ROADWORKS SUMMARY
Broxburn Drive, SOUTH OCKENDON, RM15 5PD

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Broxburn Drive, RM15 5PD and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Broxburn Drive, SOUTH OCKENDON, RM15 5PD

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Broxburn Drive are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thurrock Council logo
LONG TERM
Between
13 Jan 2024 and 10 Oct 2025
Details
View Map
Share
Civic Square

Thurrock Council were proposing to carry out Highway improvement works on Civic Square, Tilbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2024 and run through until 10 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thurrock Council on 19 Aug 2024 at 15:33.

Kent County Council logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Rennie Drive

Kent County Council are carrying out Highway improvement works on Rennie Drive, Dartford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 February 2024 at 15:21 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 19 Aug 2024 at 09:56.

Southern Gas Networks logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Knockhall Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Knockhall Road, Greenhithe.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 August 2024 at 16:45 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Nov 2024 at 10:20.

Kent County Council logo
LONG TERM
Between
9 Sep 2024 and 25 Apr 2025
Details
View Map
Share
Follow
College Road

Kent County Council are proposing to carry out Highway improvement works on College Road, Northfleet, Gravesend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 25 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kent County Council on 30 Jul 2024 at 14:48.

Kent County Council logo
LONG TERM
Between
9 Sep 2024 and 25 Apr 2025
Details
View Map
Share
Follow
College Road

Kent County Council are proposing to carry out Highway improvement works on College Road, Northfleet, Gravesend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 25 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kent County Council on 4 Sep 2024 at 08:17.

London Borough Of Bexley logo
LONG TERM
Between
9 Sep 2024 and 18 Jul 2025
Details
View Map
Share
Follow
Walnut Tree Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Walnut Tree Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 18 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Bexley on 14 May 2024 at 08:26.

Cadent Gas logo
LONG TERM
Between
22 Sep and 30 Nov 2024
Details
View Map
Share
Follow
Southend Road

Cadent Gas are proposing to carry out Utility asset works on Southend Road, Grays.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 21 Mar 2023 at 16:56.

Kent County Council logo
LONG TERM
Between
27 Sep 2024 and 31 Mar 2026
Details
View Map
Share
Follow
Galley Hill Road

Kent County Council are proposing to carry out Highway repair and maintenance works on Galley Hill Road, Swanscombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2024 and could run through until 31 March 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kent County Council on 11 Oct 2024 at 14:51.

Kent County Council logo
LONG TERM
Until
31 Mar 2026
Details
View Map
Share
Follow
Galley Hill Road

Kent County Council are carrying out Highway repair and maintenance works on Galley Hill Road, Swanscombe.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 September 2024 at 00:01 and could run through until 31 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 11 Oct 2024 at 15:25.

Thurrock Council logo
LONG TERM
Between
14 Oct 2024 and 14 Feb 2025
Details
View Map
Share
Marshfoot Road

Thurrock Council were proposing to carry out Highway improvement works on Marshfoot Road, Chadwell St Mary.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2024 and run through until 14 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thurrock Council on 29 Aug 2024 at 10:49.

Thurrock Council logo
LONG TERM
Between
14 Oct 2024 and 14 Feb 2025
Details
View Map
Share
Marshfoot Road

Thurrock Council were proposing to carry out Highway improvement works on Marshfoot Road, Grays.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2024 and run through until 14 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thurrock Council on 29 Aug 2024 at 10:21.

Thurrock Council logo
LONG TERM
Between
14 Oct 2024 and 14 Feb 2025
Details
View Map
Share
Follow
A1089 J A126 Leave S

Thurrock Council are proposing to carry out Highway improvement works on A1089 J A126 Leave S, Thurrock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 14 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thurrock Council on 3 Jul 2024 at 16:00.

UK Power Networks South Eastern logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Alkerden Lane

UK Power Networks South Eastern are carrying out New service connection on Alkerden Lane, Swanscombe.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 13:00 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 20 Nov 2024 at 11:32.

UK Power Networks South Eastern logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Gilbert Close

UK Power Networks South Eastern are carrying out New service connection on Gilbert Close, Swanscombe.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 13:00 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 20 Nov 2024 at 11:29.

