ROADWORKS SUMMARY
Comptons Lane, HORSHAM, RH13 5NX

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Comptons Lane, RH13 5NX and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Comptons Lane, HORSHAM, RH13 5NX

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Comptons Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

West Sussex County Council logo
LONG TERM
Between
1 Apr 2025 and 30 Apr 2026
Details
View Map
Share
Crawley Avenue

West Sussex County Council were proposing to carry out Highway repair and maintenance works on Crawley Avenue, Northgate, Crawley.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 30 April 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 17 Jul 2025 at 10:55.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Follow
Rusper Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Rusper Road, Horsham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 11:30 and could run through until 21 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 13:21.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Follow
Rusper Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rusper Road, Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 21 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Jul 2025 at 10:41.

ESP Electricity logo
Finishing
Tomorrow
Details
View Map
Share
Five Oaks Road

ESP Electricity were proposing to carry out New service connection on Five Oaks Road, Slinfold.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 19 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by ESP Electricity on 19 Aug 2025 at 08:13.

ESP Electricity logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Five Oaks Road

ESP Electricity are carrying out New service connection on Five Oaks Road, Slinfold.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 08:30 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by ESP Electricity on 8 Sep 2025 at 08:56.

West Sussex County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Naldrett Close

West Sussex County Council are proposing to carry out Highway improvement works on Naldrett Close, Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 19 September 2025. The works will impact the footway only.

This roadwork event was last updated by West Sussex County Council on 1 Apr 2025 at 11:52.

West Sussex County Council logo
LONG TERM
Between
11 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Gorse End To North Heath Lane

West Sussex County Council are proposing to carry out Highway improvement works on Gorse End To North Heath Lane, North Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2025 and could run through until 28 November 2025. The works will impact the footway only.

This roadwork event was last updated by West Sussex County Council on 1 Apr 2025 at 08:25.

West Sussex County Council logo
LONG TERM
Between
11 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Broome Close To Footpath

West Sussex County Council are proposing to carry out Highway improvement works on Broome Close To Footpath, North Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2025 and could run through until 28 November 2025. The works will impact the footway only.

This roadwork event was last updated by West Sussex County Council on 31 Mar 2025 at 12:15.

West Sussex County Council logo
LONG TERM
Between
11 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Erica Way 22

West Sussex County Council are proposing to carry out Highway improvement works on Erica Way 22, North Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2025 and could run through until 28 November 2025. The works will impact the footway only.

This roadwork event was last updated by West Sussex County Council on 1 Apr 2025 at 08:30.

West Sussex County Council logo
LONG TERM
Between
11 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Broome Close

West Sussex County Council are proposing to carry out Highway improvement works on Broome Close, Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2025 and could run through until 28 November 2025. The works will impact the footway only.

This roadwork event was last updated by West Sussex County Council on 31 Mar 2025 at 13:35.

West Sussex County Council logo
LONG TERM
Between
11 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Heather Close 21 To 14

West Sussex County Council are proposing to carry out Highway improvement works on Heather Close 21 To 14, North Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2025 and could run through until 28 November 2025. The works will impact the footway only.

This roadwork event was last updated by West Sussex County Council on 31 Mar 2025 at 14:18.

West Sussex County Council logo
LONG TERM
Between
11 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Heather Close 22 To 54

West Sussex County Council are proposing to carry out Highway improvement works on Heather Close 22 To 54, North Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2025 and could run through until 28 November 2025. The works will impact the footway only.

This roadwork event was last updated by West Sussex County Council on 31 Mar 2025 at 14:32.

West Sussex County Council logo
LONG TERM
Between
11 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Heather Close

West Sussex County Council are proposing to carry out Highway improvement works on Heather Close, Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2025 and could run through until 28 November 2025. The works will impact the footway only.

This roadwork event was last updated by West Sussex County Council on 31 Mar 2025 at 14:27.

