ROADWORKS SUMMARY
Haywards Heath Road, HAYWARDS HEATH, RH17 6NF
Introduction
View current and future planned roadworks and road closures for Haywards Heath Road, RH17 6NF and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Haywards Heath Road, HAYWARDS HEATH, RH17 6NF
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Haywards Heath Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
19 Feb 2024 and 18 Feb 2029
West Sussex County Council are proposing to carry out Highway repair and maintenance works on The Boulevard, Northgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2024 and could run through until 18 February 2029. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 19 Feb 2024 at 12:37.
5 Jan 2026 and 29 Feb 2028
West Sussex County Council are proposing to carry out Highway improvement works on Haslett Avenue West, Northgate, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 January 2026 and could run through until 29 February 2028. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 3 Oct 2025 at 16:30.
1 Apr 2026 and 31 Mar 2027
West Sussex County Council are proposing to carry out Highway improvement works on Wakehams Green Drive, Pound Hill, Crawley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2026 and could run through until 31 March 2027. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 23 Oct 2025 at 16:30.
1 Apr 2026 and 10 Sep 2027
West Sussex County Council are proposing to carry out Highway improvement works on Old Hollow, Copthorne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2026 and could run through until 10 September 2027. The works will impact the carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 3 Oct 2025 at 12:38.
1 Apr 2026 and 31 Mar 2027
West Sussex County Council are proposing to carry out Highway improvement works on Top Road, Sharpthorne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2026 and could run through until 31 March 2027. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 23 Oct 2025 at 16:30.
1 Apr 2026 and 31 Mar 2027
West Sussex County Council are proposing to carry out Highway improvement works on The Hollow, West Hoathly.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2026 and could run through until 31 March 2027. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 23 Oct 2025 at 16:30.
1 Apr 2026 and 31 Mar 2027
West Sussex County Council are proposing to carry out Highway improvement works on Northlands Avenue, Haywards Heath.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2026 and could run through until 31 March 2027. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 23 Oct 2025 at 16:30.
5 Jun and 2 Nov 2026
West Sussex County Council are proposing to carry out Diversionary works on Selsfield Road, Ardingly.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2026 and could run through until 2 November 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 6 Jan 2026 at 13:24.
13 Jul and 30 Oct 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Three Bridges Road, Three Bridges, Crawley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 July 2026 and could run through until 30 October 2026. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 22 Jan 2026 at 15:05.
27 Jul and 18 Sep 2026
West Sussex County Council are proposing to carry out roadworks on Market Place, Haywards Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 July 2026 and could run through until 18 September 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 26 Feb 2026 at 16:30.
11 Dec 2026
South East Water are carrying out Utility asset works on Farlington Avenue, Haywards Heath.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 July 2026 at 07:00 and could run through until 11 December 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South East Water on 3 Sep 2026 at 14:18.
24 Aug 2026 and 30 Apr 2027
West Sussex County Council are proposing to carry out roadworks on London Lane, Cuckfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2026 and could run through until 30 April 2027. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 26 Aug 2026 at 16:23.
7 Sep and 2 Oct 2026
South East Water are proposing to carry out Utility asset works on Heath Road, Haywards Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by South East Water on 10 Jun 2026 at 11:55.
9 Oct 2026
West Sussex County Council are carrying out Highway improvement works on Turners Hill Road, Pound Hill, Crawley.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 09:00 and could run through until 9 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 14 Sep 2026 at 09:08.
Thursday
West Sussex County Council are carrying out Highway improvement works on Turners Hill Road, Pound Hill, Crawley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2026 at 20:00 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 16 Sep 2026 at 08:03.
16 Sep and 11 Nov 2026
West Sussex County Council are proposing to carry out roadworks on Turners Hill Road, Turners Hill.
These works are categorised as Major.
The works will start on or after 16 September 2026 and could run through until 11 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by West Sussex County Council on 13 Aug 2026 at 14:21.
South East Water carried out Utility repair and maintenance works on Park Lane, Lindfield.
The road was closed for some or all of the period.
The works were originally planned between 17 Sep 2026 and 21 Sep 2026 and were actually completed between 17 Sep 2026 (20:00) and 18 Sep 2026 (05:51). The works impacted the carriageway only.
This roadwork event was last updated by South East Water on 18 Sep 2026 at 08:31.
18 Sep and 5 Oct 2026
National Highways are proposing to carry out Highway repair and maintenance works on Brighton Road, Tilgate, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2026 and could run through until 5 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 15 Sep 2026 at 14:08.
18 Sep and 5 Oct 2026
National Highways are proposing to carry out Highway repair and maintenance works on Brighton Road, Tilgate, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2026 and could run through until 5 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 18 Sep 2026 at 12:15.