Electricity Network Company logo
Until
29 Nov 2024
Details
View Map
Share
Follow
West Street

Electricity Network Company are carrying out Utility asset works on West Street, Erith.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 11:55 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 4 Nov 2024 at 11:55.

National Highways logo
Finishing
Wednesday
Details
View Map
Share
Bean Road

National Highways were proposing to carry out Remedial works on Bean Road, Bluewater, Greenhithe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 27 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by National Highways on 19 Nov 2024 at 15:58.

Electricity Network Company logo
Until
29 Nov 2024
Details
View Map
Share
Follow
London Road

Electricity Network Company are carrying out Utility asset works on London Road, Stone.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 18 Nov 2024 at 15:12.

Cadent Gas logo
Between
11 Nov and 10 Dec 2024
Details
View Map
Share
Follow
Newton Road

Cadent Gas are proposing to carry out Utility asset works on Newton Road, Tilbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 10:14.

Cadent Gas logo
Until
11 Dec 2024
Details
View Map
Share
Follow
Newton Road

Cadent Gas are carrying out Utility asset works on Newton Road, Tilbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 November 2024 at 08:00 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 09:41.

Cadent Gas logo
Between
11 Nov and 10 Dec 2024
Details
View Map
Share
Follow
Newton Road

Cadent Gas are proposing to carry out Utility asset works on Newton Road, Tilbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 09:22.

Cadent Gas logo
Until
2 Dec 2024
Details
View Map
Share
Follow
Foxton Road

Cadent Gas are carrying out Utility asset works on Foxton Road, South Stifford, Grays.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 November 2024 at 08:22 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 09:40.

Thurrock Council logo
LONG TERM
Between
11 Nov 2024 and 14 Mar 2025
Details
View Map
Share
Follow
Marshfoot Road

Thurrock Council are proposing to carry out Highway improvement works on Marshfoot Road, Chadwell St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thurrock Council on 11 Sep 2024 at 09:31.

Thurrock Council logo
LONG TERM
Until
14 Mar 2025
Details
View Map
Share
Follow
Marshfoot Road

Thurrock Council are carrying out Highway improvement works on Marshfoot Road, Chadwell St Mary.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thurrock Council on 11 Nov 2024 at 08:38.

Thurrock Council logo
LONG TERM
Between
11 Nov 2024 and 14 Mar 2025
Details
View Map
Share
Follow
Marshfoot Road

Thurrock Council are proposing to carry out Highway improvement works on Marshfoot Road, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thurrock Council on 11 Sep 2024 at 09:30.

Thurrock Council logo
LONG TERM
Until
14 Mar 2025
Details
View Map
Share
Follow
Marshfoot Road

Thurrock Council are carrying out Highway improvement works on Marshfoot Road, Grays.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thurrock Council on 11 Nov 2024 at 08:37.

London Borough Of Bexley logo
LONG TERM
Until
18 Jul 2025
Details
View Map
Share
Follow
Walnut Tree Road

London Borough Of Bexley are carrying out Highway improvement works on Walnut Tree Road, Erith.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Bexley on 11 Nov 2024 at 08:00.

Cadent Gas logo
Between
11 Nov and 10 Dec 2024
Details
View Map
Share
Follow
St Peters Road

Cadent Gas are proposing to carry out Utility asset works on St Peters Road, Chadwell St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 09:54.

Cadent Gas logo
Until
10 Dec 2024
Details
View Map
Share
Follow
St Peters Road

Cadent Gas are carrying out Utility asset works on St Peters Road, Chadwell St Mary.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 09:26 and could run through until 10 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 10:05.

Thurrock Council logo
Between
11 and 30 Nov 2024
Details
View Map
Share
Follow
Arterial Road Roundabout

Thurrock Council are proposing to carry out Highway improvement works on Arterial Road Roundabout, West Thurrock.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 November 2024. The works will impact the verge only.

This roadwork event was last updated by Thurrock Council on 21 Aug 2024 at 15:40.

Thurrock Council logo
Until
30 Nov 2024
Details
View Map
Share
Follow
Arterial Road Roundabout

Thurrock Council are carrying out Highway improvement works on Arterial Road Roundabout, West Thurrock.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 23:00 and could run through until 30 November 2024. The works will impact the verge only.

This roadwork event was last updated by Thurrock Council on 12 Nov 2024 at 08:40.

