ROADWORKS SUMMARY
Tilbury Docks, TILBURY, RM18 7LA
Introduction

View current and future planned roadworks and road closures for Tilbury Docks, RM18 7LA and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Tilbury Docks, TILBURY, RM18 7LA
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Tilbury Docks are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
13 Jan 2024 and 10 Oct 2025
Thurrock Council were proposing to carry out Highway improvement works on Civic Square, Tilbury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2024 and run through until 10 October 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thurrock Council on 19 Aug 2024 at 15:33.
15 Jul 2024 and 15 Jul 2025
Kent County Council are proposing to carry out roadworks on Queen Street, Gravesend.
These works are categorised as Major.
The works will start on or after 15 July 2024 and could run through until 15 July 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Kent County Council on 16 Jul 2024 at 10:25.
15 Jul 2024 and 15 Jul 2025
Kent County Council are proposing to carry out roadworks on Crooked Lane, Gravesend.
These works are categorised as Major.
The works will start on or after 15 July 2024 and could run through until 15 July 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Kent County Council on 16 Jul 2024 at 10:24.
27 Sep 2024 and 31 Mar 2026
Kent County Council are proposing to carry out Highway repair and maintenance works on Galley Hill Road, Swanscombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 September 2024 and could run through until 31 March 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Kent County Council on 11 Oct 2024 at 14:51.
31 Mar 2026
Kent County Council are carrying out Highway repair and maintenance works on Galley Hill Road, Swanscombe.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 September 2024 at 00:01 and could run through until 31 March 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Kent County Council on 11 Oct 2024 at 15:25.
13 Jan and 10 Oct 2025
Thurrock Council were proposing to carry out Highway improvement works on Civic Square, Tilbury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 10 October 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thurrock Council on 19 Aug 2024 at 15:28.
13 Jan and 10 Oct 2025
Thurrock Council were proposing to carry out Highway improvement works on Civic Square, Tilbury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 10 October 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thurrock Council on 11 Sep 2024 at 14:01.
13 Jan and 10 Oct 2025
Thurrock Council are proposing to carry out Highway improvement works on Civic Square, Tilbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thurrock Council on 18 Sep 2024 at 09:14.
10 Oct 2025
Thurrock Council are carrying out Highway improvement works on Civic Square, Tilbury.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 January 2025 at 08:00 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thurrock Council on 10 Mar 2025 at 10:26.
13 Jan and 10 Oct 2025
Thurrock Council are proposing to carry out Highway improvement works on Calcutta Road, Tilbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thurrock Council on 23 Oct 2024 at 10:25.
10 Oct 2025
Thurrock Council are carrying out Highway improvement works on Calcutta Road, Tilbury.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 January 2025 at 08:00 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thurrock Council on 13 Jan 2025 at 08:43.
29 Jun 2025
Riverside Energy Park are carrying out Utility asset works on Fastrack The Bridge, Dartford.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 February 2025 at 08:00 and could run through until 29 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Riverside Energy Park on 21 May 2025 at 09:28.
8 Apr and 4 Jul 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on New Barn Road, Longfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks South Eastern on 23 Jan 2025 at 13:39.
8 Apr and 4 Jul 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on New Barn Road, Southfleet.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2025 and could run through until 4 July 2025. The works will impact the carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks South Eastern on 23 Jan 2025 at 13:39.
Friday
Southern Gas Networks are carrying out Utility repair and maintenance works on Nash Bank, Northfleet.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 April 2025 at 07:30 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 13:51.
Tomorrow
Cadent Gas were proposing to carry out Utility asset works on Clarkbourne Drive, Grays.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 4 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 30 Apr 2025 at 11:13.
Friday
National Highways are proposing to carry out Highway improvement works on Hall Road, Southfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 17 Feb 2025 at 10:36.
Friday
National Highways are carrying out Highway improvement works on Hall Road, Southfleet.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 May 2025 at 21:15 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 20 May 2025 at 10:32.
Friday
Electricity Network Company were proposing to carry out Utility asset works on High Street, Northfleet, Gravesend.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 May 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 2 Jun 2025 at 14:13.
Friday
Electricity Network Company were proposing to carry out Utility asset works on Hive Lane, Northfleet, Gravesend.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 May 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 2 Jun 2025 at 14:14.
26 May and 8 Sep 2025
National Highways are proposing to carry out Highway repair and maintenance works on Princes Road, East Of Junction One B, Dartford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 8 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 12 May 2025 at 13:50.
Saturday
National Highways are carrying out Works for road purposes on Watling Street, Stone.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 21:45 and could run through until 7 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 28 May 2025 at 08:39.
