ROADWORKS SUMMARY
High Street, EAST GRINSTEAD, RH19 3DD
Introduction
View current and future planned roadworks and road closures for High Street, RH19 3DD and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to High Street, EAST GRINSTEAD, RH19 3DD
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for High Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
Tomorrow
UK Power Networks South Eastern are carrying out Utility asset works on Vicarage Road, Lingfield.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 September 2024 at 12:35 and could run through until 22 November 2024. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks South Eastern on 19 Nov 2024 at 13:11.
30 Sep and 29 Nov 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Street, Dormansland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 10 Jul 2024 at 11:27.
6 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on West Street, Dormansland.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 October 2024 at 10:30 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 11:09.
20 Dec 2024
Surrey County Council are carrying out Highway repair and maintenance works on Effingham Road, Copthorne.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 October 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 17 Oct 2024 at 11:53.
14 Oct and 20 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Effingham Road, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 12 Aug 2024 at 07:09.
11 Nov and 6 Dec 2024
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Newhache, Dormansland.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 6 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 13 Sep 2024 at 09:49.
Monday
Energy Assets Networks (formerly Utility Distribution Networks) were proposing to carry out New service connection on London Road, East Grinstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 25 November 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 7 Oct 2024 at 10:31.
Monday
Energy Assets Networks (formerly Utility Distribution Networks) were proposing to carry out New service connection on Beeching Way, East Grinstead.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 25 November 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 7 Oct 2024 at 10:33.
18 Nov and 6 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crawley Down Road, Felbridge.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 09:23.
18 Nov and 13 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kinnibrugh Drive, Dormansland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 18 Sep 2024 at 11:39.
18 and 29 Nov 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on East Hill Lane, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 13 Nov 2024 at 07:40.
18 and 29 Nov 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on East Hill Lane, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 31 Oct 2024 at 08:58.
18 and 30 Nov 2024
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Hartfield Road, Forest Row.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 14 Aug 2024 at 09:14.
Tuesday
Southern Gas Networks are carrying out Utility repair and maintenance works on Crawley Down Road, Felbridge.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 10:00 and could run through until 26 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 14:42.
Tuesday
UK Power Networks South Eastern are proposing to carry out New service connection on Cat Street, Hartfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2024 and could run through until 26 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 10 Sep 2024 at 11:32.
Wednesday
South East Water are proposing to carry out New service connection on Horsted Lane, Sharpthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 4 Nov 2024 at 14:45.
25 Nov and 23 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hollow Lane, Dormansland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 08:14.
25 Nov and 23 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dormans Road, Dormansland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 07:12.
Wednesday
South East Water are proposing to carry out New service connection on Horsted Lane, Sharpthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 14 Oct 2024 at 10:19.
Wednesday
South East Water are proposing to carry out New service connection on Horsted Lane, Sharpthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 18 Nov 2024 at 09:25.
25 and 29 Nov 2024
UK Power Networks South Eastern are proposing to carry out New service connection on East Street, Turners Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 16 Oct 2024 at 11:18.
25 and 29 Nov 2024
UK Power Networks South Eastern are proposing to carry out New service connection on East Street, Turners Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 21 Nov 2024 at 14:18.
2 and 17 Dec 2024
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Hindleap Lane, Forest Row.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 11 Oct 2024 at 09:53.
2 and 23 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Newhache, Dormansland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 07:10.
2 and 23 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kinnibrugh Drive, Dormansland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 08:16.
2 and 20 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crawley Down Road, Felbridge.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 11:34.
2 and 17 Dec 2024
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Hindleap Lane, Forest Row.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 10 Sep 2024 at 10:50.
3 and 6 Dec 2024
UK Power Networks South Eastern are proposing to carry out New service connection on Cansiron Lane, Ashurst Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 6 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 7 Oct 2024 at 10:28.
3 and 6 Dec 2024
UK Power Networks South Eastern are proposing to carry out New service connection on Cansiron Lane, Ashurst Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 6 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 1 Oct 2024 at 11:09.
9 and 20 Dec 2024
West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, East Grinstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 26 Sep 2024 at 12:13.
9 and 21 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on East Grinstead Road, Lingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 2 Oct 2024 at 07:06.
9 and 13 Dec 2024
UK Power Networks South Eastern are proposing to carry out New service connection on Cat Street, Hartfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 1 Oct 2024 at 16:35.
9 and 17 Dec 2024
West Sussex County Council are proposing to carry out Highway improvement works on Wallage Lane, Rowfant.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 14:37.
9 and 16 Dec 2024
West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, East Grinstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 26 Sep 2024 at 11:40.
9 and 21 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Felcourt Road, Lingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 11 Sep 2024 at 11:51.
9 and 21 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Felcourt Road, Lingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 2 Oct 2024 at 07:05.
9 and 21 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Blackberry Lane, Lingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 11 Sep 2024 at 11:51.
9 and 21 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Blackberry Lane, Lingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 2 Oct 2024 at 07:05.
9 and 21 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on East Grinstead Road, Lingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 11 Sep 2024 at 11:51.
16 and 20 Dec 2024
UK Power Networks South Eastern are proposing to carry out New service connection on Cat Street, Hartfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 31 Oct 2024 at 12:45.
6 Jan and 28 Feb 2025
West Sussex County Council are proposing to carry out Highway improvement works on De La Warr Road, East Grinstead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 16 May 2024 at 08:32.
6 Jan and 28 Feb 2025
West Sussex County Council are proposing to carry out Highway improvement works on Church Lane, East Grinstead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 16 May 2024 at 07:26.
6 and 17 Jan 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Hartfield Road, Forest Row.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 2 Oct 2024 at 09:29.
21 and 23 Jan 2025
South East Water are proposing to carry out New service connection on Priory Road, Forest Row.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 9 Oct 2024 at 12:15.
21 and 23 Jan 2025
South East Water are proposing to carry out Remedial works on Priory Road, Forest Row.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 31 Oct 2024 at 10:44.
27 Jan and 8 Feb 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Hartfield Road, Forest Row.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 8 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 11 Oct 2024 at 10:06.
31 Jan and 22 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Turners Hill Road, Crawley Down.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 22 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 17 Oct 2024 at 08:18.
3 Feb and 21 Mar 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Harts Lane, Hartfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 11 Oct 2024 at 09:34.
4 and 6 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on East Park Lane, Newchapel, Lingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 19 Nov 2024 at 09:04.
5 and 11 Feb 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Blackberry Lane, Lingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 19 Nov 2024 at 08:42.
5 and 10 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Lingfield Road, East Grinstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 8 Nov 2024 at 11:30.
10 and 11 Feb 2025
BT are proposing to carry out Utility asset works on Vowels Lane, West Hoathly.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 11 February 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 12 Nov 2024 at 13:20.
17 and 21 Feb 2025
West Sussex County Council are proposing to carry out Highway improvement works on North Lane, West Hoathly.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 25 Oct 2024 at 11:20.
17 Feb and 7 Mar 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Crawley Down Road, Felbridge.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 7 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 24 Sep 2024 at 13:04.
Roadworks Map near to High Street, EAST GRINSTEAD, RH19 3DD
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to High Street, EAST GRINSTEAD, RH19 3DD (22 Events)
(Scheduled Dates)
(miles)
(Scheduled: 18 Nov 2024 - 22 Nov 2024)
(Scheduled: 21 Nov 2024 - 25 Nov 2024)
Contains public sector information licensed under the Open Government Licence v3.0.