Cadent Gas logo
LONG TERM
Until
15 Dec 2024
Details
View Map
Share
Follow
Courtney Road

Cadent Gas are carrying out Utility asset works on Courtney Road, Chadwell St Mary.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:43 and could run through until 15 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 10:03.

Cadent Gas logo
LONG TERM
Between
11 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Courtney Road

Cadent Gas are proposing to carry out Utility asset works on Courtney Road, Chadwell St Mary.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Jul 2024 at 10:50.

Cadent Gas logo
LONG TERM
Between
11 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Courtney Road

Cadent Gas are proposing to carry out Utility asset works on Courtney Road, Chadwell St Mary.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Aug 2024 at 12:08.

Cadent Gas logo
Until
6 Dec 2024
Details
View Map
Share
Follow
Brentwood Road

Cadent Gas are carrying out Utility asset works on Brentwood Road, Chadwell St Mary.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:53 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 10:04.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Long Lane

Cadent Gas are proposing to carry out Utility asset works on Long Lane, Stifford Clays, Grays.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 12:23.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Long Lane

Cadent Gas are proposing to carry out Utility asset works on Long Lane, Stifford Clays, Grays.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 14:10.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Long Lane

Cadent Gas are proposing to carry out Utility asset works on Long Lane, Stifford Clays, Grays.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 14:16.

Cadent Gas logo
Between
11 Nov and 10 Dec 2024
Details
View Map
Share
Follow
Chestnut Avenue

Cadent Gas are proposing to carry out Utility asset works on Chestnut Avenue, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 09:20.

Cadent Gas logo
Between
11 Nov and 10 Dec 2024
Details
View Map
Share
Follow
Chestnut Avenue

Cadent Gas are proposing to carry out Utility asset works on Chestnut Avenue, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 09:33.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Long Lane

Cadent Gas are proposing to carry out Utility asset works on Long Lane, Stifford Clays, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 14:19.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Long Lane

Cadent Gas are proposing to carry out Utility asset works on Long Lane, Stifford Clays, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 14:23.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Long Lane

Cadent Gas are proposing to carry out Utility asset works on Long Lane, Stifford Clays, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 10:59.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Long Lane

Cadent Gas are proposing to carry out Utility asset works on Long Lane, Stifford Clays, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 09:38.

Cadent Gas logo
LONG TERM
Between
11 Nov and 12 Dec 2024
Details
View Map
Share
Follow
Goddard Road

Cadent Gas are proposing to carry out Utility asset works on Goddard Road, Stifford Clays, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 12:35.

Cadent Gas logo
LONG TERM
Between
11 Nov and 12 Dec 2024
Details
View Map
Share
Follow
Goddard Road

Cadent Gas are proposing to carry out Utility asset works on Goddard Road, Stifford Clays, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 09:33.

Cadent Gas logo
LONG TERM
Between
11 Nov and 12 Dec 2024
Details
View Map
Share
Follow
Goddard Road

Cadent Gas are proposing to carry out Utility asset works on Goddard Road, Stifford Clays, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 13:38.

Until
8 Dec 2024
Details
View Map
Share
Follow
Bob Dunn Way

Riverside Energy Park are carrying out Utility asset works on Bob Dunn Way, Dartford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Riverside Energy Park on 18 Nov 2024 at 08:30.

Cadent Gas logo
Between
18 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Brentwood Road

Cadent Gas are proposing to carry out Utility asset works on Brentwood Road, Chadwell St Mary.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Jul 2024 at 10:47.

Cadent Gas logo
Between
18 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Brentwood Road

Cadent Gas are proposing to carry out Utility asset works on Brentwood Road, Chadwell St Mary.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Aug 2024 at 13:40.

Cadent Gas logo
Between
18 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Brentwood Road

Cadent Gas are proposing to carry out Utility asset works on Brentwood Road, Chadwell St Mary.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 14:38.

Cadent Gas logo
Between
18 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Brentwood Road

Cadent Gas are proposing to carry out Utility asset works on Brentwood Road, Chadwell St Mary.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 08:58.

Cadent Gas logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Chestnut Avenue

Cadent Gas are carrying out Utility asset works on Chestnut Avenue, Grays.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 12:21 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 12:47.