18 Sep and 5 Oct 2026
National Highways are proposing to carry out Highway repair and maintenance works on Crawley S/western Bypass Eastbound, Broadfield, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2026 and could run through until 5 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 15 Sep 2026 at 14:13.
18 Sep and 5 Oct 2026
National Highways are proposing to carry out Highway repair and maintenance works on Brighton Road, Pease Pottage.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2026 and could run through until 5 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 18 Sep 2026 at 11:37.
18 Sep and 5 Oct 2026
National Highways are proposing to carry out Highway repair and maintenance works on Brighton Road, Pease Pottage.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2026 and could run through until 5 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 25 Aug 2026 at 08:25.
18 Sep and 5 Oct 2026
National Highways are proposing to carry out Highway repair and maintenance works on Crawley S/western Bypass Eastbound, Broadfield, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2026 and could run through until 5 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 18 Sep 2026 at 12:16.
21 Sep and 21 Oct 2026
South East Water are proposing to carry out Utility asset works on The Broadway, Haywards Heath.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 21 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by South East Water on 2 Sep 2026 at 15:37.
Wednesday
Southern Water are proposing to carry out Utility repair and maintenance works on Grouse Road, Colgate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the verge only.
This roadwork event was last updated by Southern Water on 6 Aug 2026 at 09:42.
21 Sep and 16 Oct 2026
South East Water are proposing to carry out Utility asset works on Heath Road, Haywards Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by South East Water on 14 Sep 2026 at 14:27.
21 Sep and 30 Oct 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodfield Road, Northgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Sep 2026 at 09:19.
21 Sep and 9 Oct 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Northgate Avenue, Northgate, Crawley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 9 October 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 15 Sep 2026 at 09:18.
Wednesday
West Sussex County Council are proposing to carry out Highway improvement works on Tylers Green, Cuckfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 28 Jul 2026 at 14:51.
21 Sep 2026 and 19 Mar 2027
South East Water are proposing to carry out Utility asset works on Perrymount Road, Haywards Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 19 March 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by South East Water on 26 Aug 2026 at 15:26.
29 Sep 2026
West Sussex County Council are proposing to carry out Highway improvement works on Southgate Drive, Southgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 29 September 2026 and are due to last for only one day. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 3 Sep 2026 at 15:18.
29 Sep 2026
West Sussex County Council are proposing to carry out Highway improvement works on Southgate Drive, Southgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 29 September 2026 and are due to last for only one day. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 7 Sep 2026 at 11:58.
29 Sep and 1 Oct 2026
West Sussex County Council are proposing to carry out Highway improvement works on Brighton Road, Pease Pottage.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 14 Sep 2026 at 10:42.
30 Sep and 3 Oct 2026
West Sussex County Council are proposing to carry out Highway improvement works on Northlands Avenue, Haywards Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 28 Aug 2026 at 10:42.
30 Sep and 3 Oct 2026
West Sussex County Council are proposing to carry out Highway improvement works on Market Place, Haywards Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 12 May 2026 at 08:32.
30 Sep and 8 Oct 2026
National Highways are proposing to carry out Works for road purposes on London Road, Bolney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2026 and could run through until 8 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 13 Jul 2026 at 09:34.
30 Sep and 2 Oct 2026
UK Power Networks South Eastern are proposing to carry out Remedial works on Mill Green Road, Haywards Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 16 Sep 2026 at 14:12.
30 Sep and 3 Oct 2026
West Sussex County Council are proposing to carry out Highway improvement works on Northlands Avenue, Haywards Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 25 Aug 2026 at 11:14.
30 Sep and 3 Oct 2026
West Sussex County Council are proposing to carry out Highway improvement works on Milton Road, Haywards Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 13 May 2026 at 08:17.
30 Sep and 3 Oct 2026
West Sussex County Council are proposing to carry out Highway improvement works on Boltro Road, Haywards Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 12 May 2026 at 09:17.
30 Sep and 2 Oct 2026
UK Power Networks South Eastern are proposing to carry out Remedial works on Mill Green Road, Haywards Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 16 Sep 2026 at 14:31.
1 and 3 Oct 2026
West Sussex County Council are proposing to carry out Highway improvement works on Southgate Roundabout, Southgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2026 and could run through until 3 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 7 Sep 2026 at 09:30.
1 and 3 Oct 2026
West Sussex County Council are proposing to carry out Highway improvement works on Southgate Roundabout, Southgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2026 and could run through until 3 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 1 Sep 2026 at 10:48.
1 and 3 Oct 2026
West Sussex County Council are proposing to carry out Highway improvement works on Brighton Road, Broadfield, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2026 and could run through until 3 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 8 Sep 2026 at 08:22.