Tomorrow
Kent County Council are carrying out Highway improvement works on Knockhall Chase, Greenhithe.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 May 2025 at 00:00 and could run through until 4 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kent County Council on 30 May 2025 at 09:08.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on Rayleigh Road, Stanford Le Hope.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 May 2025 at 08:50 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 29 May 2025 at 09:22.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on London Road, Stanford Le Hope.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 May 2025 at 08:36 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 30 May 2025 at 08:41.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on Kingsman Road, Stanford Le Hope.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 May 2025 at 08:48 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 29 May 2025 at 09:23.
2 Jun and 27 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Valley Drive, Gravesend.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 27 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 11 Feb 2025 at 08:54.
2 Jun and 27 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Valley Drive, Gravesend.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 27 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 24 Feb 2025 at 13:35.
2 Jun and 18 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Valley Drive, Gravesend.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Feb 2025 at 12:07.
18 Jul 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Valley Drive, Gravesend.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 08:00 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 08:23.
Friday
GTC Pipelines are proposing to carry out Utility asset works on St Clements Road, Greenhithe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by GTC Pipelines on 17 Mar 2025 at 07:54.
Friday
GTC Pipelines are carrying out Utility asset works on St Clements Road, Greenhithe.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 08:45 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by GTC Pipelines on 2 Jun 2025 at 08:54.
2 and 16 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Runnymede Road, Stanford Le Hope.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 09:14.
2 and 16 Jun 2025
Cadent Gas were proposing to carry out Utility asset works on Runnymede Road, Stanford Le Hope.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 16 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 16 May 2025 at 08:00.
3 and 16 Jun 2025
BT were proposing to carry out Utility asset works on Church Road, Thurrock, West Tilbury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 June 2025 and run through until 16 June 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 19 Feb 2025 at 12:08.
5 and 18 Jun 2025
BT were proposing to carry out Utility asset works on Church Road, Thurrock, West Tilbury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 June 2025 and run through until 18 June 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 21 Feb 2025 at 12:41.
5 and 11 Jun 2025
BT are proposing to carry out Utility asset works on Church Road, Thurrock, West Tilbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 11 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 5 Mar 2025 at 09:57.
5 and 11 Jun 2025
BT were proposing to carry out Utility asset works on Church Road, Thurrock, West Tilbury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 June 2025 and run through until 11 June 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 29 May 2025 at 13:29.
Monday
Kent County Council are proposing to carry out Highway improvement works on School Lane, Bean.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 21 Feb 2025 at 08:11.
Monday
Kent County Council are proposing to carry out Highway improvement works on School Lane, Bean.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 21 Feb 2025 at 09:35.
9 and 17 Jun 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Watling Street, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 17 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 14 Mar 2025 at 16:12.
9 and 17 Jun 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Watling Street, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 17 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 7 May 2025 at 07:44.
10 and 13 Jun 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Park Avenue, Northfleet, Gravesend.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 June 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 10 Apr 2025 at 10:02.
16 and 20 Jun 2025
Southern Gas Networks are proposing to carry out New service connection on Coutts Avenue, Shorne, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Mar 2025 at 06:26.
16 and 20 Jun 2025
Southern Gas Networks are proposing to carry out New service connection on Coutts Avenue, Shorne, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Mar 2025 at 12:48.
16 and 20 Jun 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Dickens Road, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 24 Mar 2025 at 14:15.
16 and 20 Jun 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Dickens Road, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 7 May 2025 at 07:46.
16 Jun and 19 Jul 2025
Network Rail are proposing to carry out Works for Rail Purposes on East Milton Road, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 19 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 11 Apr 2025 at 13:28.
16 Jun and 19 Jul 2025
Network Rail are proposing to carry out roadworks on Harmer Street, Gravesend.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 19 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 14 Apr 2025 at 15:12.
19 and 20 Jun 2025
Kent County Council are proposing to carry out Highway improvement works on Hever Court Road, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 13 May 2025 at 22:21.
19 and 20 Jun 2025
Kent County Council were proposing to carry out Highway improvement works on Hever Court Road, Gravesend.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 June 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Kent County Council on 16 May 2025 at 15:08.
23 and 27 Jun 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Wood Lane, Darenth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 21 Mar 2025 at 12:39.
23 and 27 Jun 2025
UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Meadow Way, Dartford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 13 Mar 2025 at 08:10.
23 and 27 Jun 2025
UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Meadow Way, Dartford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 18 Mar 2025 at 11:13.
23 Jun and 11 Jul 2025
Thurrock Council were proposing to carry out Highway improvement works on Brentwood Road, Chadwell St Mary.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 June 2025 and run through until 11 July 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thurrock Council on 16 Apr 2025 at 11:38.
