ROADWORKS SUMMARY
Cudworth Lane, DORKING, RH5 5BG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Cudworth Lane, RH5 5BG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Cudworth Lane, DORKING, RH5 5BG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Cudworth Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

West Sussex County Council logo
LONG TERM
Between
31 Jul 2024 and 30 Mar 2025
Details
View Map
Share
Follow
London Road Southbound

West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road Southbound, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 30 March 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 10 May 2024 at 08:12.

West Sussex County Council logo
LONG TERM
Between
31 Jul 2024 and 30 Mar 2025
Details
View Map
Share
Follow
London Road Northbound

West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road Northbound, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 30 March 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 10 May 2024 at 08:12.

West Sussex County Council logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Breezehurst Drive

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Breezehurst Drive, Bewbush, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 August 2024 and could run through until 23 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 5 Aug 2024 at 11:50.

West Sussex County Council logo
LONG TERM
Between
4 Oct 2024 and 4 Apr 2025
Details
View Map
Share
Follow
Chestnut Walk

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Chestnut Walk, Langley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2024 and could run through until 4 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 21 Aug 2024 at 12:11.

Surrey County Council logo
LONG TERM
Between
7 Oct 2024 and 7 Apr 2025
Details
View Map
Share
Follow
Horsham Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Horsham Road, North Holmwood, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 7 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 3 Jul 2024 at 09:18.

Surrey County Council logo
LONG TERM
Between
6 Dec 2024 and 6 Jun 2025
Details
View Map
Share
Follow
Reigate Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Reigate Road, Sidlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 6 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 4 Sep 2024 at 07:58.

Surrey County Council logo
LONG TERM
Between
6 Dec 2024 and 6 Jun 2025
Details
View Map
Share
Follow
Dovers Green Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Dovers Green Road, Reigate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 6 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 4 Sep 2024 at 08:10.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 27 Feb 2025
Details
View Map
Share
Follow
Fairway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fairway, Ifield, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 11:49.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Dovers Green Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Dovers Green Road, Reigate.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:00 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Feb 2025 at 12:48.

Surrey County Council logo
LONG TERM
Between
13 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Norwood Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on Norwood Hill, Charlwood, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 20 Nov 2024 at 10:39.

Surrey County Council logo
LONG TERM
Between
13 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Stan Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on Stan Hill, Charlwood, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 20 Nov 2024 at 10:37.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Ewhurst Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ewhurst Road, West Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 12:36.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Ewhurst Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ewhurst Close, West Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 14:25.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Reynolds Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Reynolds Road, West Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 12:52.

UK Power Networks South Eastern logo
Finishing
Friday
Details
View Map
Share
Follow
Capel Road

UK Power Networks South Eastern are carrying out Utility repair and maintenance works on Capel Road, Rusper.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 11:25 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 13 Feb 2025 at 08:26.

Southern Gas Networks logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Lodge Close

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Lodge Close, West Green, Crawley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 28 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Jan 2025 at 14:09.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Meadowlands

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Meadowlands, West Green, Crawley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 14 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Jan 2025 at 15:27.

Surrey County Council logo
LONG TERM
Between
3 Feb and 3 Aug 2025
Details
View Map
Share
Reigate Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Reigate Road, Sidlow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 3 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 3 Sep 2024 at 14:21.

Surrey County Council logo
LONG TERM
Between
3 Feb and 3 Aug 2025
Details
View Map
Share
Dovers Green Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Dovers Green Road, Reigate.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 3 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 3 Sep 2024 at 14:30.

West Sussex County Council logo
LONG TERM
Between
10 Feb and 26 Mar 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway improvement works on London Road, West Green, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 12 Aug 2024 at 10:20.

West Sussex County Council logo
LONG TERM
Until
26 Mar 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are carrying out Highway improvement works on London Road, West Green, Crawley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 07:30 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 10 Feb 2025 at 08:28.

West Sussex County Council logo
LONG TERM
Between
10 Feb and 26 Mar 2025
Details
View Map
Share
Follow
Crawley Avenue

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, Langley Green, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 12 Aug 2024 at 10:23.

West Sussex County Council logo
LONG TERM
Until
26 Mar 2025
Details
View Map
Share
Follow
Crawley Avenue

West Sussex County Council are carrying out Highway improvement works on Crawley Avenue, Langley Green, Crawley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 07:30 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 10 Feb 2025 at 08:32.