West Sussex County Council logo
LONG TERM
Between
11 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Heather Close 23 To 22

West Sussex County Council are proposing to carry out Highway improvement works on Heather Close 23 To 22, North Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2025 and could run through until 28 November 2025. The works will impact the footway only.

This roadwork event was last updated by West Sussex County Council on 31 Mar 2025 at 13:05.

West Sussex County Council logo
LONG TERM
Between
11 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Fern Way

West Sussex County Council are proposing to carry out Highway improvement works on Fern Way, Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2025 and could run through until 28 November 2025. The works will impact the footway only.

This roadwork event was last updated by West Sussex County Council on 31 Mar 2025 at 12:49.

West Sussex County Council logo
LONG TERM
Between
11 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Heath Way 59 To 47

West Sussex County Council are proposing to carry out Highway improvement works on Heath Way 59 To 47, North Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2025 and could run through until 28 November 2025. The works will impact the footway only.

This roadwork event was last updated by West Sussex County Council on 31 Mar 2025 at 15:26.

West Sussex County Council logo
LONG TERM
Between
11 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Owlscastle Close To Goose Green Close

West Sussex County Council are proposing to carry out Highway improvement works on Owlscastle Close To Goose Green Close, North Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2025 and could run through until 28 November 2025. The works will impact the footway only.

This roadwork event was last updated by West Sussex County Council on 31 Mar 2025 at 14:33.

West Sussex County Council logo
LONG TERM
Between
11 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Heath Way

West Sussex County Council are proposing to carry out Highway improvement works on Heath Way, Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2025 and could run through until 28 November 2025. The works will impact the footway only.

This roadwork event was last updated by West Sussex County Council on 1 Apr 2025 at 08:30.

West Sussex County Council logo
LONG TERM
Between
11 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Gorse End To Heath Way

West Sussex County Council are proposing to carry out Highway improvement works on Gorse End To Heath Way, North Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2025 and could run through until 28 November 2025. The works will impact the footway only.

This roadwork event was last updated by West Sussex County Council on 31 Mar 2025 at 15:37.

West Sussex County Council logo
LONG TERM
Between
11 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Heath Way 89 To 75

West Sussex County Council are proposing to carry out Highway improvement works on Heath Way 89 To 75, North Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2025 and could run through until 28 November 2025. The works will impact the footway only.

This roadwork event was last updated by West Sussex County Council on 1 Apr 2025 at 08:22.

West Sussex County Council logo
LONG TERM
Between
11 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Erica Way 6 To 4

West Sussex County Council are proposing to carry out Highway improvement works on Erica Way 6 To 4, North Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2025 and could run through until 28 November 2025. The works will impact the footway only.

This roadwork event was last updated by West Sussex County Council on 1 Apr 2025 at 08:12.

West Sussex County Council logo
LONG TERM
Between
11 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Erica Way

West Sussex County Council are proposing to carry out Highway improvement works on Erica Way, Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2025 and could run through until 28 November 2025. The works will impact the footway only.

This roadwork event was last updated by West Sussex County Council on 31 Mar 2025 at 15:56.

West Sussex County Council logo
LONG TERM
Between
11 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Broome Close 24 To 15

West Sussex County Council are proposing to carry out Highway improvement works on Broome Close 24 To 15, North Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2025 and could run through until 28 November 2025. The works will impact the footway only.

This roadwork event was last updated by West Sussex County Council on 31 Mar 2025 at 14:29.

West Sussex County Council logo
LONG TERM
Between
11 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Broome Close 24 To 16

West Sussex County Council are proposing to carry out Highway improvement works on Broome Close 24 To 16, North Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2025 and could run through until 28 November 2025. The works will impact the footway only.

This roadwork event was last updated by West Sussex County Council on 31 Mar 2025 at 12:27.

West Sussex County Council logo
LONG TERM
Between
11 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Broome Close 27 To 24

West Sussex County Council are proposing to carry out Highway improvement works on Broome Close 27 To 24, North Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2025 and could run through until 28 November 2025. The works will impact the footway only.