Cadent Gas logo
LONG TERM
Between
18 Nov and 19 Dec 2024
Details
View Map
Share
Follow
Goddard Road

Cadent Gas are proposing to carry out Utility asset works on Goddard Road, Stifford Clays, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 09:33.

Kent County Council logo
Finishing
Tuesday
Details
View Map
Share
Bob Dunn Way

Kent County Council were proposing to carry out Highway improvement works on Bob Dunn Way, Stone.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 November 2024 and run through until 26 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Kent County Council on 20 Nov 2024 at 08:37.

Kent County Council logo
Finishing
Tuesday
Details
View Map
Share
Bob Dunn Way

Kent County Council were proposing to carry out Highway improvement works on Bob Dunn Way, Stone.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 November 2024 and run through until 26 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Kent County Council on 19 Nov 2024 at 09:31.

National Highways logo
Finishing
Saturday
Details
View Map
Share
Follow
Southend Arterial Road

National Highways are proposing to carry out Works for road purposes on Southend Arterial Road, Great Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 9 Sep 2024 at 13:56.

National Highways logo
Finishing
Saturday
Details
View Map
Share
Follow
Southend Arterial Road

National Highways are proposing to carry out Works for road purposes on Southend Arterial Road, Great Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 16 Sep 2024 at 11:47.

National Highways logo
Finishing
Saturday
Details
View Map
Share
Follow
Southend Arterial Road

National Highways are proposing to carry out Works for road purposes on Southend Arterial Road, Great Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 24 Sep 2024 at 15:35.

National Highways logo
Finishing
Saturday
Details
View Map
Share
Follow
Southend Arterial Road

National Highways are proposing to carry out Works for road purposes on Southend Arterial Road, Great Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 2 Oct 2024 at 13:25.

National Highways logo
Finishing
Saturday
Details
View Map
Share
Follow
Southend Arterial Road

National Highways are carrying out Works for road purposes on Southend Arterial Road, Great Warley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 22:00 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 21 Nov 2024 at 08:04.

Between
20 and 30 Nov 2024
Details
View Map
Share
Follow
South Road

Riverside Energy Park are proposing to carry out Utility asset works on South Road, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Riverside Energy Park on 30 Oct 2024 at 17:04.

Between
20 and 30 Nov 2024
Details
View Map
Share
Follow
Queens Road

Riverside Energy Park are proposing to carry out Utility asset works on Queens Road, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Riverside Energy Park on 30 Oct 2024 at 17:05.

Finishing
Tomorrow
Details
View Map
Share
Follow
Coniston Avenue

London Borough Of Havering are proposing to carry out Highway improvement works on Coniston Avenue, Upminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 26 Jul 2024 at 08:00.

Finishing
Tomorrow
Details
View Map
Share
Follow
Coniston Avenue

London Borough Of Havering are carrying out Highway improvement works on Coniston Avenue, Upminster.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 08:00 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 20 Nov 2024 at 08:02.

Southern Water logo
Between
21 and 29 Nov 2024
Details
View Map
Share
Follow
The Shore

Southern Water are proposing to carry out Utility repair and maintenance works on The Shore, Northfleet, Gravesend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 4 Sep 2024 at 08:27.

BT logo
Finishing
Monday
Details
View Map
Share
Follow
Russel Road

BT are proposing to carry out Utility asset works on Russel Road, Thurrock, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 25 November 2024. The works will impact the verge only.

This roadwork event was last updated by BT on 29 Oct 2024 at 14:40.

UK Power Networks South Eastern logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Milton Street

UK Power Networks South Eastern were proposing to carry out New service connection on Milton Street, Swanscombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Nov 2024 at 14:43.

Thurrock Council logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Burnley Road

Thurrock Council are proposing to carry out Highway improvement works on Burnley Road, West Thurrock.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 5 Nov 2024 at 15:31.

Thurrock Council logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Burnley Road

Thurrock Council are proposing to carry out Highway improvement works on Burnley Road, West Thurrock.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 19 Nov 2024 at 10:16.

Cadent Gas logo
Between
25 Nov and 16 Dec 2024
Details
View Map
Share
Follow
St Marys Road

Cadent Gas are proposing to carry out Utility asset works on St Marys Road, Chadwell St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 09:57.

