ROADWORKS SUMMARY
Eastbourne Road, LINGFIELD, RH7 6JP
Introduction
View current and future planned roadworks and road closures for Eastbourne Road, RH7 6JP and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Eastbourne Road, LINGFIELD, RH7 6JP
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Eastbourne Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
Wednesday
Surrey County Council are proposing to carry out Highway repair and maintenance works on Woolborough Lane, Outwood, Smallfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2024 and could run through until 1 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 17 Apr 2024 at 07:17.
14 Aug 2024 and 15 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Wheelers Lane, Smallfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 August 2024 and could run through until 15 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 13 May 2024 at 05:53.
14 Aug 2024 and 15 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Redehall Road, Smallfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 August 2024 and could run through until 15 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 13 May 2024 at 05:52.
1 Nov 2024 and 30 Apr 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Pendell Road, Bletchingley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 30 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 13 May 2024 at 05:21.
1 Nov 2024 and 30 Apr 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Bletchingley Road, Merstham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 30 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 13 May 2024 at 05:20.
1 Nov 2024 and 1 May 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on East Hill, Oxted.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 November 2024 and run through until 1 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 28 Nov 2024 at 14:19.
12 Jan 2025
Network Rail are carrying out Works for Rail Purposes on High Street, Horley.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 9 December 2024 at 06:00 and could run through until 12 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 9 Dec 2024 at 08:12.
9 Dec 2024 and 12 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on High Street, Horley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 12 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 18 Oct 2024 at 14:45.
Monday
Southern Gas Networks are carrying out Utility repair and maintenance works on Nutfield Road, Nutfield.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 December 2024 at 01:00 and could run through until 30 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Dec 2024 at 15:13.
Today
Network Rail were proposing to carry out Works for Rail Purposes on Station Road, Horley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 December 2024 and run through until 27 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 20 Dec 2024 at 14:06.
Today
Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Horley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 2 Oct 2024 at 12:01.
6 Jan and 17 Feb 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Stangrove Road, Edenbridge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 17 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Dec 2024 at 08:04.
6 and 27 Jan 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, Langley Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 31 Oct 2024 at 13:46.
6 and 10 Jan 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Whitewood Lane, South Godstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 16 Oct 2024 at 08:53.
6 and 10 Jan 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Whitewood Lane, South Godstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 15 Oct 2024 at 11:43.
7 and 30 Jan 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, Langley Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 10 Dec 2024 at 12:35.
11 and 13 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Crowhurst Lane End, Tandridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 7 Oct 2024 at 07:41.
11 and 13 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Crowhurst Lane End, Tandridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 4 Dec 2024 at 11:07.
13 and 16 Jan 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Snow Hill, Crawley Down.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 17 Dec 2024 at 14:56.
13 Jan and 3 Feb 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Church Lane, Copthorne.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 3 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 19 Dec 2024 at 15:30.
13 and 27 Jan 2025
Surrey County Council were proposing to carry out Highway improvement works on Redehall Road, Smallfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 18 Oct 2024 at 07:38.
14 and 16 Jan 2025
BT are proposing to carry out Utility asset works on Kings Mill Lane, Redhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 5 Nov 2024 at 16:01.
15 and 21 Jan 2025
Ses Water (formerly Sutton & East Surrey Water Company) were proposing to carry out Utility asset works on Church Road, Burstow, Smallfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 January 2025 and run through until 21 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 6 Nov 2024 at 08:35.
25 Jan and 8 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Balcombe Road, Tinsley Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 January 2025 and could run through until 8 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 15 Oct 2024 at 11:07.
27 Jan and 7 Feb 2025
Surrey County Council are proposing to carry out Highway improvement works on Redehall Road, Smallfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 12 Dec 2024 at 15:22.
27 and 29 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Outwood Lane, Bletchingley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 30 Oct 2024 at 09:25.
27 and 29 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Outwood Lane, Bletchingley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 5 Nov 2024 at 07:43.
27 Jan and 7 Feb 2025
Surrey County Council are proposing to carry out Highway improvement works on Redehall Road, Smallfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 31 Oct 2024 at 08:59.
27 Jan and 24 Mar 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on West Hill, Oxted.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 24 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 3 Dec 2024 at 07:14.
27 Jan and 24 Mar 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Church Lane, Oxted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 24 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 3 Dec 2024 at 07:14.
27 Jan and 12 Apr 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Shipley Bridge Lane, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 12 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 8 Nov 2024 at 14:34.
