ROADWORKS SUMMARY
The Borough, BETCHWORTH, RH3 7NB

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for The Borough, RH3 7NB and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to The Borough, BETCHWORTH, RH3 7NB

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for The Borough are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Greenways

Surrey County Council are proposing to carry out Highway repair and maintenance works on Greenways, Walton On The Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 10 Sep 2024 at 14:35.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Dovers Green Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Dovers Green Road, Reigate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 5 Dec 2024 at 15:38.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Wellhouse Lane

Surrey County Council were proposing to carry out Highway repair and maintenance works on Wellhouse Lane, Strood Green, Dorking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Jul 2025 at 15:21.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Wellhouse Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Wellhouse Lane, Strood Green, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 14 Aug 2024 at 09:31.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Beechdene

Surrey County Council are proposing to carry out Highway repair and maintenance works on Beechdene, Tadworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 16 Aug 2024 at 14:34.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Kingsdene

Surrey County Council are proposing to carry out Highway repair and maintenance works on Kingsdene, Tadworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 10 Sep 2024 at 14:38.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Church Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Church Road, Reigate.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Jul 2025 at 15:25.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Heathcote

Surrey County Council are proposing to carry out Highway repair and maintenance works on Heathcote, Tadworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 14 Aug 2024 at 09:10.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Wellhouse Lane

Surrey County Council were proposing to carry out Highway repair and maintenance works on Wellhouse Lane, Brockham, Dorking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Jul 2025 at 15:21.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Wellhouse Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Wellhouse Lane, Brockham, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 14 Aug 2024 at 09:29.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Emlyn Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Emlyn Lane, Leatherhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 14 Aug 2024 at 09:11.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Belmont Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Belmont Road, Leatherhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 14 Aug 2024 at 09:14.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
St Johns Avenue

Surrey County Council are proposing to carry out Highway repair and maintenance works on St Johns Avenue, Leatherhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 25 Oct 2024 at 12:28.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Reigate Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on Reigate Hill, Reigate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 14 Aug 2024 at 08:52.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Bunce Common Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Bunce Common Road, Leigh, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 14 Aug 2024 at 09:23.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Norwood Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on Norwood Hill, Charlwood, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 7 Jan 2025 at 10:18.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Blackbrook Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Blackbrook Road, South Holmwood, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 8 Nov 2024 at 19:03.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Blackbrook Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Blackbrook Road, South Holmwood, Dorking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 7 Nov 2024 at 11:14.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Shrewsbury Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Shrewsbury Road, Redhill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Jul 2025 at 13:17.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Headley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Headley Road, Leatherhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Dec 2024 at 13:47.

Surrey County Council logo
Until
30 Sep 2025
Details
View Map
Share
Follow
Norwood Hill

Surrey County Council are carrying out Highway repair and maintenance works on Norwood Hill, Charlwood, Dorking Rural.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 September 2025 at 08:00 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 12 Sep 2025 at 08:57.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Dorking Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Dorking Road, Walton On The Hill.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 September 2025 at 00:10 and could run through until 23 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Sep 2025 at 15:26.

Surrey County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Reigate Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on Reigate Hill, Reigate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 7 Jul 2025 at 13:41.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Brokes Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Brokes Road, Reigate.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2025 at 11:45 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 15 Sep 2025 at 11:37.

Surrey County Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Reigate Hill

Surrey County Council are carrying out Highway repair and maintenance works on Reigate Hill, Reigate.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 20:30 and could run through until 27 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 19 Sep 2025 at 12:37.

Surrey County Council logo
Finishing
Tomorrow
Details
View Map
Share
Bunce Common Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Bunce Common Road, Leigh, Dorking Rural.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2025 and run through until 22 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Jul 2025 at 14:53.

Surrey County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Woodhatch Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Woodhatch Road, Reigate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 18 Sep 2025 at 14:25.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Bridge Street

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Bridge Street, Leatherhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 4 Jul 2025 at 09:35.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Bridge Street

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Bridge Street, Leatherhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 10 Jul 2025 at 12:06.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Bridge Street

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Bridge Street, Leatherhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Jul 2025 at 10:18.