Cadent Gas logo
Between
25 Nov and 16 Dec 2024
Details
View Map
Share
Follow
St Marys Road

Cadent Gas are proposing to carry out Utility asset works on St Marys Road, Chadwell St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 07:18.

Cadent Gas logo
Between
25 Nov and 16 Dec 2024
Details
View Map
Share
Follow
St Marys Road

Cadent Gas are proposing to carry out Utility asset works on St Marys Road, Chadwell St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 11:40.

Cadent Gas logo
Between
25 Nov and 9 Dec 2024
Details
View Map
Share
Follow
The Griffins

Cadent Gas are proposing to carry out Utility asset works on The Griffins, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 09:21.

Cadent Gas logo
Between
25 Nov and 9 Dec 2024
Details
View Map
Share
Follow
The Griffins

Cadent Gas are proposing to carry out Utility asset works on The Griffins, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 09:36.

Cadent Gas logo
Between
25 Nov and 9 Dec 2024
Details
View Map
Share
Follow
The Griffins

Cadent Gas are proposing to carry out Utility asset works on The Griffins, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 10:52.

Cadent Gas logo
Between
25 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Bodell Close

Cadent Gas are proposing to carry out Utility asset works on Bodell Close, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 09:22.

Cadent Gas logo
Between
25 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Bodell Close

Cadent Gas are proposing to carry out Utility asset works on Bodell Close, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 09:35.

Cadent Gas logo
Between
25 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Bodell Close

Cadent Gas are proposing to carry out Utility asset works on Bodell Close, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 10:20.

National Highways logo
Between
25 and 30 Nov 2024
Details
View Map
Share
Follow
Stanford Road

National Highways are proposing to carry out Highway repair and maintenance works on Stanford Road, Orsett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 20 Nov 2024 at 11:18.

National Highways logo
Between
27 and 30 Nov 2024
Details
View Map
Share
Follow
Bean Road

National Highways are proposing to carry out Highway improvement works on Bean Road, Bluewater, Greenhithe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 8 Nov 2024 at 10:59.

UK Power Networks South Eastern logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Milton Street

UK Power Networks South Eastern are proposing to carry out New service connection on Milton Street, Swanscombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 19 Sep 2024 at 08:39.

Between
4 and 6 Dec 2024
Details
View Map
Share
East Thurrock Road

Essex And Suffolk Water were proposing to carry out Permanent reinstatement on East Thurrock Road, Grays.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Essex And Suffolk Water on 10 Sep 2024 at 13:44.

Between
4 and 6 Dec 2024
Details
View Map
Share
East Thurrock Road

Essex And Suffolk Water were proposing to carry out Permanent reinstatement on East Thurrock Road, Grays.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Essex And Suffolk Water on 10 Sep 2024 at 13:48.

Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
East Thurrock Road

Essex And Suffolk Water are proposing to carry out Permanent reinstatement on East Thurrock Road, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex And Suffolk Water on 12 Sep 2024 at 13:24.

Between
5 and 7 Dec 2024
Details
View Map
Share
Follow
Station Lane

London Borough Of Havering are proposing to carry out Highway improvement works on Station Lane, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 13 Aug 2024 at 11:30.

Cadent Gas logo
Between
6 and 20 Dec 2024
Details
View Map
Share
Follow
Long Lane

Cadent Gas are proposing to carry out Utility asset works on Long Lane, Stifford Clays, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 08:57.

BT logo
Between
9 and 16 Dec 2024
Details
View Map
Share
Follow
Fen Lane

BT are proposing to carry out Utility asset works on Fen Lane, North Ockendon, Upminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 16 December 2024. The works will impact the verge only.

This roadwork event was last updated by BT on 1 Oct 2024 at 10:19.

Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
The Broadway

London Borough Of Havering are proposing to carry out Highway improvement works on The Broadway, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 26 Jul 2024 at 08:31.

Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
The Broadway

London Borough Of Havering are proposing to carry out Highway improvement works on The Broadway, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 20 Sep 2024 at 14:03.

Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
East Thurrock Road

Essex And Suffolk Water are proposing to carry out Permanent reinstatement on East Thurrock Road, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex And Suffolk Water on 19 Nov 2024 at 15:54.

Between
11 and 13 Dec 2024
Details
View Map
Share
Prospect Place

Essex And Suffolk Water were proposing to carry out Utility repair and maintenance works on Prospect Place, Grays.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Essex And Suffolk Water on 2 Oct 2024 at 10:08.

