archdale Road

Sheffield City Council are proposing to carry out Utility asset works on Archdale Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 24 Oct 2024 at 14:42.

Sheffield City Council logo
LONG TERM
Between
28 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Hastilar Road

Sheffield City Council are proposing to carry out Utility asset works on Hastilar Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 24 Oct 2024 at 14:40.

Sheffield City Council logo
LONG TERM
Between
28 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Archdale Close

Sheffield City Council are proposing to carry out Utility asset works on Archdale Close, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 24 Oct 2024 at 14:43.

Sheffield City Council logo
LONG TERM
Between
28 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Thompson Road

Sheffield City Council are proposing to carry out Utility asset works on Thompson Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 24 Oct 2024 at 14:58.

Sheffield City Council logo
LONG TERM
Between
28 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Granville Road

Sheffield City Council are proposing to carry out Utility asset works on Granville Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 24 Oct 2024 at 14:52.

Sheffield City Council logo
LONG TERM
Between
28 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Granville Square

Sheffield City Council are proposing to carry out Utility asset works on Granville Square, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 24 Oct 2024 at 14:48.

Sheffield City Council logo
LONG TERM
Between
28 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Shrewsbury Road

Sheffield City Council are proposing to carry out Utility asset works on Shrewsbury Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 24 Oct 2024 at 14:51.

Sheffield City Council logo
LONG TERM
Between
28 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Talbot Street

Sheffield City Council are proposing to carry out Utility asset works on Talbot Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 24 Oct 2024 at 14:49.

Sheffield City Council logo
LONG TERM
Between
28 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Cricket Inn Road

Sheffield City Council are proposing to carry out Utility asset works on Cricket Inn Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 24 Oct 2024 at 14:53.

Sheffield City Council logo
LONG TERM
Between
28 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Bernard Street

Sheffield City Council are proposing to carry out Utility asset works on Bernard Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 24 Oct 2024 at 14:54.

Sheffield City Council logo
LONG TERM
Between
28 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Sandbed Road

Sheffield City Council are proposing to carry out Utility asset works on Sandbed Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 24 Oct 2024 at 14:55.

Sheffield City Council logo
Between
30 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Norton Avenue

Sheffield City Council are proposing to carry out Utility asset works on Norton Avenue, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 13:39.

Sheffield City Council logo
Between
30 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Norton Avenue

Sheffield City Council are proposing to carry out Utility asset works on Norton Avenue, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 17:17.

Sheffield City Council logo
Between
30 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Ridgeway Road

Sheffield City Council are proposing to carry out Utility asset works on Ridgeway Road, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 13:39.

Sheffield City Council logo
Between
30 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Ridgeway Road

Sheffield City Council are proposing to carry out Utility asset works on Ridgeway Road, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 17:19.

Sheffield City Council logo
Between
30 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Woodhouse Lane

Sheffield City Council are proposing to carry out Utility asset works on Woodhouse Lane, Beighton, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 13:39.

Sheffield City Council logo
Between
30 Jan and 14 Feb 2025
Details
View Map
Share
Follow
High Street

Sheffield City Council are proposing to carry out Utility asset works on High Street, Beighton, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Nov 2024 at 09:32.

Sheffield City Council logo
Between
30 Jan and 14 Feb 2025
Details
View Map
Share
Follow
High Street

Sheffield City Council are proposing to carry out Utility asset works on High Street, Beighton, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 18 Nov 2024 at 15:02.

Sheffield City Council logo
Between
30 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Rotherham Road

Sheffield City Council are proposing to carry out Utility asset works on Rotherham Road, Beighton, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 13:39.

Sheffield City Council logo
Between
30 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Rotherham Road

Sheffield City Council are proposing to carry out Utility asset works on Rotherham Road, Beighton, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 17:38.

Sheffield City Council logo
Between
30 Jan and 14 Feb 2025
Details
View Map
Share
Woodhouse Lane

Sheffield City Council were proposing to carry out Utility asset works on Woodhouse Lane, Beighton, Sheffield.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 January 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Nov 2024 at 09:32.

Sheffield City Council logo
Between
31 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Mosborough Parkway

Sheffield City Council are proposing to carry out Utility asset works on Mosborough Parkway, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 13:39.

Sheffield City Council logo
Between
31 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Mosborough Parkway

Sheffield City Council are proposing to carry out Utility asset works on Mosborough Parkway, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 17:39.

Sheffield City Council logo
Between
31 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Mosborough Parkway

Sheffield City Council are proposing to carry out Utility asset works on Mosborough Parkway, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 13:39.