23 Jun and 12 Jul 2025
Thurrock Council are proposing to carry out Highway improvement works on Brentwood Road, Chadwell St Mary.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 12 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thurrock Council on 7 May 2025 at 09:21.
23 and 27 Jun 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Annalee Gardens, South Ockendon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 12:10.
28 Jun and 7 Jul 2025
National Highways are proposing to carry out Works for road purposes on Watling Street, Stone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 June 2025 and could run through until 7 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 13 Jan 2025 at 11:31.
30 Jun and 4 Jul 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Kitchener Avenue, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 20 Mar 2025 at 13:27.
30 Jun and 4 Jul 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Kitchener Avenue, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 29 May 2025 at 13:37.
1 and 18 Jul 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Longfield Avenue, Longfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 14 Apr 2025 at 10:39.
1 Jul and 14 Aug 2025
Cadent Gas were proposing to carry out Utility asset works on Arisdale Avenue, South Ockendon.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 July 2025 and run through until 14 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 May 2025 at 11:57.
2 and 8 Jul 2025
UK Power Networks South Eastern were proposing to carry out Disconnection or alteration of supply on Childs Crescent, Swanscombe.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 July 2025 and run through until 8 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 4 Apr 2025 at 15:33.
2 and 8 Jul 2025
UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Childs Crescent, Swanscombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 July 2025 and could run through until 8 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 14 Apr 2025 at 13:16.
7 and 18 Jul 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Marks Square, Northfleet, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 26 Mar 2025 at 14:35.
7 and 10 Jul 2025
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Darenth Wood Road, Darenth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 2 May 2025 at 11:32.
14 and 16 Jul 2025
Kent County Council are proposing to carry out Highway improvement works on Crooked Lane, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 7 May 2025 at 07:39.
14 and 16 Jul 2025
Kent County Council are proposing to carry out Highway improvement works on Crooked Lane, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 8 May 2025 at 07:38.
14 and 16 Jul 2025
Kent County Council are proposing to carry out Highway improvement works on Crooked Lane, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 8 May 2025 at 11:50.
19 Jul and 3 Aug 2025
Kent County Council are proposing to carry out Highway repair and maintenance works on Wrotham Road, Meopham, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 July 2025 and could run through until 3 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 17 Apr 2025 at 08:22.
19 Jul and 3 Aug 2025
Kent County Council are proposing to carry out Highway repair and maintenance works on Wrotham Road, Meopham, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 July 2025 and could run through until 3 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 23 Apr 2025 at 09:33.
19 Jul and 3 Aug 2025
Kent County Council are proposing to carry out Highway repair and maintenance works on Wrotham Road, Istead Rise, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 July 2025 and could run through until 3 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 23 Apr 2025 at 23:35.
19 Jul and 2 Aug 2025
Kent County Council are proposing to carry out Highway repair and maintenance works on Broad Ditch Road, Northfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 July 2025 and could run through until 2 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 23 Apr 2025 at 23:32.
19 Jul and 2 Aug 2025
Kent County Council are proposing to carry out Highway repair and maintenance works on Broad Ditch Road, Southfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 July 2025 and could run through until 2 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 15 Apr 2025 at 10:49.
21 Jul and 28 Sep 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on New Barn Road, Longfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 28 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 24 Jan 2025 at 10:06.
21 Jul and 28 Sep 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on New Barn Road, Longfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 28 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 29 Jan 2025 at 09:30.
21 Jul and 28 Sep 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on New Barn Road, Southfleet.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 28 September 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 24 Jan 2025 at 10:03.
21 Jul and 28 Sep 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on New Barn Road, Southfleet.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 28 September 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 29 Jan 2025 at 09:30.
21 Jul and 26 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Southend Road, Grays.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 09:12.
23 and 31 Jul 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Hillingdon Road, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 2 Apr 2025 at 18:28.
28 Jul and 5 Aug 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Old Road West, Gravesend.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 5 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 17 Apr 2025 at 14:57.
28 Jul and 1 Aug 2025
Southern Gas Networks are proposing to carry out New service connection on Wrotham Road, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Mar 2025 at 09:03.
28 Jul and 6 Aug 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Pelham Road, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 6 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 2 Apr 2025 at 18:22.
28 and 30 Jul 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Raphael Road, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 2 May 2025 at 07:00.
28 and 30 Jul 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Raphael Road, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 9 May 2025 at 10:07.
28 Jul and 26 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on College Road, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 09:35.
28 Jul and 3 Oct 2025
Thurrock Council were proposing to carry out Highway repair and maintenance works on Ship Lane, Aveley.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 3 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thurrock Council on 30 Apr 2025 at 15:49.