Southern Gas Networks logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
By-pass Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on By-pass Road, Leatherhead.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 17 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Sep 2025 at 09:03.

Southern Gas Networks logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
By-pass Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on By-pass Road, Leatherhead.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Dec 2024 at 13:48.

Surrey County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Woodhatch Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Woodhatch Road, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 15 Sep 2025 at 15:02.

Southern Gas Networks logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Beaufort Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beaufort Road, Reigate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Aug 2025 at 15:47.

Southern Gas Networks logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Beaufort Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beaufort Road, Reigate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 10:05.

BT logo
Finishing
Thursday
Details
View Map
Share
Follow
Crampshaw Lane

BT are proposing to carry out Utility asset works on Crampshaw Lane, Ashtead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 9 Jul 2025 at 13:36.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
24 Sep and 15 Oct 2025
Details
View Map
Share
Follow
Lyons Court

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Lyons Court, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 15 Jul 2025 at 14:01.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
24 Sep and 15 Oct 2025
Details
View Map
Share
Follow
Lyons Court

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Lyons Court, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 3 Jul 2025 at 10:12.

Southern Gas Networks logo
Between
29 Sep and 7 Oct 2025
Details
View Map
Share
Follow
Slipshoe Street

Southern Gas Networks are proposing to carry out New service connection on Slipshoe Street, Reigate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 7 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 29 Jul 2025 at 15:24.

Thames Water logo
Between
29 Sep and 10 Oct 2025
Details
View Map
Share
Highlands Road

Thames Water were proposing to carry out Utility repair and maintenance works on Highlands Road, Leatherhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 10 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Jul 2025 at 07:38.

National Highways logo
Between
6 and 11 Oct 2025
Details
View Map
Share
Follow
Leatherhead Road

National Highways are proposing to carry out Works for road purposes on Leatherhead Road, Leatherhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 5 Aug 2025 at 11:11.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Lyons Court

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Lyons Court, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 11 Sep 2025 at 10:41.

Surrey County Council logo
LONG TERM
Between
6 Oct and 17 Nov 2025
Details
View Map
Share
Follow
Westcott Road

Surrey County Council are proposing to carry out Works for road purposes on Westcott Road, Dorking.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 15 Aug 2025 at 08:21.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Josephine Avenue

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Josephine Avenue, Lower Kingswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 23 Jul 2025 at 12:08.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Josephine Avenue

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Josephine Avenue, Lower Kingswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 8 Aug 2025 at 08:17.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
8 and 15 Oct 2025
Details
View Map
Share
Follow
Lyons Court

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Lyons Court, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 18 Aug 2025 at 13:10.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
9 and 15 Oct 2025
Details
View Map
Share
Follow
Lyons Court

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Lyons Court, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 2 Sep 2025 at 09:42.

Surrey County Council logo
Between
13 and 24 Oct 2025
Details
View Map
Share
Follow
Blackbrook Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Blackbrook Road, South Holmwood, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 10 Sep 2025 at 12:40.

Surrey County Council logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Woodhatch Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Woodhatch Road, Reigate.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 15 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 15 Sep 2025 at 08:44.

Southern Gas Networks logo
Between
13 and 24 Oct 2025
Details
View Map
Share
Follow
Evesham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Evesham Road, Reigate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Sep 2025 at 11:34.

Surrey County Council logo
LONG TERM
Between
14 Oct 2025 and 14 Mar 2026
Details
View Map
Share
Follow
Church Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Church Road, Reigate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 14 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 17 Jul 2025 at 14:42.

Surrey County Council logo
LONG TERM
Between
14 Oct 2025 and 14 Mar 2026
Details
View Map
Share
Follow
Shrewsbury Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Shrewsbury Road, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 14 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 17 Jul 2025 at 14:14.

