ROADWORKS SUMMARY
Warren Close, EAST GRINSTEAD, RH19 2PR
Introduction
View current and future planned roadworks and road closures for Warren Close, RH19 2PR and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Warren Close, EAST GRINSTEAD, RH19 2PR
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Warren Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
14 Aug 2024 and 15 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Redehall Road, Smallfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 August 2024 and could run through until 15 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 13 May 2024 at 05:52.
14 Aug 2024 and 15 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Wheelers Lane, Smallfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 August 2024 and could run through until 15 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 13 May 2024 at 05:53.
Monday
Southern Gas Networks are carrying out Utility repair and maintenance works on West Street, Dormansland.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 October 2024 at 10:30 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 11:57.
Friday
Surrey County Council are carrying out Highway repair and maintenance works on Effingham Road, Copthorne.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 October 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 17 Oct 2024 at 11:53.
Friday
Surrey County Council are proposing to carry out Highway repair and maintenance works on Effingham Road, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 12 Aug 2024 at 07:09.
Monday
Southern Gas Networks are carrying out Utility repair and maintenance works on Dormans Road, Dormansland.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 November 2024 at 14:30 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 29 Nov 2024 at 15:12.
Friday
West Sussex County Council are carrying out Highway improvement works on Antlands Lane, Tinsley Green, Crawley.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 November 2024 at 12:46 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 13 Dec 2024 at 09:20.
Monday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kinnibrugh Drive, Dormansland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 08:16.
Monday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Newhache, Dormansland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 07:10.
Friday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crawley Down Road, Felbridge.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 11:34.
Monday
Surrey County Council are carrying out Highway repair and maintenance works on Blackberry Lane, Lingfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 December 2024 at 09:00 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 10 Dec 2024 at 09:06.
Saturday
Surrey County Council are proposing to carry out Highway repair and maintenance works on East Grinstead Road, Lingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 11 Sep 2024 at 11:51.
Saturday
Surrey County Council are proposing to carry out Highway repair and maintenance works on Blackberry Lane, Lingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 11 Sep 2024 at 11:51.
Monday
Surrey County Council are carrying out Highway repair and maintenance works on Felcourt Road, Lingfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 December 2024 at 09:00 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 10 Dec 2024 at 09:06.
Saturday
Surrey County Council are proposing to carry out Highway repair and maintenance works on Felcourt Road, Lingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 11 Sep 2024 at 11:51.
Monday
Surrey County Council are carrying out Highway repair and maintenance works on East Grinstead Road, Lingfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 December 2024 at 09:00 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 10 Dec 2024 at 09:05.
Friday
West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, East Grinstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 26 Sep 2024 at 12:13.
Monday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hollow Lane, Dormansland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 6 Dec 2024 at 08:39.
Tomorrow
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Balcombe Road, Tinsley Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 28 Nov 2024 at 08:53.
6 and 27 Jan 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, Langley Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 31 Oct 2024 at 13:46.
6 and 10 Jan 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Whitewood Lane, South Godstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 16 Oct 2024 at 08:53.
6 and 10 Jan 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Whitewood Lane, South Godstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 15 Oct 2024 at 11:43.
7 and 30 Jan 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, Langley Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 10 Dec 2024 at 12:35.
11 and 13 Jan 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Crawley Avenue Roundabout, Pound Hill, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 5 Dec 2024 at 15:48.
11 and 13 Jan 2025
National Highways were proposing to carry out Highway repair and maintenance works on Crawley Avenue Roundabout, Pound Hill, Crawley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 January 2025 and run through until 13 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by National Highways on 6 Dec 2024 at 11:25.
11 and 13 Jan 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Crawley Avenue Roundabout, Pound Hill, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 5 Dec 2024 at 15:41.
11 and 13 Jan 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Crawley Avenue, Three Bridges, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 5 Dec 2024 at 15:45.
13 and 27 Jan 2025
Surrey County Council were proposing to carry out Highway improvement works on Redehall Road, Smallfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 18 Oct 2024 at 07:38.
13 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Lane, Copthorne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 13:00.
13 and 16 Jan 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Snow Hill, Crawley Down.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 17 Dec 2024 at 14:56.
15 and 21 Jan 2025
Ses Water (formerly Sutton & East Surrey Water Company) were proposing to carry out Utility asset works on Church Road, Burstow, Smallfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 January 2025 and run through until 21 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 6 Nov 2024 at 08:35.
15 and 20 Jan 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Antlands Lane, Tinsley Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 4 Nov 2024 at 10:48.
15 and 20 Jan 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Antlands Lane, Tinsley Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 29 Oct 2024 at 13:20.
21 and 23 Jan 2025
South East Water are proposing to carry out New service connection on Priory Road, Forest Row.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 9 Oct 2024 at 12:15.
21 and 23 Jan 2025
South East Water are proposing to carry out New service connection on Priory Road, Forest Row.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 10 Dec 2024 at 12:40.
21 and 23 Jan 2025
South East Water are proposing to carry out Remedial works on Priory Road, Forest Row.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 31 Oct 2024 at 10:44.
25 Jan and 8 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Balcombe Road, Tinsley Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 January 2025 and could run through until 8 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 15 Oct 2024 at 11:07.
27 Jan and 7 Feb 2025
Surrey County Council are proposing to carry out Highway improvement works on Redehall Road, Smallfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 12 Dec 2024 at 15:22.
27 Jan and 7 Feb 2025
Surrey County Council are proposing to carry out Highway improvement works on Redehall Road, Smallfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 31 Oct 2024 at 08:59.