28 Jul and 5 Sep 2025
Thurrock Council are proposing to carry out Highway repair and maintenance works on Ship Lane, Aveley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thurrock Council on 7 May 2025 at 09:46.
29 and 31 Jul 2025
BT are proposing to carry out Utility asset works on Coldharbour Road, Kent, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 7 May 2025 at 13:38.
29 and 31 Jul 2025
BT are proposing to carry out Utility repair and maintenance works on Hall Road, Kent, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 7 May 2025 at 13:38.
1 and 18 Aug 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Milton Road, Gravesend.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 August 2025 and run through until 18 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 24 Apr 2025 at 13:32.
1 and 18 Aug 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Milton Road, Gravesend.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 7 May 2025 at 07:34.
4 and 21 Aug 2025
Kent County Council are proposing to carry out Highway improvement works on St Francis Avenue, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 8 May 2025 at 12:25.
4 and 21 Aug 2025
Kent County Council are proposing to carry out Highway improvement works on St Francis Avenue, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 8 May 2025 at 13:40.
4 and 30 Aug 2025
Kent County Council are proposing to carry out Highway improvement works on St Francis Avenue, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 30 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 13 May 2025 at 15:26.
4 and 7 Aug 2025
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Darenth Wood Road, Darenth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 7 August 2025. The works will impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 2 May 2025 at 11:37.
4 and 12 Aug 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Pelham Road, Gravesend.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 August 2025 and run through until 12 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 30 Apr 2025 at 12:16.
4 and 16 Aug 2025
Thurrock Council are proposing to carry out Highway repair and maintenance works on Exit Off Slip A13 Eastbound To Orsett Cock Roundabout, Orsett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 16 August 2025. The works will impact the verge only.
This roadwork event was last updated by Thurrock Council on 23 Apr 2025 at 09:19.
7 and 13 Aug 2025
Kent County Council are proposing to carry out Highway improvement works on Wrotham Road, Meopham, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 2 Jun 2025 at 12:52.
11 and 18 Aug 2025
Southern Gas Networks are proposing to carry out New service connection on Wood Lane, Darenth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 May 2025 at 07:51.
11 and 18 Aug 2025
Southern Gas Networks are proposing to carry out New service connection on Wood Lane, Darenth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 May 2025 at 09:24.
11 and 18 Aug 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Milton Place, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 14 May 2025 at 11:39.
11 and 18 Aug 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Milton Place, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 14 May 2025 at 14:10.
18 and 22 Aug 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Old Road West, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 21 May 2025 at 13:31.
18 and 26 Aug 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Pelham Road South, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 26 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 7 May 2025 at 07:25.
18 and 22 Aug 2025
Thurrock Council were proposing to carry out Highway improvement works on Station Road, East Tilbury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 August 2025 and run through until 22 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thurrock Council on 22 May 2025 at 09:36.
18 and 22 Aug 2025
Thurrock Council are proposing to carry out Highway improvement works on Station Road, East Tilbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thurrock Council on 28 May 2025 at 09:30.
18 and 24 Aug 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Blackshots Lane, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 24 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 May 2025 at 10:10.
18 and 30 Aug 2025
Thurrock Council are proposing to carry out Highway repair and maintenance works on Entry On Slip Orsett Cock Roundabout To A13 Westbound, Orsett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 30 August 2025. The works will impact the verge only.
This roadwork event was last updated by Thurrock Council on 23 Apr 2025 at 09:29.
19 and 21 Aug 2025
Thurrock Council are proposing to carry out Highway repair and maintenance works on Kingsman Road, Stanford Le Hope.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thurrock Council on 14 May 2025 at 09:56.
25 and 28 Aug 2025
National Highways are proposing to carry out Works for road purposes on Long Lane, Stifford Clays, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 28 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 22 May 2025 at 10:29.
26 and 29 Aug 2025
UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on The Gables, Longfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 28 May 2025 at 12:02.
29 Aug and 5 Sep 2025
National Highways are proposing to carry out Works for road purposes on Hoford Road, West Tilbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 22 May 2025 at 20:57.
29 Aug and 2 Sep 2025
National Highways are proposing to carry out Works for road purposes on Gammonfields Way, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 August 2025 and could run through until 2 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 22 May 2025 at 20:45.
Roadworks Map near to Tilbury Docks, TILBURY, RM18 7LA (Loading...)















- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Tilbury Docks, TILBURY, RM18 7LA (11 Events)
(Scheduled Dates)
(miles)
(Scheduled: 13 Jan 2025 - 10 Oct 2025)
(Scheduled: 13 Jan 2025 - 10 Oct 2025)
(Scheduled: 28 May 2025 - 4 Jun 2025)
Contains public sector information licensed under the Open Government Licence v3.0.