This roadwork event was last updated by West Sussex County Council on 31 Mar 2025 at 14:34.

West Sussex County Council logo
LONG TERM
Between
11 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Goosegreen Close

West Sussex County Council are proposing to carry out Highway improvement works on Goosegreen Close, Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2025 and could run through until 28 November 2025. The works will impact the footway only.

This roadwork event was last updated by West Sussex County Council on 31 Mar 2025 at 13:47.

West Sussex County Council logo
LONG TERM
Between
11 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Goose Green Close To Heath Way

West Sussex County Council are proposing to carry out Highway improvement works on Goose Green Close To Heath Way, North Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2025 and could run through until 28 November 2025. The works will impact the footway only.

This roadwork event was last updated by West Sussex County Council on 31 Mar 2025 at 12:20.

West Sussex County Council logo
LONG TERM
Between
11 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Owlscastle Close

West Sussex County Council are proposing to carry out Highway improvement works on Owlscastle Close, Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2025 and could run through until 28 November 2025. The works will impact the footway only.

This roadwork event was last updated by West Sussex County Council on 31 Mar 2025 at 12:10.

West Sussex County Council logo
LONG TERM
Between
11 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Heath Way To Barnsnap Close

West Sussex County Council are proposing to carry out Highway improvement works on Heath Way To Barnsnap Close, North Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2025 and could run through until 28 November 2025. The works will impact the footway only.

This roadwork event was last updated by West Sussex County Council on 31 Mar 2025 at 12:00.

West Sussex County Council logo
LONG TERM
Between
11 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Barnsnap Close To Garages

West Sussex County Council are proposing to carry out Highway improvement works on Barnsnap Close To Garages, Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2025 and could run through until 28 November 2025. The works will impact the footway only.

This roadwork event was last updated by West Sussex County Council on 31 Mar 2025 at 13:42.

West Sussex County Council logo
LONG TERM
Between
11 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Barnsnap Close

West Sussex County Council are proposing to carry out Highway improvement works on Barnsnap Close, Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2025 and could run through until 28 November 2025. The works will impact the footway only.

This roadwork event was last updated by West Sussex County Council on 31 Mar 2025 at 13:39.

West Sussex County Council logo
LONG TERM
Between
11 Sep and 28 Nov 2025
Details
View Map
Share
Broome Close To Footpath

West Sussex County Council were proposing to carry out Highway improvement works on Broome Close To Footpath, North Horsham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 September 2025 and run through until 28 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by West Sussex County Council on 11 Mar 2025 at 13:22.

Southern Water logo
Finishing
Tomorrow
Details
View Map
Share
Copsale Road

Southern Water were proposing to carry out Utility repair and maintenance works on Copsale Road, Maplehurst.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 September 2025 and run through until 19 September 2025. The works were due to impact the verge only.

This roadwork event was last updated by Southern Water on 22 Jul 2025 at 15:23.

West Sussex County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Colwyn Close

West Sussex County Council are proposing to carry out Highway improvement works on Colwyn Close, Bewbush, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 19 September 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 5 Sep 2025 at 14:29.

West Sussex County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Colwyn Close

West Sussex County Council are proposing to carry out Highway improvement works on Colwyn Close, Bewbush, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 19 September 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 24 Jul 2025 at 11:08.

Southern Gas Networks logo
Between
22 Sep and 19 Oct 2025
Details
View Map
Share
Follow
Brook Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brook Road, Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 19 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Jul 2025 at 10:48.

Southern Gas Networks logo
Between
22 Sep and 19 Oct 2025
Details
View Map
Share
Follow
Jackdaw Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Jackdaw Lane, Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 19 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Jul 2025 at 11:05.