27 Jan and 12 Apr 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Shipley Bridge Lane, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 12 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 8 Nov 2024 at 14:34.
29 Jan and 13 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, Langley Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 17 Dec 2024 at 14:54.
29 Jan and 7 Mar 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, Langley Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 15 Nov 2024 at 10:09.
31 Jan and 22 Feb 2025
West Sussex County Council were proposing to carry out Highway repair and maintenance works on Turners Hill Road, Crawley Down.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 January 2025 and run through until 22 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 27 Nov 2024 at 12:57.
31 Jan and 22 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Turners Hill Road, Crawley Down.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 22 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 27 Nov 2024 at 12:54.
31 Jan and 22 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Turners Hill Road, Crawley Down.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 22 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 27 Nov 2024 at 14:37.
3 and 21 Feb 2025
West Sussex County Council are proposing to carry out Highway improvement works on Copthorne Way Roundabout, Copthorne.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 5 Dec 2024 at 11:56.
3 and 21 Feb 2025
West Sussex County Council are proposing to carry out Highway improvement works on Dukes Head Roundabout, Copthorne.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 11 Dec 2024 at 12:36.
3 and 7 Feb 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Church Road, Burstow, Smallfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 12 Nov 2024 at 11:29.
3 and 7 Feb 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Church Road, Burstow, Smallfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 11 Dec 2024 at 07:40.
3 and 21 Feb 2025
West Sussex County Council are proposing to carry out Highway improvement works on Copthorne Common, Copthorne.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 11 Dec 2024 at 12:09.
3 and 21 Feb 2025
West Sussex County Council are proposing to carry out Highway improvement works on Copthorne Way, Copthorne.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 5 Dec 2024 at 11:23.
4 and 6 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on East Park Lane, Newchapel, Lingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 26 Nov 2024 at 14:46.
4 and 6 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on East Park Lane, Newchapel, Lingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 12:20.
5 and 10 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Lingfield Road, East Grinstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 8 Nov 2024 at 11:30.
5 and 11 Feb 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Blackberry Lane, Lingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 19 Nov 2024 at 08:42.
5 and 11 Feb 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Blackberry Lane, Lingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 11 Dec 2024 at 13:19.
6 Feb and 12 Apr 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Tinsley Lane, Three Bridges, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 12 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 20 Nov 2024 at 15:54.
10 and 11 Feb 2025
BT are proposing to carry out Utility asset works on Vowels Lane, West Hoathly.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 11 February 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 12 Nov 2024 at 13:20.
13 and 28 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Gatwick Road, Northgate, Crawley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 11 Dec 2024 at 14:36.
17 Feb and 7 Mar 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Crawley Down Road, Felbridge.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 7 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 24 Sep 2024 at 13:04.
17 and 21 Feb 2025
West Sussex County Council are proposing to carry out Highway improvement works on North Lane, West Hoathly.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 25 Oct 2024 at 11:20.
17 Feb and 21 Mar 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Balcombe Road, Tinsley Green, Crawley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 6 Dec 2024 at 10:14.
17 Feb and 21 Mar 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Balcombe Road, Tinsley Green, Crawley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 6 Dec 2024 at 11:29.
24 and 26 Feb 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on East Hill Lane, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 12 Dec 2024 at 09:03.
24 and 27 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Dukes Head Roundabout, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 27 Nov 2024 at 13:04.
24 and 27 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Dukes Head Roundabout, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 27 Nov 2024 at 14:36.
24 Feb and 7 Mar 2025
West Sussex County Council were proposing to carry out Highway improvement works on Vicarage Walk, East Grinstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 7 March 2025. The works were due to impact the footway and footpath.
This roadwork event was last updated by West Sussex County Council on 27 Nov 2024 at 16:00.
24 Feb and 7 Mar 2025
West Sussex County Council are proposing to carry out Highway improvement works on Vicarage Walk, East Grinstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway and footpath.
This roadwork event was last updated by West Sussex County Council on 13 Dec 2024 at 10:39.
24 and 27 Feb 2025
West Sussex County Council were proposing to carry out Highway repair and maintenance works on Dukes Head Roundabout, Copthorne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 27 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 27 Nov 2024 at 13:33.
25 and 27 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, East Grinstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 28 Nov 2024 at 08:23.
1 Mar and 8 Apr 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Crawley Avenue Access Westbound, Pound Hill, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2025 and could run through until 8 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 11 Dec 2024 at 14:11.
3 and 7 Mar 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Broadbridge Lane, Smallfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 12 Dec 2024 at 09:08.
3 and 5 Mar 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Saxbys Lane, Lingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 5 Dec 2024 at 13:29.
4 and 11 Mar 2025
West Sussex County Council are proposing to carry out Highway improvement works on Beeching Way, East Grinstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 12 Dec 2024 at 09:30.
6 and 24 Mar 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, Langley Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 March 2025 and could run through until 24 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 10 Dec 2024 at 12:54.
10 and 12 Mar 2025
West Sussex County Council were proposing to carry out Highway repair and maintenance works on Holtye Road, East Grinstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 12 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 5 Dec 2024 at 14:09.
11 and 13 Mar 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Holtye Road, East Grinstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 9 Dec 2024 at 14:24.
17 and 28 Mar 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Priory Road, Forest Row.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 17 Dec 2024 at 14:27.
Roadworks Map near to Warren Close, EAST GRINSTEAD, RH19 2PR
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Warren Close, EAST GRINSTEAD, RH19 2PR (7 Events)