Surrey County Council logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Westcott Road

Surrey County Council are proposing to carry out Works for road purposes on Westcott Road, Dorking.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 28 Aug 2025 at 08:43.

Surrey County Council logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Westcott Road

Surrey County Council were proposing to carry out Works for road purposes on Westcott Road, Dorking.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 28 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 26 Aug 2025 at 08:18.

Surrey County Council logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Westcott Road

Surrey County Council were proposing to carry out Works for road purposes on Westcott Road, Dorking.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 28 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 26 Aug 2025 at 08:14.

Southern Gas Networks logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Punchbowl Lane

Southern Gas Networks are proposing to carry out New service connection on Punchbowl Lane, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 09:35.

BT logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Chequers Lane

BT are proposing to carry out Utility asset works on Chequers Lane, Walton On The Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 18 Sep 2025 at 15:32.

BT logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Chequers Lane

BT are proposing to carry out Utility asset works on Chequers Lane, Walton On The Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 19 Aug 2025 at 11:10.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Tollgate Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Tollgate Road, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 16 Jul 2025 at 12:01.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Tollgate Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Tollgate Road, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 24 Jul 2025 at 09:32.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Tollgate Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Tollgate Road, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 11 Aug 2025 at 09:41.

National Highways logo
Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
Leatherhead Road

National Highways are proposing to carry out Works for road purposes on Leatherhead Road, Leatherhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 31 Mar 2025 at 13:56.

Southern Gas Networks logo
Between
3 and 11 Nov 2025
Details
View Map
Share
Follow
Slipshoe Street

Southern Gas Networks are proposing to carry out New service connection on Slipshoe Street, Reigate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 11 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 12:11.

Southern Gas Networks logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Punchbowl Lane

Southern Gas Networks are proposing to carry out New service connection on Punchbowl Lane, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 13:50.

Surrey County Council logo
Between
3 and 8 Nov 2025
Details
View Map
Share
Follow
Mogador Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Mogador Road, Lower Kingswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 8 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 12 Sep 2025 at 14:29.

Surrey County Council logo
Between
3 and 30 Nov 2025
Details
View Map
Share
Follow
Westcott Road

Surrey County Council are proposing to carry out Works for road purposes on Westcott Road, Dorking.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 30 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 17 Sep 2025 at 07:37.

Southern Gas Networks logo
Between
4 Nov and 2 Dec 2025
Details
View Map
Share
Follow
Slipshatch Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Slipshatch Road, Reigate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2025 and could run through until 2 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Dec 2024 at 15:24.

Thames Water logo
Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Highlands Road

Thames Water are proposing to carry out Utility repair and maintenance works on Highlands Road, Leatherhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Jul 2025 at 10:42.

BT logo
Between
19 and 21 Nov 2025
Details
View Map
Share
The Avenue

BT were proposing to carry out Utility asset works on The Avenue, Tadworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 November 2025 and run through until 21 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 4 Sep 2025 at 13:55.

UK Power Networks South Eastern logo
Between
15 and 19 Dec 2025
Details
View Map
Share
Follow
Park Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Park Lane, Ashtead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 8 Sep 2025 at 14:15.


Roadworks Map near to The Borough, BETCHWORTH, RH3 7NB (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 21 Sep 2025 22:56
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to The Borough, BETCHWORTH, RH3 7NB (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Surrey County Council logo
MAJOR
  
WELLHOUSE LANE, STROOD GREEN 
(1.0 miles)
Surrey County Council
Highway repair and maintenance works - Carriageway - Road closure
Planned
Scheduled: 1 Apr 2025 - 1 Oct 2025
1.0
Details
Share
Follow
2
Surrey County Council logo
MAJOR
  
WELLHOUSE LANE, STROOD GREEN 
(1.0 miles)
Surrey County Council
Highway repair and maintenance works - Carriageway - Road closure
Cancelled
(Scheduled: 1 Apr 2025 - 1 Oct 2025)
1.0
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.