Southern Gas Networks logo
Between
22 Sep and 19 Oct 2025
Details
View Map
Share
Follow
Jackdaw Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Jackdaw Lane, Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 19 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Jul 2025 at 10:48.

Southern Gas Networks logo
Between
22 Sep and 19 Oct 2025
Details
View Map
Share
Follow
Brook Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brook Road, Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 19 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Jul 2025 at 11:06.

West Sussex County Council logo
On
25 Sep 2025
Details
View Map
Share
Follow
River Mead

West Sussex County Council are proposing to carry out Highway improvement works on River Mead, Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 25 September 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 30 Jul 2025 at 09:08.

West Sussex County Council logo
On
25 Sep 2025
Details
View Map
Share
Follow
River Mead

West Sussex County Council are proposing to carry out Highway improvement works on River Mead, Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 25 September 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 11 Sep 2025 at 14:07.

UK Power Networks South Eastern logo
LONG TERM
Between
29 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Horsham Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Horsham Road, Handcross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 31 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 21 Jul 2025 at 13:06.

UK Power Networks South Eastern logo
LONG TERM
Between
29 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Horsham Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Horsham Road, Handcross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 31 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 21 Jul 2025 at 13:57.

West Sussex County Council logo
Between
29 and 30 Sep 2025
Details
View Map
Share
Follow
Cowfold Road

West Sussex County Council are proposing to carry out Highway improvement works on Cowfold Road, West Grinstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 15 Jul 2025 at 15:32.

West Sussex County Council logo
Between
29 and 30 Sep 2025
Details
View Map
Share
Coolham Road

West Sussex County Council were proposing to carry out Highway improvement works on Coolham Road, West Grinstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 30 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 5 Aug 2025 at 07:11.

West Sussex County Council logo
Between
30 Sep and 1 Oct 2025
Details
View Map
Share
Worthing Road Northbound

West Sussex County Council were proposing to carry out Highway improvement works on Worthing Road Northbound, Shipley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 5 Aug 2025 at 07:11.

West Sussex County Council logo
Between
1 and 2 Oct 2025
Details
View Map
Share
Worthing Road Southbound

West Sussex County Council were proposing to carry out Highway improvement works on Worthing Road Southbound, Shipley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 October 2025 and run through until 2 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 5 Aug 2025 at 07:11.

West Sussex County Council logo
Between
2 and 3 Oct 2025
Details
View Map
Share
Follow
Coolham Road

West Sussex County Council are proposing to carry out Highway improvement works on Coolham Road, West Grinstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 15 Jul 2025 at 15:27.

West Sussex County Council logo
Between
2 and 3 Oct 2025
Details
View Map
Share
Cowfold Road

West Sussex County Council were proposing to carry out Highway improvement works on Cowfold Road, West Grinstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2025 and run through until 3 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 5 Aug 2025 at 07:11.

West Sussex County Council logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Old Holbrook

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Old Holbrook, Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 28 Jul 2025 at 11:04.

West Sussex County Council logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Northlands Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Northlands Road, Warnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 18 Aug 2025 at 10:51.

West Sussex County Council logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Northlands Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Northlands Road, Warnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 11 Aug 2025 at 11:46.

West Sussex County Council logo
Between
6 and 9 Oct 2025
Details
View Map
Share
Follow
High Beeches Lane

West Sussex County Council are proposing to carry out Highway improvement works on High Beeches Lane, Handcross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 1 Sep 2025 at 12:53.

Southern Water logo
LONG TERM
Between
13 Oct 2025 and 26 Jun 2026
Details
View Map
Share
Follow
Littleworth Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Littleworth Lane, Partridge Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 26 June 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Water on 1 Sep 2025 at 11:04.

West Sussex County Council logo
On
17 Oct 2025
Details
View Map
Share
Emms Lane

West Sussex County Council were proposing to carry out Highway improvement works on Emms Lane, Brooks Green.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were scheduled for 17 October 2025 The works were due to impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 12 Aug 2025 at 08:46.