Sheffield City Council logo
Between
31 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Mosborough Parkway

Sheffield City Council are proposing to carry out Utility asset works on Mosborough Parkway, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Nov 2024 at 17:39.

Sheffield City Council logo
Between
3 and 18 Feb 2025
Details
View Map
Share
Follow
Beighton Road

Sheffield City Council are proposing to carry out Utility asset works on Beighton Road, Woodhouse, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 23:15.

Sheffield City Council logo
Between
3 and 18 Feb 2025
Details
View Map
Share
Follow
Beighton Road

Sheffield City Council are proposing to carry out Utility asset works on Beighton Road, Woodhouse, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Nov 2024 at 09:59.

Northern Powergrid (Yorkshire) logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Sheffield Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Sheffield Road, Templeborough, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Nov 2024 at 10:04.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Eckington Way

Sheffield City Council are proposing to carry out Utility asset works on Eckington Way, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 23:15.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Eckington Way

Sheffield City Council are proposing to carry out Utility asset works on Eckington Way, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 16:46.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Eckington Way

Sheffield City Council are proposing to carry out Utility asset works on Eckington Way, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 15:28.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Drake House Lane

Sheffield City Council are proposing to carry out Utility asset works on Drake House Lane, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 12:31.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Drake House Lane

Sheffield City Council are proposing to carry out Utility asset works on Drake House Lane, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 12:31.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Eckington Way

Sheffield City Council are proposing to carry out Utility asset works on Eckington Way, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 23:15.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Eckington Way

Sheffield City Council are proposing to carry out Utility asset works on Eckington Way, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 13:16.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Eckington Way

Sheffield City Council are proposing to carry out Utility asset works on Eckington Way, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 13:16.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Waterthorpe Greenway

Sheffield City Council are proposing to carry out Utility asset works on Waterthorpe Greenway, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 13:17.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Waterthorpe Greenway

Sheffield City Council are proposing to carry out Utility asset works on Waterthorpe Greenway, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 13:17.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Eckington Way

Sheffield City Council are proposing to carry out Utility asset works on Eckington Way, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 15:44.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Sevenairs Road

Sheffield City Council are proposing to carry out Utility asset works on Sevenairs Road, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 13:16.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Sevenairs Road

Sheffield City Council are proposing to carry out Utility asset works on Sevenairs Road, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 20 Nov 2024 at 13:17.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Eckington Way

Sheffield City Council are proposing to carry out Utility asset works on Eckington Way, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 23:15.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Eckington Way

Sheffield City Council are proposing to carry out Utility asset works on Eckington Way, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Nov 2024 at 10:10.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Eckington Way

Sheffield City Council are proposing to carry out Utility asset works on Eckington Way, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 23:15.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Eckington Way

Sheffield City Council are proposing to carry out Utility asset works on Eckington Way, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Nov 2024 at 13:04.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Mosborough Parkway

Sheffield City Council are proposing to carry out Utility asset works on Mosborough Parkway, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 23:15.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Mosborough Parkway

Sheffield City Council are proposing to carry out Utility asset works on Mosborough Parkway, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Nov 2024 at 10:05.

Sheffield City Council logo
Between
10 and 25 Feb 2025
Details
View Map
Share
Follow
Eckington Road

Sheffield City Council are proposing to carry out Utility asset works on Eckington Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 23:14.

Sheffield City Council logo
Between
10 and 25 Feb 2025
Details
View Map
Share
Follow
Eckington Road

Sheffield City Council are proposing to carry out Utility asset works on Eckington Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Nov 2024 at 10:07.

Sheffield City Council logo
Between
10 and 25 Feb 2025
Details
View Map
Share
Follow
West Street

Sheffield City Council are proposing to carry out Utility asset works on West Street, Beighton, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 23:14.

Sheffield City Council logo
Between
10 and 25 Feb 2025
Details
View Map
Share
Follow
West Street

Sheffield City Council are proposing to carry out Utility asset works on West Street, Beighton, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 23:14.

Sheffield City Council logo
Between
10 and 25 Feb 2025
Details
View Map
Share
Follow
Drake House Way

Sheffield City Council are proposing to carry out Utility asset works on Drake House Way, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 23:15.

Sheffield City Council logo
Between
10 and 25 Feb 2025
Details
View Map
Share
Follow
Drake House Way

Sheffield City Council are proposing to carry out Utility asset works on Drake House Way, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Nov 2024 at 10:00.