West Sussex County Council logo
LONG TERM
Between
10 Feb and 26 Mar 2025
Details
View Map
Share
Follow
London Road Roundabout

West Sussex County Council are proposing to carry out Highway improvement works on London Road Roundabout, Northgate, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 3 Sep 2024 at 12:31.

West Sussex County Council logo
LONG TERM
Until
26 Mar 2025
Details
View Map
Share
Follow
London Road Roundabout

West Sussex County Council are carrying out Highway improvement works on London Road Roundabout, Northgate, Crawley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 09:30 and could run through until 26 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 10 Feb 2025 at 09:34.

West Sussex County Council logo
LONG TERM
Between
10 Feb and 26 Mar 2025
Details
View Map
Share
Follow
Crawley Avenue

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, Northgate, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 12 Aug 2024 at 10:13.

West Sussex County Council logo
LONG TERM
Until
26 Mar 2025
Details
View Map
Share
Follow
Crawley Avenue

West Sussex County Council are carrying out Highway improvement works on Crawley Avenue, Northgate, Crawley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 07:30 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 10 Feb 2025 at 08:29.

West Sussex County Council logo
LONG TERM
Between
10 Feb and 26 Mar 2025
Details
View Map
Share
Follow
London Road Southbound

West Sussex County Council are proposing to carry out Highway improvement works on London Road Southbound, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 12 Aug 2024 at 10:07.

West Sussex County Council logo
LONG TERM
Between
10 Feb and 26 Mar 2025
Details
View Map
Share
Follow
London Road Southbound

West Sussex County Council are proposing to carry out Highway improvement works on London Road Southbound, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 3 Sep 2024 at 10:09.

West Sussex County Council logo
LONG TERM
Until
26 Mar 2025
Details
View Map
Share
Follow
London Road Southbound

West Sussex County Council are carrying out Highway improvement works on London Road Southbound, Crawley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 07:30 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 10 Feb 2025 at 08:31.

West Sussex County Council logo
LONG TERM
Between
10 Feb and 6 Jun 2025
Details
View Map
Share
Follow
Manor Royal

West Sussex County Council are proposing to carry out Highway improvement works on Manor Royal, Northgate, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 14 Jan 2025 at 09:06.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Vicarage Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Vicarage Lane, Horley.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 11:00 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Feb 2025 at 15:06.

West Sussex County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Charlwood Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Charlwood Road, Ifield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 28 Jan 2025 at 09:16.

Surrey County Council logo
LONG TERM
Between
17 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Reigate Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Reigate Road, Hookwood, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 23 Aug 2024 at 12:44.

Surrey County Council logo
LONG TERM
Between
17 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Reigate Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Reigate Road, Hookwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 23 Aug 2024 at 12:43.

UK Power Networks South Eastern logo
Between
20 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Reigate Road

UK Power Networks South Eastern are proposing to carry out New service connection on Reigate Road, Sidlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 9 Jan 2025 at 10:35.

Southern Gas Networks logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Town Barn Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Town Barn Road, West Green, Crawley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 28 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 15:30.

Southern Gas Networks logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Town Mead

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Town Mead, West Green, Crawley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 28 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 15:30.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Russ Hill

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Russ Hill, Charlwood, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 18 Dec 2024 at 10:58.

West Sussex County Council logo
LONG TERM
Between
24 Feb and 29 Mar 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, Langley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 29 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 10 Dec 2024 at 13:17.

West Sussex County Council logo
LONG TERM
Between
24 Feb and 29 Mar 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, Langley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 29 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 10 Dec 2024 at 13:14.

Surrey County Council logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Broad Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Broad Lane, Leigh, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 27 Jan 2025 at 12:38.

Surrey County Council logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Broad Lane

Surrey County Council were proposing to carry out Highway repair and maintenance works on Broad Lane, Leigh, Dorking Rural.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 11 Feb 2025 at 08:16.

Surrey County Council logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Lonesome Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Lonesome Lane, Reigate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 12 Feb 2025 at 17:31.

Surrey County Council logo
LONG TERM
Between
4 Mar and 15 Apr 2025
Details
View Map
Share
Norwood Hill

Surrey County Council were proposing to carry out Highway repair and maintenance works on Norwood Hill, Charlwood, Dorking Rural.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 March 2025 and run through until 15 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 15 Jan 2025 at 10:40.