West Sussex County Council logo
Between
22 and 23 Oct 2025
Details
View Map
Share
Follow
Horsham Bypass Southbound

West Sussex County Council are proposing to carry out Highway improvement works on Horsham Bypass Southbound, Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 28 Aug 2025 at 14:47.

West Sussex County Council logo
Between
22 and 23 Oct 2025
Details
View Map
Share
Follow
Crawley Road Westbound

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Road Westbound, Colgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 22 Aug 2025 at 10:57.

UK Power Networks South Eastern logo
Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
Orchard Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Orchard Road, Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 20 Aug 2025 at 09:38.

UK Power Networks South Eastern logo
Between
28 Oct and 4 Nov 2025
Details
View Map
Share
Orchard Road

UK Power Networks South Eastern were proposing to carry out Disconnection or alteration of supply on Orchard Road, Horsham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2025 and run through until 4 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 19 Aug 2025 at 09:30.

UK Power Networks South Eastern logo
Between
28 Oct and 3 Nov 2025
Details
View Map
Share
Orchard Road

UK Power Networks South Eastern were proposing to carry out Disconnection or alteration of supply on Orchard Road, Horsham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2025 and run through until 3 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 18 Aug 2025 at 08:16.

National Highways logo
Between
1 and 17 Nov 2025
Details
View Map
Share
Follow
Brighton Road

National Highways are proposing to carry out Works for road purposes on Brighton Road, Pease Pottage.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2025 and could run through until 17 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 26 Aug 2025 at 08:42.

National Highways logo
Between
1 and 17 Nov 2025
Details
View Map
Share
Follow
Crawley S/western Bypass Eastbound

National Highways are proposing to carry out Works for road purposes on Crawley S/western Bypass Eastbound, Broadfield, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2025 and could run through until 17 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 26 Aug 2025 at 08:44.

National Highways logo
Between
1 and 17 Nov 2025
Details
View Map
Share
Follow
Tollgate Hill Roundabout

National Highways are proposing to carry out Works for road purposes on Tollgate Hill Roundabout, Broadfield, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2025 and could run through until 17 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 26 Aug 2025 at 08:41.

Southern Gas Networks logo
Between
3 and 28 Nov 2025
Details
View Map
Share
West Parade

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on West Parade, Horsham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 28 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 10:57.

West Sussex County Council logo
Between
5 and 7 Nov 2025
Details
View Map
Share
Follow
Brighton Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Brighton Road, Mannings Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 7 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 22 Aug 2025 at 12:53.

National Highways logo
Between
8 and 24 Nov 2025
Details
View Map
Share
Follow
Tollgate Hill Roundabout

National Highways are proposing to carry out Works for road purposes on Tollgate Hill Roundabout, Broadfield, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2025 and could run through until 24 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 16 Sep 2025 at 12:14.

National Highways logo
Between
8 and 24 Nov 2025
Details
View Map
Share
Follow
Crawley S/western Bypass Eastbound

National Highways are proposing to carry out Works for road purposes on Crawley S/western Bypass Eastbound, Broadfield, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2025 and could run through until 24 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 16 Sep 2025 at 12:11.

National Highways logo
Between
8 and 24 Nov 2025
Details
View Map
Share
Follow
Brighton Road

National Highways are proposing to carry out Works for road purposes on Brighton Road, Pease Pottage.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2025 and could run through until 24 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 16 Sep 2025 at 12:12.

West Sussex County Council logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
Five Oaks Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Five Oaks Road, Slinfold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 11 Aug 2025 at 12:08.

Southern Gas Networks logo
Between
24 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Springfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Springfield Road, Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2025 at 14:05.

Southern Gas Networks logo
Between
24 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Albion Way Westbound

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Albion Way Westbound, Horsham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2025 at 14:07.

Southern Gas Networks logo
Between
24 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Albion Way Eastbound

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Albion Way Eastbound, Horsham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2025 at 14:07.