BT logo
Between
16 and 21 Dec 2024
Details
View Map
Share
Follow
London Road

BT are proposing to carry out Utility asset works on London Road, South Stifford, Grays.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 25 Sep 2024 at 09:57.

BT logo
Between
16 and 21 Dec 2024
Details
View Map
Share
Follow
London Road

BT are proposing to carry out Utility asset works on London Road, South Stifford, Grays.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 18 Sep 2024 at 09:19.

Cadent Gas logo
LONG TERM
Between
1 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Fieldway

Cadent Gas are proposing to carry out Utility asset works on Fieldway, Stifford Clays, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 12:41.

Southern Gas Networks logo
Between
2 and 6 Jan 2025
Details
View Map
Share
Follow
Eynsford Road

Southern Gas Networks are proposing to carry out Remedial works on Eynsford Road, Greenhithe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 6 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 07:40.

Southern Gas Networks logo
Between
2 and 4 Jan 2025
Details
View Map
Share
Follow
Eynsford Road

Southern Gas Networks are proposing to carry out Remedial works on Eynsford Road, Greenhithe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 4 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 10:33.

Thurrock Council logo
LONG TERM
Between
6 Jan and 25 Apr 2025
Details
View Map
Share
London Road

Thurrock Council were proposing to carry out Highway improvement works on London Road, West Thurrock.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 25 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thurrock Council on 20 Aug 2024 at 11:35.

Thurrock Council logo
LONG TERM
Between
6 Jan and 25 Apr 2025
Details
View Map
Share
Follow
London Road

Thurrock Council are proposing to carry out Highway improvement works on London Road, West Thurrock.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thurrock Council on 13 Feb 2024 at 10:27.

Thurrock Council logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
London Road

Thurrock Council are proposing to carry out Highway improvement works on London Road, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thurrock Council on 13 Sep 2024 at 12:00.

Cadent Gas logo
LONG TERM
Between
6 Jan and 19 Feb 2025
Details
View Map
Share
Follow
Felicia Way

Cadent Gas are proposing to carry out Utility asset works on Felicia Way, Chadwell St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 10:18.

Cadent Gas logo
LONG TERM
Between
6 Jan and 19 Feb 2025
Details
View Map
Share
Follow
Felicia Way

Cadent Gas are proposing to carry out Utility asset works on Felicia Way, Chadwell St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 10:38.

Cadent Gas logo
LONG TERM
Between
6 Jan and 19 Feb 2025
Details
View Map
Share
Follow
Felicia Way

Cadent Gas are proposing to carry out Utility asset works on Felicia Way, Chadwell St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 13:20.

Cadent Gas logo
LONG TERM
Between
6 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Fieldway

Cadent Gas are proposing to carry out Utility asset works on Fieldway, Stifford Clays, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 14:31.

Cadent Gas logo
LONG TERM
Between
6 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Fieldway

Cadent Gas are proposing to carry out Utility asset works on Fieldway, Stifford Clays, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 07:40.

Cadent Gas logo
LONG TERM
Between
6 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Fieldway

Cadent Gas are proposing to carry out Utility asset works on Fieldway, Stifford Clays, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 10:20.

BT logo
Between
6 and 15 Jan 2025
Details
View Map
Share
Follow
Fen Lane

BT are proposing to carry out Utility asset works on Fen Lane, North Ockendon, Upminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 24 Sep 2024 at 13:44.

Cadent Gas logo
LONG TERM
Between
7 Jan and 23 Feb 2025
Details
View Map
Share
Follow
Chadwell Road

Cadent Gas are proposing to carry out Utility asset works on Chadwell Road, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Jun 2023 at 07:31.

Between
8 and 11 Jan 2025
Details
View Map
Share
Follow
Hall Lane

London Borough Of Havering are proposing to carry out Highway improvement works on Hall Lane, Upminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 2 Oct 2024 at 09:43.

Southern Gas Networks logo
Between
9 and 24 Jan 2025
Details
View Map
Share
Follow
Springhead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Springhead Road, Northfleet, Gravesend.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 08:05.

Southern Gas Networks logo
Between
9 and 24 Jan 2025
Details
View Map
Share
Follow
York Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on York Road, Northfleet, Gravesend.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 08:06.