Surrey County Council logo
LONG TERM
Between
4 Mar and 15 Apr 2025
Details
View Map
Share
Stan Hill

Surrey County Council were proposing to carry out Highway repair and maintenance works on Stan Hill, Charlwood, Dorking Rural.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 March 2025 and run through until 15 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 15 Jan 2025 at 10:40.

West Sussex County Council logo
Between
6 and 18 Mar 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, Langley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 18 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 15 Nov 2024 at 10:16.

UK Power Networks South Eastern logo
Between
10 and 25 Mar 2025
Details
View Map
Share
Follow
Reigate Road

UK Power Networks South Eastern are proposing to carry out New service connection on Reigate Road, Sidlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 25 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 22 Jan 2025 at 08:13.

Surrey County Council logo
Between
10 and 15 Mar 2025
Details
View Map
Share
Follow
Middle Street

Surrey County Council are proposing to carry out Highway repair and maintenance works on Middle Street, Brockham, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 1 Oct 2024 at 13:34.

Surrey County Council logo
Between
10 and 15 Mar 2025
Details
View Map
Share
Follow
Middle Street

Surrey County Council are proposing to carry out Highway repair and maintenance works on Middle Street, Brockham, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Oct 2024 at 11:25.

West Sussex County Council logo
Between
13 and 15 Mar 2025
Details
View Map
Share
Follow
Kelvin Way

West Sussex County Council are proposing to carry out Highway improvement works on Kelvin Way, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 5 Nov 2024 at 10:56.

West Sussex County Council logo
Between
13 and 15 Mar 2025
Details
View Map
Share
Follow
Kelvin Lane

West Sussex County Council are proposing to carry out Highway improvement works on Kelvin Lane, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 5 Nov 2024 at 13:48.

West Sussex County Council logo
Between
13 and 15 Mar 2025
Details
View Map
Share
Follow
Faraday Road

West Sussex County Council are proposing to carry out Highway improvement works on Faraday Road, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 5 Nov 2024 at 09:29.

West Sussex County Council logo
LONG TERM
Between
17 Mar and 17 Apr 2025
Details
View Map
Share
Follow
Crawley Road Eastbound

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Road Eastbound, Colgate.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 17 April 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 7 Jan 2025 at 09:06.

West Sussex County Council logo
LONG TERM
Between
17 Mar and 17 Apr 2025
Details
View Map
Share
Follow
Crawley Road Eastbound

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Road Eastbound, Colgate.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 17 April 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 17 Jan 2025 at 14:18.

West Sussex County Council logo
LONG TERM
Between
17 Mar and 17 Apr 2025
Details
View Map
Share
Follow
Crawley Road Roundabout

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Road Roundabout, Faygate.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 17 April 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 7 Jan 2025 at 09:06.

West Sussex County Council logo
LONG TERM
Between
17 Mar and 17 Apr 2025
Details
View Map
Share
Follow
Crawley Road Roundabout

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Road Roundabout, Faygate.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 17 April 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 17 Jan 2025 at 14:28.

West Sussex County Council logo
LONG TERM
Between
17 Mar and 17 Apr 2025
Details
View Map
Share
Follow
Crawley Road Westbound

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Road Westbound, Colgate.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 17 April 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 7 Jan 2025 at 09:06.

West Sussex County Council logo
LONG TERM
Between
17 Mar and 17 Apr 2025
Details
View Map
Share
Follow
Crawley Road Westbound

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Road Westbound, Colgate.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 17 April 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 17 Jan 2025 at 14:23.

Surrey County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Horley Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Horley Road, Charlwood, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 29 Nov 2024 at 17:37.

Surrey County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Charlwood Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Charlwood Road, Charlwood, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 29 Nov 2024 at 17:36.

BT logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Manor Drive

BT are proposing to carry out Utility repair and maintenance works on Manor Drive, Horley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 20 Dec 2024 at 14:43.

BT logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Manor Drive

BT are proposing to carry out Utility repair and maintenance works on Manor Drive, Horley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 17 Jan 2025 at 15:25.

Surrey County Council logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
South Parade

Surrey County Council are proposing to carry out Highway repair and maintenance works on South Parade, Horley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 12 Feb 2025 at 17:45.

Surrey County Council logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
South Parade

Surrey County Council are proposing to carry out Highway repair and maintenance works on South Parade, Horley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 13 Feb 2025 at 11:56.