29 Jan and 13 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, Langley Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 17 Dec 2024 at 14:54.
29 Jan and 7 Mar 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, Langley Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 15 Nov 2024 at 10:09.
31 Jan and 22 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Turners Hill Road, Crawley Down.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 22 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 27 Nov 2024 at 12:54.
31 Jan and 22 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Turners Hill Road, Crawley Down.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 22 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 27 Nov 2024 at 14:37.
31 Jan and 22 Feb 2025
West Sussex County Council were proposing to carry out Highway repair and maintenance works on Turners Hill Road, Crawley Down.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 January 2025 and run through until 22 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 27 Nov 2024 at 12:57.
3 and 21 Feb 2025
West Sussex County Council are proposing to carry out Highway improvement works on Dukes Head Roundabout, Copthorne.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 18 Dec 2024 at 10:56.
3 and 7 Feb 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Church Road, Burstow, Smallfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 11 Dec 2024 at 07:40.
3 and 7 Feb 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Church Road, Burstow, Smallfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 12 Nov 2024 at 11:29.
3 Feb and 17 Mar 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Crouch House Road, Edenbridge.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 17 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 20 Dec 2024 at 08:05.
4 and 6 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on East Park Lane, Newchapel, Lingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 12:20.
4 and 6 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on East Park Lane, Newchapel, Lingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 26 Nov 2024 at 14:46.
5 and 10 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Lingfield Road, East Grinstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 8 Nov 2024 at 11:30.
5 and 11 Feb 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Blackberry Lane, Lingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 19 Nov 2024 at 08:42.
5 and 11 Feb 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Blackberry Lane, Lingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 11 Dec 2024 at 13:19.
8 Feb and 8 Mar 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Effingham Lane, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 February 2025 and could run through until 8 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 23 Dec 2024 at 11:10.
17 Feb and 7 Mar 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Crawley Down Road, Felbridge.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 7 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 24 Sep 2024 at 13:04.
24 and 26 Feb 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on East Hill Lane, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 12 Dec 2024 at 09:03.
24 and 27 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Dukes Head Roundabout, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 27 Nov 2024 at 13:04.
24 and 27 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Dukes Head Roundabout, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 27 Nov 2024 at 14:36.
24 Feb and 10 Mar 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Manor House Gardens, Edenbridge.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 10 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Dec 2024 at 08:06.
24 and 26 Feb 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on East Hill Lane, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 23 Dec 2024 at 08:02.
24 and 27 Feb 2025
West Sussex County Council were proposing to carry out Highway repair and maintenance works on Dukes Head Roundabout, Copthorne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 27 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 27 Nov 2024 at 13:33.
25 and 27 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, East Grinstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 28 Nov 2024 at 08:23.
3 and 7 Mar 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Broadbridge Lane, Smallfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 12 Dec 2024 at 09:08.
3 and 5 Mar 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Saxbys Lane, Lingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 5 Dec 2024 at 13:29.
6 and 24 Mar 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, Langley Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 March 2025 and could run through until 24 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 10 Dec 2024 at 12:54.
10 and 14 Mar 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Outwood Lane, Bletchingley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 23 Dec 2024 at 08:15.
13 and 15 Mar 2025
National Highways are proposing to carry out Works for road purposes on Tandridge Hill Lane, Godstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 9 Sep 2024 at 07:11.
13 and 15 Mar 2025
National Highways are proposing to carry out Works for road purposes on Tandridge Hill Lane, Godstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 22 Nov 2024 at 07:21.
17 Mar and 15 May 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on West Hill, Oxted.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 15 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 24 Dec 2024 at 08:21.
17 Mar and 15 May 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Church Lane, Oxted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 15 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 24 Dec 2024 at 08:18.
24 Mar and 11 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crawley Down Road, Felbridge.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 07:38.
25 Mar and 8 Apr 2025
Energy Assets Networks (formerly Utility Distribution Networks) were proposing to carry out New service connection on London Road, East Grinstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 March 2025 and run through until 8 April 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 11 Dec 2024 at 10:48.
25 Mar and 8 Apr 2025
Energy Assets Networks (formerly Utility Distribution Networks) were proposing to carry out New service connection on Beeching Way, East Grinstead.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 March 2025 and run through until 8 April 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 11 Dec 2024 at 10:48.
Roadworks Map near to Eastbourne Road, LINGFIELD, RH7 6JP
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.