ROADWORKS SUMMARY
Muttons Lane, PULBOROUGH, RH20 3AL
Introduction
View current and future planned roadworks and road closures for Muttons Lane, RH20 3AL and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Muttons Lane, PULBOROUGH, RH20 3AL
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Muttons Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
6 Jan 2025
West Sussex County Council are carrying out Highway repair and maintenance works on Church Hill, Pulborough.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 April 2023 at 10:30 and could run through until 6 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by West Sussex County Council on 8 Oct 2024 at 09:30.
8 Jul 2024 and 8 Jan 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Turners Mead, Storrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2024 and could run through until 8 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 12 Jun 2024 at 10:54.
29 Aug 2024 and 28 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Spierbridge Road, Storrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 August 2024 and could run through until 28 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 9 Apr 2024 at 11:53.
30 Aug 2024 and 28 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Spinney North, Pulborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 August 2024 and could run through until 28 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 14 Mar 2024 at 15:41.
30 Aug 2024 and 28 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Swan Close, Storrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 August 2024 and could run through until 28 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 14 Mar 2024 at 15:42.
4 Sep 2024 and 4 Mar 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on The Moat, Pulborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 September 2024 and could run through until 4 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 14 Mar 2024 at 15:40.
4 Sep 2024 and 4 Mar 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Moat Lane, Pulborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 September 2024 and could run through until 4 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 14 Mar 2024 at 15:39.
5 Sep 2024 and 6 Mar 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Rectory Close, Pulborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 September 2024 and could run through until 6 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 9 Apr 2024 at 11:54.
7 Sep 2024 and 8 Mar 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Link Lane, Pulborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 September 2024 and could run through until 8 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 9 Apr 2024 at 11:54.
8 Sep 2024 and 8 Mar 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on The Spinney, Pulborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2024 and could run through until 8 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 14 Mar 2024 at 15:36.
28 Sep 2024 and 28 Mar 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Rectory Close, Pulborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2024 and could run through until 28 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 14 Aug 2024 at 09:52.
29 Sep 2024 and 30 Mar 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on The Spinney, Pulborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2024 and could run through until 30 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 19 Aug 2024 at 12:13.
29 Sep 2024 and 29 Mar 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on St Marys Close, Pulborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2024 and could run through until 29 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 14 Aug 2024 at 10:05.
29 Sep 2024 and 29 Mar 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on The Moat, Pulborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2024 and could run through until 29 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 14 Aug 2024 at 10:01.
29 Sep 2024 and 29 Mar 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Spinney North, Pulborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2024 and could run through until 29 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 19 Aug 2024 at 12:01.
30 Sep 2024 and 30 Mar 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Moat Lane, Pulborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 30 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 14 Aug 2024 at 10:09.
1 Oct 2024 and 1 Apr 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Link Lane, Pulborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2024 and could run through until 1 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 19 Aug 2024 at 12:22.
19 Nov 2024 and 17 May 2025
West Sussex County Council are proposing to carry out Works for road purposes on Swallows Lane, Dial Post.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 17 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 19 Nov 2024 at 09:23.
Friday
Southern Water are carrying out Utility repair and maintenance works on Church Street, Storrington.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 November 2024 at 10:31 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 21 Nov 2024 at 11:49.
Tuesday
West Sussex County Council are carrying out Highway repair and maintenance works on Washington Road, Steyning.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 21:00 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 22 Nov 2024 at 16:01.
Tuesday
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Steyning Bypass, Steyning.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 2 Sep 2024 at 15:21.
Tuesday
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Steyning Bypass, Steyning.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 9 Sep 2024 at 11:40.
Tuesday
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Washington Road, Steyning.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 3 Sep 2024 at 14:53.
Tuesday
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Steyning Road, Wiston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 3 Sep 2024 at 08:35.
Tuesday
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Steyning Road, Wiston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 9 Sep 2024 at 11:41.
2 and 6 Dec 2024
Virgin Media are proposing to carry out Remedial works on Elm Grove Lane, Steyning.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Virgin Media on 1 Oct 2024 at 14:17.
2 and 6 Dec 2024
Virgin Media were proposing to carry out Remedial works on Elm Grove Lane, Steyning.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Virgin Media on 30 Sep 2024 at 08:55.
2 and 6 Dec 2024
Virgin Media were proposing to carry out Remedial works on Elm Grove Lane, Steyning.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Virgin Media on 12 Sep 2024 at 14:57.
2 and 6 Dec 2024
Virgin Media were proposing to carry out Remedial works on Elm Grove Lane, Steyning.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Virgin Media on 5 Sep 2024 at 14:07.
5 and 9 Dec 2024
West Sussex County Council were proposing to carry out Highway repair and maintenance works on Steyning Road, Wiston.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 December 2024 and run through until 9 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 11 Oct 2024 at 09:32.
5 and 9 Dec 2024
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Steyning Road, Wiston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 9 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 09:15.
9 and 13 Dec 2024
Virgin Media were proposing to carry out Remedial works on Castle Lane, Bramber.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 5 Sep 2024 at 14:05.
9 and 13 Dec 2024
Virgin Media were proposing to carry out Remedial works on Castle Lane, Bramber.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 12 Sep 2024 at 14:54.
9 and 13 Dec 2024
Virgin Media were proposing to carry out Remedial works on Castle Lane, Bramber.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Virgin Media on 30 Sep 2024 at 08:54.
9 and 13 Dec 2024
Virgin Media are proposing to carry out Remedial works on Castle Lane, Bramber.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Virgin Media on 1 Oct 2024 at 14:15.
19 and 21 Dec 2024
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Steyning Road, Wiston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 29 Oct 2024 at 09:09.
7 and 24 Jan 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Castle Lane, Bramber.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 January 2025 and run through until 24 January 2025. The works were due to impact the verge only.
This roadwork event was last updated by Southern Water on 12 Nov 2024 at 09:34.
7 and 9 Jan 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Castle Lane, Bramber.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the verge only.
This roadwork event was last updated by Southern Water on 19 Nov 2024 at 15:04.
13 and 21 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Old Mill Drive, Storrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 15:30.
14 and 16 Jan 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Crays Lane, Thakeham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the verge only.
This roadwork event was last updated by Southern Water on 12 Nov 2024 at 12:31.
14 and 16 Jan 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Crays Lane, Thakeham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the verge only.
This roadwork event was last updated by Southern Water on 10 Nov 2024 at 12:54.
20 and 28 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Old Mill Drive, Storrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 14:36.
20 and 24 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Broadford Bridge Road, West Chiltington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 15 Oct 2024 at 12:02.
20 and 24 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Broadford Bridge Road, West Chiltington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 12 Oct 2024 at 17:56.
3 and 5 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Haglands Lane, West Chiltington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 19 Nov 2024 at 12:40.
Roadworks Map near to Muttons Lane, PULBOROUGH, RH20 3AL
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Muttons Lane, PULBOROUGH, RH20 3AL (1 Events)
(Scheduled Dates)
(miles)
(Scheduled: 22 Nov 2024 - 26 Nov 2024)
Contains public sector information licensed under the Open Government Licence v3.0.