Cadent Gas logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Longstone Crescent

Cadent Gas are proposing to carry out Remedial works on Longstone Crescent, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 16:45.

Cadent Gas logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Longstone Crescent

Cadent Gas are proposing to carry out Remedial works on Longstone Crescent, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 17:18.

Cadent Gas logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Vicar Lane

Cadent Gas were proposing to carry out Utility asset works on Vicar Lane, Woodhouse, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 09:12.

Cadent Gas logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Vicar Lane

Cadent Gas are proposing to carry out Utility asset works on Vicar Lane, Woodhouse, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 10:33.

Cadent Gas logo
LONG TERM
Between
10 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Treetown Crescent

Cadent Gas are proposing to carry out Utility asset works on Treetown Crescent, Treeton, Rotherham.

These works are categorised as Major.

The works will start on or after 10 February 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 12:59.

Sheffield City Council logo
Between
17 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Queen Street

Sheffield City Council are proposing to carry out Utility asset works on Queen Street, Mosborough, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 22:09.

Sheffield City Council logo
Between
17 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Queen Street

Sheffield City Council are proposing to carry out Utility asset works on Queen Street, Mosborough, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 22:09.

Sheffield City Council logo
Between
17 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Eckington Road

Sheffield City Council are proposing to carry out Utility asset works on Eckington Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Nov 2024 at 22:09.

Sheffield City Council logo
Between
17 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Eckington Road

Sheffield City Council are proposing to carry out Utility asset works on Eckington Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Nov 2024 at 13:04.

Cadent Gas logo
LONG TERM
Between
17 Feb and 14 Apr 2025
Details
View Map
Share
Follow
Ravenscroft Road

Cadent Gas are proposing to carry out Utility asset works on Ravenscroft Road, Sheffield.

These works are categorised as Major.

The works will start on or after 17 February 2025 and could run through until 14 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 11:32.


Roadworks Map near to Medlock Road, SHEFFIELD, S13 9AY

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 21 Nov 2024 22:24
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Medlock Road, SHEFFIELD, S13 9AY (22 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Yorkshire Water logo
MEDLOCK WAY 
(0.2 miles)
Yorkshire Water
Remedial works - Footway - Some carriageway incursion
Complete
20 Nov 2024 10:15 - 11:30
0.2
Details
Share
2
HANDSWORTH ROAD 
(0.3 miles)
Last Mile Electricity (formerly Global Utility Connections)
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
21 Nov 2024 10:00 - 16:00
0.3
Details
Share
3
HANDSWORTH ROAD 
(0.3 miles)
Last Mile Electricity (formerly Global Utility Connections)
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 21 Nov 2024 - 22 Nov 2024
0.3
Details
Share
Follow
4
HANDSWORTH ROAD 
(0.3 miles)
Last Mile Electricity (formerly Global Utility Connections)
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 21 Nov 2024 - 22 Nov 2024
0.3
Details
Share
Follow
5
HANDSWORTH ROAD 
(0.3 miles)
Last Mile Electricity (formerly Global Utility Connections)
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 21 Nov 2024 - 22 Nov 2024
0.3
Details
Share
Follow
6
HANDSWORTH ROAD 
(0.3 miles)
Last Mile Electricity (formerly Global Utility Connections)
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 21 Nov 2024 - 22 Nov 2024
0.3
Details
Share
Follow
7
Yorkshire Water logo
URGENT
  
RICHMOND ROAD 
(0.3 miles)
Yorkshire Water
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
18 Nov 2024 09:30 - 11:30
0.3
Details
Share
8
Yorkshire Water logo
EMERGENCY
  
RICHMOND ROAD 
(0.4 miles)
Yorkshire Water
Utility repair and maintenance works - Carriageway - Multi-way signals
In Progress
Since: 21 Nov 2024 12:30
(Scheduled: 21 Nov 2024 - 27 Nov 2024)
0.4
Details
Share
Follow
9
Sheffield City Council logo
EMERGENCY
  
HANDSWORTH ROAD 
(0.5 miles)
Sheffield City Council
Utility asset works - Footway - No carriageway incursion
In Progress
Since: 26 Sep 2024 00:00
(Scheduled: 26 Sep 2024 - 5 Dec 2024)
0.5
Details
Share
Follow
10
Yorkshire Water logo
URGENT
  
ORGREAVE CLOSE 
(0.6 miles)
Yorkshire Water
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 20 Nov 2024 22:25
(Scheduled: 20 Nov 2024 - 27 Nov 2024)
0.6
Details
Share
Follow
  • ...