1 and 3 Oct 2026
West Sussex County Council are proposing to carry out Highway improvement works on Brighton Road, Broadfield, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2026 and could run through until 3 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 7 Sep 2026 at 09:29.
1 and 3 Oct 2026
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Paddockhurst Road, Balcombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2026 and could run through until 3 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 17 Sep 2026 at 13:47.
2 and 16 Oct 2026
West Sussex County Council were proposing to carry out Section 50 on Boltro Road, Haywards Heath.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 October 2026 and run through until 16 October 2026. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 26 Aug 2026 at 11:44.
5 and 6 Oct 2026
West Sussex County Council are proposing to carry out Highway improvement works on Staplefield Road, Cuckfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 6 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 20 Aug 2026 at 14:39.
5 and 16 Oct 2026
West Sussex County Council are proposing to carry out Section 50 on Oaklands Road, Haywards Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 16 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 7 Sep 2026 at 15:08.
5 and 9 Oct 2026
West Sussex County Council were proposing to carry out Section 50 on Market Place, Haywards Heath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 October 2026 and run through until 9 October 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by West Sussex County Council on 28 Aug 2026 at 10:15.
5 and 9 Oct 2026
West Sussex County Council were proposing to carry out Section 50 on Market Place, Haywards Heath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 October 2026 and run through until 9 October 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by West Sussex County Council on 28 Aug 2026 at 13:25.
5 and 30 Oct 2026
West Sussex County Council are proposing to carry out Highway improvement works on Bowers Place, Crawley Down.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 30 October 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 11 Aug 2026 at 10:52.
7 Oct 2026
West Sussex County Council were proposing to carry out Highway improvement works on Wallage Lane, Rowfant.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were scheduled for 7 October 2026 The works were due to impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 9 Sep 2026 at 09:32.
7 and 9 Oct 2026
South East Water are proposing to carry out Utility repair and maintenance works on Old Hollow, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2026 and could run through until 9 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 23 Jul 2026 at 08:32.
8 Oct 2026
West Sussex County Council are proposing to carry out Highway improvement works on Penland Road, Haywards Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 8 October 2026 and are due to last for only one day. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 3 Sep 2026 at 15:13.
8 Oct 2026
West Sussex County Council are proposing to carry out Highway improvement works on Penland Road, Haywards Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 8 October 2026 and are due to last for only one day. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 9 Sep 2026 at 15:12.
12 and 16 Oct 2026
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Netherwood, Gossops Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 11 Aug 2026 at 11:06.
12 and 16 Oct 2026
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Rosedale Close, Gossops Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 11 Aug 2026 at 11:08.
12 and 15 Oct 2026
West Sussex County Council are proposing to carry out Highway improvement works on Warninglid Lane, Warninglid.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 15 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 26 Aug 2026 at 12:27.
12 and 15 Oct 2026
West Sussex County Council are proposing to carry out Highway improvement works on Warninglid Lane, Warninglid.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 15 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 14 Sep 2026 at 10:41.
13 and 17 Oct 2026
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Woburn Road, Gossops Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2026 and could run through until 17 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 12 Aug 2026 at 10:23.
14 and 18 Oct 2026
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Wenlock Close, Gossops Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2026 and could run through until 18 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 11 Aug 2026 at 11:17.
14 and 16 Oct 2026
West Sussex County Council are proposing to carry out Highway improvement works on Haslett Avenue East Westbound, Three Bridges, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 19 Aug 2026 at 10:09.
15 and 19 Oct 2026
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Kingscote Hill, Gossops Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 12 Aug 2026 at 10:38.
15 and 19 Oct 2026
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Chatfields, Gossops Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 11 Aug 2026 at 11:23.
17 and 21 Oct 2026
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Albany Road, West Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 October 2026 and could run through until 21 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 12 Aug 2026 at 09:36.
19 and 21 Oct 2026
South East Water are proposing to carry out New service connection on Lion Lane, Turners Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 21 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 5 Aug 2026 at 15:50.
19 Oct and 6 Nov 2026
Southern Water are proposing to carry out Utility repair and maintenance works on Kilnmead, Northgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 6 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 14 Sep 2026 at 10:57.
19 Oct and 6 Nov 2026
Southern Water are proposing to carry out Utility repair and maintenance works on Kilnmead, Northgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 6 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 5 Aug 2026 at 11:33.
19 Oct and 20 Nov 2026
South East Water are proposing to carry out Utility repair and maintenance works on America Lane, Haywards Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by South East Water on 11 Aug 2026 at 09:14.
