ROADWORKS SUMMARY
Station Road, LINGFIELD, RH7 6DY
Introduction
View current and future planned roadworks and road closures for Station Road, RH7 6DY and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Station Road, LINGFIELD, RH7 6DY
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Station Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
14 Aug 2024 and 15 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Wheelers Lane, Smallfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 August 2024 and could run through until 15 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 13 May 2024 at 05:53.
14 Aug 2024 and 15 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Redehall Road, Smallfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 August 2024 and could run through until 15 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 13 May 2024 at 05:52.
23 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on West Street, Dormansland.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 October 2024 at 10:30 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 11:57.
20 Dec 2024
Surrey County Council are carrying out Highway repair and maintenance works on Effingham Road, Copthorne.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 October 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 17 Oct 2024 at 11:53.
14 Oct and 20 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Effingham Road, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 12 Aug 2024 at 07:09.
Friday
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Newhache, Dormansland.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 6 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 13 Sep 2024 at 09:49.
Friday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crawley Down Road, Felbridge.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 09:23.
18 Nov and 13 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kinnibrugh Drive, Dormansland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 18 Sep 2024 at 11:39.
23 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Dormans Road, Dormansland.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 November 2024 at 14:30 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 29 Nov 2024 at 15:12.
Tomorrow
Surrey County Council are carrying out Highway repair and maintenance works on Hall Hill, Oxted.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 November 2024 at 20:34 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 29 Nov 2024 at 07:37.
Tuesday
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Hilders Lane, Edenbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 10 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 2 Sep 2024 at 13:07.
2 and 23 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hollow Lane, Dormansland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 13:23.
2 and 20 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crawley Down Road, Felbridge.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 11:34.
2 and 23 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kinnibrugh Drive, Dormansland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 08:16.
2 and 23 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Newhache, Dormansland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 07:10.
Saturday
Surrey County Council are proposing to carry out Highway repair and maintenance works on Eastbourne Road, South Godstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 25 Nov 2024 at 14:55.
Saturday
Surrey County Council are proposing to carry out Highway repair and maintenance works on Eastbourne Road, Blindley Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 25 Nov 2024 at 14:58.
Sunday
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Snow Hill, Crawley Down.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 22 Nov 2024 at 07:48.
9 and 21 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on East Grinstead Road, Lingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 2 Oct 2024 at 07:06.
9 and 21 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Felcourt Road, Lingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 11 Sep 2024 at 11:51.
9 and 21 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Felcourt Road, Lingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 2 Oct 2024 at 07:05.
9 and 21 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Blackberry Lane, Lingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 11 Sep 2024 at 11:51.
9 and 21 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Blackberry Lane, Lingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 2 Oct 2024 at 07:05.
9 and 20 Dec 2024
West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, East Grinstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 26 Sep 2024 at 12:13.
9 and 16 Dec 2024
West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, East Grinstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 26 Sep 2024 at 11:40.
9 and 21 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on East Grinstead Road, Lingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 11 Sep 2024 at 11:51.
6 and 24 Jan 2025
Kent County Council are proposing to carry out Highway improvement works on Brocas Road, Hever.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Kent County Council on 20 Nov 2024 at 09:41.
6 Jan and 28 Feb 2025
West Sussex County Council are proposing to carry out Highway improvement works on Church Lane, East Grinstead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 16 May 2024 at 07:26.
6 and 24 Jan 2025
Kent County Council were proposing to carry out Highway improvement works on Brocas Road, Hever.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Kent County Council on 20 Nov 2024 at 08:53.
6 Jan and 28 Feb 2025
West Sussex County Council are proposing to carry out Highway improvement works on De La Warr Road, East Grinstead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 16 May 2024 at 08:32.
6 and 10 Jan 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Whitewood Lane, South Godstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 15 Oct 2024 at 11:43.
6 and 10 Jan 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Whitewood Lane, South Godstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 16 Oct 2024 at 08:53.
6 Jan and 17 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stangrove Road, Edenbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 14:18.
11 and 13 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Crowhurst Lane End, Tandridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 7 Oct 2024 at 07:41.
11 and 13 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Crowhurst Lane End, Tandridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 4 Dec 2024 at 09:20.
13 and 27 Jan 2025
Surrey County Council were proposing to carry out Highway improvement works on Redehall Road, Smallfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 18 Oct 2024 at 07:38.
13 and 15 Jan 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Hever Road, Edenbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 21 Oct 2024 at 14:26.
13 and 15 Jan 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Hever Road, Edenbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 28 Oct 2024 at 09:57.
27 Jan and 24 Mar 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Church Lane, Oxted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 24 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 3 Dec 2024 at 07:14.
27 Jan and 24 Mar 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on West Hill, Oxted.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 24 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 3 Dec 2024 at 07:14.
27 Jan and 7 Feb 2025
Surrey County Council are proposing to carry out Highway improvement works on Redehall Road, Smallfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 31 Oct 2024 at 08:59.
31 Jan and 22 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Turners Hill Road, Crawley Down.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 22 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 27 Nov 2024 at 12:54.
31 Jan and 22 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Turners Hill Road, Crawley Down.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 22 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 27 Nov 2024 at 14:37.
31 Jan and 22 Feb 2025
West Sussex County Council were proposing to carry out Highway repair and maintenance works on Turners Hill Road, Crawley Down.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 January 2025 and run through until 22 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 27 Nov 2024 at 12:57.
3 Feb and 17 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crouch House Road, Edenbridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 14:55.
4 and 6 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on East Park Lane, Newchapel, Lingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 26 Nov 2024 at 14:46.
4 and 6 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on East Park Lane, Newchapel, Lingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 12:20.
5 and 11 Feb 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Blackberry Lane, Lingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 19 Nov 2024 at 08:42.
5 and 10 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Lingfield Road, East Grinstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 8 Nov 2024 at 11:30.
17 Feb and 7 Mar 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Crawley Down Road, Felbridge.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 7 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 24 Sep 2024 at 13:04.
24 Feb and 10 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Manor House Gardens, Edenbridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 14:52.
24 and 26 Feb 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on East Hill Lane, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 21 Nov 2024 at 10:35.
24 and 27 Feb 2025
West Sussex County Council were proposing to carry out Highway repair and maintenance works on Dukes Head Roundabout, Copthorne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 27 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 27 Nov 2024 at 13:33.
24 and 27 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Dukes Head Roundabout, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 27 Nov 2024 at 14:36.
24 and 27 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Dukes Head Roundabout, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 27 Nov 2024 at 13:04.
24 Feb and 7 Mar 2025
West Sussex County Council were proposing to carry out Highway improvement works on Vicarage Walk, East Grinstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 7 March 2025. The works were due to impact the footway and footpath.
This roadwork event was last updated by West Sussex County Council on 27 Nov 2024 at 16:00.
24 Feb and 7 Mar 2025
West Sussex County Council are proposing to carry out Highway improvement works on Vicarage Walk, East Grinstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway and footpath.
This roadwork event was last updated by West Sussex County Council on 27 Nov 2024 at 16:08.
25 and 27 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, East Grinstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 28 Nov 2024 at 08:23.
Roadworks Map near to Station Road, LINGFIELD, RH7 6DY
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Station Road, LINGFIELD, RH7 6DY (1 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.