Southern Water logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
Bonfire Hill

Southern Water are proposing to carry out New service connection on Bonfire Hill, Southwater.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Water on 4 Sep 2025 at 12:20.

West Sussex County Council logo
Between
26 and 28 Nov 2025
Details
View Map
Share
Follow
Five Oaks Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Five Oaks Road, Slinfold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2025 and could run through until 28 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 11 Aug 2025 at 12:32.

West Sussex County Council logo
LONG TERM
Between
1 Dec 2025 and 16 Jan 2026
Details
View Map
Share
Follow
Horsham Road

West Sussex County Council are proposing to carry out Highway improvement works on Horsham Road, Cowfold.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 16 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 1 Sep 2025 at 12:38.

West Sussex County Council logo
LONG TERM
Between
1 Dec 2025 and 16 Jan 2026
Details
View Map
Share
Follow
Horsham Road

West Sussex County Council are proposing to carry out Highway improvement works on Horsham Road, Cowfold.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 16 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 5 Sep 2025 at 09:13.


Roadworks Map near to Comptons Lane, HORSHAM, RH13 5NX (18 Events)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Last Updated: 18 Sep 2025 22:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Comptons Lane, HORSHAM, RH13 5NX (18 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Southern Water logo
DANEHURST CRESCENT 
(0.3 miles)
Southern Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Cancelled
(Scheduled: 16 Sep 2025 - 18 Sep 2025)
0.3
Details
Share
2
Southern Water logo
BRIGHTON ROAD 
(0.4 miles)
Southern Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 19 Sep 2025 - 23 Sep 2025
0.4
Details
Share
Follow
3
West Sussex County Council logo
MAJOR
  
STIRLING WAY 
(0.5 miles)
West Sussex County Council
Highway repair and maintenance works - Verge - Some carriageway incursion
Planned
Scheduled: 17 Apr 2023 - 15 Apr 2028
0.5
Details
Share
Follow
4
Virgin Media logo
BEDFORD ROAD 
(0.5 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 17 Sep 2025 - 18 Sep 2025
0.5
Details
Share
Follow
5
Cityfibre Metro Networks logo
WEALD CLOSE 
(0.5 miles)
Cityfibre Metro Networks
Utility asset works - Footway - Some carriageway incursion
In Progress
Since: 18 Sep 2025 10:26
(Scheduled: 18 Sep 2025)
0.5
Details
Share
Follow
6
Southern Gas Networks logo
URGENT
  
NEW STREET 
(0.6 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - No carriageway incursion
In Progress
Since: 16 Sep 2025 14:00
(Scheduled: 16 Sep 2025 - 23 Sep 2025)
0.6
Details
Share
Follow
7
Cityfibre Metro Networks logo
NEW STREET 
(0.6 miles)
Cityfibre Metro Networks
Remedial works - Footway - Multi-way signals
Planned
Scheduled: 19 Sep 2025 - 23 Sep 2025
0.6
Details
Share
Follow
8
UK Power Networks South Eastern logo
URGENT
  
STATION ROAD 
(0.6 miles)
UK Power Networks South Eastern
Utility repair and maintenance works - Footway - Road closure
In Progress
Since: 17 Sep 2025 13:45
(Scheduled: 17 Sep 2025 - 23 Sep 2025)
0.6
Details
Share
Follow
9
Southern Water logo
MANOR FIELDS 
(0.8 miles)
Southern Water
Utility repair and maintenance works - Verge - No carriageway incursion
Planned
Scheduled: 19 Sep 2025 - 23 Sep 2025
0.8
Details
Share
Follow
10
West Sussex County Council logo
MAJOR
  
PARK STREET NORTHBOUND 
(0.8 miles)
West Sussex County Council
Highway repair and maintenance works - Carriageway - Road closure
Planned
Scheduled: 18 Sep 2025
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.