ROADWORKS SUMMARY
Slaugham, HAYWARDS HEATH, RH17 6AG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for RH17 6AG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Slaugham, HAYWARDS HEATH, RH17 6AG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

West Sussex County Council logo
LONG TERM
Between
31 Jul 2024 and 30 Mar 2025
Details
View Map
Share
Follow
Crawley S/western Bypass Westbound

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Crawley S/western Bypass Westbound, Broadfield, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 30 March 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 10 May 2024 at 08:09.

West Sussex County Council logo
LONG TERM
Between
16 Aug 2024 and 16 Feb 2025
Details
View Map
Share
Follow
Breezehurst Drive

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Breezehurst Drive, Bewbush, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 August 2024 and could run through until 16 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 24 Jun 2024 at 10:58.

West Sussex County Council logo
LONG TERM
Between
20 Aug 2024 and 20 Feb 2025
Details
View Map
Share
Follow
Pelham Drive

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Pelham Drive, Broadfield, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2024 and could run through until 20 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 24 Jun 2024 at 11:00.

West Sussex County Council logo
LONG TERM
Between
23 Aug 2024 and 23 Feb 2025
Details
View Map
Share
Follow
Creasys Drive

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Creasys Drive, Broadfield, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 August 2024 and could run through until 23 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 24 Jun 2024 at 12:07.

West Sussex County Council logo
LONG TERM
Between
23 Aug 2024 and 23 Feb 2025
Details
View Map
Share
Follow
Breezehurst Drive

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Breezehurst Drive, Bewbush, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 August 2024 and could run through until 23 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 5 Aug 2024 at 11:50.

West Sussex County Council logo
LONG TERM
Between
29 Aug 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Coachmans Drive

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Coachmans Drive, Broadfield, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2024 and could run through until 28 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 24 Jun 2024 at 12:15.

West Sussex County Council logo
LONG TERM
Between
30 Aug 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Pelham Drive

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Pelham Drive, Broadfield, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 August 2024 and could run through until 2 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 16 Aug 2024 at 09:31.

West Sussex County Council logo
LONG TERM
Between
2 Sep 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Creasys Drive

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Creasys Drive, Broadfield, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 2 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 13 Aug 2024 at 10:10.

West Sussex County Council logo
LONG TERM
Between
4 Oct 2024 and 4 Apr 2025
Details
View Map
Share
Follow
Scory Close

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Scory Close, Bewbush, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2024 and could run through until 4 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 21 Aug 2024 at 12:35.

UK Power Networks South Eastern logo
Until
3 Jan 2025
Details
View Map
Share
Follow
Highlands Road

UK Power Networks South Eastern are carrying out Utility repair and maintenance works on Highlands Road, Horsham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 December 2024 at 10:27 and could run through until 3 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 27 Dec 2024 at 15:00.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 27 Feb 2025
Details
View Map
Share
Follow
Fairway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fairway, Ifield, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 11:49.

South East Water logo
LONG TERM
Between
2 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Turners Mill Road

South East Water are proposing to carry out New service connection on Turners Mill Road, Haywards Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 8 Oct 2024 at 11:56.

South East Water logo
LONG TERM
Between
2 Jan and 24 Feb 2025
Details
View Map
Share
Turners Mill Road

South East Water were proposing to carry out New service connection on Turners Mill Road, Haywards Heath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 24 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by South East Water on 4 Oct 2024 at 14:11.

South East Water logo
LONG TERM
Between
2 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Turners Mill Road

South East Water are proposing to carry out New service connection on Turners Mill Road, Haywards Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 24 Sep 2024 at 10:48.

South East Water logo
LONG TERM
Between
2 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Turners Mill Road

South East Water are proposing to carry out New service connection on Turners Mill Road, Haywards Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 3 Sep 2024 at 11:24.

West Sussex County Council logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway improvement works on London Road, Balcombe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 12:31.

Southern Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Brighton Road

Southern Water are proposing to carry out Utility repair and maintenance works on Brighton Road, Horsham.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 13 Dec 2024 at 08:17.

Southern Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Brighton Road

Southern Water are proposing to carry out Utility repair and maintenance works on Brighton Road, Horsham.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 16 Dec 2024 at 10:33.

Southern Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Brighton Road

Southern Water are proposing to carry out Utility repair and maintenance works on Brighton Road, Horsham.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 17 Dec 2024 at 15:33.