Thurrock Council logo
LONG TERM
Between
13 Jan and 10 Oct 2025
Details
View Map
Share
Civic Square

Thurrock Council were proposing to carry out Highway improvement works on Civic Square, Tilbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 10 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thurrock Council on 19 Aug 2024 at 15:28.

Thurrock Council logo
LONG TERM
Between
13 Jan and 10 Oct 2025
Details
View Map
Share
Civic Square

Thurrock Council were proposing to carry out Highway improvement works on Civic Square, Tilbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 10 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thurrock Council on 11 Sep 2024 at 14:01.

Thurrock Council logo
LONG TERM
Between
13 Jan and 10 Oct 2025
Details
View Map
Share
Follow
Civic Square

Thurrock Council are proposing to carry out Highway improvement works on Civic Square, Tilbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thurrock Council on 18 Sep 2024 at 09:14.

Thurrock Council logo
LONG TERM
Between
13 Jan and 10 Oct 2025
Details
View Map
Share
Follow
Calcutta Road

Thurrock Council are proposing to carry out Highway improvement works on Calcutta Road, Tilbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thurrock Council on 23 Oct 2024 at 10:25.

BT logo
Between
13 and 18 Jan 2025
Details
View Map
Share
Follow
London Road

BT are proposing to carry out Utility asset works on London Road, South Stifford, Grays.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Oct 2024 at 09:42.

BT logo
Between
13 and 18 Jan 2025
Details
View Map
Share
Follow
London Road

BT are proposing to carry out Utility asset works on London Road, South Stifford, Grays.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 Oct 2024 at 11:20.

BT logo
Between
13 and 18 Jan 2025
Details
View Map
Share
Follow
London Road

BT are proposing to carry out Utility asset works on London Road, South Stifford, Grays.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 1 Oct 2024 at 11:41.

Thurrock Council logo
Between
13 and 18 Jan 2025
Details
View Map
Share
Follow
Stanford Road

Thurrock Council are proposing to carry out Highway repair and maintenance works on Stanford Road, Orsett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 16 Oct 2024 at 09:15.

Thurrock Council logo
Between
13 and 18 Jan 2025
Details
View Map
Share
Follow
Stanford Road

Thurrock Council are proposing to carry out Highway repair and maintenance works on Stanford Road, Orsett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 20 Nov 2024 at 13:51.

Transport for London (TfL) logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 11:42.

Transport for London (TfL) logo
Between
13 and 25 Jan 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 25 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 13:44.

Thurrock Council logo
LONG TERM
Between
18 Jan and 7 Mar 2025
Details
View Map
Share
London Road

Thurrock Council were proposing to carry out Highway improvement works on London Road, Grays.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 January 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thurrock Council on 8 Oct 2024 at 14:58.

Thurrock Council logo
LONG TERM
Between
18 Jan and 7 Mar 2025
Details
View Map
Share
London Road

Thurrock Council were proposing to carry out Highway improvement works on London Road, Grays.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 January 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thurrock Council on 14 Nov 2024 at 13:24.

Cadent Gas logo
Between
20 Jan and 18 Feb 2025
Details
View Map
Share
Follow
Thorley Road

Cadent Gas are proposing to carry out Utility asset works on Thorley Road, Stifford Clays, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 18 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 14:15.

Cadent Gas logo
Between
20 Jan and 18 Feb 2025
Details
View Map
Share
Follow
Thorley Road

Cadent Gas are proposing to carry out Utility asset works on Thorley Road, Stifford Clays, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 18 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 12:16.

Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Church Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Church Road, Bulphan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 21 Nov 2024 at 08:09.

Transport for London (TfL) logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 11:45.

Transport for London (TfL) logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 15 Nov 2024 at 07:51.

Thames Water logo
Between
28 and 31 Jan 2025
Details
View Map
Share
Follow
Milton Street

Thames Water are proposing to carry out New service connection on Milton Street, Swanscombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 11:28.

Cadent Gas logo
Between
3 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Aluric Close

Cadent Gas are proposing to carry out Utility asset works on Aluric Close, Chadwell St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 10:22.

Cadent Gas logo
Between
3 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Aluric Close

Cadent Gas are proposing to carry out Utility asset works on Aluric Close, Chadwell St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 10:39.