West Sussex County Council logo
Between
18 and 26 Mar 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, Langley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 15 Nov 2024 at 10:23.

Surrey County Council logo
Between
18 and 22 Mar 2025
Details
View Map
Share
Dovers Green Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Dovers Green Road, Reigate.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 March 2025 and run through until 22 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 10 Jan 2025 at 13:40.

West Sussex County Council logo
Between
19 and 25 Mar 2025
Details
View Map
Share
Follow
Charlwood Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Charlwood Road, Ifield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 25 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 31 Jan 2025 at 09:19.

UK Power Networks South Eastern logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Withey Meadows

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Withey Meadows, Hookwood, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 24 Dec 2024 at 12:46.

Surrey County Council logo
Between
26 Mar and 1 Apr 2025
Details
View Map
Share
Follow
Dovers Green Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Dovers Green Road, Reigate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 1 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 17 Jan 2025 at 15:07.

Surrey County Council logo
Between
28 and 31 Mar 2025
Details
View Map
Share
Follow
Bunce Common Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Bunce Common Road, Leigh, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 28 Jan 2025 at 13:41.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
1 and 7 Apr 2025
Details
View Map
Share
Rectory Lane

Ses Water (formerly Sutton & East Surrey Water Company) were proposing to carry out Utility asset works on Rectory Lane, Charlwood, Dorking Rural.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 7 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 7 Jan 2025 at 08:37.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Charlwood Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Charlwood Road, Charlwood, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Aug 2024 at 09:44.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Abinger Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Abinger Road, Leith Hill, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 16 Aug 2024 at 17:17.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Thornton Close

Surrey County Council are proposing to carry out Highway repair and maintenance works on Thornton Close, Horley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 16 Aug 2024 at 14:31.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Thornton Place

Surrey County Council are proposing to carry out Highway repair and maintenance works on Thornton Place, Horley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 29 Aug 2024 at 07:54.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Norwood Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on Norwood Hill, Charlwood, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 7 Jan 2025 at 10:18.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Charlesfield Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Charlesfield Road, Horley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 16 Aug 2024 at 14:17.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Blackbrook Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Blackbrook Road, South Holmwood, Dorking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 7 Nov 2024 at 11:14.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Blackbrook Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Blackbrook Road, South Holmwood, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 8 Nov 2024 at 19:03.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Bunce Common Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Bunce Common Road, Leigh, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Aug 2024 at 09:23.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Wellhouse Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Wellhouse Lane, Brockham, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Aug 2024 at 09:29.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Wellhouse Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Wellhouse Lane, Brockham, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 15 Aug 2024 at 16:10.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Wellhouse Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Wellhouse Lane, Strood Green, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Aug 2024 at 09:31.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Wellhouse Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Wellhouse Lane, Strood Green, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 15 Aug 2024 at 16:12.

Thames Water logo
Between
4 and 20 Apr 2025
Details
View Map
Share
Follow
Vincent Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Vincent Lane, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2025 and could run through until 20 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Feb 2025 at 14:41.

Thames Water logo
Between
4 and 20 Apr 2025
Details
View Map
Share
Vincent Lane

Thames Water were proposing to carry out Utility repair and maintenance works on Vincent Lane, Dorking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 April 2025 and run through until 20 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Feb 2025 at 11:37.

Thames Water logo
Between
5 and 20 Apr 2025
Details
View Map
Share
Vincent Lane

Thames Water were proposing to carry out Utility repair and maintenance works on Vincent Lane, Dorking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 April 2025 and run through until 20 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Feb 2025 at 10:31.

Surrey County Council logo
Between
6 Apr and 2 May 2025
Details
View Map
Share
Follow
Stan Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on Stan Hill, Charlwood, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 15 Jan 2025 at 15:47.

Surrey County Council logo
Between
6 Apr and 2 May 2025
Details
View Map
Share
Norwood Hill

Surrey County Council were proposing to carry out Highway repair and maintenance works on Norwood Hill, Charlwood, Dorking Rural.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 April 2025 and run through until 2 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 15 Jan 2025 at 11:32.

Surrey County Council logo
Between
6 Apr and 2 May 2025
Details
View Map
Share
Follow
Norwood Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on Norwood Hill, Charlwood, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 15 Jan 2025 at 15:50.

Surrey County Council logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Horley Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Horley Road, Charlwood, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 19 Dec 2024 at 13:30.