Southern Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Brighton Road

Southern Water are proposing to carry out Utility repair and maintenance works on Brighton Road, Horsham.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 27 Dec 2024 at 14:59.

West Sussex County Council logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway improvement works on London Road, Balcombe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 14 Oct 2024 at 09:21.

West Sussex County Council logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Cuckfield Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Cuckfield Road, Ansty.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 4 Nov 2024 at 10:43.

West Sussex County Council logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Cuckfield Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Cuckfield Road, Ansty.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 29 Oct 2024 at 13:59.

Southern Gas Networks logo
Between
13 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Langdale Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Langdale Road, Ifield, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 10:52.

Southern Gas Networks logo
Between
20 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Woodcroft Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodcroft Road, Ifield, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 10:51.

Southern Gas Networks logo
Between
20 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Thirlmere Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thirlmere Road, Ifield, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 10:55.

West Sussex County Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Kent Street

West Sussex County Council are proposing to carry out Highway improvement works on Kent Street, Cowfold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 12 Dec 2024 at 08:33.

West Sussex County Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Kent Street

West Sussex County Council are proposing to carry out Highway improvement works on Kent Street, Cowfold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 10 Dec 2024 at 08:29.

West Sussex County Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Wineham Lane

West Sussex County Council are proposing to carry out Highway improvement works on Wineham Lane, Wineham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 2 Dec 2024 at 10:20.

West Sussex County Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Wineham Lane

West Sussex County Council are proposing to carry out Highway improvement works on Wineham Lane, Wineham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 9 Dec 2024 at 09:30.

West Sussex County Council logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Roffey Roundabout

West Sussex County Council are proposing to carry out Highway improvement works on Roffey Roundabout, Horsham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 18 Dec 2024 at 11:11.

West Sussex County Council logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Horsham Northern Bypass Eastbound

West Sussex County Council are proposing to carry out Highway improvement works on Horsham Northern Bypass Eastbound, Horsham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 18 Dec 2024 at 11:13.

West Sussex County Council logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Crawley Road Westbound

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Road Westbound, North Horsham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 18 Dec 2024 at 11:10.

UK Power Networks South Eastern logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Whitemans Green

UK Power Networks South Eastern are proposing to carry out New service connection on Whitemans Green, Cuckfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 9 Dec 2024 at 16:38.

UK Power Networks South Eastern logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Winchester Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Winchester Road, Tilgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 31 Oct 2024 at 14:00.

UK Power Networks South Eastern logo
Between
18 and 24 Feb 2025
Details
View Map
Share
Follow
Winchester Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Winchester Road, Tilgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 27 Oct 2024 at 15:00.

West Sussex County Council logo
Between
21 and 24 Feb 2025
Details
View Map
Share
Follow
Swallowfield Close

West Sussex County Council are proposing to carry out Highway improvement works on Swallowfield Close, Mannings Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 15 Oct 2024 at 09:31.

West Sussex County Council logo
Between
21 and 24 Feb 2025
Details
View Map
Share
Follow
Church Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Church Road, Mannings Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 15 Oct 2024 at 10:18.

West Sussex County Council logo
Between
21 and 24 Feb 2025
Details
View Map
Share
Follow
Woodlands Walk

West Sussex County Council are proposing to carry out Highway improvement works on Woodlands Walk, Mannings Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 15 Oct 2024 at 09:24.

West Sussex County Council logo
Between
21 and 24 Feb 2025
Details
View Map
Share
Follow
Winterpit Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Winterpit Lane, Mannings Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 15 Oct 2024 at 10:22.

West Sussex County Council logo
Between
21 and 24 Feb 2025
Details
View Map
Share
Follow
Pound Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Pound Lane, Mannings Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 15 Oct 2024 at 10:14.

UK Power Networks South Eastern logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Chanctonbury Way

UK Power Networks South Eastern are proposing to carry out Utility asset works on Chanctonbury Way, Southgate, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 24 Dec 2024 at 08:23.

West Sussex County Council logo
Between
25 and 28 Feb 2025
Details
View Map
Share
Follow
Holyrood Place

West Sussex County Council are proposing to carry out Highway improvement works on Holyrood Place, Broadfield, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 13:41.

West Sussex County Council logo
Between
25 and 28 Feb 2025
Details
View Map
Share
Follow
Pelham Place

West Sussex County Council are proposing to carry out Highway improvement works on Pelham Place, Broadfield, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 13:39.