Cadent Gas logo
Between
3 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Aluric Close

Cadent Gas are proposing to carry out Utility asset works on Aluric Close, Chadwell St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 08:13.

Thurrock Council logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Follow
Arterial Road

Thurrock Council are proposing to carry out Highway repair and maintenance works on Arterial Road, North Stifford, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 16 Oct 2024 at 09:45.

Thurrock Council logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Follow
Link From A1012 Roundabout To A1306 Interchange

Thurrock Council are proposing to carry out Highway repair and maintenance works on Link From A1012 Roundabout To A1306 Interchange, North Stifford, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 16 Oct 2024 at 09:35.

Thurrock Council logo
LONG TERM
Between
3 Feb and 10 Apr 2025
Details
View Map
Share
Follow
Stifford Roundabout

Thurrock Council are proposing to carry out Highway improvement works on Stifford Roundabout, North Stifford, Grays.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 10 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thurrock Council on 16 Oct 2024 at 09:46.

Cadent Gas logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Follow
Fairfield Avenue

Cadent Gas are proposing to carry out Utility asset works on Fairfield Avenue, Stifford Clays, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 14:00.

Cadent Gas logo
Between
10 Feb and 11 Mar 2025
Details
View Map
Share
Follow
Ashley Gardens

Cadent Gas are proposing to carry out Utility asset works on Ashley Gardens, Stifford Clays, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 11 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 14:30.

Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Gourney Grove

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Gourney Grove, Stifford Clays, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 20 Nov 2024 at 11:03.

Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Gourney Grove

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Gourney Grove, Stifford Clays, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 20 Nov 2024 at 11:16.

Cadent Gas logo
LONG TERM
Between
17 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Harty Close

Cadent Gas are proposing to carry out Utility asset works on Harty Close, Stifford Clays, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 14:30.

Cadent Gas logo
LONG TERM
Between
17 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Harty Close

Cadent Gas are proposing to carry out Utility asset works on Harty Close, Stifford Clays, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 13:58.

Cadent Gas logo
LONG TERM
Between
17 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Harty Close

Cadent Gas are proposing to carry out Utility asset works on Harty Close, Stifford Clays, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 14:32.

Thurrock Council logo
LONG TERM
Between
17 Feb and 29 Mar 2025
Details
View Map
Share
Follow
Brentwood Road

Thurrock Council are proposing to carry out Highway improvement works on Brentwood Road, Chadwell St Mary.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 29 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thurrock Council on 20 Nov 2024 at 09:18.


Roadworks Map near to Broxburn Drive, SOUTH OCKENDON, RM15 5PD

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 21 Nov 2024 22:24
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Broxburn Drive, SOUTH OCKENDON, RM15 5PD (5 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cadent Gas logo
EMERGENCY
  
FOOTPATH ACCESS FOR VERBENA CLOSE 
(0.3 miles)
Cadent Gas
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
17 Nov 2024 14:10 - 20 Nov 2024 09:04
0.3
Details
Share
2
URGENT
  
ARAGLEN AVENUE 
(0.5 miles)
Essex And Suffolk Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
18 Nov 2024 17:31 - 21 Nov 2024 12:22
0.5
Details
Share
3
Cornerstone Telecommunications Infrastructure logo
PILGRIMS LANE, NORTH STIFFORD 
(0.9 miles)
Cornerstone Telecommunications Infrastructure
Utility asset works - Footway, Verge - Lane closure
Planned
Scheduled: 22 Nov 2024 - 23 Nov 2024
0.9
Details
Share
Follow
4
Cornerstone Telecommunications Infrastructure logo
PILGRIMS LANE, NORTH STIFFORD 
(0.9 miles)
Cornerstone Telecommunications Infrastructure
Utility asset works - Footway, Verge - Lane closure
Cancelled
(Scheduled: 22 Nov 2024 - 23 Nov 2024)
0.9
Details
Share
5
Cornerstone Telecommunications Infrastructure logo
PILGRIMS LANE, NORTH STIFFORD 
(0.9 miles)
Cornerstone Telecommunications Infrastructure
Utility asset works - Footway, Verge - Lane closure
In Progress
Since: 21 Nov 2024 10:00
(Scheduled: 21 Nov 2024 - 23 Nov 2024)
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.