19 Oct and 20 Nov 2026
South East Water are proposing to carry out Utility repair and maintenance works on America Lane, Haywards Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by South East Water on 17 Sep 2026 at 09:41.
22 and 24 Oct 2026
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Lewes Road, Lindfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2026 and could run through until 24 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 15 Sep 2026 at 12:24.
26 and 29 Oct 2026
West Sussex County Council are proposing to carry out Highway improvement works on North Road, Three Bridges, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 29 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 2 Jul 2026 at 10:01.
26 and 29 Oct 2026
West Sussex County Council are proposing to carry out Highway improvement works on Forge Road, Three Bridges, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 29 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 24 Jun 2026 at 07:46.
26 and 29 Oct 2026
West Sussex County Council are proposing to carry out Highway improvement works on Crossways, Three Bridges, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 29 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 2 Jul 2026 at 10:01.
27 and 29 Oct 2026
West Sussex County Council are proposing to carry out Highway improvement works on Staplefield Road, Cuckfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2026 and could run through until 29 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 25 Aug 2026 at 10:59.
30 Oct and 9 Nov 2026
West Sussex County Council are proposing to carry out Highway improvement works on Hazelwick Avenue Northbound, Three Bridges, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2026 and could run through until 9 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 17 Apr 2026 at 09:40.
30 Oct and 9 Nov 2026
West Sussex County Council are proposing to carry out Highway improvement works on North Road, Three Bridges, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2026 and could run through until 9 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 17 Apr 2026 at 09:38.
30 Oct and 9 Nov 2026
West Sussex County Council are proposing to carry out Highway improvement works on Bycroft Way, Three Bridges, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2026 and could run through until 9 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 19 Mar 2026 at 14:37.
30 Oct and 9 Nov 2026
West Sussex County Council are proposing to carry out Highway improvement works on Hazelwick Avenue, Three Bridges, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2026 and could run through until 9 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 13 May 2026 at 14:11.
2 and 20 Nov 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Haslett Avenue East, Three Bridges, Crawley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 20 November 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 22 Jan 2026 at 15:05.
9 and 11 Nov 2026
South East Water are proposing to carry out Utility repair and maintenance works on Brantridge Lane, Balcombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 11 November 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 10 Sep 2026 at 08:01.
9 and 11 Nov 2026
South East Water were proposing to carry out Utility repair and maintenance works on Redbridge Lane, Balcombe.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 November 2026 and run through until 11 November 2026. The works were due to impact the carriageway and verge.
This roadwork event was last updated by South East Water on 10 Sep 2026 at 09:17.
9 Nov and 4 Dec 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crossways, Three Bridges, Crawley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 4 December 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 17 Aug 2026 at 11:20.
16 Nov 2026
West Sussex County Council are proposing to carry out Highway improvement works on Wallage Lane, Rowfant.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 16 November 2026 and are due to last for only one day. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 10 Sep 2026 at 15:47.
16 Nov 2026
West Sussex County Council are proposing to carry out Highway improvement works on Wallage Lane, Rowfant.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 16 November 2026 and are due to last for only one day. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 10 Sep 2026 at 13:12.
16 and 20 Nov 2026
West Sussex County Council are proposing to carry out Section 50 on Market Place, Haywards Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by West Sussex County Council on 2 Sep 2026 at 10:29.
17 Nov 2026 and 11 Mar 2027
South East Water are proposing to carry out Utility asset works on Oathall Road, Haywards Heath.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2026 and could run through until 11 March 2027. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 2 Sep 2026 at 15:42.
17 Nov 2026 and 11 Mar 2027
South East Water are proposing to carry out Utility asset works on Oathall Avenue, Haywards Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2026 and could run through until 11 March 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by South East Water on 7 Sep 2026 at 11:49.
23 Nov and 18 Dec 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Keble Close, Pound Hill, Crawley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 18 December 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 24 Aug 2026 at 10:17.
23 Nov and 18 Dec 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Keble Close, Pound Hill, Crawley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 18 December 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 8 Sep 2026 at 15:14.
7 and 22 Dec 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lyndhurst Close, Southgate, Crawley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 22 December 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 17 Sep 2026 at 15:28.
9 and 16 Dec 2026
UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on North Lane, West Hoathly.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2026 and could run through until 16 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 9 Sep 2026 at 15:51.
14 and 16 Dec 2026
West Sussex County Council are proposing to carry out Highway improvement works on High Beeches Lane, Handcross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 December 2026 and could run through until 16 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 27 May 2026 at 14:16.
Roadworks Map near to Haywards Heath Road, HAYWARDS HEATH, RH17 6NF
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Haywards Heath Road, HAYWARDS HEATH, RH17 6NF (0 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.