West Sussex County Council logo
Between
25 and 28 Feb 2025
Details
View Map
Share
Follow
Pelham Place Roundabout

West Sussex County Council are proposing to carry out Highway improvement works on Pelham Place Roundabout, Broadfield, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 18 Oct 2024 at 13:44.

BT logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Elm Grove

BT were proposing to carry out Utility asset works on Elm Grove, Horsham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Dec 2024 at 13:14.

UK Power Networks South Eastern logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Willow Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Willow Road, Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 3 Dec 2024 at 14:40.

UK Power Networks South Eastern logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Willow Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Willow Road, Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 5 Dec 2024 at 12:11.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Sandygate Lane

Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on Sandygate Lane, Lower Beeding.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 19 Dec 2024 at 16:15.

South East Water logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Slaugham Road

South East Water are proposing to carry out Remedial works on Slaugham Road, Staplefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 3 Dec 2024 at 09:31.

Network Rail logo
Between
14 and 17 Mar 2025
Details
View Map
Share
Follow
Wimland Road

Network Rail are proposing to carry out Works for Rail Purposes on Wimland Road, Faygate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 6 Dec 2024 at 13:03.

West Sussex County Council logo
LONG TERM
Between
17 Mar and 17 Apr 2025
Details
View Map
Share
Follow
Tollgate Hill Roundabout

West Sussex County Council are proposing to carry out Highway improvement works on Tollgate Hill Roundabout, Broadfield, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 17 April 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 18 Dec 2024 at 15:17.

West Sussex County Council logo
LONG TERM
Between
17 Mar and 17 Apr 2025
Details
View Map
Share
Follow
Crawley Road Westbound

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Road Westbound, Colgate.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 17 April 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 18 Dec 2024 at 12:50.

West Sussex County Council logo
LONG TERM
Between
17 Mar and 17 Apr 2025
Details
View Map
Share
Follow
Crawley Road Roundabout

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Road Roundabout, Faygate.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 17 April 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 18 Dec 2024 at 12:22.

West Sussex County Council logo
LONG TERM
Between
17 Mar and 17 Apr 2025
Details
View Map
Share
Follow
Crawley S/western Bypass Eastbound

West Sussex County Council are proposing to carry out Highway improvement works on Crawley S/western Bypass Eastbound, Broadfield, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 17 April 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 18 Dec 2024 at 14:44.

West Sussex County Council logo
LONG TERM
Between
17 Mar and 17 Apr 2025
Details
View Map
Share
Follow
Crawley S/western Bypass Westbound

West Sussex County Council are proposing to carry out Highway improvement works on Crawley S/western Bypass Westbound, Broadfield, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 17 April 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 18 Dec 2024 at 15:26.

West Sussex County Council logo
LONG TERM
Between
17 Mar and 17 Apr 2025
Details
View Map
Share
Follow
Crawley Road Eastbound

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Road Eastbound, Colgate.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 17 April 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 18 Dec 2024 at 12:11.

South East Water logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Slough Green Lane

South East Water were proposing to carry out Remedial works on Slough Green Lane, Cuckfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 19 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South East Water on 24 Dec 2024 at 09:53.

South East Water logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Slough Green Lane

South East Water are proposing to carry out Remedial works on Slough Green Lane, Cuckfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 17 Dec 2024 at 09:37.

West Sussex County Council logo
LONG TERM
Between
17 Mar and 17 Apr 2025
Details
View Map
Share
Follow
Crawley Road Eastbound

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Road Eastbound, Colgate.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 17 April 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 18 Dec 2024 at 12:21.

West Sussex County Council logo
LONG TERM
Between
17 Mar and 17 Apr 2025
Details
View Map
Share
Follow
Crawley Road Westbound

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Road Westbound, Colgate.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 17 April 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 18 Dec 2024 at 12:21.

West Sussex County Council logo
LONG TERM
Between
17 Mar and 17 Apr 2025
Details
View Map
Share
Follow
Faygate Roundabout

West Sussex County Council are proposing to carry out Highway improvement works on Faygate Roundabout, Faygate, Horsham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 17 April 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 18 Dec 2024 at 12:13.

Network Rail logo
Between
21 and 24 Mar 2025
Details
View Map
Share
Follow
Wimland Road

Network Rail are proposing to carry out Works for Rail Purposes on Wimland Road, Faygate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 6 Dec 2024 at 13:33.


Roadworks Map near to Slaugham, HAYWARDS HEATH, RH17 6AG

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Dec 2024 19:56
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Slaugham, HAYWARDS HEATH, RH17 6AG (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.