Surrey County Council logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Horley Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Horley Road, Charlwood, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 7 Jan 2025 at 09:21.

Surrey County Council logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Charlwood Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Charlwood Road, Charlwood, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 20 Dec 2024 at 09:18.

Surrey County Council logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Charlwood Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Charlwood Road, Charlwood, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 7 Jan 2025 at 09:22.

West Sussex County Council logo
Between
11 and 29 Apr 2025
Details
View Map
Share
Follow
Mayes Lane

West Sussex County Council are proposing to carry out Highway improvement works on Mayes Lane, Warnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 16 Jan 2025 at 16:06.

West Sussex County Council logo
Between
11 and 29 Apr 2025
Details
View Map
Share
Follow
Bognor Road

West Sussex County Council are proposing to carry out Highway improvement works on Bognor Road, Warnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 30 Jan 2025 at 14:04.

West Sussex County Council logo
Between
11 and 29 Apr 2025
Details
View Map
Share
Follow
Mayes Lane

West Sussex County Council are proposing to carry out Highway improvement works on Mayes Lane, Warnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 6 Feb 2025 at 15:05.

West Sussex County Council logo
Between
11 and 29 Apr 2025
Details
View Map
Share
Follow
Mayes Lane

West Sussex County Council are proposing to carry out Highway improvement works on Mayes Lane, Warnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 12 Feb 2025 at 09:09.

West Sussex County Council logo
Between
11 and 29 Apr 2025
Details
View Map
Share
Follow
Bognor Road

West Sussex County Council are proposing to carry out Highway improvement works on Bognor Road, Warnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 6 Feb 2025 at 15:04.

West Sussex County Council logo
Between
11 and 29 Apr 2025
Details
View Map
Share
Follow
Bognor Road

West Sussex County Council are proposing to carry out Highway improvement works on Bognor Road, Warnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 12 Feb 2025 at 13:57.

West Sussex County Council logo
Between
11 and 29 Apr 2025
Details
View Map
Share
Marches Road

West Sussex County Council were proposing to carry out Highway improvement works on Marches Road, Warnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 April 2025 and run through until 29 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 27 Jan 2025 at 10:44.

West Sussex County Council logo
Between
11 and 29 Apr 2025
Details
View Map
Share
Follow
Marches Road

West Sussex County Council are proposing to carry out Highway improvement works on Marches Road, Warnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 7 Feb 2025 at 13:17.

Southern Water logo
Between
14 and 29 Apr 2025
Details
View Map
Share
Follow
Stane Street

Southern Water are proposing to carry out Utility repair and maintenance works on Stane Street, Ockley, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 7 Feb 2025 at 13:39.

West Sussex County Council logo
Between
14 Apr and 2 May 2025
Details
View Map
Share
Follow
London Road Northbound

West Sussex County Council are proposing to carry out Highway improvement works on London Road Northbound, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 2 May 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 7 Jan 2025 at 11:52.

West Sussex County Council logo
Between
14 Apr and 2 May 2025
Details
View Map
Share
Follow
London Road Northbound

West Sussex County Council are proposing to carry out Highway improvement works on London Road Northbound, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 2 May 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 20 Jan 2025 at 16:24.

West Sussex County Council logo
Between
14 Apr and 2 May 2025
Details
View Map
Share
Follow
London Road Northbound

West Sussex County Council are proposing to carry out Highway improvement works on London Road Northbound, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 2 May 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 22 Jan 2025 at 13:25.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Rectory Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Rectory Lane, Charlwood, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 7 Jan 2025 at 09:49.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Rectory Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Rectory Lane, Charlwood, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 7 Jan 2025 at 13:21.

West Sussex County Council logo
Between
14 Apr and 2 May 2025
Details
View Map
Share
Follow
London Road Southbound

West Sussex County Council are proposing to carry out Highway improvement works on London Road Southbound, Langley Green, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 2 May 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 14 Jan 2025 at 09:03.

West Sussex County Council logo
Between
14 Apr and 2 May 2025
Details
View Map
Share
Follow
London Road Southbound

West Sussex County Council are proposing to carry out Highway improvement works on London Road Southbound, Langley Green, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 2 May 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 17 Jan 2025 at 10:33.

West Sussex County Council logo
Between
14 Apr and 2 May 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway improvement works on London Road, Langley Green, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 2 May 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 14 Jan 2025 at 09:01.

West Sussex County Council logo
Between
14 Apr and 2 May 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway improvement works on London Road, Langley Green, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 2 May 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 17 Jan 2025 at 10:33.

BT logo
Between
16 and 18 Apr 2025
Details
View Map
Share
Follow
Partridge Lane

BT are proposing to carry out Utility asset works on Partridge Lane, Surrey, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 18 April 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 22 Jan 2025 at 15:55.

BT logo
Between
16 and 18 Apr 2025
Details
View Map
Share
Follow
Partridge Lane

BT are proposing to carry out Utility asset works on Partridge Lane, Surrey, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 18 April 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 11 Feb 2025 at 14:46.

Surrey County Council logo
Between
16 Apr and 1 May 2025
Details
View Map
Share
Follow
Capel By-pass

Surrey County Council are proposing to carry out Highway repair and maintenance works on Capel By-pass, Beare Green, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 7 Jan 2025 at 09:13.

Surrey County Council logo
Between
22 and 30 Apr 2025
Details
View Map
Share
Follow
Charlwood Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Charlwood Road, Charlwood, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Jan 2025 at 11:15.

BT logo
Between
24 and 28 Apr 2025
Details
View Map
Share
Follow
Partridge Lane

BT are proposing to carry out Utility repair and maintenance works on Partridge Lane, Surrey, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 28 April 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 21 Jan 2025 at 14:42.

BT logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
East Street

BT are proposing to carry out Utility asset works on East Street, West Sussex, Rusper.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 3 Feb 2025 at 10:21.

West Sussex County Council logo
Between
28 Apr and 16 May 2025
Details
View Map
Share
Follow
Crawley Avenue

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, Northgate, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 16 May 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 14 Jan 2025 at 09:04.

West Sussex County Council logo
Between
28 Apr and 16 May 2025
Details
View Map
Share
Follow
Crawley Avenue

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, Northgate, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 16 May 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 17 Jan 2025 at 10:26.

West Sussex County Council logo
Between
28 Apr and 16 May 2025
Details
View Map
Share
Follow
London Road Southbound

West Sussex County Council are proposing to carry out Highway improvement works on London Road Southbound, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 16 May 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 13 Jan 2025 at 16:03.

West Sussex County Council logo
Between
28 Apr and 16 May 2025
Details
View Map
Share
Follow
London Road Southbound

West Sussex County Council are proposing to carry out Highway improvement works on London Road Southbound, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 16 May 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 17 Jan 2025 at 10:28.

West Sussex County Council logo
Between
12 May and 6 Jun 2025
Details
View Map
Share
Follow
Crawley Avenue

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, Southgate, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the footway, verge and cycleway.

This roadwork event was last updated by West Sussex County Council on 14 Jan 2025 at 09:15.

West Sussex County Council logo
Between
12 May and 6 Jun 2025
Details
View Map
Share
Follow
Crawley Avenue

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, Southgate, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the footway, verge and cycleway.

This roadwork event was last updated by West Sussex County Council on 17 Jan 2025 at 10:26.

West Sussex County Council logo
Between
12 May and 6 Jun 2025
Details
View Map
Share
Follow
Crawley Avenue

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, Gossops Green, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 14 Jan 2025 at 09:14.

West Sussex County Council logo
Between
12 May and 6 Jun 2025
Details
View Map
Share
Follow
Crawley Avenue

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, Gossops Green, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 17 Jan 2025 at 10:26.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
12 and 14 May 2025
Details
View Map
Share
Follow
Norwood Hill Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Norwood Hill Road, Charlwood, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 14 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 7 Jan 2025 at 13:33.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
12 and 14 May 2025
Details
View Map
Share
Follow
Norwood Hill Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Norwood Hill Road, Charlwood, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 14 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 9 Jan 2025 at 09:34.

Surrey County Council logo
Between
15 May and 10 Jun 2025
Details
View Map
Share
Follow
Stan Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on Stan Hill, Charlwood, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 30 Jan 2025 at 13:11.

Surrey County Council logo
Between
15 May and 10 Jun 2025
Details
View Map
Share
Follow
Norwood Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on Norwood Hill, Charlwood, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 30 Jan 2025 at 13:16.


Roadworks Map near to Cudworth Lane, DORKING, RH5 5BG (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 17 Feb 2025 03:25
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Cudworth Lane, DORKING, RH5 5BG (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.